SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING ......CHRISTINE MEIKLE SCHOOL UNE 2014 SITE ANALYSIS +...

3
CHRISTINE MEIKLE SCHOOL JUNE 2014 SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING STRATEGIES CHRISTINE MEIKLE SCHOOL SITE LOCATION 3525 50 ST NW CHRISTINE MEIKLE SCHOOL SITE LOCATION 3525 50 ST NW VARSITY COMMUNITY COMMERCIAL DEVELOPMENT 3 SCHOOLS MARKET MALL SHOPPING CENTRE CROWCHILD TRAIL TRANSCANADA HIGHWAY CHILDREN’S HOSPITAL BOW RIVER NATURAL PARK AREA UNIVERSITY OF CALGARY SITE SHAGANAPPI TR 32ND AVE NW 40TH AVE NW 50TH ST NW 49TH ST NW SITE 3m setback Playground 3m setback Varna Cres. NW Varscliff Pl. NW 3m setback 50th st NW 3m setback Varanger Pl. utility ROW

Transcript of SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING ......CHRISTINE MEIKLE SCHOOL UNE 2014 SITE ANALYSIS +...

Page 1: SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING ......CHRISTINE MEIKLE SCHOOL UNE 2014 SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING STRATEGIES CHRISTINE MEIKLE SCHOOL SITE LOCATION …

C H R I S T I N E M E I K L E S C H O O L

JUNE 2014

SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING STRATEGIES

CHRISTINE MEIKLE SCHOOL SITE LOCATION3525 50 ST NW

CHRISTINE MEIKLE SCHOOL SITE LOCATION3525 50 ST NW

VARSITY COMMUNITY COMMERCIAL DEVELOPMENT

3 SCHOOLS

MARKET MALL SHOPPING CENTRE

CROWCHILD TRAIL

TRANSCANADA HIGHWAY

CHILDREN’S HOSPITAL

BOW RIVER

NATURAL PARK AREA

UNIVERSITY OF CALGARY

S ITE

SHAG

ANAP

PI T

R

32ND AVE NW

40TH AVE NW

50TH

ST

NW

49TH

ST

NW

SITE3m setback

Play

grou

nd

3m setback

Varna Cres. NW

Varscliff Pl. NW

3m s

etba

ck50

th s

t NW

3m s

etba

ckVa

rang

er P

l.

utility ROW

Page 2: SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING ......CHRISTINE MEIKLE SCHOOL UNE 2014 SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING STRATEGIES CHRISTINE MEIKLE SCHOOL SITE LOCATION …

C H R I S T I N E M E I K L E S C H O O L

JUNE 2014

• Treed berm to provide buffer for bus loop drop-off zone

• Provide greenspace and park connection - at road block and through route for pedestrians

• Treed buffer on south and west edge to be maintained

• Strong connectivity to park

• Separation of buses and parking

• Parking is separated from residential adjacencies

• Gradual height change - low along adjacent housing, building to higher spaces at the centre of the site

• Maximize protection of bus loop drop-off zone

• Provide greenspace and park connection - at road block and through route for pedestrians

• Minimize building frontage adjacent to high end residential, minimize “back door” facades

• Treed buffer on south and west edge to be maintained

• Minimize presence of parking lot / Parking is separated from residential adjacencies

• Shifting sectional qualities

• Strong connectivity to park

• Gradual height change - low along adjacent housing, building to higher spaces at the centre of the site

SITE PLAN CONCEPTS - OPTION B: PARTIAL TWO STOREY [ONE STOREY ALONG SOUTH WING]

SITE PLAN CONCEPTS - OPTION A: ONE STOREY [ONE STOREY ALONG SOUTH AXIS]

Page 3: SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING ......CHRISTINE MEIKLE SCHOOL UNE 2014 SITE ANALYSIS + CONTEXTUAL STUDIES + MASSING STRATEGIES CHRISTINE MEIKLE SCHOOL SITE LOCATION …

C H R I S T I N E M E I K L E S C H O O L

JUNE 2014

S I T E3m setbackP

layg

roun

d

3m setback

Varna Cres. NW

Varscl i f f Pl . NW

3m

set

back

50

th s

t N

W

3m

set

back

Vara

nge

r P

l.

u t i l i ty ROW