SIP/ASBU/2012- WP/18. FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva. Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, 21-25 May 2012). Overview. BACKGROUND TO FF-ICE DRIVERS FOR CHANGE SUMMARY OF CONCEPT IMPLICATIONS BENEFITS. - PowerPoint PPT Presentation

Transcript of SIP/ASBU/2012- WP/18

Page 1: SIP/ASBU/2012- WP/18

International Civil Aviation Organization

SIP/ASBU/2012-WP/18

FF-ICE

A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE

Workshop on preparations for ANConf/12 − ASBU methodology(Bangkok, 14-18/Nadi, 21-25 May 2012)

Saulo Da Silva

Page 2: SIP/ASBU/2012- WP/18

Overview

• BACKGROUND TO FF-ICE • DRIVERS FOR CHANGE• SUMMARY OF CONCEPT• IMPLICATIONS• BENEFITS

2ICAO SIP 2012 - ASBU workshops

Page 3: SIP/ASBU/2012- WP/18

Flight plan

‘SPECIFIED INFORMATION PROVIDED

TO AIR TRAFFIC SERVICE UNITS,

RELATIVE TO AN INTENDED FLIGHT

OR PORTION OF A FLIGHT OF AN

AIRCRAFT’

(ICAO DEFINITION)

3ICAO SIP 2012 - ASBU workshops

Page 4: SIP/ASBU/2012- WP/18

Air Traffic Management (ATM)

‘THE DYNAMIC, INTEGRATED MANAGEMENT OF AIR

TRAFFIC AND AIRSPACE INCLUDING AIR TRAFFIC

SERVICES, AIRSPACE MANAGEMENT AND AIR

TRAFFIC FLOW MANAGEMENT – SAFELY,

ECONOMICALLY AND EFFICIENTLY – THROUGH THE

PROVISION OF FACILITIES AND SEAMLESS SERVICES

IN COLLABORATION WITH ALL PARTIES AND

INVOLVING AIRBORNE AND GROUND BASED

FUNCTIONS’

4ICAO SIP 2012 - ASBU workshops

Page 5: SIP/ASBU/2012- WP/18

FF-ICE

• 2004 – ICAO Started developing future flight plan concept of ‘information for a collaborative environment’.

5ICAO SIP 2012 - ASBU workshops

Page 6: SIP/ASBU/2012- WP/18

The need for change

• How often is the ICAO paper flight plan form actually used to file a flight plan?

• How representative of the capabilities of both airborne and ground based systems is the current form and process?

6ICAO SIP 2012 - ASBU workshops

Page 7: SIP/ASBU/2012- WP/18

Limitations of ATM system (1)

• Disparate services & procedures

• Reliance on voice radio communications

• Rigid airspace divisions & route structures

• Limited collaborative planning amongst ANSPs,

aerodrome & a/c operators

• Less than optimum use of resources

7ICAO SIP 2012 - ASBU workshops

Page 8: SIP/ASBU/2012- WP/18

Limitations of ATM system (2)

• Limited facilities for real-time information exchange

• Limited ability to maximise benefits for aircraft with advanced avionics

• Long lead times for development and deployment of improved systems.

8ICAO SIP 2012 - ASBU workshops

Page 9: SIP/ASBU/2012- WP/18

Consequences

• Non optimized departure & arrival procedures

• Exclusion of civil traffic from airspace reserved for special use

• Indirect fixed routes• Excessive system related delays• Operation of a/c at inefficient FLs, speeds & in

unfavourable MET • Insufficient flexibility to properly manage

disruptions to airline operations.

9ICAO SIP 2012 - ASBU workshops

Page 10: SIP/ASBU/2012- WP/18

ICAO requirements

• Global ATM Operational Concept (Doc 9854)

• Manual on ATM System Requirements (DOC 9882)

• Manual on Global Performance of the Air Navigation System (doc 9883).

10ICAO SIP 2012 - ASBU workshops

Page 11: SIP/ASBU/2012- WP/18

FF-ICE concept

11ICAO SIP 2012 - ASBU workshops

• Facts and data to support performance based decision making

• Data representing results of performance based decision making

• Data related to managing the performance of individual flight

• Data related to managing overall performance & meeting expectations

• Mechanisms for ensuring data consistency and interoperability

• Mechanisms for increased flexibility regarding new information.

Page 12: SIP/ASBU/2012- WP/18

Addressing limitations

• Sharing flight information• Advance notification• Inconsistent information• Information distribution• Information security• Flexible information set.

12ICAO SIP 2012 - ASBU workshops

Page 13: SIP/ASBU/2012- WP/18

Principles of FF-ICE(1)

• Flexible concept allowing new technologies & procedures to be incorporated as necessary

• Detailed indication of a/c performance capabilities

• Early indication of intent• Information for increased & more automated

CDM• Avoidance of unnecessary limitations on

information

13ICAO SIP 2012 - ASBU workshops

Page 14: SIP/ASBU/2012- WP/18

Principles of FF-ICE (2)

• Support for 4D trajectory management• Avoidance of filing unnecessary/ambiguous info• Provision of info security requirements• Consideration of cost impact• Ensures information is machine readable• Globally standardised definitions of information

elements.

14ICAO SIP 2012 - ASBU workshops

Page 15: SIP/ASBU/2012- WP/18

Information elements

• Flight identifying information• Flight SAR information• Flight permission information• Flight preferences and constraints information• Trajectory type• Surface segment type• Airborne element type• Performance information• Aircraft intent• Flight trajectory information

15ICAO SIP 2012 - ASBU workshops

Page 16: SIP/ASBU/2012- WP/18

Technical environment

• Data model

• System Wide Information Management

(SWIM)

• Supporting infrastructure

16ICAO SIP 2012 - ASBU workshops

Page 17: SIP/ASBU/2012- WP/18

Infrastructure

• Communication network

• Safety and security features

• Data exchange formats – will use XML

17ICAO SIP 2012 - ASBU workshops

Page 18: SIP/ASBU/2012- WP/18

Example timeline for info provision

• Scheduling and strategic activities

• Pre-tactical operational planning

• Tactical operational planning

• Flight operation

18ICAO SIP 2012 - ASBU workshops

Page 19: SIP/ASBU/2012- WP/18

Transition & implementation

• Operator flight planning systems - will require changes to extract and process info to facilitate the collaborative process

• ASP and AOP systems – modifications to implementing systems to facilitate interaction

• Documentation & training – changes to procedures & systems will necessitate new documentation & training.

19ICAO SIP 2012 - ASBU workshops

Page 20: SIP/ASBU/2012- WP/18

Benefits

20ICAO SIP 2012 - ASBU workshops

• Cost Effectiveness - Standard information will reduce cost of system development

• Efficiency - Better knowledge of trajectory information will allow more optimum flight profile

• Global Interoperability – Global interoperability is facilitated by easier connection of all stakeholders

Page 21: SIP/ASBU/2012- WP/18

Benefits

21ICAO SIP 2012 - ASBU workshops

• Participation by the ATM community - Participation of all stakeholders is facilitated through real-time data sharing

• Predictability - The sharing of information between aircraft and ground systems will enhance the predictability

• Safety - System wide data sharing will allow early detection of inconsistencies and updated information which will improve situation awareness..

Page 22: SIP/ASBU/2012- WP/18

22ICAO SIP 2012 - ASBU workshops