Sip pppt

10
SIP PROJECT PRESENTATION

Transcript of Sip pppt

Page 1: Sip pppt

SIP PROJECTPRESENTATION

Page 2: Sip pppt

PROJECT

NAME OF THE COMPANY: FEDERAL MOGUL BEARINGS INDIA LTD.

LOCATION: PLOT NO. 5 SECTOR-2 PARWANOO DIST- SOLAN HIMACHAL PRADESH

TRAINING PERIOD: 4TH JUNE – 31ST JULY

PROJECT NAME: INVENTORY MANAGEMENT AT FEDERAL MOGUL.

Page 3: Sip pppt

FEDERAL MOGUL CORPORATIONFederal-Mogul Corporation is an innovative and diversified

$6.7 billion global supplier of quality products, trusted

brands and creative solutions to manufacturers of

automotive, light commercial, heavy-duty and off-highway

vehicles, as well as in power generation, aerospace,

marine, rail and industrial.

Headquarter : Southfield, Michigan, USA.

Page 4: Sip pppt

FMBIL

VISION

Be the leading supplier of filter solution in India and a global supplier of automotive filters for both OE and Auto market applications.

MISSION

Providing superior products on time at every time.

Page 5: Sip pppt

PRODUCTS

3 main categories

• ORIGINAL EQUIPMENT

• AFTER MARKET

• INDUSTRIAL

Under these 3 a wide range of products are made which are bearings, shockers, copper wires, bushes etc.

Page 6: Sip pppt

OBJECTIVES

• TO UNDERSTAND THE WORKING OF SUPPLY CHAIN IN THE INDUSTRY.

• TO UNDERSTAND THE WORKING CULTURE IN A MANUFACTURING UNIT.

• TO UNDESTAND THE EHS MEASURES TAKEN BY THE COMPANY.

Page 7: Sip pppt

ABOUT INVENTORY

Inventories consist of raw materials, stores, spares, packing materials, coal, petroleum products, works-in-progress and finished products in stock either at the factory or deposits. In industries it is very important component of total investment.

Page 8: Sip pppt

LEARNINGS

• Gained knowledge about working culture of MNC.

• Learned about various key functions related to supply chain.

• Understood about exports and imports procedures.

Page 9: Sip pppt

RECOMMENDATIONS

• There should be a systematic division of material in various areas which are SINTER LINE, STORE, PACKING, and POWDER PLANT.

• Stock should be maintained properly instead of monthly checks weekly checks should be done.

• Proper training about the Pros and Cons related with inventory should be given to the staff members as well as the workforce.

• Proper co-ordination within the various departments in the organization plays a very vital role in improving the cost as well as the inventory.

• The inventory should be done as per the plans set up by the planning department much in advance so that it would become much easier to take actions as are set by the PPC.

Page 10: Sip pppt

THANKYOU