SIMULATION MODELING FOR QUALITY AND PRODUCTIVITYIN STEEL CORD MANUFACTURING
Can Hulusi Türkseven, Gürdal Ertek
Faculty of Engineering and Natural Sciences
Sabancı UniversityOrhanli, Tuzla, 34956
Istanbul, Turkey
![Page 2: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/2.jpg)
• Steel cord manufacturing system
• Distinguishing characteristics
• Various production settings
• Applicability of simulation as a management decision support tool
![Page 3: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/3.jpg)
Steel Cord Manufacturing
• Main reinforcement material in manufacture of steel radial tires
• Continuous processes where wire semi-products are stored on discrete inventory units (“spool”s)
![Page 4: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/4.jpg)
Steel Cord Manufacturing
• Special considerations applicable to a narrow scope of industries
(Ex: the reversal of the wire wound on the spools at each bunching operation)– Cable manufacturing (electric/energy/fiber-
optic)– Nylon cord manufacturing– Copper rod manufacturing
![Page 5: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/5.jpg)
The Manufacturing Process
• “Steel rod wire”, is thinned into “filament”s which are used in successive bunching operations to construct the “steel cord” final products.
• Intermediate wire products are wound onto spools of varying capacities.
![Page 6: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/6.jpg)
The Manufacturing Process
Dry drawing I & II
Annealing
Cold air bath
Cold water bath
Acidic solution
Basic solution
Spiralling
Bunching
Wet drawing
Copper plating
Zinc plating
Packaging
to Copper plating
Steel wire rod
Filament
Steel cord
Begin Production
End production
RE
SEA
RC
H F
OC
US
RE
SEA
RC
H F
OC
US
![Page 7: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/7.jpg)
The Manufacturing Process
• Payoff: filament coming out of wet drawing
• Core: bunched wires entering next bunching operation
• Take-up: output of each bunching operation
• Construction: the final steel cord product
• The “take-up” becomes the “core” for the following bunching operation.
![Page 8: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/8.jpg)
The Manufacturing Process
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2
Bunching 2
Bunching 3
Bunching 3
Bunching 3
CASE 3CASE 3
CASE 2CASE 2
CASE 1CASE 1
![Page 9: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/9.jpg)
Cross-section of a Steel Cord
8
Steel wire rod (raw material)
Filament (payoff)
Final product(construction) 3+8+12x0.2+1+1
3+8x0.2 Bunched steel wire
3x0.2 Bunched steel wire
1
2
8
7
10
11
5
4
6
39
12
5 4
1
2
36
7
2 13
Spiral Spiral filamentfilament
Bunching 2 Bunching 3 & Spiralling
Bunching 1
Draw
ing
Operation
Core
![Page 10: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/10.jpg)
Change-overs
• When “run-out” of a spool…– “Change-over”: Setup performed by a skilled
operator to feed the next spool
• When the take-up spool is completely full… Change-over of take-up
• Wire typically wasted at every change-over
• Tying of changed spools results in a “knot”.
![Page 11: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/11.jpg)
Change-overs for (3x1)
Change-overs for (3+9+15)
Change-overs for (3+9)
![Page 12: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/12.jpg)
Wire Fractures• “Wire fractures”, random breaks of the wire due to
structural properties– Uncontrollable– May also result in considerable number of additional knots.
• Cause?– previous fractures?– the locations of previous knots?– core and payoff lengths?
• Statistical analysis of the data did not suggest any patterns
![Page 13: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/13.jpg)
Rejected Spools
• Tire manufacturers prefer that the spools with the final cuts of steel cords contain no knots at all.
• “Rejected spools”: Final spools that contain knots
• Management objective: to decrease the number of knots and the number of rejected spools
![Page 14: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/14.jpg)
Research Motivation
• “Optimal” spool lengths for each bunching operation
• Minimize rejected spools
• Such that spool lengths are within a certain percentage of the current spool lengths
![Page 15: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/15.jpg)
Unique Challanges
• Knots locations are reversed at every spool change:
• When a wound spool of length h with knot locations (k1, k2, ..., kn) is fed into the
bunching operation, the unwinding results in knot locations (h-kn, ..., h-k2, h-k1).
![Page 16: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/16.jpg)
Simulation Model
• Programmed in C++ (MS Visual C++)• GUI with Borland Delphi• ~1 minute running time for a 10 ton production
schedule (10 simulation experiments)
• Why general-purpose language?– There are complexities (ex: reversing of knot locations at
bunching operations) that would be next to impossible to reflect using spreadsheets and would have to be custom-programmed if a simulation language or modeling software were used.
![Page 17: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/17.jpg)
![Page 18: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/18.jpg)
Simulation Model
• Input Parameters– Usage ratios – Wire densities – Fracture ratios– Machine characteristics
and quantities – Knotting time – Final spool length
• Decision Variables– Spool lengths
• Outputs– Number of accepted
spools– Number of rejected
spools – Rejected wire length– Throughput time
![Page 19: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/19.jpg)
Results
• Accurate estimation of the system performance measures
• Validated with historical data
• Accuracy can be increased through increasing simulation run lengths and number of simulations
![Page 20: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/20.jpg)
Conclusions / Suggestions
• Some of the current operational rules used by operators are proven to be useful– Ex: Performing a take-up change-over if only a
few hundred meters have remained on the bunching operation
• Feasibility of implementing dynamic control policies can be investigated
![Page 21: Simulation modeling for quality and productivity in steel cord manufacturing](https://reader036.fdocuments.in/reader036/viewer/2022062702/554a29cab4c90542548b4e6f/html5/thumbnails/21.jpg)
Future Work
• Machine break-downs • Dynamic spool selection • Feasibility of machinery• Simulation optimization
• Generic modeling environment to analyze systems with similar manufacturing characteristics