Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC...

21
Simplification of the CRC Energy Efficiency Scheme 4 th February 2013

Transcript of Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC...

Page 1: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Simplification of the CRC Energy Efficiency Scheme

4th February 2013

Page 2: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Welcome

Public sector support on:

• Energy management

• Service adaptation

• Community resilience

• Low carbon economy

� Network

� Information

� Training

� Project funding

� Wide range of resources at:

www.claspinfo.org

CRC Energy Efficiency Scheme

administrator for England and

Wales

Leading NW Climate Change

Partnership

Funding CLASP 2012/13

Page 3: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Todays Seminar

Simplification of the CRC Energy Efficiency Scheme

Steve Smith and Neil Guthrie, Environment Agency

Questions and Answers

Round-table Discussions

Feeding back, concluding thoughts and questions

Page 4: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Simplification

Steve Smith

CRC Operations Support Officer

Page 5: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Phase 2 Qualification

Page 6: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Qualification;

• 6000 MWh of electricity delivered through settled half hour

meters between 01 April 2012 – 31 March 2013

• Exclude supplies to CCA and EU ETS facilities and dynamic pseudo

supplies

• Public bodies to register/assess qualification on the basis of their

legal structure on 31 March 2013 (same as phase 1).

Page 7: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Compliance

Page 8: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Fuels;

• Electricity delivered through meter profiles 3-8 and 00 only

• Gas used for heating purposes, delivered through meters that

measured more than 73,200kWh during the compliance year

Page 9: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Supply Rules;

• Footprint reports going

• Residual Measurement Lists going

• Core non-core distinction going

Page 10: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Supply Rules;

• Emission factors will be brought in line with DEFRA annual Green

House Gas Emissions factors

• Licensed activities:

Gas used for electricity generation excluded

Electricity directly used for generation transmission and distribution

of gas excluded

Page 11: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Supply Rules;

• Electricity Generating Credits to be removed from the scheme

• New emissions factor for self supplied electricity

Page 12: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Supply Rules;

• CCA Exemptions to be removed from the scheme

• This also applies to energy supplied to EU ETS installations

• Energy supplied to state funded schools in England will also be

excluded

Page 13: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Supply Rules;

• Responsible for the supply you request to be delivered

• The payment requirement is to be removed from the supply

criteria

• A supply can only be classed as unconsumed if it is metered

• The landlord tenant rule is to stay the same, except for

construction leases of 30 years or more

Page 14: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Organisational Rules:

• SGUs going, replaced by Participant Equivalents (PE)

• Disaggregation will be available for all undertakings (except top

parent) – individually or as a group

• Disaggregation can take place at any time

• Designated change staying largely as it is

Page 15: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Allowance Sales;

• 2 sales each year

• Surrender of allowances deadline moved to end of October

Page 16: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Reporting and Record Keeping:

• Data retention requirements to be reduced to 6 years after the

end of the scheme year it refers to

The Performance League Table:

• PLT stopping from 2012/13 onwards

Page 17: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Dates Phase 1 Phase 2

01 April 2012 - 31 March 2013 Compliance Year Qualification Year

April 2013 - July 2013 Submit Annual Report

June 2013 - July 2013 Purchase Allowances

Autumn Registration

31 October 2013 Surrender Allowances

01 April 2013 - 31 March 2014 Compliance Year

April 2014 - July 2014 Submit Annual Report

June 2014 - July 2014 Purchase Allowances Forecast Emission Sale

31 October 2014 Surrender Allowances

01 April 2014 - 31 March 2015 Compliance Year

April 2015 - July 2015 Submit Annual Report

June 2015 - July 2015 Buy to Comply Sale

June 2015 - July 2015 Forecast Emission Sale (for yr 2)

31 October 2015 Surrender Allowances

Time Table:

Subject to change

Continues

Page 18: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Transition Period;

For current compliance year 2012/13:

• Only report on 2 fuels:

- Electricity delivered through meter profiles 3-8 and 00

- Gas used for heating purposes, delivered through meters that

measured more than 73,200kWh during the compliance year

• 2% de minimis on gas applies

• Electricity Generating Credits cannot be claimed where the input

fuel should have been reported in years 1 and 2

• Surrender date for allowances will be end of October

Page 19: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

CRC Energy Efficiency Scheme

Questions

Page 20: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Table Discussions

• Introduce yourselves

�Experience / role with regards to CRC

• Views on simplification

� Barriers / challenges remaining

� Examples of CRC as driver for carbon management

• Further information or support required?

• Feedback

Please make notes on

the A3 sheets, FAO the

Environment Agency

30 mins in total

Page 21: Simplification of the CRC Energy Efficiency Schememedia.claspinfo.org/sites/default/files/CRC Presentation 4th Feb 201… · • Electricity delivered through meter profiles 3-8 and

Feedback and Final Questions

Thank you for coming.

Links to presentations will be emailed out.

www.claspinfo.org

http://www.environment-agency.gov.uk/business/topics/pollution/126698.aspx