Welcome
Public sector support on:
• Energy management
• Service adaptation
• Community resilience
• Low carbon economy
� Network
� Information
� Training
� Project funding
� Wide range of resources at:
www.claspinfo.org
CRC Energy Efficiency Scheme
administrator for England and
Wales
Leading NW Climate Change
Partnership
Funding CLASP 2012/13
Todays Seminar
Simplification of the CRC Energy Efficiency Scheme
Steve Smith and Neil Guthrie, Environment Agency
Questions and Answers
Round-table Discussions
Feeding back, concluding thoughts and questions
Simplification
Steve Smith
CRC Operations Support Officer
CRC Energy Efficiency Scheme
Phase 2 Qualification
CRC Energy Efficiency Scheme
Qualification;
• 6000 MWh of electricity delivered through settled half hour
meters between 01 April 2012 – 31 March 2013
• Exclude supplies to CCA and EU ETS facilities and dynamic pseudo
supplies
• Public bodies to register/assess qualification on the basis of their
legal structure on 31 March 2013 (same as phase 1).
CRC Energy Efficiency Scheme
Compliance
CRC Energy Efficiency Scheme
Fuels;
• Electricity delivered through meter profiles 3-8 and 00 only
• Gas used for heating purposes, delivered through meters that
measured more than 73,200kWh during the compliance year
CRC Energy Efficiency Scheme
Supply Rules;
• Footprint reports going
• Residual Measurement Lists going
• Core non-core distinction going
CRC Energy Efficiency Scheme
Supply Rules;
• Emission factors will be brought in line with DEFRA annual Green
House Gas Emissions factors
• Licensed activities:
Gas used for electricity generation excluded
Electricity directly used for generation transmission and distribution
of gas excluded
CRC Energy Efficiency Scheme
Supply Rules;
• Electricity Generating Credits to be removed from the scheme
• New emissions factor for self supplied electricity
CRC Energy Efficiency Scheme
Supply Rules;
• CCA Exemptions to be removed from the scheme
• This also applies to energy supplied to EU ETS installations
• Energy supplied to state funded schools in England will also be
excluded
CRC Energy Efficiency Scheme
Supply Rules;
• Responsible for the supply you request to be delivered
• The payment requirement is to be removed from the supply
criteria
• A supply can only be classed as unconsumed if it is metered
• The landlord tenant rule is to stay the same, except for
construction leases of 30 years or more
CRC Energy Efficiency Scheme
Organisational Rules:
• SGUs going, replaced by Participant Equivalents (PE)
• Disaggregation will be available for all undertakings (except top
parent) – individually or as a group
• Disaggregation can take place at any time
• Designated change staying largely as it is
CRC Energy Efficiency Scheme
Allowance Sales;
• 2 sales each year
• Surrender of allowances deadline moved to end of October
CRC Energy Efficiency Scheme
Reporting and Record Keeping:
• Data retention requirements to be reduced to 6 years after the
end of the scheme year it refers to
The Performance League Table:
• PLT stopping from 2012/13 onwards
CRC Energy Efficiency Scheme
Dates Phase 1 Phase 2
01 April 2012 - 31 March 2013 Compliance Year Qualification Year
April 2013 - July 2013 Submit Annual Report
June 2013 - July 2013 Purchase Allowances
Autumn Registration
31 October 2013 Surrender Allowances
01 April 2013 - 31 March 2014 Compliance Year
April 2014 - July 2014 Submit Annual Report
June 2014 - July 2014 Purchase Allowances Forecast Emission Sale
31 October 2014 Surrender Allowances
01 April 2014 - 31 March 2015 Compliance Year
April 2015 - July 2015 Submit Annual Report
June 2015 - July 2015 Buy to Comply Sale
June 2015 - July 2015 Forecast Emission Sale (for yr 2)
31 October 2015 Surrender Allowances
Time Table:
Subject to change
Continues
CRC Energy Efficiency Scheme
Transition Period;
For current compliance year 2012/13:
• Only report on 2 fuels:
- Electricity delivered through meter profiles 3-8 and 00
- Gas used for heating purposes, delivered through meters that
measured more than 73,200kWh during the compliance year
• 2% de minimis on gas applies
• Electricity Generating Credits cannot be claimed where the input
fuel should have been reported in years 1 and 2
• Surrender date for allowances will be end of October
CRC Energy Efficiency Scheme
Questions
Table Discussions
• Introduce yourselves
�Experience / role with regards to CRC
• Views on simplification
� Barriers / challenges remaining
� Examples of CRC as driver for carbon management
• Further information or support required?
• Feedback
Please make notes on
the A3 sheets, FAO the
Environment Agency
30 mins in total
Feedback and Final Questions
Thank you for coming.
Links to presentations will be emailed out.
www.claspinfo.org
http://www.environment-agency.gov.uk/business/topics/pollution/126698.aspx