AGENDA
• Welcome and Introductions• WOL-JV Remarks• LADWP Greetings• Phase II Presentation• Contractor Bonding• Bid Package Q&A Discussion• Networking
DAN RAKERS/VINCE QUINONES | Project Director, WOL-JV
• Welcome • Introductions • Management Team• Community Based Organizations• Attendees
MARK TURNER | Senior VP, Webcor
• Introduction of WOL-JV Partners• Webcor• Obayashi• Lyles
• Project Overview
STEPHAN TUCKER | Project and Construction Management, LADWP
• LADWP Greetings• Outreach Goals and Commitment to
Project
DAN RAKERS/VINCE QUINONES | Project Director, WOL-JV
• Phase II Presentation• Project Scope• Project Details• Prequalification Packages• Subcontract Agreement• CCIP Manual• Additional Statement and Federal Requirements• PLA
BID PACKAGE A • Sub Drains, Onsite Piping, RSC1A West
• Excavation/Installation/Backfill 3,000 LF of 78” WSP• Excavation/ Installation/Backfill 102 LF of 72” Overflow WSP• 13,334 LF of 8”subdrain pipe• 2,900 LF of 6” wall/roof drains• 3,121 LF of 12” Collector system, including manholes and
associated miscellaneous metal items • Survey Services
• Fee Based Proposal and Award • Field crew rate and office engineering rate to be included
• Geomembrane Liner & Miradrain System• Placement of 550,000 SF of BGM & 330,000 SF of Miradrain
TENTATIVE DATES | Package A
July 6th, 2015- Prequalification RFQ Release
August 5th, 2015- Prequalification RFQ Deadline
August 14th, 2015- RFP Release
September 25th, 2015- RFP Deadline
BID PACKAGE B • Concrete
• 90,000 CY Reservoir & Inlet Vault • Chemical Mixing System• Miscellaneous Metals for reservoir structure, and inlet vault
• Site Earthwork • Reservoir Backfill• Topsoil Placement• Grading for Site Concrete
• Electrical• Installation of electrical equipment • Construction of duct banks• Installation of power and control wiring• Function test/Check out of all Project Electrical systems
BID PACKAGE B • HVAC
• Ventilation systems at Inlet Vault and Manholes• Site Concrete
• Access Roads, Crane Pads, V Gutters, Curbs • Painting
• Finish coating of all exposed piping, valves and equipment, including items within buildings and vaults
TENTATIVE DATES | Package B
July 6th, 2015- Prequalification RFQ Release
August 5th, 2015- Prequalification RFQ Deadline
November, 2015- RFP Release
December, 2015- RFP Deadline
KRISTINE MENDEZ | Director, Western Region Surety, AON Construction Services Group
• Contractor Bonding
Julia Gray | [email protected](213) 239-6460