Silver Creek Dam Potential Failure Modes Analysis (PFMA)

download Silver Creek Dam Potential Failure Modes Analysis (PFMA)

of 88

Transcript of Silver Creek Dam Potential Failure Modes Analysis (PFMA)

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    1/88

    FinalReport

    Silver Creek Dam Potential Failure Modes

    Analysis (PFMA)

    11APRIL2011

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    2/88

    ES1

    EXECUTIVESUMMARYE.1 IntroductionSilverCreekDamislocatedonSilverCreek,approximately2milessoutheastofSilverton,Oregon. The

    drainageareaforthedamisapproximately46squaremilesandextendssoutheastoftheprojectand

    includesSilverFallsStatePark. ThedamwasdesignedbyCH2MhillandconstructedbetweenMay1973

    andNovember1974fortheCityofSilverton,Oregon. Duetothehistoryofseepageandproximityof

    thedamtoresidentsofSilvertondownstreamofthedam,theCityhasdecidedtoconstructan

    automateddatacollectionandearlywarningsysteminordertotrytoimproveitsabilitytomonitorthe

    conditionofthedamandtoprovidewarningtoresidentsifunsafeconditionsdevelopatthedam.

    TheCityofSilvertonandthePortlandDistrictUSArmyCorpsofEngineers(USACE)haveagreedto

    partneronthedesignandinstallationofthedatacollectionandwarningsystemaspartofthe

    ContinuingAuthoritiesProgram(CAP). Aspartofthisproject,USACErecommendedthatapotential

    failuremodesanalysis(PFMA)beconductedforthedam. ThepurposeofthePFMAwastoidentify

    potentialmodesoffailureforthedaminordertoevaluatewhatmeasuresmaybetakentoreduce

    eithera)thelikelihoodthatfailureofthedamwilloccurand/orb)theconsequencesifthedamshould

    fail. TheresultsofthePFMAwillbeusedtofocusthescopeofworkforthedesignofthemonitoring

    andearlywarningsystem.

    E.2 ResultsofPFMAThePFMAteam,consistingofengineersfromUSACEandCityOperationsPersonnelidentified36

    potentialfailuremodes. Ofthese,16werepreliminarilyidentifiedasbeingcredibleandsignificant.

    Afterevaluatingthese16failuremodesfurther,someofthefailuremodeswerefoundtobesimilarand

    werecombinedandsomewereconsideredcrediblebutnotsignificant. Afterfurtherevaluation,4

    failuremodeswereconsideredcredibleandsignificant. Thecredibleandsignificantfailuremodeswere

    identifiedas: SpillwaySlabJacking,DownstreamSillandStillingBasinScour,UpstreamSillScourand

    Overtopping. Seepagewasconsidered,howeveritwasjudgedtobelessofaconcernthanthefour

    significantfailuremodesidentified.

    E.3 MajorFindingsandUnderstandingsDuringthePFMAsessionthefollowingMajorFindingsandUnderstandingswereidentified:1) TheDamappearstobewellmaintainedandprojectoperationsstaffismaintainingtheprojectto

    thebestoftheirabilities.

    2) AvarietyofdocumentswereavailableforreviewforthePFMA. AlistofthedocumentsisincludedasAppendixA. Ingeneral,therewasalackofconstructionphotosassociatedwithoriginal

    construction(oneaerialphotowasavailablefromoriginalconstruction).

    3) Generalaccesstotherightsideoftheprojectisbycar. Accesstotherightabutmentoftheprojectsite(includingtherightspillwaytrainingwallandfishladder)canbegainedonfoot.Accesstothe

    embankment,lowleveloutletandleftabutmentofthedamrequiresaboat.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    3/88

    ES2

    4) Undernormaloperations,poolrisestospillwaycrest(El.424feet)foraboutninemonthsofeveryyear. PoolofrecordisaboutEl.430feet(6feetoverthecrest).

    5) DownstreamfloodingoccurseveryyearatSilverGardensRetirementHome,requiringsandbaggingeveryyear. Thiswillcontinueunlessstructuralmeasuresaretakentopreventflooding.

    6) Thereisnostreamgaugingupstreamofthedamorforecastdataavailableattheproject. Asaresult,theCityisunabletopredictfloodinginadvancefromrainfall.

    7) Therearenoweirstomeasureseepagepresentatthisproject. Thecitycurrentlymanuallymeasuresseepagewithabucketandstopwatchperiodically. Thismethodresultsininconsistent

    dataandnoplottingofseepagedatahasoccurredtodate.

    8) Thereisnoseepagecollection/measuringpresentontheleftabutment. Becauseofthehistoricalseepageconcerns,seepagewasextensivelydiscussed. ForthisPFMA,generalseepagewasbroken

    downintoseepageleadingtoaspecificfailuremechanism(i.e.increasedseepagecausesan

    increaseinupliftpressurebeneaththespillwayslabs,leadingtofailureofspillwayslabs,which

    allowserosionoftheunderlyingfoundationmaterials,leadingtobreachofthedam).

    9) Outletcapacityandreliabilityarekeystosafeprojectoperations. Theprojectcannotdewaterquicklyifneededforanemergency(exceptinsummer). Inaddition,therearereliabilityconcerns

    basedonoperationhistory.

    10) Inspectors/CityStaffcannotvieworinspecttheleftsideoftheDam(embankment,spillwayandabutment)withoutaboat. Thisresultsininfrequentandinadequateinspection.

    11) Citystaffcannotintervenetostopdamfailurewithouttheuseofahelicopterorboat/barge.Placingmaterialatthedam,suchasrockorothermaterialstopreventorstopdamfailureis

    difficult.

    12) ThecurrentEmergencyActionPlan(EAP)doesnotallowforfullcontactwiththepopulation. Thecalllistforthecurrentemergencypublicnotificationssystem(EverbridgeCallSystem)isnot

    complete. AccordingtoCityOperationsStaff,thesuppliersoftheoldnotificationsystem(Code

    Red)willnotreleasethefulllisttotheCity. TheEverbridgesystemwillautomaticallycallall

    landlinesinSilverton. However,Cityresidentswontbecontactedoncellularphonesunlessthey

    havesignedupfortheEverbridgecallsystem(eveniftheysigneduporiginallyfortheoldRedCode

    system).

    13) TheProjectOperationsplanneedstriggerthresholdsforinspection(whentogoto24hoursurveillance,etc.)andwarning. Criticalelevationsneedtobeestablishedforthisprojectinorder

    toensureadequateinspectionandearlywarning.

    14) Knownfoundationfeatureswillcontinuetoseep(basaltinterflowzone@398,landslidetalusonrightabutment). However,theseareasarenotpronetopipinganddamfailure.

    15) Visiblesignsofdistressarepresentatthedam(thespillwaytrainingwallsaretilted,stillingbasinscourisapparentatthesite,newand/orincreasedseepagehasbeenidentifiedinrecentyears).

    16) TheCityreportsthatseepagehasincreasedinrecentyears(leftandrightsideofoutletworks,newpipeinstalledinFeb2010),butthereisnowayfortheCitytoquantifyormeasuretoverifyif

    seepageisincreasingduetoalackofaweirorothermeasurementsystemthatcouldbeusedto

    quantifythisseepage.

    17) TheCityinspectsthedamtwiceperyearandtheStateinspectsthedamapproximatelyonceperyear. Inspectionrequiresboataccesssofrequentinspectionisdifficult.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    4/88

    ES3

    18) Stillingbasinscourisevidentandhasbeenpreviouslyreportedinpostconstructioninspections.ThereisnorecordofscourinspectionormonitoringbytheCity. Originalrecommendedoperations

    andmaintenancedocumentindicatesthatthestillingbasinispronetoscourandshouldbe

    frequentlyinspected. Theinspectionswillrequiredivertingwaterfromthelowleveloutletandfish

    ladderandpumpingfromthestillingbasinduringperiodsofnoflowthroughthespillway;oruseof

    anROV.

    19) PowerattheprojectisCitysuppliedandisonlycurrentlyavailableontherightsideoftheDam. Nobackuppower,suchasanemergencygenerator,isavailableatthesite. Somemethodof

    alternativepower,suchasasolarpanel,maybeneededforanyproposedmonitoringsystem.

    20) Someofthepiezometersarecurrentlynonfunctionalandsomeofthepiezometerstandpipesaresmallindiameter. Smalldiameterpiezometersmayprovedifficulttoautomate. Ifnew

    piezometersarerequired,accesstotheembankmentwillhavetobegainedbyboatorhelicopter.

    21) Operationspersonnelhavenomeansofverifyingthelowleveloutletgateposition(42in.or18inoutlet)operationscannotseetheoutletfromthecontrolstandlocatedontheleftbank.

    22) Outletoperationduringhighflows(openorclosed)isnotdefinedintheoperationsmanual. Theoutletmaynotbestructurallysoundathighpoolswhenthegateisopenduetothepotentialfor

    cavitation. Inaddition,theairintakefortheoutletmaybeinundatedinhighfloweventswhichwill

    resultinsurgeflow.

    23) Lowspotsarepresentattherightabutment. Thismeansovertoppingmayoccuratlowerelevations.

    24) Nocurrenthydraulicmodeling/routinghasbeenperformedinordertodefinethresholds(100yrflood,PFM,etc.),poolsandtailwaters. Ifmodelingdatawasavailable,theabilitytosetmeaningful

    thresholdsforanearlywarningsystemwouldbeimproved.

    25) Whilethetopoftheembankmentisdesignedatelevation440,theclaycorewithintheembankmentonlyextendsuptoElev.435;thefilterextendsuptoElev.430. Increasedseepage

    abovetheclaycoreshouldbeanticipatedwithpoollevelsgreaterthanEl.435. Inaddition,thelack

    ofaclaycoreextendingtothetopofthedammayresultinovertoppingoccurringatelevations

    belowelevation440(i.e.overtoppingmaybeginbeforethepoolreachesthetopofthedamdueto

    wave/winderosionoftheembankment). Thepotentialforovertoppingtobeginatalower

    elevationshouldbeconsideredwhendefiningtriggerpointsforanearlywarningsystem.

    26) TheCitywasnotabletoproducecurrentsurveydatafortrueheightofembankmentcrest,thetopsofwallsorabutments. Settlementoftheembankmentorotherlowspotsmayresultin

    overtoppingatlowerelevationsthananticipated. Knowingthelocationoflowspotsisimportant

    fordetermininglocationsofstockingemergencymaterialsandtofocusfloodfightingefforts.

    27) BasedontheresultsofanalysisperformedtodatebyCornforthConsultants,theembankmentandabutmentsareexpectedtobeadequatelystableunderseismicconditionsandliquefaction

    susceptibilityislow.

    28) Noseismicanalysisoftheconcretespillwayorspillwaywallhasbeenperformed. Itisanticipatedthatlossofthewallmayleadtofailureoftheembankment.(Wallsdesignedfor0.05g,currentMCE

    fromUSGS=0.4g).

    29) Thereappearstobeagapinthecoretrenchontherightabutmentbelowthetrainingwall. ThepresenceofagapatthislocationmayresultinseepageatpoolsaboveElev.430.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    5/88

    ES4

    30) Interventionmaterials(sandbags,riprap)arenotcurrentlystockpiledonthesite.31) Thereareresidencelocationswithinveryshorttraveltimesdownstreamofthedam.Warningtime

    wouldnotbepossibleforsomefailuremodes.

    32) LossofpoolinsummermonthswilleliminatethedownstreamwatersupplyandforcetheCitytogotowaterconservation.

    33) Alogboomwasinstalledattheendofconstructionattheupperendofthepoolbutisnolongerpresent. Buildupofreservoirrimdebriscouldclogthespillwayduringhighflowevents.

    34) Largevegetationdebrisisexpectedtocontinuetocollectdownstreamofthespillwaybelowthestillingbasin,reducingchannelcapacity. Ifthismaterialcontinuestocollectovermanyyears,it

    maycreateadownstreamhazardduringasubsequentlargefloodeventasoccurredinrecent

    floodingeventsontheSandyRiverresultingindownstreamdamagetobridgesandproperty.

    35) Projectstaffwasunawareofthepresenceof4footfilterdrainthatrunsfromthefilterzonetotheleftoftheoutletpipeandendsdownstreamimmediatelytotheleftoftheoutletstructure(this

    mayormaynotexistsinceasbuiltdrawingsdonotshowitbutitisdiscussedinCH2MHill

    correspondence). Ifitexists,thisdrainmaycontributetoseepageexitingnearthelowleveloutlet

    structureatthetoeofthedam.

    36) Therearenorecordsofconduitinspection/ROVinsidetheoutletpipe.37) Zone1materialsontheupstreamshelloftheembankmentconsistofwellgradedsilty,sandy

    gravelandshouldactasaflowlimiter/pipingrestriction(filldevelopedvoids)shoulditinitiate.

    38) Thelowlevelconduitpassesthroughthedamatthebaseoftheembankment. Itisfoundedonbedrockwhereitpassesbeneaththeimperviouscore. Theconduitissquareandhasseepage

    collarson10footcenters. Imperviousbackfillaroundtheconduitwasplacedin4inchliftsand

    compactedwithhandtampers.

    E.4 Conclusions1) Failuremodesrelatedtoseepagethroughtherightabutmentlandslidematerialareconsidered

    crediblebutnotassignificantasthe4credibleandsignificantfailuremodesidentifiedinthisreport.

    Itwasjudgedthatevenunderhighpoolconditions,suchasElev.440(PMFconditions),therelative

    increaseinhydraulicgradientcomparedtowhattheprojecthasexperiencedisnotenoughto

    initiatepipinginthegenerallypervious,angular,basaltfragmentsthatcomprisethelandslide

    deposit. However,itisimportanttocontinuemonitoringseepagetodetectanyincreasesthatmay

    indicateapotentialdevelopingissueofconcern.

    2)With

    respect

    to

    the

    significant

    and

    credible

    failure

    modes,

    an

    automated

    early

    warning

    system

    wouldbemosteffectiveatreducingriskassociatedwiththeovertoppingfailuremode.

    3) Forovertoppingfailuremodes,itisanticipatedthat,ifproperlydesignedandmaintained,anautomatedearlywarningsystemmaybeabletoprovideearlywarningtodecisionmakersintimeto

    reducetheriskassociatedwithovertoppingfailuremodes.

    4) Initiationandprogressionofthefailuremodesassociatedwitherosionofthespillwayfoundationwouldbedifficulttomonitorwithanautomatedmonitoringsystemandthereforedifficultto

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    6/88

    ES5

    provideadvancedwarningoffailurebyanearlywarningsystem.Monitoringhorizontaldraindata

    anddatafromanewpiezometerinstalledtotheleftoftheleftspillwaywallanddownstreamofthe

    embankmentfilterzonecouldbeusedtomonitordevelopmentofthefailuremodeassociatedwith

    upstreamsillscourandincreasedseepagethroughtherightabutment. However,visualmonitoring

    forspillwayslaboffsetsandstillingbasinandupstreamsillerosionaremoredirectwaystoidentify

    whetherthesefailuremodesareinitiating.

    5) Forfailuremodesassociatedwithspillwayfoundationerosion,itisanticipatedthatthetimefrominitiationtouncontrolledreleaseofthepoolcouldbemonthsifthefailureoccurredundernormal

    poolconditionsbutdays(possiblyhours)underhighflood(suchasa100yearevent). Duringhighflows,unlessinitiationisobserveddirectlybyCitystaff,minimalwarningwillbeprovidedtothedownstreampopulation forspillwayfailureinitiatedfailuremodesregardlessofwhetherawarningsystemisinstalled.

    6) Ifproperlydesignedandmaintained,theautomateddatacollectionfunctionoftheproposedearlywarningsystemwillprovideabenefitofincreasedconsistencyandqualityofdata(including

    piezometeranddraindata)collectedbythesystem. Alldatashouldbestoredforfuturereference.

    Thisdatahelpstoassesstheconditionofthedamandimprovesunderstandingforhowthedam

    respondsundervariouspoolandseasonalconditions.

    7) TheautomateddatacollectionfunctioncouldalsobeusedtoprovideconfirmationofflowsthroughthelowleveloutletandfrequentupdatesontheelevationofSilverCreekDamdownstreamofthe

    damtoimprovecoordinationoffloodresponseactivitiesassociatedwithhydrologiceventsthatare

    notrelatedtodamfailure.

    E.5 RecommendationsRegardingtheEarlyWarningSystem1) Theautomatedearlywarningsystemshouldincludeareservoirlevelmeasurementandraingage.

    Multiplelevelthresholdsforreservoirlevelandraindatashouldbedefinedaspartofthedesignof

    theearlywarningsystem. Ataminimum,thethresholdsshouldconsidertheelevationsofthetop

    ofthecore(El.435)andthelowspottotherightoftherightabutmentwall(approx.El.438). In

    addition,duetothegapinthecoretrenchontherightabutmentbelowthetrainingwall,theCity

    shouldanticipatethepossibilityofincreasedseepagewithpoolsaboveElev.430andmonitorthis

    location. Thesystemshouldprovidenotificationoftheexceedanceofthethresholdstoappropriate

    decisionmakingpersonnelattheCity. Inaddition,itshouldcollectandstoredataforfuture

    referenceandanalysis.

    2)The

    City

    should

    design

    and

    install

    weir

    collection

    boxes

    to

    measure

    the

    flow

    rate

    of

    known

    seeps

    anddrainflows,especiallyflowsassociatedwiththetoedrains. Changesintheseflowratesmay

    indicatechangingconditionsatthedam.

    3) Intheeventthatdrainflowsshowsustainedincreasesinflow,considerinstallationofanewpiezometertotheleftoftheleftspillwaywallforthepurposesofmonitoringpiezometricpressure

    withinthelandslidedepositthatprovidesthefoundationforthespillway. Thewaterlevelinthis

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    7/88

    ES6

    piezometercouldbemonitoredwithanautomateddatacollectionsystemwiththresholdsassigned

    toprovidenotification.

    4) Thereliabilityoftheexistingpiezometersshouldbeevaluatedaspartofthedesignofthewarningsystem.

    5) Forthepurposesofhistoricaldatacollection,theautomatedwarningsystemshouldbedesignedtocollectdatafromthepiezometersandweirstoimprovetheconsistencyofdatacollectionand

    review.

    6) Theautomatedsystemshouldsupportstorageofhistoricaldataforthepurposesofreviewinghistoricaltrendsandprovidingreportswhenneeded. Timehistoryplotsofdatashouldbereviewed

    atleastmonthlybytheCityandmorefrequentlyifvisualobservationsindicatepotentialdeveloping

    issuesofconcern.

    7) ForthepurposesofimprovingfloodresponsebytheCity,theautomatedwarningsystemshouldbedesignedtocollectdataforwaterlevelatdownstreamlocationsasdeterminedbytheCity.

    Multiplelevelthresholdscanbedevelopedtoprovideanassessmentoflevelofurgency.

    8) TheCitysEmergencyActionPlanshouldbeupdatedtoincorporatetheearlywarningsystemandtoaddressnotificationofallcitizensimpactedbyflooding.

    E.6 AdditionalRecommendationstoImproveDamSafetyandReliability1) Performasurveyofthedamalongthecrestofthedamfromleftabutmenttorightabutmentin

    ordertodeterminethepresenceoflowpointsonthedam. Iftherearelowspots,theyshouldbe

    raisedtothedesignelevation.

    2) Performsurveyofspillwayandabutmentwallsforverticalandhorizontaldeflectioninordertoestablishabaselineforcomparisonwithfuturesurveys. Additionalsurveysshouldbecompletedat

    leastevery5years. Ifsurveysindicatemovement,theresultsofthesurveysshouldbereviewedby

    astructuralengineerforevaluation.

    3) Inspectandsurveythestillingbasinforscourduringperiodwhenspillingisnotoccurring(summerlowpoolinspection)inordertoestablishabaselineforcomparisonwithfuturesurveys. Inspectthe

    stillingbasinforincreasedscourafterlargeflowevents. Performtheinspectionsandsurveysat

    leastevery5years.

    4) Inspectthespillwayforverticaloffsetsbetweenslabsduringperiodwhenspillingisnotoccurring(summerlowpoolinspection). Themostcriticaloffsetisthedownstreamslabupliftedrelativeto

    theupstreamslab;thiscreateslocalizedhighpressuresthatmaypenetratedownalongtheslab

    jointandcreatehighupliftpressure. Ifdownstreamverticaloffsetsarepresent,grindthe

    downstreamslabdowntoremoveoffsets. Recommendvisualinspectionsarecompletedatleast

    onceperyear.

    5) Visuallyinspectupstreamimperviousblanketforholesforitsfulllengthupstream(notjusttheupstreamsill)whenpossible. Visuallyinspectsillforerosionatleastonceperyearorafterlargespill

    events.

    6) InspecttheintegrityofthelowleveloutletpipeusingaRemotelyOperatedVehicle(ROV).

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    8/88

    ES7

    7) Evaluateandimplementoptionsforincreasingthereliabilityofthelowleveloutlethydraulicsystemandforconfirmationofgateopeningsize. Tothisend,thewarningsystemshouldincludecollection

    ofdataontheflowthroughthelowleveloutlettoimprovetheabilitytoconfirmgateopeningsize.

    8) TheCitysnewpublicnotificationsystem(Everbridge)willcallallCityofSilvertontelephonelandlinesbutdoesnotincludetheentirecontactlistfromtheprovideroftheoldpublicnotification

    system(CodeRed). RecommendevaluatingwaystoupdatetheEverbridgesystemcontactlistforall

    cellularphoneuserstotheextentpossible.

    9) Performhydraulicmodelingtodeterminethefrequencyandmagnitudeandroutingofstormevents(determinerelationshipsbetweenfloodfrequency,peakflowanddownstreamwaterelevations).

    TheresultsofthemodelingwouldhelptheCitywithdecisionsregardingbalancingdownstream

    floodingimpactswithdamsafetyrisksandtoimprovetheCitysabilitytowarnthepopulation.

    Oncetheresultsofthemodelingarecomplete,itmaybeappropriatetomodifytheoperationsplan

    fortheproject.

    10)TheCityshouldconsidermakingstructuralimprovementstopreventfloodingofresidentsatlowelevationlocations(suchasSilverGardensRetirementHome).

    11)Theincreasedwoodydebrisbuildingupdownstreamofthestillingbasincreatesapotentialfordownstreamdamageduringfuturestormevents. Duringlargeevents,thismaterialmaybecome

    dislodgedandcausedamagetobridgesandproperty. TheCityshouldconsiderremovingthis

    materialevery5years.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    9/88

    i

    TableofContents1.0 INTRODUCTION...................................................................................................................................... 1

    2.0 BACKGROUND........................................................................................................................................ 1

    3.0 PFMAPROCESS...................................................................................................................................... 2

    4.0MAJORFINDINGSANDUNDERSTANDINGS............................................................................................ 3

    5.0CREDIBLEANDSIGNIFICANTFAILUREMODES........................................................................................ 6

    5.1SpillwaySlabJacking(PFMCinAppendixB)...................................................................................... 6

    5.1.1Description................................................................................................................................... 6

    5.1.2FactorsthatIncreasetheLikelihoodofthisPFM......................................................................... 7

    5.1.3RiskReductionMeasures............................................................................................................. 7

    5.1.4WarningTime............................................................................................................................... 7

    5.2 DownstreamSillandStillingBasinScour(PFMDandPFMEinAppendixB).................................... 7

    5.2.1Description................................................................................................................................... 7

    5.2.2FactorsthatIncreasetheLikelihoodofthisPFM......................................................................... 7

    5.2.3RiskReductionMeasures............................................................................................................. 8

    5.2.4WarningTime............................................................................................................................... 8

    5.3Scourofupstreamspillwaysill(PFMFinAppendixB)....................................................................... 8

    5.3.1Description................................................................................................................................... 8

    5.3.2FactorsthatIncreasetheLikelihoodofthisPFM......................................................................... 8

    5.3.3RiskReductionMeasures............................................................................................................. 9

    5.3.4WarningTime............................................................................................................................... 9

    5.4 Overtopping(PFMJ,KandNinAppendixB)..................................................................................... 9

    5.4.1Description................................................................................................................................... 9

    5.4.2FactorsthatIncreasetheLikelihoodofthisPFM......................................................................... 9

    5.4.3RiskReductionMeasures............................................................................................................. 9

    5.4.4WarningTime............................................................................................................................. 10

    5.5 RightAbutmentSeepage................................................................................................................. 10

    6.0APPLICABILITYOFANEARLYWARNINGSYSTEMTOSIGNIFICANTFAILUREMODES........................... 10

    7.0CONCLUSIONSANDRECOMMENDATIONS........................................................................................... 12

    7.1Conclusions....................................................................................................................................... 12

    7.2Recommendations............................................................................................................................ 13

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    10/88

    ii

    7.2.1 AutomatedDataCollectionandEarlyWarningSystemRecommendations............................ 13

    7.2.2 AdditionalRecommendationstoImproveDamSafetyandReliability.................................... 14

    Figures

    Figure1SitePlan

    Figure2SketchofSpillwaySlabJackingFailureMode

    Figure3SketchofScourofDownstreamSpillwaySillandStillingBasinFailureMode

    Figure4SketchofScourofUpstreamSpillwaySillFailureMode

    AppendicesAppendixA References

    AppendixBPFMANotes

    AppendixCSiteVisitNotesandPhotographs

    AppendixDProjectDrawings

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    11/88

    1

    1.0 INTRODUCTIONSilverCreekDamislocatedonSilverCreek,approximately2milessoutheastofSilverton,Oregon. Silver

    CreekistributarytoPuddingRiverapproximately6milesbelowtheproject. Thedamwasdesignedby

    CH2MHillandwasconstructedbetweenMay1973andNovember1974. Thedamwasconstructedto

    storewaterformunicipalwatersupplyandrecreation. Duetothehistoryofseepageandproximityof

    thedamtoresidentsofSilvertondownstreamofthedam,theCityofSilvertonhasdecidedtoconstruct

    anautomateddatacollectionandearlywarningsysteminordertotrytoimproveitsabilitytomonitor

    theconditionofthedamandtoprovidewarningtoresidentsifunsafeconditionsdevelopatthedam.

    TheCityofSilvertonandthePortlandDistrictUSArmyCorpsofEngineers(USACE)haveagreedto

    partneronthedesignandinstallationofthedatacollectionandwarningsystemaspartofthe

    ContinuingAuthoritiesProgram(CAP). Aspartofthisproject,USACErecommendedthatapotential

    failure

    modes

    analysis

    (PFMA)

    be

    conducted

    for

    the

    dam.

    The

    purpose

    of

    the

    PFMA

    was

    to

    identify

    potentialmodesoffailureforthedaminordertoevaluatewhatmeasuresmaybetakentoreduce

    eithera)thelikelihoodthatfailureofthedamwilloccurand/orb)theconsequences,ifthedamshould

    fail. FailureisdefinedinUSACEEngineeringRegulation(ER)111021156SafetyofDamsPoliciesand

    ProceduresandbythePFMAteamassudden,rapidanduncontrolledreleaseofimpoundedwater. A

    failuremodeisadetaileddescriptionofapossiblechainofeventsfrominitiationthroughfailure. Riskis

    definedastheprobabilityofaload(suchasapoollevelorearthquake)multipliedbytheprobabilityof

    failure(giventheload),multipliedbytheconsequencesofthefailure. Asaresult,thePFMAprovidesa

    meansforidentifyingriskattheproject. TheresultsofthePFMAprovideasenseofwhatpossible

    modesoffailureanautomatedearlywarningsystemmightbeeffectiveatreducingriskbutalsofor

    thosethatthesystemmaynotbeabletoeffectivelyreducerisk. ThePFMAalsoprovidesvaluable

    informationthatcanbeusedtodeterminewhatdatashouldbecollectedfromtheautomateddata

    collectionandearlywarningsystem. InformationlearnedfromthePFMAcanalsoinformtheCityof

    criticalaspectsorareasontheprojectthatrequirespecialattention.

    2.0 BACKGROUNDThedamwasconstructedbetweenMay1973andNovember1974. Uponfirstfilling,seepagewas

    observedontherightsideoftheearthembankment. Figure1isasiteplanforthedam. Thereservoir

    wasloweredshortlythereafterandaseriesofhorizontaldrainswereinstalledintofoundationmaterials

    below

    the

    right

    side

    of

    the

    earth

    embankment.

    In

    addition,

    a

    buttress

    filter

    layer

    berm

    was

    placed

    on

    muchoftherightsideoftheembankmenttointerceptseepagenotcapturedbythedrains.

    InJune1981,USACEandtheOregonWaterResourcesDepartmentcompletedaPhase1Inspection

    Report. ItidentifiedtheSilverCreekDamasahighhazarddambecauseofthepotentiallossofliferisk

    andthelevelofpotentialpropertydamageimmediatelydownstreamofthedam. Theinspection

    evaluatedabutmentandfoundationconditions,embankmentstability,hydraulicandhydrologic

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    12/88

    Embankment

    Spillway

    Fish Ladder

    Left Abutment

    Right Abutment

    Figure 1. Site Plan

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    13/88

    2

    conditions,andstructural/mechanicalfeatures. Theinspectionfoundthedamtobeinsatisfactory

    conditionforcontinuedoperation.

    InMarch1993,amagnitude5.6earthquake(ScottsMills)occurredwithanepicenterapproximately10

    mileseastoftheCityofSilverton. Themagnitudeoftheearthquakeanditslocationnearthedam

    causedincreasedfocusonseismicsafetyintheregion. InJuly1999,theCitycontractedtoCornforthConsultantstoperformanassessmentofthestabilityofthedamundersteadystate,rapiddrawdown

    andseismicconditions. Theanalysisindicatedthatthedamdemonstratedadequatefactorsofsafety

    foreachoftheconditionsconsidered.

    AttherequestoftheCityofSilverton,adambreakanalysiswasperformedbyPhilipWilliamsand

    AssociatesinJanuary2000. Theanalysiswasperformedtoprovideinformationtobeincorporatedinto

    anEmergencyActionPlan(EAP)fortheproject. TheanalysisconcludedthatfullbreachofSilverCreek

    DamwouldbecatastrophictotheCityandthatelapsedtimefromdamfailuretothepassageofthe

    floodwaveislessthanonehour. ItwasrecommendedinthisreportthattheCityinstallsanearly

    warningsystematthedam.

    In2002,SquierAssociatesperformedapreliminarydesignreportforanearlywarningsystem. The

    designreportincludedrecommendationsforanearlywarningsystembasedon3failuremechanisms:

    seepagefailureundernormaloperatingconditions,seismicdeformationsandinstabilityand

    overtoppingfailuresresultingfromflooding.

    USACEregulations(ER111021156)nowrequirethataPFMAprocessbeperformedforallmajordam

    modificationsorevaluationofinterimriskreductionmeasures. In2010,USACEdecidedthataPFMA

    wasnecessarytoevaluatetheapplicabilityofanearlywarningsystemtoreduceriskatSilverCreek

    Dam.

    3.0 PFMAPROCESSThefirststepintheprocesswastoidentifytheteammembersthatwouldparticipateinthePFMA. In

    general,PFMAteamsincludeafacilitator,cofacilitatorandtechnicalexperts. Themakeupofthe

    technicalexpertsonaPFMAteamdependsuponthenatureoftheproject. Projectsthathaveahigh

    degreeofcomplexitymayrequireteammembersfromeachofStructural,Geotechnical,Mechanicaland

    ElectricalEngineeringandHydraulicsandHydrologydisciplinesinadditiontomembersfamiliarwith

    operationalaspectsofthedam. ForSilverCreekDam,itwasdecidedthatthecomplexityoftheproject

    withregardtoelectricalandmechanicalequipmentwassuchthatteammembersrepresentingthe

    otherdisciplinesandtheCitysoperationalteammemberhavesufficientknowledgeinthisareato

    addressissuesinthesedisciplines.

    Oncetheteamwasidentified,eachoftheteammembersreviewedbackgroundinformationonthe

    project. ProjectinformationwasgatheredbytheCityofSilvertonandwastransmittedtoUSACEprior

    tothestartofthePFMA,whichwasperformedasafocusedworkshop,between10and14January,

    2011. EachoftheteammembersreviewedthebackgroundinformationpriortothePFMAworkshop,so

    thateachmemberhadfamiliaritywiththeprojectbythetimeoftheworkshop. Onday1,theteam

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    14/88

    3

    continuedtoreviewbackgroundinformationasagroupandsummarizedinitialmajorfindingsand

    understandings(seeSection4.0). Onthesecondday,theteamconductedasitevisittotheprojectso

    thattheteamcouldbecomemorefamiliarwithsiteconditions. Theremainderoftheweekwasspent

    identifying,describingandevaluatingpotentialfailuremodesfortheproject. Theteamidentifiedthe

    majorfeaturesoftheprojectandbasedontheteamsexperienceandtrainingforperformingPFMAs

    identifiedpossiblefailuremodes.Withthislistofpotentialfailuremodes,theteamdevelopeda

    preliminaryratingastohowsignificanteachpotentialmodewas. Byconvention,USACEassignseach

    modeoneofthefollowingcategories:

    a) Credible: aphysicallyplausiblefailuremode.b) Significant(orCredibleandSignificant): thesefailuremodesareasubsetofcrediblefailure

    modes. Theprobabilityoffailureandassociatedconsequencesapproachcloselyorexceeda

    tolerablerisklimitguideline.

    c) Noncredible: notaphysicallyplausiblefailuremode.AppendixBincludesthedetailednotesthatweretakenduringtheworkshop.

    4.0MAJORFINDINGSANDUNDERSTANDINGSThissectionincludesalistofthemajorfindingsandunderstandingsabouttheprojectthatwere

    identifiedfromreviewofthebackgroundinformation,thesitevisitandduringthePFMAworkshop:

    1) TheDamappearstobewellmaintainedandprojectoperationsstaffismaintainingtheprojecttothebestoftheirabilities.

    2) AvarietyofdocumentswereavailableforreviewforthePFMA. AlistofthedocumentsisincludedasAppendixA. Ingeneral,therewasalackofconstructionphotosassociatedwithoriginalconstruction(oneaerialphotowasavailablefromoriginalconstruction).

    3) Generalaccesstotherightsideoftheprojectisbycar. Accesstotherightabutmentoftheprojectsite(includingtherightspillwaytrainingwallandfishladder)canbegainedonfoot.Accesstothe

    embankment,lowleveloutletandleftabutmentofthedamrequiresaboat.

    4) Undernormaloperations,poolrisestospillwaycrest(El.424feet)foraboutninemonthsofeveryyear. PoolofrecordisaboutEl.430feet(6feetoverthecrest).

    5) DownstreamfloodingoccurseveryyearatSilverGardensRetirementHome,requiringsandbaggingeveryyear. Thiswillcontinueunlessstructuralmeasuresaretakentopreventflooding.

    6) Thereisnostreamgaugingupstreamofthedamorforecastdataavailableattheproject. Asaresult,theCityisunabletopredictfloodinginadvancefromrainfall.

    7) Therearenoweirstomeasureseepagepresentatthisproject. Thecitycurrentlymanuallymeasuresseepagewithabucketandstopwatchperiodically. Thismethodresultsininconsistent

    dataandnoplottingofseepagedatahasoccurredtodate.

    8) Thereisnoseepagecollection/measuringpresentontheleftabutment. Becauseofthehistoricalseepageconcerns,seepagewasextensivelydiscussed. ForthisPFMA,generalseepagewasbroken

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    15/88

    4

    downintoseepageleadingtoaspecificfailuremechanism(i.e.increasedseepagecausesan

    increaseinupliftpressurebeneaththespillwayslabs,leadingtofailureofspillwayslabs,which

    allowserosionoftheunderlyingfoundationmaterials,leadingtobreachofthedam).

    9) Outletcapacityandreliabilityarekeystosafeprojectoperations. Theprojectcannotdewaterquicklyifneededforanemergency(exceptinsummer). Inaddition,therearereliabilityconcerns

    basedonoperationhistory.

    10) Inspectors/CityStaffcannotvieworinspecttheleftsideoftheDam(embankment,spillwayandabutment)withoutaboat. Thisresultsininfrequentandinadequateinspection.

    11) Citystaffcannotintervenetostopdamfailurewithouttheuseofahelicopterorboat/barge.Placingmaterialatthedam,suchasrockorothermaterialstopreventorstopdamfailureis

    difficult.

    12) ThecurrentEmergencyActionPlan(EAP)doesnotallowforfullcontactwiththepopulation. Thecalllistforthecurrentemergencypublicnotificationssystem(EverbridgeCallSystem)isnot

    complete. AccordingtoCityOperationsStaff,thesuppliersoftheoldnotificationsystem(Code

    Red)willnotreleasethefulllisttotheCity. TheEverbridgesystemwillautomaticallycallall

    landlinesinSilverton. However,Cityresidentswontbecontactedoncellularphonesunlessthey

    havesignedupfortheEverbridgecallsystem(eveniftheysigneduporiginallyfortheoldRedCode

    system).

    13) TheProjectOperationsplanneedstriggerthresholdsforinspection(whentogoto24hoursurveillance,etc.)andwarning. Criticalelevationsneedtobeestablishedforthisprojectinorder

    toensureadequateinspectionandearlywarning.

    14) Knownfoundationfeatureswillcontinuetoseep(basaltinterflowzone@398,landslidetalusonrightabutment). However,theseareasarenotpronetopipinganddamfailure.

    15) Visiblesignsofdistressarepresentatthedam(thespillwaytrainingwallsaretilted,stillingbasinscourisapparentatthesite,newand/orincreasedseepagehasbeenidentifiedinrecentyears).

    16) TheCityreportsthatseepagehasincreasedinrecentyears(leftandrightsideofoutletworks,newpipeinstalledinFeb2010),butthereisnowayfortheCitytoquantifyormeasuretoverifyif

    seepageisincreasingduetoalackofaweirorothermeasurementsystemthatcouldbeusedto

    quantifythisseepage.

    17) TheCityinspectsthedamtwiceperyearandtheStateinspectsthedamapproximatelyonceperyear. Inspectionrequiresboataccesssofrequentinspectionisdifficult.

    18) Stillingbasinscourisevidentandhasbeenpreviouslyreportedinpostconstructioninspections.ThereisnorecordofscourinspectionormonitoringbytheCity. Originalrecommendedoperations

    andmaintenancedocumentindicatesthatthestillingbasinispronetoscourandshouldbe

    frequentlyinspected. Theinspectionswillrequiredivertingwaterfromthelowleveloutletandfish

    ladderandpumpingfromthestillingbasinduringperiodsofnoflowthroughthespillway;oruseof

    anROV.

    19) PowerattheprojectisCitysuppliedandisonlycurrentlyavailableontherightsideoftheDam. Nobackuppower,suchasanemergencygenerator,isavailableatthesite. Somemethodof

    alternativepower,suchasasolarpanel,maybeneededforanyproposedmonitoringsystem.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    16/88

    5

    20) Someofthepiezometersarecurrentlynonfunctionalandsomeofthepiezometerstandpipesaresmallindiameter. Smalldiameterpiezometersmayprovedifficulttoautomate. Ifnew

    piezometersarerequired,accesstotheembankmentwillhavetobegainedbyboatorhelicopter.

    21) Operationspersonnelhavenomeansofverifyingthelowleveloutletgateposition(42in.or18inoutlet)operationscannotseetheoutletfromthecontrolstandlocatedontheleftbank.

    22) Outletoperationduringhighflows(openorclosed)isnotdefinedintheoperationsmanual. Theoutletmaynotbestructurallysoundathighpoolswhenthegateisopenduetothepotentialfor

    cavitation. Inaddition,theairintakefortheoutletmaybeinundatedinhighfloweventswhichwill

    resultinsurgeflow.

    23) Lowspotsarepresentattherightabutment. Thismeansovertoppingmayoccuratlowerelevations.

    24) Nocurrenthydraulicmodeling/routinghasbeenperformedinordertodefinethresholds(100yrflood,PFM,etc.),poolsandtailwaters. Ifmodelingdatawasavailable,theabilitytosetmeaningful

    thresholdsforanearlywarningsystemwouldbeimproved.

    25) Whilethetopoftheembankmentisdesignedatelevation440,theclaycorewithintheembankmentonlyextendsuptoElev.435;thefilterextendsuptoElev.430. Increasedseepage

    abovetheclaycoreshouldbeanticipatedwithpoollevelsgreaterthanEl.435. Inaddition,thelack

    ofaclaycoreextendingtothetopofthedammayresultinovertoppingoccurringatelevations

    belowelevation440(i.e.overtoppingmaybeginbeforethepoolreachesthetopofthedamdueto

    wave/winderosionoftheembankment). Thepotentialforovertoppingtobeginatalower

    elevationshouldbeconsideredwhendefiningtriggerpointsforanearlywarningsystem.

    26) TheCitywasnotabletoproducecurrentsurveydatafortrueheightofembankmentcrest,thetopsofwallsorabutments. Settlementoftheembankmentorotherlowspotsmayresultin

    overtoppingatlowerelevationsthananticipated. Knowingthelocationoflowspotsisimportant

    fordetermininglocationsofstockingemergencymaterialsandtofocusfloodfightingefforts.

    27) BasedontheresultsofanalysisperformedtodatebyCornforthConsultants,theembankmentandabutmentsareexpectedtobeadequatelystableunderseismicconditionsandliquefaction

    susceptibilityislow.

    28) Noseismicanalysisoftheconcretespillwayorspillwaywallhasbeenperformed. Itisanticipatedthatlossofthewallmayleadtofailureoftheembankment.(Wallsdesignedfor0.05g,currentMCE

    fromUSGS=0.4g).

    29) Thereappearstobeagapinthecoretrenchontherightabutmentbelowthetrainingwall. ThepresenceofagapatthislocationmayresultinseepageatpoolsaboveElev.430.

    30) Interventionmaterials(sandbags,riprap)arenotcurrentlystockpiledonthesite.31) Thereareresidencelocationswithinveryshorttraveltimesdownstreamofthedam.Warningtime

    wouldnotbepossibleforsomefailuremodes.

    32) LossofpoolinsummermonthswilleliminatethedownstreamwatersupplyandforcetheCitytogotowaterconservation.

    33) Alogboomwasinstalledattheendofconstructionattheupperendofthepoolbutisnolongerpresent. Buildupofreservoirrimdebriscouldclogthespillwayduringhighflowevents.

    34) Largevegetationdebrisisexpectedtocontinuetocollectdownstreamofthespillwaybelowthestillingbasin,reducingchannelcapacity. Ifthismaterialcontinuestocollectovermanyyears,it

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    17/88

    6

    maycreateadownstreamhazardduringasubsequentlargefloodeventasoccurredinrecent

    floodingeventsontheSandyRiverresultingindownstreamdamagetobridgesandproperty.

    35) Projectstaffwasunawareofthepresenceof4footfilterdrainthatrunsfromthefilterzonetotheleftoftheoutletpipeandendsdownstreamimmediatelytotheleftoftheoutletstructure(this

    mayormaynotexistsinceasbuiltdrawingsdonotshowitbutitisdiscussedinCH2MHill

    correspondence). Ifitexists,thisdrainmaycontributetoseepageexitingnearthelowleveloutlet

    structureatthetoeofthedam.

    36) Therearenorecordsofconduitinspection/ROVinsidetheoutletpipe.37) Zone1materialsontheupstreamshelloftheembankmentconsistofwellgradedsilty,sandy

    gravelandshouldactasaflowlimiter/pipingrestriction(filldevelopedvoids)shoulditinitiate.

    38) Thelowlevelconduitpassesthroughthedamatthebaseoftheembankment. Itisfoundedonbedrockwhereitpassesbeneaththeimperviouscore. Theconduitissquareandhasseepage

    collarson10footcenters. Imperviousbackfillaroundtheconduitwasplacedin4inchliftsand

    compactedwithhandtampers.

    5.0CREDIBLEANDSIGNIFICANTFAILUREMODESDuringthePFMA,theteamidentified36potentialfailuremodes(PFMs). Ofthese,16werepreliminarily

    identifiedaspossiblybeingcredibleandsignificant. Afterevaluatingthese16failuremodesfurther,

    someoftheidentifiedfailuremodeswerefoundtobesimilarandcombinedandsomewereconsidered

    crediblebutnotsignificant. Intheend,4failuremodeswereconsideredcredibleandsignificant. Inthis

    section,eachofthesesignificantfailuremodesaredescribed,alongwithpossibleactionsormeasures

    thatcanbetakentoreduceriskassociatedwiththefailuremode. ThePFMAnotes(AppendixB)

    includesmoredetailedinformationregardingtheevaluationofeachfailuremode.

    5.1SpillwaySlabJacking(PFMCinAppendixB)5.1.1DescriptionSpillwayflowimpactsonverticaloffsetinspillwayslabswhichresultfromupliftpressureorslab

    settlement(eitherunderlongtermstaticconditionsorseismicallyinduced). Themostcriticaloffsetis

    thedownstreamslabupliftedrelativetotheupstreamslab,whichcreateslocalizedhighpressuresthat

    maypenetratedownalongtheslabjointandcreatehighupliftpressure. Landslidefoundationmaterials

    areexposedinitiatingerosion. Exposedtalus/landslideishighlyerodibleandscourwillprogress.

    Continuedlossoffoundationmaterialresultsinadditionalslabfailuresupstreamandadditional

    foundationexposureanderosion. Erosionprogressestotheupmostslaberodingdowntobasalt

    resultinginuncontrolledrelease. Figure2isasketchofthisfailuremode.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    18/88

    Figure2.

    SpillwaySlab

    JackingFailureMode

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    19/88

    7

    5.1.2FactorsthatIncreasetheLikelihoodofthisPFM Jointsarekeyshapedwithpremoldedjointfillerbetweenslabswithaplasticwaterstop

    embeddedapproximately3inchesbelowtopofspillwayslab(nodowelingorstructuraltie

    betweenslabs).

    Constructionfinalreportdocumentsdifficultywithrockanchorinstallationduetopoorrockquality

    and

    saturated

    foundation

    (water

    in

    anchor

    holes).

    Visualobservationduringthesitevisitshowedturbulence/flowdisturbanceontheleftsideofthespillwayatthetoe.

    Spillwayflowsoccurapproximately9monthsoutoftheyear. Poolwasverycalmimmediatelydownstreamofendofspillwaythenturbulentdownstreamof

    calmarea(possibledeeppool).

    Nodata/inspectionexceptvisualflowdisturbancesdocumentedduringsitevisit. Drainsarenotinspectedorcleaned.

    5.1.3RiskReductionMeasures Attimesofnonspilling,inspectforoffsetsbetweenspillwayblocks. Grindslabsflushatjoints. Anchortheslabs. Fillvoids/scourholeswithconcrete(holesaroundandunder).

    5.1.4WarningTime Warningopportunitytime(timefromabilitytodetectfailuremechanismtoinitiationofthe

    mechanism)is0ornegative. Itcanbeseenafteraslabhasfailed(maybe).

    Breachformationtime(timefrominitiationofbreachtolossofdam): fornormalpoolsmonths,andforhighflowsgreaterthan100yrsdays,maybehours.

    5.2 DownstreamSillandStillingBasinScour(PFMDandPFMEinAppendixB)

    5.2.1DescriptionSpillwayflowinitiateserosionofthebasaltandspillwaystillingbasinconcrete. Erosioncontinues,

    underminingthespillwayconcreteandfoundation. Failure/underminingofthespillwayfoundationat

    thetoeresultsinlossofspillwayslabsupport. Lossofslabsupportpermitsslabfailure,exposingthe

    talus/landslidefoundation. Exposedtalusishighlyerodibleandscourwillprogress. Continuedlossof

    foundationmaterialresultsinfailureofadditionalslabsupstreamandadditionalfoundationexposure

    anderosion. Erosionprogressestotheupmostslab,resultinginallspillwayslabshavingbeendisplaced

    anderodingdowntobasaltresultinginuncontrolledrelease. Figure3isasketchofthisfailuremode.

    5.2.2FactorsthatIncreasetheLikelihoodofthisPFM Spillwaywasextendedduetopoorfoundationconditions(talus)

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    20/88

    Figure

    3.

    Sp

    illway

    Downstream

    Sill

    an

    d

    St

    illi

    ng

    Bas

    in

    Scour

    Fa

    ilure

    Mo

    de

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    21/88

    8

    Constructionfinalreportdocumentsdifficultywithrockanchorinstallationduetopoorrockqualityandsaturatedfoundation(waterinanchorholes).

    Oct.1975inspectionmentionsscouratthesill. Visualobservationduringthesitevisitshowedturbulence/flowdisturbanceontheleftsideofthe

    spillwayatthetoe.

    Foundationbedrock

    was

    described

    as

    poor

    to

    fair

    quality.

    Originalinspectionmanualindicatedconcernabouterosionofthestillingbasinandrecommends

    frequentinspectionsandmonitoringforerosion. (MaximumhistoricalpoolofElev.430correspondstoflowofapproximately5,000cfs).

    Spillwayflowsoccurapproximately9monthsoutoftheyear. Poolwasverycalmimmediatelydownstreamofendofspillwaythenturbulentdownstreamof

    calmarea(possibledeeppool). Thismaybeindicativeofapossibledeeppoolcreatedbyscour.

    5.2.3RiskReductionMeasures Visuallymonitorforscourandsurveythedownstreamsillandstillingbasin. Armorstillingbasin. Anchorthespillwayslabs. Fillvoids/scourholeswithconcrete(holesaroundandunder).

    5.2.4WarningTime Warningopportunitytimeis0ornegative. Itcanbeseenafteraslabhasfailed(maybe). Breachformationtimefornormalpoolsmonths;andforhighflowsgreaterthan100yrs

    days,maybehours.

    5.3Scourofupstreamspillwaysill(PFMFinAppendixB).5.3.1DescriptionScourpresentontheupstreamsillofthespillwaypermitsadditionalflowunderthespillway. Theresultingflowovertaxesthespillwaydrainsystemcreatingfullupliftonthespillwayandslabs. Increasedupliftandcyclesofloadingdisplacespillwayslabs(byoffset,settlement,anchoragefailure,etc.)resultinginexposedhighlyerodibletalus/landslidefoundation. Erosionprogressesthroughcontinuedlossofslabsupportandscour. Scourprogressesupstreamtofullpoolresultinginuncontrolledreleasedowntobedrock(approximatelyEl.375). Figure4isasketchofthisfailuremode.5.3.2FactorsthatIncreasetheLikelihoodofthisPFM

    Constructionfinalreportdocumentsdifficultywithrockanchorinstallationduetopoorrockqualityandsaturatedfoundation(waterinanchorholes).

    Spillwayflowsoccurapproximately9monthsoutoftheyear. Upstreamimperviousblankethashistoricallyerodedandbeenrepairedwithpitrunrockwhich

    doesnotprovidethesameseepagecutoffthattheoriginalblanketwouldprovide.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    22/88

    Figure

    4.

    Upstre

    am

    Sp

    illway

    Sill

    Scour

    Fa

    ilure

    Mod

    e.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    23/88

    9

    Eachrepaircycleindicatesremovalofimperviousblanket,resultinginreducedscourbutincreasedflowbeneaththespillway.

    5.3.3RiskReductionMeasures Ensurespillwaydrainsareeffective. Ensureupstreamclayblanketremainsimpervious. Anchorslabsifneeded. Addpiezometeradjacenttothespillwayasanindicatorofhydraulicpressureunderthespillway

    slabs. Calculateacceptableupliftpressurethresholdatwhichslabsbecomedislodgedand

    monitorforthesepressures.

    5.3.4WarningTime Warningopportunitytimeis0ornegative. Itcanbeseenafteraslabhasfailed(maybe). Breachformationtimefornormalpoolsmonths,andforhighflowsgreaterthan100yrs

    days,maybehours.

    5.4 Overtopping(PFMJ,KandNinAppendixB).5.4.1DescriptionPoolrisesabovetheEl.435(topoftheclaycore),waveactioninitiateserosionofsandy/gravelinthe

    embankmentupstreamshellandcrest. Materialsloughingupstreamanddownstreamdecreasesthe

    crestwidth/seepagepathleadingtoovertoppingandcontinuedovertoppingleadstodowncuttingof

    theembankment. Breachoccurs,downcuttingtothevalleyfloorleadingtouncontrolledreleaseand

    downstreamconsequences.

    5.4.2FactorsthatIncreasetheLikelihoodofthisPFM CoreonlydesignedtoEl.435. Historicaldebrisblockagecouldraisethepool. Insufficientfreeboard ProjectcannotpassthePMF(accordingtoPMFestimatedin1981USACEReport) Flashypool(i.e.poolrisesquicklywithraineventsduetoasmalldrainagebasin). Actualcrestelevationvariesandisunknownduetoalackofsurveydata. Truecrestofdamcould

    belowerresultinginmorefrequentovertoppingatalowerthanpredictedlevel.

    LowspotoccursatrightabutmentatEl.438wouldpermitovertoppingatlowerelevationsthanPMForrestofproject.

    Insufficientdrawdowncapacity Landslideproneareasinthebasin(surge)

    5.4.3RiskReductionMeasures Raiselowspots Armortheupstreamface

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    24/88

    10

    Armorthedownstreamface

    5.4.4WarningTime Warningopportunitytimeishoursbutcouldbeincreasedwithanearly/floodwarningsystem.. Breachformationtimeisapproximately2hours.

    5.5 RightAbutmentSeepageSeepagethroughtherightabutmentlandslidedepositisconsideredanimportantissuebutfailure

    modesassociatedwiththisconditionwerenotconsideredascriticalasthesignificantfailuremodes

    identifiedabove. Thereservoirhasgenerallyfilleduptothespillwaycrest(El424ft)eachyear.When

    observed,seepagehasbeenclearwithnoevidenceofpipinginitiating. Also,infrequentobservationsat

    higherpoolsabovespillway(poolofrecordis430feet),doesnotprovideanyevidenceof

    turbidity/cloudyseepagetosuggestthatpipingmayhaveinitiatedoroccurred. Thereisnoreasonto

    believethatgoingfrompoolofrecordofEl430toa100yearpoolofEl431(oneadditionalfoothigher

    or2percentincreaseindepthofwaterdowntothebaseoftheembankment)wouldchangethe

    hydraulicgradientsufficientlytoinitiatepiping. APMFeventwouldraisepool10feetabovepoolof

    record(20percenthigher). A20percentincreaseseepagegradientwasthoughtnottobesufficientto

    initiatepipingoftheperviouslandslidedebris. However,itisimportanttocontinuemonitoringseepage

    todetectanyincreasesthatmayindicateapotentialdevelopingissueofconcern.

    6.0APPLICABILITYOFANEARLYWARNINGSYSTEMTOSIGNIFICANTFAILUREMODESThetermearlywarningsystemcanbeinterpretedtoencompassavarietyofsystemsthatcould

    potentiallybebeneficialforreducingriskatthisproject. Inaverysimpleform,anearlywarningsystem

    couldsimplybeafloodwarningsystemthatutilizesrainfalland/orreservoirwaterleveldatato

    providenotificationofelevatingpoolconditions. Inthissimpleform,thesystemwouldbeprettybasic

    andhaveonlythatfunction. Inmoreadvancedform,thesystemcouldmonitordatafromavarietyof

    instruments,comparethatdatatopredeterminedalgorithmsorthresholdsbasedonseveraldifferent

    failuremodesandprovidenotificationwhencertainconditionsaremet. Thistypeofsystemmightbe

    referredtoasanearlydamfailurewarningsystem. Forthepurposesofthisreport,itisassumedthat

    theCitydesirestoinstallasystemconsistentwiththelatterdescription.

    For

    failure

    modes

    that

    have

    parameters

    that

    are

    directly

    related

    to

    the

    initiation

    and

    further

    developmentofthosefailuremodesthatcanbemonitoredthroughautomation,itispossiblethata

    systemcouldbedesignedtoprovideearlydetectionandnotificationofthesemodesoffailure. The

    effectivenessofthissystemwouldberatedbasedonthedegreetowhichtheinitiationand

    developmentofthemostsignificantfailuremodes(i.e.thosethathavethehighestlikelihoodofcausing

    significantdownstreamconsequences)canbedetectedbytheautomatedsysteminsufficienttimeto

    bothnotifydecisionmakersandtoallowtimeforinterventionand/orevacuation. Clearly,then,the

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    25/88

    11

    effectivenessofthesystematagivenprojectwilldependuponthenatureofthemostsignificantfailure

    modesatthatproject.

    ThesignificantfailuremodesforSilverCreekDam,basedonthePFMAworkshop,weresummarizedin

    Section5above. Ofthesignificantpotentialfailuremodesidentified,anearlydamfailurewarning

    systemwouldbemosteffectiveatprovidingwarningfortheovertoppingfailuremodedescribedin

    Section5.4. Thesystemcouldutilizecriteriasuchasreservoirlevelortherateofriseofthepoollevel

    (orcombinationofthetwo)toprovideearlydetectionofovertoppingconcerns. Thesystemcould

    providenotificationatvariousthresholdstoindicatehowsignificanttheconditionsare. Animportant

    elevationforovertoppingconcernsisElev.435,thetopoftheimperviouscoresectionofthedam. The

    coresectionisthelowpermeabilityzonewithinthedamthatprovidestheabilityofthedamto

    impoundwater. Increasedseepagethroughtheembankmentfillabovetheimperviouscorezonewould

    beexpectedtooccurforpoollevelsaboveEl.435sincethepoolisabovethetopofthecore. In

    addition,waveactionatthesehighpoollevelsmayerodethecrestofthedamresultinginpotential

    overtoppingatelevationslessthanthecurrentcrestofthedam. Section7includesadditional

    considerationsandrecommendationsregardingovertopping.

    Theothercredibleandsignificantfailuremodesarerelatedtorapiderosionofthefoundationmaterial

    beneaththespillwayduetothelossofspillwayslabs(seeSections5.1through5.3). Themosteffective

    meansofdetectingadevelopingconditionforthesefailuremodesistoregularlyinspectforoffsets

    betweenadjacentslabjointsandforscourinthestillingbasinandontheupstreamsill. Themostcritical

    offsetisthedownstreamslabupliftedrelativetheupstreamslabwhichcreateslocalizedhighpressures

    thatmaypenetratedownalongtheslabjointandcreatehighupliftpressurebeneaththeslab. Forthe

    upstreamsillscourfailuremode,describedinSection5.3,itisanticipatedthatprogressionofthisfailure

    modewouldresultinincreasedseepageinthehorizontaldrainsinstalledwithinthelandslidedeposit. A

    sustained,

    gradual

    increase

    in

    seepage

    during

    spilling

    that

    is

    not

    related

    to

    rainfall

    would

    be

    expected

    to

    occur. Theearlywarningsystemshouldincludeautomatedcollectionofdraindatafromthedrains

    (eitherindividuallyorsomedrainscanbecombined). Thiswillrequireconstructionofweirstocollect

    theflow. TheCitycouldalsoconsiderinstallinganewshallowpiezometertomonitordevelopmentof

    thisfailuremode. Thepiezometercouldbeinstalledtotheleftoftheleftspillwaywalldownstreamof

    thefilterzonetoadepthofapproximately10feetbelowthebaseofthespillwaywithapressuresensor

    forautomatedmonitoring. Increasedupliftpressurebeneaththespillwayshouldresultinincreased

    piezometriclevelinthispiezometerduetohydraulicconnectivityoflandslidematerialbeneaththe

    spillwayandthatscreenedbythepiezometer.Whiletheweirsandpiezometermightprovideindication

    ofprogressionofthisfailuremode,visualinspectionoftheupstreamsillandclayblanketisamore

    directandeffectivemeansfordetectingiferosionisoccurring. Also,itisimportanttonotethatthe

    automatedsystemwouldprobablynotbeabletoprovideearlydetectionandwarningfortheslab

    jacking(Section5.1)andstillingbasinanddownstreamsillscourfailuremodes(Section5.2).

    Inadditiontothebenefitsdescribedabove,anautomatedwarningsystemthatincludesdatacollection

    fromtheexistingpiezometersandnewdrainagecollectionweirsnearthetoeofthedamwouldprovide

    benefitintermsofincreasingthefrequencyofmeasurementsfromtheseinstruments. Althoughthe

    existingpiezometerswerenottiedtosignificantfailuremodes,theyaretiedtocrediblefailuremodes

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    26/88

    12

    thattheteamidentified. Traditionally,suchmeasurementshavebeentakenmanuallyonceperyearattheproject,althoughtherehavebeengapsoftimewhereseveralyearshavegonebywithouttakingmeasurements. Piezometricwaterlevelsanddrainflowratesareimportantindicatorsofdamperformance. Theseinstrumentsshouldbemonitoredconsistentlyatleastoncepermonth(withautomation,higherfrequencyiseasilyobtained)tounderstandseasonalfluctuationsandlongtermtrends. Withpropermaintenance,theautomatedsystemwillconsistentlycollectthedata,improvingtheunderstandingofthebehaviorofthedamandreducingefforttoreviewthehistoricaldata.Adustmentstothelowleveloutletgatesaremadeusingmanualcontrolslocatedatthecrestofthedamadjacenttotherightspillwaytrainingwall. Currently,operationscannotverifythelowleveloutletgatepositionwhenadjustmentsaremade. Theoutletisnotvisiblefromthislocationinordertoconfirmthattheactualgateadjustmentsweremade. Thewarningsystemshouldcollectdataforflowoutofthelowleveloutletsothatconfirmationofgateadjustmentscanbeobtained.AnautomatedwarningsystemcouldalsobeusedtonotifyCitystaffwhenimportantthresholdwaterlevelsdownstreamofthedamarereached. Althoughthisnotificationmaynotbetiedtofailureofthedam,itmaybeusefulfortheCitytoknowwhendownstreamwaterlevelsreachcertainelevationstohelpcoordinatefloodresponse. Thesystemcouldmonitordownstreamwaterlevelsatvariouslocationsandcouldbeprogrammedtoprovidenotificationatmultipleelevationstoindicatehowseveredownstreamfloodingconditionsarebecoming.

    7.0CONCLUSIONSANDRECOMMENDATIONS7.1ConclusionsAlistofmajorfindingsandunderstandingsfromthePFMAworkshopisprovidedinSection4. Thissectionprovidesconclusionsspecificallyrelatedtotheproposedearlywarningsystem.1) ThePFMAworkshopresultedintheidentificationof4significantandcrediblepotentialfailure

    modes. Threeofthe4modeswererelatedtoerosionofthespillwayfoundationduetoeitherslabjacking,erosionofthestillingbasinorerosionoftheupstreamsillofthespillway. Thefourthmodeisovertoppingofthedam.

    2) Failuremodesrelatedtoseepagethroughtherightabutmentlandslidematerialareconsideredcrediblebutnotassignificantasthe4modesidentifiedabove. Itwasjudgedthatevenunderhighpoolconditions,suchasElev.440(PMFconditions),therelativeincreaseinhydraulicgradientcomparedtowhattheprojecthasexperiencedisnotenoughtoinitiatepipinginthegenerallypervious,angular,basaltfragmentsthatcomprisethelandslidedeposit. However,itisimportanttocontinuemonitoringseepagetodetectanyincreasesthatmayindicateapotentialdevelopingissueofconcern.

    3) Withrespecttothesignificantandcrediblefailuremodes,anautomatedearlywarningsystemwouldbemosteffectiveatreducingriskassociatedwiththeovertoppingfailuremode.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    27/88

    13

    4) Forovertoppingfailuremodes,itisanticipatedthat,ifproperlydesignedandmaintained,anautomatedearlywarningsystemmaybeabletoprovideearlywarningtodecisionmakersintimeto

    reducetheriskassociatedwithovertoppingfailuremodes.

    5) Initiationandprogressionofthefailuremodesassociatedwitherosionofthespillwayfoundationwouldbedifficulttomonitorwithanautomatedmonitoringsystemandthereforedifficultto

    provideadvancedwarningoffailurebyanearlywarningsystem.Monitoringhorizontaldraindata

    anddatafromanewpiezometerinstalledtotheleftoftheleftspillwaywallanddownstreamofthe

    embankmentfilterzonecouldbeusedtomonitordevelopmentofthefailuremodeassociatedwith

    upstreamsillscourandincreasedseepagethroughtherightabutment. However,visualmonitoring

    forspillwayslaboffsetsandstillingbasinandupstreamsillerosionaremoredirectwaystoidentify

    whetherthesefailuremodesareinitiating.

    6) Forfailuremodesassociatedwithspillwayfoundationerosion,itisanticipatedthatthetimefrominitiationtouncontrolledreleaseofthepoolcouldbemonthsifthefailureoccurredundernormal

    poolconditionsbutdays(possiblyhours)underhighflood(suchasa100yearevent). Duringhighflows,unlessinitiationisobserveddirectlybyCitystaff,minimalwarningwillbeprovidedtothedownstreampopulation forspillwayfailureinitiatedfailuremodesregardlessofwhetherawarningsystemisinstalled.

    7) Ifproperlydesignedandmaintained,theautomateddatacollectionfunctionoftheproposedearlywarningsystemwillprovideabenefitofincreasedconsistencyandqualityofdata(including

    piezometeranddraindata)collectedbythesystem. Thisdatahelpstoassesstheconditionofthe

    damandimprovesunderstandingforhowthedamrespondsundervariouspoolandseasonal

    conditions.

    8) TheautomateddatacollectionfunctioncouldalsobeusedtoprovideconfirmationofflowsthroughthelowleveloutletandfrequentupdatesontheelevationofSilverCreekDamdownstreamofthe

    damtoimprovecoordinationoffloodresponseactivitiesassociatedwithhydrologiceventsthatare

    notrelatedtodamfailure.

    7.2Recommendations7.2.1AutomatedDataCollectionandEarlyWarningSystemRecommendations1) Theautomatedearlywarningsystemshouldincludeareservoirlevelmeasurementandraingage.

    Multiplelevelthresholdsforreservoirlevelandraindatashouldbedefinedaspartofthedesignof

    theearlywarningsystem. Ataminimum,thethresholdsshouldconsidertheelevationsofthetop

    ofthecore(El.435)andthelowspottotherightoftherightabutmentwall(approx.El.438). In

    addition,duetothegapinthecoretrenchontherightabutmentbelowthetrainingwall,theCity

    shouldanticipatethepossibilityofincreasedseepagewithpoolsaboveElev.430andmonitorthis

    location. Thesystemshouldprovidenotificationoftheexceedanceofthethresholdstoappropriate

    decisionmakingpersonnelattheCity. Inaddition,itshouldcollectandstoredataforfuture

    referenceandanalysis.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    28/88

    14

    2) TheCityshoulddesignandinstallweircollectionboxestomeasuretheflowrateofknownseepsanddrainflows,especiallyflowsassociatedwiththetoedrains. Changesintheseflowratesmay

    indicatechangingconditionsatthedam.

    3) Intheeventthatdrainflowsshowsustainedincreasesinflow,considerinstallationofanewpiezometertotheleftoftheleftspillwaywallforthepurposesofmonitoringpiezometricpressure

    withinthelandslidedepositthatprovidesthefoundationforthespillway. Thewaterlevelinthis

    piezometercouldbemonitoredwithanautomateddatacollectionsystemwiththresholdsassigned

    toprovidenotification.

    4) Thereliabilityoftheexistingpiezometersshouldbeevaluatedaspartofthedesignofthewarningsystem.

    5) Forthepurposesofhistoricaldatacollection,theautomatedwarningsystemshouldbedesignedtocollectdatafromthepiezometersandweirstoimprovetheconsistencyofdatacollectionand

    review.

    6) Theautomatedsystemshouldsupportstorageofhistoricaldataforthepurposesofreviewinghistoricaltrendsandprovidingreportswhenneeded. Timehistoryplotsofdatashouldbereviewed

    atleastmonthlybytheCityandmorefrequentlyifvisualobservationsindicatepotentialdeveloping

    issuesofconcern.

    7) ForthepurposesofimprovingfloodresponsebytheCity,theautomatedwarningsystemshouldbedesignedtocollectdataforwaterlevelatdownstreamlocationsasdeterminedbytheCity.

    Multiplelevelthresholdscanbedevelopedtoprovideanassessmentoflevelofurgency.

    8) TheCitysEmergencyActionPlanshouldbeupdatedtoincorporatetheearlywarningsystemandtoaddressnotificationofallcitizensimpactedbyflooding.

    7.2.2Additional

    Recommendations

    to

    Improve

    Dam

    Safety

    and

    Reliability

    1) Performasurveyofthedamalongthecrestofthedamfromleftabutmenttorightabutmentin

    ordertodeterminethepresenceoflowpointsonthedam. Iftherearelowspots,theyshouldbe

    raisedtothedesignelevation.

    2) Performsurveyofspillwayandabutmentwallsforverticalandhorizontaldeflectioninordertoestablishabaselineforcomparisonwithfuturesurveys. Additionalsurveysshouldbecompletedat

    leastevery5years. Ifsurveysindicatemovement,theresultsofthesurveysshouldbereviewedby

    astructuralengineerforevaluation.

    3) Inspectandsurveythestillingbasinforscourduringperiodwhenspillingisnotoccurring(summerlow

    pool

    inspection)

    in

    order

    to

    establish

    a

    baseline

    for

    comparison

    with

    future

    surveys.

    Inspect

    the

    stillingbasinforincreasedscourafterlargeflowevents. Performtheinspectionsandsurveysat

    leastevery5years.

    4) Inspectthespillwayforverticaloffsetsbetweenslabsduringperiodwhenspillingisnotoccurring(summerlowpoolinspection). Themostcriticaloffsetisthedownstreamslabupliftedrelativeto

    theupstreamslab;thiscreateslocalizedhighpressuresthatmaypenetratedownalongtheslab

    jointandcreatehighupliftpressure. Ifdownstreamverticaloffsetsarepresent,grindthe

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    29/88

    15

    downstreamslabdowntoremoveoffsets. Recommendvisualinspectionsarecompletedatleast

    onceperyear.

    5) Visuallyinspectupstreamimperviousblanketforholesforitsfulllengthupstream(notjusttheupstreamsill)whenpossible. Visuallyinspectsillforerosionatleastonceperyearorafterlargespill

    events.

    6) InspecttheintegrityofthelowleveloutletpipeusingaRemotelyOperatedVehicle(ROV).7) Evaluateandimplementoptionsforincreasingthereliabilityofthelowleveloutlethydraulicsystem

    andforconfirmationofgateopeningsize. Tothisend,thewarningsystemshouldincludecollection

    ofdataontheflowthroughthelowleveloutlettoimprovetheabilitytoconfirmgateopeningsize.

    8) TheCitysnewpublicnotificationsystem(Everbridge)willcallallCityofSilvertontelephonelandlinesbutdoesnotincludetheentirecontactlistfromtheprovideroftheoldpublicnotification

    system(CodeRed). RecommendevaluatingwaystoupdatetheEverbridgesystemcontactlistforall

    cellularphoneuserstotheextentpossible.

    9) Performhydraulicmodelingtodeterminethefrequencyandmagnitudeandroutingofstormevents(determinerelationshipsbetweenfloodfrequency,peakflowanddownstreamwaterelevations).

    TheresultsofthemodelingwouldhelptheCitywithdecisionsregardingbalancingdownstream

    floodingimpactswithdamsafetyrisksandtoimprovetheCitysabilitytowarnthepopulation.

    Oncetheresultsofthemodelingarecomplete,itmaybeappropriatetomodifytheoperationsplan

    fortheproject.

    10)TheCityshouldconsidermakingstructuralimprovementstopreventfloodingofresidentsatlowelevationlocations(suchasSilverGardensRetirementHome).

    11)Theincreasedwoodydebrisbuildingupdownstreamofthestillingbasincreatesapotentialfordownstreamdamageduringfuturestormevents. Duringlargeevents,thismaterialmaybecome

    dislodgedandcausedamagetobridgesandproperty. TheCityshouldconsiderremovingthis

    materialevery5years.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    30/88

    SILVERCREEKDAMPOTENTIALFAILUREMODESANALYSIS(PFMA)REPORT

    APPENDIXAREFERENCES

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    31/88

    A1

    HistoricalDocuments DesignMemoranda/Analysis

    DesignLettertoStateEngineer,CH2M,28March1973,(FILE241D4,towardsback) ProjectInformationlettertoSilvertonMayor,CH2MHill,10April1973,(FILE241D4,

    towardsback)thisincludesinfoontheoutlets,suggestedO&M,fishfacilities.

    DetailedProjectReportSection205SilverCreekDamEarlyWarningSystem,CorpsofEngineers,August2004.

    SilverCreekDam,Section205PreliminaryAssessment,CorpsofEngineers,DraftMaterial,8July2003.

    SilverCreekDamBreakAnalysis,FinalReport,PhilipWilliams&Associates,Ltd.,January18,2000.(Haveentireprojectfile).

    SilverCreekDamEarlyWarningSystemPreliminaryDesignReport,SquierAssociates,April2002.

    ConstructionControlData FinalConstructionReport,SilverCreekDam,CH2MHill,13January1975.(redfile)

    TripReportsandFieldInspectionReports Inspectiontripreport,CH2MHill,26August1975. (FILE241D4) Setof16OregonWaterResourceDepartmentInspectionReportsbetween1981and2010.

    AsBuiltDrawings Specifications

    Projectplansandspecifications,March1973. ConstructionPhotographs

    Aerialphotoduringconstruction(File#319). Geotechnical/Geological/GeophysicalInvestigations

    AnEngineeringReportonSubsurfaceExplorationandPreliminaryDesignAnalysisfortheConstructionofaDamonSilverCreek,CH2M,May1966.(Thisinvestigationappearstobe

    atalocationdownstreamoftheactualdamsite).

    SubsurfaceInvestigationofaDamSiteonSilverCreek,CH2MHill,April1973.(Includesgeologicmapping,boringlogsandsoilandrockdescriptionsatthecurrentdamsite(B)and

    ataproposed damsitedownstreamofthecurrentlocationlocationA).

    BoringLogs(includedinabovereports)

    LivingDocuments OperationandMaintenance(O&M)Manual

    SuggestedInspection,OperationandMaintenanceofSilverCreekDam,nodate,signedskw.

    EmergencyActionPlan(EAP)

    WaterControlManual(WCM) SuggestedInspection,OperationandMaintenanceofSilverCreekDam,nodate,signed

    skw.

    ISO90007.11Damoperatingprocedures,includeswaterdemandsandinspectionchecklist

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    32/88

    A2

    PeriodicInspectionandContinuingEvaluation PeriodicInspections

    SilverCreekDam,Phase1InspectionReport,NationalDamSafetyProgram, OregonWaterResourcesDepartment,June1981.

    IntermediateInspectionso AnnualInspectionseriesofStateDamSafetyinspectionso Incidents

    Damseepagememo,CityofSilverton,Feb2010. Previouslyundetectedseepagewasencounteredneardownstreamoutletstructure,aseepagemonitoringpointwas

    constructed,photosareincluded.

    InstrumentationData SilverCreekDamPiezometerInstallationContractorCH2MHill,11978,File#319.(File

    containsspecsanddesigndetailsfornewpiezometersappearstobeforpiezosP3through

    P10,includessomemanualplotsandtablesofpiezoanddraindataforfirstcoupleyears

    followingconstruction).

    Spreadsheetsandtablesofpiezoanddraindatafor1975through2007.

    EvaluationandModificationReports SeismicSafetyEvaluation

    SeismicStabilityAnalysis,SilverCreekDam,CornforthConsultants,21July1999. DamModificationReports

    Descriptionandconstructionphotosofintakerepairperformedin1993poolwaslowered anddescriptionandphotosofadditionalrepairsin2002.

    Filefolderwithcorrespondenceandsomesketchesofrepairworkperformedasaresultof1996flood.

    PlansandSpecificationsforConcreteRepairsproject,July9,2009. OperationandMaintenance(O&M)Program

    SuggestedInspection,OperationandMaintenanceofSilverCreekDam,nodate,signedskw.

    OtherDocuments FloodInsuranceStudy,U.S.DepartmentofHousingandUrbanDevelopment,FederalInsurance

    Administration,September1978(includesfloodprofilesdownstreamfor10year,50year,100

    yearand500yearfloods).

    Seriesofuntitledplansthatappeartobeinundationmaps. Currentratingcurve(No.9) forSilverCreekatdownstreamgagingstation. Ratingcurveandflowdataforconditionspriortodam. Setofplandrawingsassociatedwithgettingpermitsforthedam.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    33/88

    SILVERCREEKDAMPOTENTIALFAILUREMODESANALYSIS(PFMA)REPORT

    APPENDIXBPFMANOTES

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    34/88

    B1

    PHYSICALDATA

    TopofDam: 440(439.4) TopofSpillwayCrest: 423.67onnorthendcurbwith424toSouth. Outletinvert: 376.8 TopofCore: 435.0 FishLadderPipeInvert: 421.0 TopofFilter: 430 Crestwidth=20ft Basemax=340ft Elev.OfBaseofDamisapprox.370ft Maxheightapprox.70ft. Embankment490ftlong,spillway160ftlong Outletexitinvert: 371.0(from376.8) Filterzoneis4ftwide Coreminimum20feetwide Coretrenchis24ftwidetoElev370

    GEOTECH

    Core4inminussandy,clayeysilt(ML)lowplasticity Zone1upstreamanddownstreamsilty,sandygravel(alluviumfromriverbottomreservoir

    borrow)

    Zone2downstreamsiltyrockfragments Structuralbackfill3in.minusrock Drainageberm3in.minuscrushedrock Filterzonewellgraded,4ftwide,3in.minus,lessthan4%fines North(Right)AbutmentrepresentedbyB13

    SiltDeposit(Landslide)ontop Top25ftextremelypermeable(fractured,loose,open,4in.angular,leakedonfirst

    fillingatspillway)

    Siltytalusontopoffracturedbasalt BedrockisatElev.375(80ftdown)

    South(Left)AbutmentrepresentedbyB12andB16(250ftdownstream) Plasticsilt,hasclaytoelev.410 Sitsonfracturedbasalt B16showsbouldersandgravelsdownstream

    Bedrock/FoundationRock Northlandslide,porous Spillwaysameasnorthabutment SouthinterflowzoneatElev.398(2basaltflows)

    LiquefactionPotentiallow(maybesomesmallisolatedzones)

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    35/88

    B2

    Coretrenchmaterialwascompactedinthewet(hadtodewaterduringcompaction) OBE=0.0875g MCE=0.4g

    HYDRAULICSANDHYDROLOGY

    Pools

    Normalpool424to424.5

    WinterOctApr424to427

    AugustandSeptember440,PMF>440

    Whatistailwater?? ********Datagap********

    Flows

    NormalQinriver: 50cfs@El424(leakagethroughfishladder)

    Maxpool:200cfs@El424(leakagethroughfishladderandspillway)

    [email protected],tailwaterisaboutEl.231.

    PMF22,682cfsinflow,22650release

    Floodstage/bankfull: El.228.2,4milesdownstream

    Gagestation@WebStreettakescontinuousreadingsandsendsanautoemailalertwhentailwateris

    within4ftofEl.228.2

    WhogetsemailAndygetsit,whenitsrainingPolicedoacheckofthis.

    Currentlynoflowpredictionsatthisprojectlookforrain.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    36/88

    B3

    Thegageisatthelowspot,thisareacouldbebuiltupwithawall.

    NextlowspotisaroundEl.235

    SandbaggingisdoneatSilverGardensFamilyCare(El.227)

    Highschoolisatsameelevation.

    [email protected]

    Traveltimetooutofbankforpipingfailurefrombreachanalysisis52min.

    Overtopping21minutestoleavebank@JamesStreet

    Flowintownfor21hoursminimum(overtopping)

    TreatmentPlantismuchfurtherdownstreambutatElev.204. Nolossofatthissite(propertydamage).

    Pool429isapprox.equaltobankfullattailwaterof227.

    Everyyeariftheybuilda3tallsandbagbermthereisnootherflooding.

    *Conclusion232isfloodtailwaterofconcern.

    OPERATIONS

    42in.gateneverused,cycledonceperyear. Lasttimeoperated(Winter2009)hadtoreplacehydraulic

    cylinderinthecontrolbox. Ittook1weektohavethisrepaired. Thisistheonlywaytodewater. Inthe

    winterthiswillnotdrawdownthelake. IntheSummer,ittakesabout1daytodrawdownthelake.

    18in.gateisaregulatingline,adjustedforQ.

    INTERVENTION

    ******OPISSUE*****Accessonlyaccesstoembankmentsideisbyboat(orhelicopter). Therefore,

    thereisnoabilitytoplaceemergencymaterials. Therefore,cantstopapipeorbreach.

    Nointerventioncurrentlypossible.

    Currentlyittakes20to30minutesforacrewpersontogettothesite;ittakes10minutestogetthere

    fromtheCitycenter

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    37/88

    B4

    ResponseAndycallskeypersonwithcellphoneorradiotoactivateEOCCitymanager(1),Police

    chief(2),Policecaptain(3)andFireDepartment(4). Andywouldprovidearecommendationonaction

    totake.

    Ifbadenough,acoderedisgiven: automatedcallgoesouttopeopleonaCodeRedlist. TheCitypaysa

    companythatmaintainstheredcodelist;theCityhasanewsystem(EverbridgeCallSystem)butCode

    RedcompanywontprovidetheCitywithitslist. TheEverbridgesystemwillautomaticallycallall

    landlinesinSilverton. However,Cityresidentswontbecontactedoncellularphonesunlesstheysigned

    upfortheEverbridgecallsystem(eveniftheysigneduporiginallyfortheoldCodeRedsystem).

    EvacuationroutesareintheEAPbuttherehasbeennopopulationeducationonevacuation(nopublic

    meetings).

    PERFORMANCEHISTORY

    Firstfillingin1974,seepagewasobservedonNov.7,1974,whenthepoolwasat401.5,nextdaywater

    wasseenflowingoutthepipe(4intoedrain). Downstreamwetareasbroadenedattherightabutment

    throughthelandslidedepositmaterials;citycrewsinstalled3horizontalsurfacedrains. Seepagewas

    believedtobeoccurringupstreamoftheclayblanketbutaclaylayerforcedflowintothefilterand

    embankment.

    Nov.21,1974toNov.29,1974,11horizontaldrainswereinstalledtomonitorseepageratesanda

    downstreambermwasinstalled. Abilitytosolvetheproblemwasadverselyimpactedbynotbeingable

    togetaccessupstreamofthedam.

    August,1975 SeepagewasobservedbetweenStations3+00and3+60justabovethefilterand

    buttresslayer;itwasrecommendedtoaddadditionalfilterrock. Deteriorationofclayblanketwasalso

    observedtotherightofthespillwayentrancechannel. Weeklyobservationofblanketwas

    recommended. Fillerosionholeatupstreamendofspillway. Placegravelfiltermaterialon

    downstreamfaceofdam. Filteranddrainageblanketwasrecommendedandapparentlyinstalled. It

    alsoappearsthata12to15ftdeep,approx.3footwidecutofftrenchwasinstalledupstreamoftheright

    endoftheembankment.

    Nopiezometerdatabetween1975and1979.

    Piezometer#2droppedofffrom1975to1982. Thispiezometerisjusttotheleftofthespillwaywhere

    thecutofftrenchwasinstalled.

    Draindataisnottakenfrequentlyenoughtounderstandwhattheflowsarerespondingto.

    Seepageobservedatrighthandside100ftdownstreamofstillingpool.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    38/88

    B5

    June1981Inspection

    Poollevelwas424.4;normalpool.

    Nouncontrolledseepageobserved;seepageonlyobservedinthehorizontaldrains.

    Phreaticsurfacehasbeenestablished;primarilycontrolledbyseepagethroughrightabutmenttalus.

    Conclusionsafedam,blanketandcoretrenchworking.

    Recommendationtoreaddrains.

    1993ScottsMillsEarthquake

    EarthquakewaslargerthanOBE(operatingbaseearthquake)

    Sourcewas8milesfromproject.

    Mw=5.6

    Nodamage.

    1993InletStructureRepair

    2002InletGateRepair

    Mostlymaintenancework,newhydrauliclineslocatedinaconcretetrench.

    Between1981andFeb.2010noevidenceofseepagerelateddistress. Knownseepagequantitieshave

    beenmeasuredapproximatelyannually;seepagehasoccurredwhereyouwouldanticipateit. No

    evidenceofturbidseepage. Nosignsofslopemovement.

    UpstreamandDownstreamFlowIssues

    1. Lowspotsforflooding(SilverGardens)*****OPSISSUE*****closeproximity,awareness2. Flashyreservoir3. Landslidesupstreamofpoolindrainagebasincausesupstreamdamandsurge(littleorno

    warning)contributestoovertoppingfailuremodes.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    39/88

    B6

    BRAINSTORMINGPOTENTIALFAILUREMODES

    Step1Identifyfeatures,locationsandissuesoftheprojectforPFMsbasedon background

    informationandsitehistoryreviewandthesitevisit.

    Step2Ofthefeaturesidentifiedinstep1,identifywhichofthesehavePFMsofconcernassociated

    withthem.

    Step3DoublecheckthatallstandardGeotechinitiationmechanismshavebeenaccountedfor.

    Step4RankPFMsthatwearemostconcernedwithprovidingwarningsfor. Trytoaddressmost

    significant.

    DefinitionDocumentationreferstothearealeftofthespillwayastherightabutment. Weconsider

    thisareaasembankment. Theabutment(onrock/slide)istotherightofthespillway.

    Identificationofpotentialfailuremodesbasedonbrainstorming.

    Spillway

    1. Spillwayslabjacking(drainconcerns)normalflowconditions,erodiblematerial2. Spillwaysilldownstreamscouronleftsidenormalflowconditions,erodiblefoundationand

    concreteirregularityatthelocation

    3. Spillwaybasinscournormalflowconditions,nosurveydata,previousscour(isitonrock/seam?)

    4. Spillwayupstreamsillscournormalflowconditions,happenedbefore,clayblanketmaynotbefullypresent,canleadtoupliftofspillwayslab

    5. Spillwayrightupstreamwalljoint6. Spillwayrightdownstreamtrainingwalloffset/stabilitynormalflow,wallfalls,erosionand

    headcutting

    7. Spillwayleftdownstreamtrainingwalloffset/stability8. Spillwaytailwater/channelcapacityPMFconditions9. Spillwayfoundationseepage/stability/settlement(potentialfordifferentialsettlementdueto

    differentfoundationupstreamanddownstream)combinewithPFMs1,2,5and6

    10.DebrisblockagePMFconditions,havebumperbutnologboom;considerplacingboomupstreamofclayblanket.

    RightAbutment

    1. Surfacerunofferosionnormalflowconditions,noexitforwateronrightabutment,2. Abutmentseepage,Integrityofupstreamclayblanket,lowhydraulicgradient

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    40/88

    B7

    3. Inadequatetrainingofwateronrightabutment(upstreamofspillway)PMFflowconditions,abutmentscour.

    4. Lowspotadjacenttorightabutmentwall(groundappearstobearound438(438.5). Scourathighpools.Shallowembedmentofwall,losewall,thiscouldleadtoreleaseatpoollevelatEl.

    430*****OPSISSUE*******

    5. Landslidepresenceandcreepmovement.6. Seismicstability/liquefactionCornforthreport7. Seepageatrightwall,nocore,goingthroughlandslidedepositwithrockfragments,lowhead,

    lowgradient.

    FishLadder

    1. Spillwaydrainontherighthandsideoftheladder. Drainisapreferentialseepagepathwayalongsidethedrainthroughthegranularbackfillaroundthepipe;settlementhasbeen

    observed. Normalflowconditions,slowheadcut,lotsofwarningtime.

    2. Wallstabilitydifferentialmovementbetweenadjacentblocksobserved. Flowinladderislow.3. Ballmillingwithinthefishladderchambers(cobblesandbouldersobserved).LowQandvelocity

    offlow.******OPISSUE******

    4. Operabilityoffishladdergates.Ladderonly,nolifesafetyconsequences.*****OPISSUE*****

    Outlets/Conduit/Controls

    1. Reliabilityofhydrauliclinesandcontrols,includingsubmergedhydrauliccylinderonthegate.Happened

    before

    where

    the

    gate

    breaks,

    Normal

    flow,

    1

    in

    20

    chance

    of

    failure,

    no

    drawdown

    capabilities,stuckopen,drainpool,losedrinkingwatercapability,*******OPISSUE********

    2. Seepageonbothsidesoftheoutlet,aroundseepagecollars.Normalflowconditions*********must address********

    3. Conduitintegrityearthquakeloadingatjoints,internalerosion;foundedonbedrock,reinforced,castinplace,seepagecollars******OPISSUE*****

    4. Hydrauliccapacityoftheoutlets,200cfsismaxdischarge(operationatPMFcouldcreateproblemsifoperatingduringPMF.ContributingfactortootherPFMs(notaPFMonits

    own)*****OPISSUE*****

    5. Inabilitytoknowwhatthegatepositionis.ContributingfactortootherPFMs(notaPFMonitsown)********OP

    ISSUE********

    6. MisoperationofoutletvalvePMFconditionsdoesnotaddconsequencestoovertoppinginPMF*****OPISSUE*****(notaseparatePFM)

    7. Seismicinducedfailureoftheintaketowerfailureoftheintakedoesnotresultinovertoppingorreleasegreaterthandownstreamchannelcapacity.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    41/88

    B8

    Embankment

    1. StabilitystaticandEQ,1981reportand1999Cornforthreport,highfreeboard(notlikelytoloseduetodeformation)

    2. Foundationseepageandpipingseemat398,expectseepagebutnotpipingduetobedrockfoundation,noevidenceofinstability

    3. Corestability/overtopping heightofcoreabout5feetbelowcrest,analyzedinstability,testedfor40years.

    4. Filterzonesize,capacity,stabilityinEQ;designedfilter,historicallyperformed5. Overtopping(corelessthancrest)Lackofconsistentsurveyonverticalsettlementpotential

    lowspots.

    6. Embankmentseepageandpiping(11drainsthatflow,3drains/berm/75trench/blanket/2workingpiezometers) burrowinganimals,treesandvegetation******OPSISSUE*****

    LeftAbutment

    1. Seepageandpiping,stabilityofinterflowzoneatElev.398;stable,shouldntfailduetoseepageandstability,hasplasticfines(samematerialascore).

    2. Siltfoundationseepageandpiping,pipingatElev.398seamcausesinternalerosionofsilt,createsapipeinsiltanduncontrolledrelease

    ReviewGeotechnicalofInitiationMechanisms

    Ofthe28IMsforseepageandpiping,thefollowingIMsweredeemedapplicabletothisstructure(the

    othersdonotapply).

    IM1crossvalleydifferentialsettlementcredible,notsignificantbasedongoodperformance(no

    evidence)andmostlikelytobecontributingtoseepageandpipingfailuremechanismwhichiscovered

    elsewhere,uniformabutmentslopeoutlet#2.

    IM14corefoundation/abutmentcontactatrightabutmentpoorcompactionresultsinpossible

    seepageandpipingalongconduitOutlet#2PFM(coveredelsewhere).

    IM17seepageadjacenttoconduitcoveredunderoutlet#2PFM

    IM18featuresallowingseepageintoanonpressurizedconduitnotsignificantbecausemorelikelyto

    seepalongconduits

    IM19seepageadjacenttospillwayorabutmentwallallreadycoveredunderspillwayPFMs5,6,7

    IM20seepageduetocrackorgapadjacenttospillwayorabutmentwallallreadycoveredinspillway

    PFMs5,6,7

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    42/88

    B9

    IM22backwarderosionandpipingthroughacohesionlessfoundationnotcredible,havecoretrench

    thatcutsitoff

    IM27scouralongthecontactinbedrock

    Note=: ThePFMsweregivenapreliminaryratingregardingcredibilityandsignificance. Thefollowing

    abbreviationswereused: C&S=credibleandsignificant,C=credible,notsignificantandNC=not

    credible. TheresultsoftheevaluationsarelistedbelowfortheidentifiedPFMs.

    Spillway

    1. (C&S)Spillwayslabjacking(drainconcerns)normalflowconditions,erodiblematerial2. (C&S)Spillwaysilldownstreamscouronleftsidenormalflowconditions,erodible

    foundationandconcreteirregularityatthelocation

    3. (C&S)Spillwaybasinscournormalflowconditions,nosurveydata,previousscour(isitonrock/seam?)

    4. (C&S)Spillwayupstreamsillscournormalflowconditions,happenedbefore,clayblanketmaynotbefullypresent,canleadtoupliftofspillwayslab

    5. (C&S)Spillwayrightupstreamwalljoint6. (C&S)Spillwayrightdownstreamtrainingwalloffset/stabilitynormalflow,wallfalls,

    erosionandheadcutting

    7. (C&S)Spillwayleftdownstreamtrainingwalloffset/stability8. (C&S)Spillwaytailwater/channelcapacityPMFconditions9. Spillwayfoundationseepage/stability/settlement(potentialfordifferentialsettlementdue

    to

    different

    foundation

    upstream

    and

    downstream)

    combine

    with

    PFMs

    1,2,5

    and

    6

    10.(C&S)DebrisblockagePMFconditions,havebumperbutnologboom;considerplacingboomupstreamofclayblanket.

    RightAbutment

    1. (NC)Surfacerunofferosionnormalflowconditions,noexitforwateronrightabutment,2. (NC)Abutmentseepage,Integrityofupstreamclayblanket,lowhydraulicgradient3. (NC)Inadequatetrainingofwateronrightabutment(upstreamofspillway)PMFflow

    conditions,abutmentscour.

    4. (C&S)Lowspotadjacenttorightabutmentwall(groundappearstobearound438(438.5).Scourathighpools.Shallowembedmentofwall,losewall,thiscouldleadtoreleaseatpool

    levelatEl.430*****OPSISSUE*******

    5. (NC)Landslidepresenceandcreepmovement.6. (NC)Seismicstability/liquefactionCornforthreport7. (C)Seepageatrightwall,nocore,goingthroughlandslidedepositwithrockfragments,low

    head,lowgradient.

  • 8/6/2019 Silver Creek Dam Potential Failure Modes Analysis (PFMA)

    43/88

    B10

    FishLadder

    1. (C)Spillwaydrainontherighthandsideoftheladder. Drainisapreferentialseepagepathwayalongsidethedrainthroughthegranularbackfillaroundthepipe;settlementhasbeen

    observed. Normalflowconditions,slowheadcut,lotsofwarningtime.

    2. (C)Wallstabilitydifferentialmovementbetweenadjacentblocksobserved. Flowinladderislow.

    3. (C)Ballmillingwithinthefishladderchambers(cobblesandbouldersobserved).LowQandvelocityofflow.******OPISSUE******

    4. (C)Operabilityoffishladdergates.Ladderonly,nolifesafetyconsequences.*****OPISSUE*****

    Outlets/Conduit/Controls

    1. (C)Reliabilityofhydrauliclinesandcontrols,includingsubmergedhydrauliccylinderonthegate.Happenedbefore