SIL BEYOND A MES - glassmanevents.com · Mould per mould traceability! 19 Mould change reason...

23
SIL BEYOND A MES 1 Lyon,6-7 September 2017

Transcript of SIL BEYOND A MES - glassmanevents.com · Mould per mould traceability! 19 Mould change reason...

SIL BEYOND A MES

1

Lyon,6-7 September 2017

Manufacturing Execution System : SIL

2

Collect

Display

Extract

Exchange

Data

SIL configuration

3

General overview of your plant

4

CE workstation

At a glance the CE User monitors his Line!

5

HE workstation

6

The HE User sees CE events in real time

CE Inspection machines results at the HE

7

The HE Operator sees the defects in real time

CE Inspection machines results at the HE

8

HE sees in real time CE

defects from his

workstation.

Internal pressure

9

CE internal pressure view from the HE in SIL.

Thickness

10

At any time, thickness measurements are available for HE / CE.

[4]

[1]

Quality control results

The quality controls from the lab are available

on HE/CE Operator‘s workstation.

11

Real time Information

When a syst. Rejection starts at the CE,

a message is automatically sent to the HE workstation.

12

Corrective actions HE critical defect

Notepad: automatic or

manuals notes

13

When a critical defect occurs at the CE, a form is displayed to the

HE to start a corrective action & improve the process.

Syst. rejection started with SIL

HE losses from IS machines

14

IS Machine connected to SIL enables you to follow all your

downtimes with SIL from HE /CE workstation.

* Connected to the HE inspection machines, retrieve all results into SIL

Morning Meeting : at a glance

Events duration, HE losses, Mould changes, syst. rejects, Defects, Remarks

Morning Meeting : events

Hot End linked to the mould shop!

17

The history of your moulds starts

when you change them at the HE.

34

Dashboard in the mould shop!

18

Mould per mould traceability!

19

Mould change reason

Repair details : who, when, what…

Moulds availability

Nb Cuts per mould, per mould sets

Quality controls

Potential left

Link to the Hot End

34

Dashboards everywhere for Operators

20

Worst defect per cavity

Dashboards for Managers

21

Compare the performance

of one or several plants

from your office in the HQ ;)

At a glance, Worldwide KPI‘s

Real time information

Output comparison between the plants

22

23

Thank you for your attention,