SIAN S SIAN Scontenidos.ceoe.es/resources/image/presentacion_indonesia_3_201… · PERUMKA /...

19
INDONESIAN RAILWAYS INDONESIAN RAILWAYS DEVELOPMENT OF RAILWAY

Transcript of SIAN S SIAN Scontenidos.ceoe.es/resources/image/presentacion_indonesia_3_201… · PERUMKA /...

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    DEVELOPMENT OF RAILWAY

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    PERIODS STATUS

    1864The Inauguration of the first 26 km railway line between Kemijen andTanggung by The Dutch Colonial Government

    1864 1945

    Staat Spoorwegen (SS) / Staat Spoorwegen (SS)

    Verenigde Spoowegenbedriffj (VS) / Verenigde Spoorwegenbedrifj (VS)

    Deli Spoowegen Maatscappij (DSM) / Deli Spoowegen Maatscappij (DSM)

    1945 1950DKA / Liquidation into one Railway Institution by IndonesianGovernment (DKA)

    1950 1963 DKA RI / Establishment of Indonesian Railways Institution (DKA RI)

    1963 – 1971 PNKA / Alteration to Indonesian State Railways (PNKA)

    1971 1991 PJKA / Alteration to State Owned Company (PJKA)

    1991 1998 PERUMKA / Indonesian Railway Public Corporation

    1998 2010 PT Kereta Api (Persero) / State Owned Limited Liability Company

    RAILWAY HISTORY IN BRIEF

    2

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    1998PT Kereta Api (Persero) / State

    Owned Limited Liability Company

    1991PERUMKA / Indonesian Railway

    Public Corporation

    1971PJKA / Alteration to State Owned

    Company (PJKA)

    1963PNKA / Alteration to Indonesian

    State Railways (PNKA).

    THE JOURNEY OF PT KERETA API INDONESIA

    1950DKA RI / stablishment of

    Indonesian RailwaysInstitution (DKA RI)

    1945DKA / Liquidation into one Railway

    Institution by IndonesianGovernment (DKA)

    1864Staat Spoorwegen (SS) ,

    Verenigde Spoowegenbedriffj (VS)Deli Spoowegen Maatscappij (DSM)

    3

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    BOARD OF DIRECTORS

    4

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYSINDONESIAN RAILWAY NETWORK

    5579 stations

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    OPERATION

    1. Coal2. Containers3. Fuels4. Cement5. Bulk and Plantation Cargo6. General Cargo7. Small cargo Jawa & Sumatera8. Miscellaneous

    RAILWAY FREIGHT TRANSPORT

    6

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    PERFORMANCE OF INDONESIAN RAILWAYS

    7

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    ROLLING STOCKS

    8

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    DAILY PASSENGER2012 – 466,500

    GREATER JAKARTA RAPID TRANSIT IMPROVEMENT PLAN

    DAILY PASSENGER2019 – 1,237,080

    9

    EMU Transformation

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    STATIONSTATION

    MOTOR BIKEPARKING

    (NORTH) = 378

    CARPARKING

    (NORTH) 56

    FOODCOURT

    ATMCENTER

    CARPARKING

    (SOUTH) = 82

    MOTOR BIKEPARKING

    (SOUTH) = 229

    PLATFORM UNDERPASS

    U

    SUDIMARA STATION DESIGN

    GREATER JAKARTA RAPID TRANSIT IMPROVEMENT PLAN

    10

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    Soekarno Hatta airport link via Tangerang :a. New 6.5km track from Tanah Tinggi

    Airportb. Alignment of trains in Tanah Tinggi railway

    yardc. Expansion of Tanah Tinggi and Batu Ceper

    Stations

    SOEKARNO HATTA AIRPORT RAILWAY PLAN

    11

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    Airport Railway Terminal

    (City Air Terminal at Medan Staion)

    Kualanamu airport link :a. New 5km track from Araskabu –

    Kualanamub. Alignment of trains in Medan railway yardc. Construction of City Air Terminal at

    Medan Stationd. Expansion of Train Depot and Workshop

    at Pulo Brayan

    KUALANAMU AIRPORT RAILWAY

    12

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    AIRPORT RAILINK SERVICES

    13

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    FREIGHTS DEVELOPMENT IN JAVA

    NO COMMODITY VOLUME

    1 CONTAINERS 6.634.080

    2 CEMENT 1.358.640

    3 FERTILIZER 1.272.960

    4 COAL 489.600

    TOTAL 9.755.280

    14

    The high demand of the customers or thecandidates for logistics service usingcontainers in North Java.The working process of Double Track inJava.The investment of 100 Units of CC 206Locomotives and 1,200 units Flat Wagons(capacity = 42 tons) in 2013CC 206 Locomotive could carry up to 40

    flat wagons (capacity = 42 tons)

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    Coal Transport TargetYear 2015 : 42,4 Million Tons per annum

    SOUTH SUMATERA COAL TRANSPORT EXPANSION PLAN

    15

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    Hotel plan at Jalan Lengkong Besar No. 8, Bandung

    PROPERTY ASSETS DEVELOPMENT THROUGH COOPERATION WITHCOUNTERPART

    16

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    PROPERTY ASSETS DEVELOPMENT THROUGH COOPERATION WITHSUBSIDIARIES

    17

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    PROPERTY ASSETS DEVELOPMENT THROUGH INVESTMENTS

    Hotel Plan at Jalan Cihampelas No. 91, Bandung 18

  • INDONESIAN RAILWAYS INDONESIAN RAILWAYS

    T H A N K Y O U