Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE...
Transcript of Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE...
![Page 1: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017](https://reader034.fdocuments.in/reader034/viewer/2022043004/5f883fe6c4535b43c46c3df0/html5/thumbnails/1.jpg)
PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus
DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDecember 22, 2017
Southern Blvd.
B Ro
ad
Building 1
Exis ng Parking
Exis ng Loop Road
Exis ng Main Entrance
Si A i lSite AerialSit A i l
![Page 2: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017](https://reader034.fdocuments.in/reader034/viewer/2022043004/5f883fe6c4535b43c46c3df0/html5/thumbnails/2.jpg)
PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus
DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDecember 22, 2017
Design of Campus Overfl ow Parking Area (Including associated Landscape Design & Electrical Site Ligh ng - Supplemental)
Southern Blvd.
Design of Parking Area Expansion Lot(with Civil, Landscape and Ligh ng Design)
D&MST Bldg /Site Development
Basic Services
Design of Campus Loop Road Connec on(Including associated Landscape Design)Electrical Site Ligh ng - Supplemental)
Exclusions:Site Survey (Tree, Topographic and Boundary)Ground Penetra ng Radar and U lity SurveysSoil Borings, Percola on Tests and Geotechnical EngineeringSite Tests - Fire Hydrant Water Service FlowsUSGBC - Registra on and Cer fi ca on FeesTraffi c Signaliza on and Intersec on DesignThreshold Inspec onsFood Service DesignDental & Medical Equipment Systems DesignSpecialty Ligh ng Exterior DesignSite Plan Approval ProcessTransporta on AnalysisAccelerated Break Out Packages / Phasing
B Ro
ad
Design of new Dental & Medical Services Technology Building and required connec- on to Exis ng Phase 1 Building
No Environmental Impact An cipated or Included
Note:Current Site Aerial Image with Site En lement Plan shown for clarity.
Building 1
Exis ng Parking
Exis ng Loop Road
Exis ng Main Entrance
P li i P j g Diagramct ScopinPreliminary ProjecPreliminary ProjecPreliminary Projecct ScopP li i P j ct Scop
![Page 3: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017](https://reader034.fdocuments.in/reader034/viewer/2022043004/5f883fe6c4535b43c46c3df0/html5/thumbnails/3.jpg)
December 22, 2017
Preell iimmmmmmmiiinary PProjjeeeecccccctt SSSSSScccccccccchhhhheeeeeeeddddddulle
PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus
DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENT