SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI...
-
Upload
sandra-dennis -
Category
Documents
-
view
215 -
download
0
Transcript of SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI...
![Page 1: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/1.jpg)
SHOWCASING THE STATUS OF ROADS IN NAIROBI
PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2nd AUGUST, 2012
By: Eng. M. S. M. KAMAU, CBS, HSC
Permanent SecretaryMinistry of Roads
![Page 2: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/2.jpg)
![Page 3: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/3.jpg)
OUTLINE OF THE PRESENTATIONOUTLINE OF THE PRESENTATION
Introduction Ongoing Road Projects in Nairobi Planned Road projects in Nairobi Private Sector Participation in Development of Road
Infrastructure Opportunities for Private sector Participation Way Forward
![Page 4: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/4.jpg)
1.0 INTRODUCTION1.0 INTRODUCTION Economic pillar of the Vision 2030 is founded on road
transport infrastructure as an enabler.
Connectivity through a network of roads, railways, ports, airports, water and sanitation facilities, and telecommunications.
How does RSIP affect the operations of Nairobi Business Park and the entire business environment?
![Page 5: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/5.jpg)
1.0 INTRODUCTION1.0 INTRODUCTION
Vision 2030
Economic PillarSocial Pillar
Political Pillar
Sound Infrastructur
e
RoadsICT Ports and Harbours
Railways
EnergyTransport Telecommunications
Water & Sanitation
Airports
ICT Public sector
Reforms
Macro-economic Stability Security
Land Use
Reforms
Energy Human Resources Investme
nt
![Page 6: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/6.jpg)
1.1 Role of Road Transport in Business Development
Efficient Road Transport vital for Business Mobility and access for people and goods Public Transport Linkages with other modes of transport Stimulate development of new undeveloped areas
1.0 INTRODUCTION1.0 INTRODUCTION
![Page 7: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/7.jpg)
1.2 Challenges to Efficient Road Transport
Traffic congestion Low capacity of existing Roads Inefficient Junction designs Increased demand Low levels of Investment in roads Poor spatial planning Encroachment on Road reserves Unregulated public transport
1.0 INTRODUCTION1.0 INTRODUCTION
![Page 8: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/8.jpg)
1.3 Ministry’s Approach to the Challenges Proper maintenance of existing roads Expansion of existing Roads Opening and Construction of Missing Link Roads Construction of Bypasses Introduction of Bus Rapid Transit (BRT) Systems Proper coordination of land use Traffic management measures Demarcation and Protection of road reserves Private sector participation in infrastructure development
and Maintenance
1.0 INTRODUCTION1.0 INTRODUCTION
![Page 9: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/9.jpg)
NAIROBI MISSING LINKSNAIROBI MISSING LINKS
![Page 10: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/10.jpg)
NAIROBI BYPASSES MAPNAIROBI BYPASSES MAP
2. NAIROBI EASTERN AND NORTHERN BYPASS
![Page 11: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/11.jpg)
ONGOING PROJECTS ONGOING PROJECTS
![Page 12: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/12.jpg)
1.1. THIKA ROAD PROJECTTHIKA ROAD PROJECT Financed by the African Development Bank and GoK. To ease congestion on the busy Nairobi – Thika corridor. Substantially complete Major challenges:
-Road safety-Driver/ Road user education necessary-Relocation of services-Encroachment on road reserve/Land acquisition
![Page 13: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/13.jpg)
2. NAIROBI EASTERN &NORTHERN BYPASS2. NAIROBI EASTERN &NORTHERN BYPASS
Financed by GoK and Chinese Government
Channel traffic away from the city centre
Eastern Bypass connects the busy Mombasa Road to Thika-Road
Northern bypass connects Thika Road to Ruaka area and will eventually connect to Nairobi – Nakuru Highway.
![Page 14: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/14.jpg)
PROJECTS ONGOINGPROJECTS ONGOING
2. NAIROBI EASTERN AND NORTHERN BYPASS
NK 0+000 - Start
EK 0+000 - Start
![Page 15: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/15.jpg)
2.2 2.2 Nairobi Eastern and Northern Bypass Nairobi Eastern and Northern Bypass
Outering Road Overpass Bridge (Km 1+000) Eastern Bypass
Dual Carriageway + Footpaths (KM 1+400 – KM 4+400) Eastern Bypass
![Page 16: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/16.jpg)
3. NAIROBI WESTERN RING ROADS3. NAIROBI WESTERN RING ROADS Part of the Missing Link Roads In Nairobi. Funded by the Government of Japan through a Grant of Kshs 1.9
Billion . Part of the missing link roads in Nairobi. Construction commenced in June 2011. Expected completion in March 2013 Connect:
-Ngong Road to James Gichuru through Kileleshwa-Gitanga Road to Waiyaki way through Kileleshwa
![Page 17: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/17.jpg)
![Page 18: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/18.jpg)
4. 4. UPGRADING OF LANGATA ROADUPGRADING OF LANGATA ROAD
Financed by the Government of Kenya Upgrading to two lane dual carriage Contract Sum Kshs 2,671,000,000.00 Underpass at Bomas Junction Pedestrian walkways and cycle tracks for cyclists Box culvert Other drainage works Completion by May 2013
![Page 19: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/19.jpg)
\\
![Page 20: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/20.jpg)
5. NAIROBI SOUTHERN BYPASS5. NAIROBI SOUTHERN BYPASS
Financed by the Chinese Government and the Government of Kenya
Contract sum Ksh.17,199,793,766.00 Separate grade intersections at Mombasa, Langata, Ngong and Kikuyu roads Commenced 2nd July, 2012 Contract period is expected to be 36 months Expected completion by July 2015
![Page 21: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/21.jpg)
5. NAIROBI SOUTHERN BYPASS5. NAIROBI SOUTHERN BYPASSScope Of Works:
Construction of dual carriageway with a length of 28.6 kilometres
12 kilometre slip roads 8.5 kilometre service roads An extra 8 kilometre service roads whose location shall be
decided by the employer Three full interchanges at Bypass intersection with
Mombasa, Langata and Ngong roads Fly-overs (partial interchanges) at Community, Thogoto
and Dagoretti roads. Street lighting installation on the whole road
![Page 22: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/22.jpg)
Interchange configuration on southern Bypass /Ngong Road JunctionInterchange configuration on southern Bypass /Ngong Road Junction
Ngong RoadSouthern Bypass Road
Ngong
Nairobi
Kikuyu
Langata
![Page 23: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/23.jpg)
6. NON- MOTORIZED TRAFFIC FACILITIES 6. NON- MOTORIZED TRAFFIC FACILITIES
Statistics have shown that over 47% of Nairobi Residents walk to and from work.
Non-motorized traffic facilities have been integrated into the designs of all road projects.
NMT facilities include:-Walkways-Cycle Tracks -Foot Bridges
These also help to improve on road safety.
![Page 24: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/24.jpg)
Cycle Track
Walkway
![Page 25: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/25.jpg)
7. UPPER HILL ROADS7. UPPER HILL ROADS
Financed by Government of Kenya
Implementation in two phases:
-Phase 1: Currently under construction-Phase II: Currently under Design
![Page 26: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/26.jpg)
7.1 UPPER HILL ROADS: Phase I7.1 UPPER HILL ROADS: Phase I
Involves expansion of the existing roads by either dualling or widening of the lanes
Financed by the Government of Kenya
Contract Sum : Kshs Kshs.2,002,892,599.00
Commenced on 22nd May 2012
Expected Completion: 22nd May 2014
![Page 27: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/27.jpg)
7.2 UPPER HILL ROADS: Phase I7.2 UPPER HILL ROADS: Phase I The roads to be dualled are:
-Part of Hospital Road-Elgon Road-Kilimanjaro road-Upper Hill road -Bunyala road
![Page 28: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/28.jpg)
8. OTHER ONGOING ROAD PROJECTS 8. OTHER ONGOING ROAD PROJECTS NO. PROJECT FUNDING START DATE COMPLETION DATE
1 Upgrading of Eastleigh Roads
GoK 13th March, 2012.
24th May 2013
2 Rehabilitation of South C Roads
GoK 4th Dec, 2012 2nd Dec, 2013
3 Upgrading of Syokimau – Katani Road
GoK 4th Dec, 2012 4th Dec, 2013
4 Upgrading of Kasarani-Mwiki-Githurai Link Road (Phase I)
GoK 19th Feb, 2012 20th Oct, 2013
![Page 29: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/29.jpg)
8. 8. OTHER ONGOING ROAD PROJECTS OTHER ONGOING ROAD PROJECTS
The project for the improvement of Eastliegh roads cover the following roads with a total of 2.1km:
-2nd Avenue Eastleigh-15th Street and adjoining streets.
2nd Avenue Eastleigh and 15th Street link Juja Road to 1st Avenue Eastleigh.
![Page 30: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/30.jpg)
8. OTHER ONGOING ROAD PROJECTS8. OTHER ONGOING ROAD PROJECTS The scope of works include:
-Drainage Works-Construction of Footpaths-Construction of Bus-bays -Reconstruction of the carriageway-Junction Repairs
-Road furniture
The project commenced on 13th March, 2012 and is expected to be completed by 24th May 2013
![Page 31: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/31.jpg)
PLANNED PROJECTSPLANNED PROJECTS
![Page 32: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/32.jpg)
1. PHASE II: ADAMS ARCADE – KAREN – 1. PHASE II: ADAMS ARCADE – KAREN – NGONG - BOMASNGONG - BOMAS Negotiations ongoing for Funding by Chinese Government
Upgrading 30km to Dual Carriage standards
Estimated cost Kshs 15 Billion
Separate Grade intersections at Dagoretti corner, Junction with Southern Bypass and Karen Shopping Centre
![Page 33: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/33.jpg)
2. PHASE II: ADAMS ARCADE – KAREN – 2. PHASE II: ADAMS ARCADE – KAREN – NGONG – BOMAS (Cont’d)NGONG – BOMAS (Cont’d)
Dualling to four (4) Lanes Provision of service roads Provision for Walkways and cycle tracks Footbridges at selected points Detailed Engineering designs will be completed by end of
August 2012 Expected to commence in early 2013 with a contract
period of 36 Months Expected completion by early 2016
![Page 34: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/34.jpg)
3. Dualling of Outer Ring Road3. Dualling of Outer Ring Road
Financing Agreement signed with African development Bank for Kshs 3.5 Billion
Estimated cost Kshs 6.0 Billion
Negotiations ongoing for additional funding
Detailed Engineering designs completed
Expected to commence in early 2013 with a contract period of 36 Months
![Page 35: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/35.jpg)
4. EU Funded Missing Link Roads4. EU Funded Missing Link Roads
Financing Agreement signed with European Delegation to Kenya
Estimated cost Kshs 3.5 Billion (€ 32.5 Million) Total of 13.6km of Missing Link Roads and 11.7 km of Non-
motorized Traffic facilities Detailed Engineering designs completed Expected to commence in January 2013 with a contract
period of 36 Months Expected Completion by January 2015
![Page 36: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/36.jpg)
3. EU Funded Missing Link 3. EU Funded Missing Link RoadsRoads
MISSING LINK No
NAME LENGTH (KM)
Missing Link Roads M-1 Accra Road to Ngara Road 0.7M-5 (Muratina St) General Waruingi St to Juja Road 3.0
M-10 Likoni Road Extension): Enterprise Road to Mombasa 1.8
M-15a Ring Road Parkland (Westlands Roundabout – Limuru Road)
4.0
M-15b Ring Road Parkland Extension: (Limuru Road to Thika road)
1.6
M-16
Quarry Road Extension: (Ladhies Road to Quarry Road)
2.5
Total 13.6km
![Page 37: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/37.jpg)
3. EU Funded Missing Link Roads3. EU Funded Missing Link RoadsMISSING LINK No
NAME LENGTH (KM)
Non- Motorized Transport Routes
MISSING LINK No
NAME LENGTH (KM)
NMT-16 Footpaths and cycle tracks on Jogoo Road 4.0
NMT-17
Footpaths and cycle tracks on Lusaka Road
5.2
NMT-18 Footpaths and cycle tracks on Rabai Road 2.5
Total 11.7km
![Page 38: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/38.jpg)
5. Nairobi Urban Transport Improvement Project5. Nairobi Urban Transport Improvement Project
Financing Agreement signed with the World Bank
Comprised of Six Components:-JKIA – Museum Hill - Rironi Road-Bus Rapid Transit for Nairobi BRT (Consultancy)-Traffic Management Systems for Nairobi-Mombasa Urban Transport Master Plan-Light Rail transit for Nairobi-Capacity Building Component
![Page 39: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/39.jpg)
5. Nairobi Urban Transport Improvement Project5. Nairobi Urban Transport Improvement Project
BRT Corridors-Haile Selassie – Ring Road Pumwani Junction-Ring Road Ngara-Juja Road -Komarock Road to junction with Kangundo road-Outering Road from Kangundo Road Junction to -Komarock Road Junction
![Page 40: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/40.jpg)
Juja Road
Outer Ring Road
Kangundo Road
Jogoo Road
Manyanja Road
Msa Road
Njiru
NCBD
![Page 41: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/41.jpg)
6. GREATER EASTERN BYPASS6. GREATER EASTERN BYPASS
- To connect Mombasa Road (A109) at Lukenya Hills to Garissa Road (A2) at Kilimambogo.
- Detailed engineering designs are ongoing.
7. GREATER SOUTHERN BYPASS7. GREATER SOUTHERN BYPASS
- To connect Mombasa Road (A109) at Athi River to Narok Road (B3) at Suswa.
- Currently at planning Stage.
![Page 42: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/42.jpg)
PRIVATE SECTOR PARTICIPATION IN PRIVATE SECTOR PARTICIPATION IN ROAD INFRASTRUCTURE ROAD INFRASTRUCTURE
DEVELOPMENTDEVELOPMENT
![Page 43: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/43.jpg)
1. Funding Models for Road Infrastructure1. Funding Models for Road Infrastructure
Entire Government funding
Entire Private sector funding (PPP)
Joint funding by both Government and Private sector.
![Page 44: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/44.jpg)
2. OPPORTUNITIES FOR PRIVATE SECTOR 2. OPPORTUNITIES FOR PRIVATE SECTOR PARTICIPATIONPARTICIPATION
Road maintenance
New Road development
Public Transport (Bus Rapid Transit Systems - BRT)
Toll Roads construction
Toll Bridge construction
![Page 45: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/45.jpg)
WAY FORWARDWAY FORWARD1. Enhance investment in Road infrastructure 2. Proper maintenance of existing roads3. Promote Safety in our roads4. Encourage private sector participation in Infrastructure
financing and development5. Improve Public Transport6. Enhance good governance in Management of Roads.7. Protection of Road Reserves8. Proper coordination with other agencies with regard to
demarcation and protection of road corridors
![Page 46: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng.](https://reader035.fdocuments.in/reader035/viewer/2022062423/5697c0201a28abf838cd2207/html5/thumbnails/46.jpg)
Thank You!Thank You!