TAPE & REEL SEAL TAPE QUALITY GREEN BELT PROJECT: NLR-GB-J1302 DIVISION: NLR-THERMISTORS PLANT: BERMUDEZ I OSWALDO ALVAREZ – QUALITY ENGINEER

Transcript of Short Version - Green Belt - Oswaldo Alvarez - Certification Project

Page 1: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

TAPE & REEL SEAL TAPE QUALITY

GREEN BELT PROJECT: NLR-GB-J1302DIVISION: NLR-THERMISTORS

PLANT: BERMUDEZ IOSWALDO ALVAREZ – QUALITY ENGINEER

Page 2: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

INITIAL SITUATION & OBJECTIVE

INITIAL• LOOSE TAPE – 3,611

PPMS.• COST TO COMPANY

25,292

OBJECTIVE• GOAL: 2000 PPMS.• STRETCH GOAL: 1000

PPMS

Page 3: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

IMPACTED AREAS• TAPE AND REEL STATION – NEW SET-UP PARAMETERS• PRODUCTION – LESS RE-WORKS• MAINTENANCE – LESS MAINTENANCE CARDS• QUALITY – LESS LOTS• MATERIALS – CARRIER TAPE AND COVER TAPE USAGE• MACHINERY – NO INVESTMENT ON NEW EQUIPMENT

Page 4: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

CURRENT SITUATION AFTER IMPROVEMENTS

Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-140

2000

4000

6000

8000

10000

4653

9279

36662029

3951

883

2941 28591900

946

PPMS for loose tape

Result Goal

Page 5: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

GREEN BELT TOOLS USED• PROCESS MAP• FISHBONE DIAGRAM• XY DIAGRAM• MSA – RR• CPK• MULTIVARI• BOXPLOTS• INTERACTION PLOT• RESIDUALS• CUBE PLOT• OPTIMIZATION PLOT• CONTROL PLAN

• COMPLETE DOE: HIT TARGET FULL FACTORIAL DATA COLLECTION ANALIZE DRAW SOLUTION REPLICATE/VALIDATE IMPLEMENT SOLUTION

Page 6: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

OTHER POSSIBLE PROJECTS IDENTIFIED

• ELECTRICAL TEST IN OIL BATHS, WE HAVE CURRENTLY SOME ESCAPES AND THE PROCESS IS TEDIOUS AND MONOTONOUS.

• COATING FOR THERMISTOR, WE HAVE A HIGH PPM ON COSMETIC DEFECTS AND THE CURRENT COATING PROCESS HAS NO IMPROVEMENTS SINCE IMPLEMENTATION ON THE 90’S.

• INKING FOR FILM PRODUCTS, THE MIXTURE AND APPLICATION OF INK FOR RESISTIVE VALUE HAS A LOT OF PARAMETERS TO CONTROL AND WE CURRENTLY HAVE HIGH SCRAP IN THIS AREA.

• MARKING FOR WIRE WOUND LVR PRODUCT, WE CURRENTLY HAVE HIGH PPMS DUE TO DEFECTIVE OR MISSING STAMP ON THESE COMPONENTS

Page 7: Short Version - Green Belt - Oswaldo Alvarez - Certification Project

FINAL COMMENTS AND EXPERIENCES

• ANALYSIS OF VARIATION (MULTIVARI)• INTERACTION PLOT (INTERACTION BETWEEN PARAMETERS)• BOXPLOTS (COMPARISON BETWEEN RESULTS OF SET-UPS)• THE WHOLE THING WITH THE DOE AND THE OPTIMIZATION PLOT