Short Run SPC ASQ Portland Section 0607

21
Short Run SPC ASQ Portland Section 0607 By Ed Landauer, C.Q.E., P.E. November 13, 2012

description

Short Run SPC ASQ Portland Section 0607. By Ed Landauer, C.Q.E., P.E. November 13, 2012. Short Run SPC. What it is What it isn’t SPC is not intended to be a substitute for inspection and testing Programs such as JIT make Short Run SPC more common. What Constitutes a Short Run?. - PowerPoint PPT Presentation

Transcript of Short Run SPC ASQ Portland Section 0607

Page 1: Short Run SPC ASQ Portland Section 0607

Short Run SPC

ASQ Portland Section 0607

By Ed Landauer, C.Q.E., P.E. November 13, 2012

Page 2: Short Run SPC ASQ Portland Section 0607

Short Run SPCWhat it isWhat it isn’tSPC is not intended to be a

substitute for inspection and testingPrograms such as JIT make Short

Run SPC more common

Page 3: Short Run SPC ASQ Portland Section 0607

What Constitutes a Short Run?A run of 25 parts?A run of 100 parts?A run of 1000 parts?A run of 50,000 parts?A single part?

Page 4: Short Run SPC ASQ Portland Section 0607

General Categories of Short RunsNot enough parts in a single production run

to develop or maintain control limits on the process

Process cycles are so short that production runs are over before sufficient data can be gathered

Many different parts are made for many different customers

Examples

Page 5: Short Run SPC ASQ Portland Section 0607

Example: CNC MachineExtremely complex machineHas dozens of different toolsThat produce hundreds of different

partsWith thousands of characteristics

Page 6: Short Run SPC ASQ Portland Section 0607

Example: CNC Machine- Generic Operations

Select a tool

Position a tool

Rotate a tool

Move the part

Remove the metal

Page 7: Short Run SPC ASQ Portland Section 0607

Example: CNC MachineNearly all problems encountered

after the initial set-up involve the ability of the machine to position the tool precisely

For example, the location of a single hole provides information on the location of the tool in both the x and y directions

Page 8: Short Run SPC ASQ Portland Section 0607

Sample Set of DataTwelve subgroups- 3 observations per

subgroup 5.0037 5.0009 4.9973 5.9974 6.0021

5.9981 5.0015 5.0023 5.0029 5.9990 5.9983

6.0018 4.9989 4.9981 4.9985 6.0015 5.9977

6.0023

7.0014 6.9991 7.0003 6.0031 5.9987 5.9987

7.0009 6.9979 6.9975 5.9985 6.0011 6.0021

6.9979 6.9995 7.0021 6.0017 6.0021 6.0001

Page 9: Short Run SPC ASQ Portland Section 0607
Page 10: Short Run SPC ASQ Portland Section 0607

Method 1: Target Average and Range ChartsSubtract nominal (or target) value

from the actual measurementsx* = x - nominal

Can plot several parts from a given process on a single chart

Can plot several features from a single part on a single chart

Page 11: Short Run SPC ASQ Portland Section 0607

Method 1: RestrictionsNominal (or target) values must be

close to each other with the same tolerance

Or the most restrictive tolerance must be used for all

Page 12: Short Run SPC ASQ Portland Section 0607

Method 1: Control Limits• Calculate averages and ranges of the deviations from target

• Control limit formulas are the same as for traditional control charts

Page 13: Short Run SPC ASQ Portland Section 0607
Page 14: Short Run SPC ASQ Portland Section 0607

Method 2: Standardized Variables Control Charts

Good for recurring families of partsThey are independent of the unit of

measureThey are scaled so that different

characteristics can be plotted on the same chart

They are “true” process control charts

Page 15: Short Run SPC ASQ Portland Section 0607

Method 2: CalculationsUse the normalizing transformations

Need to use historical averages from previous data in the calculations

Page 16: Short Run SPC ASQ Portland Section 0607

Method 2: Control LimitsX-bar Chart -A2 and A2

R chart D3 and D4

Page 17: Short Run SPC ASQ Portland Section 0607

Short Run Attribute Chart- c-chartJob shop welding processProduces small quantities of single

order only partsOperation always involves joining

parts of similar material and sizeCan plot chart of weld imperfections

per 100 inches of weld

Page 18: Short Run SPC ASQ Portland Section 0607

Short Run Attribute Chart- p-chartJob shop welding processSimilar operation to previous slidePlot chart of the number of weld

imperfections per total welds per 100 inches of weld

Page 19: Short Run SPC ASQ Portland Section 0607

SummaryOnly minor change in mechanics to

move from traditional SPC to Short Run SPC

The biggest difference in the perception of Statistical Process Control rather than Statistical Product Control

Page 20: Short Run SPC ASQ Portland Section 0607

Questions?

Page 21: Short Run SPC ASQ Portland Section 0607

Thank You!

[email protected]