Shipyard Layout

Page 2: Shipyard Layout

BigBig

Page 3: Shipyard Layout

BiggerBigger

Page 4: Shipyard Layout

BiggestBiggest

Page 5: Shipyard Layout

Manufacturing Processes

Page 6: Shipyard Layout

Design Phase for 49’ BUSL Project 25 boats in 3 years Concept was

already proven and prototyped

Production drawings were created

LLTM was purchased

Page 7: Shipyard Layout

Pre-Fabrication Build Mocks, Jigs,

and Fixtures. Cut out Plate

Page 8: Shipyard Layout

Pre-Fabrication

Cut out Plate Assemble Bulkheads

Page 9: Shipyard Layout

Build Shell On Mock Inverted

Construction

Page 10: Shipyard Layout

Weld pre-fabricated components to shell.Install piping

Structural Outfit

Page 11: Shipyard Layout

Blast/ Paint/ Righten Boat shell is

blasted and painted before being flipped over.

No more welding from this point on.

Page 12: Shipyard Layout

Rough outs/ Install Deckhouse Install Aluminum

Pilothouse. Install

Pilothouse equipment.

Page 13: Shipyard Layout

Install MachineryBolt on machinery into foundations.No connections, yet.

Page 14: Shipyard Layout

Machinery ConnectionConnect all machinery.Avoids people climbing over each other

to install and hook-up.Critical alignments can be done once.

Page 15: Shipyard Layout

Electrical InstallationsOnly Electricians and Electronics

Technicians on the Boat at this time.

Page 16: Shipyard Layout

Final Paint

Page 17: Shipyard Layout

LaunchFinal Machinery test on dockDrop in water for sea trialsDeliver quality CG asset on time and