Sheridan Road Improvement Project

16
Public Works EVANSTON ILLINOIS September 5, 2014 Sheridan Road Improvement Project Sat Nagar, P.E. Assistant Director of Engineering and Infrastructure

description

Overview presentation on the Sheridan Road Improvement Project.

Transcript of Sheridan Road Improvement Project

Page 1: Sheridan Road Improvement Project

Public Works

EVANSTON

ILLINOIS

September 5, 2014

Sheridan Road Improvement Project

Sat Nagar, P.E. Assistant Director of Engineering and Infrastructure

Page 2: Sheridan Road Improvement Project

Public Works

SHERIDAN ROAD

• Limits

- Chicago Avenue to Isabella Street

• Scope

- Resurfacing, Water Main, Bike Lane, Sustainable Parkway

• Budget

- TBD based on alternate selected

• Next Steps

- Hold Community Meeting for northeast Evanston September

2014

- Historical Preservation Review September 2014

- NU to coordinate student comments Sept 2014

- Finalize Alternate Selection October 2014

- IDOT Approval Winter 2014

- Construction Summer 2015

Note: If consensus is not reached on alternate by mid October the project will be

moved to 2017.

Page 3: Sheridan Road Improvement Project

Public Works

SHERIDAN ROAD

BY THE NUMBERS

2

Page 4: Sheridan Road Improvement Project

Public Works

SHERIDAN ROAD

BY THE NUMBERS

3

Page 5: Sheridan Road Improvement Project

Public Works

COMMUNITY INVOLVEMENT

MAY 29, 2014 1ST STEERING COMMITTEE MEETING

JUNE 3, 2014 1st WARD MEETING

JULY 10, 2014 2ND STEERING COMMITTEE MEETING

JULY 14, 2014 A&PW PRESENTATION

JULY 19, 2014 CORRIDOR BIKE RIDE

JULY 19, 2014 PUBLIC INFORMATION MEETING

AUG. 4, 2014 3RD STEERING COMMITTEE MEETING

4

Page 6: Sheridan Road Improvement Project

Public Works

LANE ANALYSIS

EXISTING PROPOSED

5

Page 7: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

OPTION A - SPLIT CYCLE TRACK

3 LANES - NW PLACE TO CENTRAL ST

4 LANES – CHICAGO AVE TO FOSTER ST

EXISTING – 44’

W W

54’

6

Page 8: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

OPTION A - SPLIT CYCLE TRACK

PROS:

• Cyclists are protected/buffered from traffic

• Cyclists positioned with traffic

(less complex at intersections)

• High level bus stop designs with minimal impacts

• Easier transition at Chicago/Sheridan

• No transition required at Central St

CONS:

• Potentially impacted trees (10-20)

• Southbound cyclists along campus may ride

sidewalk

7

Page 9: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

OPTION B - SPLIT CYCLE TRACK W/ MEANDERING

3 LANES – NW PLACE TO CENTRAL ST

4 LANES – CHICAGO AVE TO FOSTER ST

EXISTING – 44’

W

48’

8

Page 10: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

OPTION B - SPLIT CYCLE TRACK W/ MEANDERING

PROS:

• Cyclists are protected/buffered from traffic

• Cyclists positioned with traffic

(less complex at intersections)

• High level bus stop designs with minimal impacts

• Easier transition at Chicago/Sheridan

• No transition required at Central St

• Potentially impacted trees (5-10)

CONS:

• Southbound cyclists along campus may ride

sidewalk

• Cycle track immediately adjacent to sidewalk

9

Page 11: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

OPTION C - EAST SIDE TWO WAY CYCLE TRACK

3 LANES – NW TO CENTRAL ST

4 LANES – CHICAGO AVE TO FOSTER ST

TRAVEL LANES SHIFTS WEST

52’

W

EXISTING – 44’

W

10

Page 12: Sheridan Road Improvement Project

Public Works

SHERIDAN RD - CHICAGO TO CENTRAL

EAST SIDE TWO WAY CYCLE TRACK

PROS:

• Cyclists are protected/buffered from traffic

• More attractive to cyclists along campus

CONS:

• Potentially impacted trees (5-15)

• Southbound through bike trips likely to remain on road or

sidewalk

• Chicago / Sheridan Transition very difficult

• Second transition required at Central St

• High Level Bus Stop Designs becomes difficult

• Southbound cyclists ride facing oncoming traffic

• Complex intersections

• Increased conflicts for vehicles turning across cycle track

• Travel lanes shift west; complexity and cost increase due

to lane shift

11

Page 13: Sheridan Road Improvement Project

Public Works

4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK)

4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING

SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK

SHERIDAN ROAD

Page 14: Sheridan Road Improvement Project

Public Works

SHERIDAN ROAD

Page 15: Sheridan Road Improvement Project

Public Works

4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK)

4 LANES – CHICAGO AVE. TO NORTHWESTERN PL. (SPLIT CYCLE TRACK) MEANDERING

SHERIDAN RD. EAST SIDE TW-WAY CYCLE TRACK

SHERIDAN ROAD

Page 16: Sheridan Road Improvement Project

Public Works

NEXT STEPS

• 7th

WARD RESIDENTIAL WORKSHOP

• NU STUDENT COORDINATION; SEPT. 2014

• FINAL DESIGN APPROVAL; SECOND

COUNCIL MEETING OCTOBER

12