shenzhen SETEC POWER company profile (ev fast charging station)
-
Upload
- -
Category
Environment
-
view
148 -
download
5
Transcript of shenzhen SETEC POWER company profile (ev fast charging station)
![Page 1: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/1.jpg)
www.setec-power.com
Email: [email protected]
Skype: evcharger
Mobile: 86-134 2515 7873
Facebook: Lily EV Charger
![Page 2: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/2.jpg)
Company Profile
Established in 2004, Shenzhen SETEC Power Co., Ltd. is one of the leading manufacturer in China specializing in designing, researching, developing, producing and selling Level 3 DC EV charging station, high-frequency switching power supply, DC/AC power inverters, DC/DC converters, solar inverter, solar pump inverters, on grid inverters and so on. We provide advanced technology and outstanding quality products.
SETEC has the professional R&D design team and research centers for you to provide efficient, reliable and innovative EV fast charger solutions. SETEC developed a series of widely used EV charging stations and CHAdeMo/CCS connector, which can meet the market requirements and customer’s demands.
SETEC has made remarkable achievements in there is recharge electric vehicle industry with the core technology and word-class production craft. EV green charger and DC quick ev charging station have become a bright spot in ev industry nowadays. Where there’s EV, there is green; where there’s fast EV Charging stations, there’s SETEC.
![Page 3: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/3.jpg)
Company Profile
Our products meet different needs of all brands of EV charging, power systems and communications systems. Our goal is "customer first, good quality and best services". Our products have passed the ISO9000:2000 quality system certification. With the rapid development of world science and technology, China's information industry and other industries driven by it are changing rapidly as a huge potential opportunity and economic benefits. We are willing to work together for mutual benefits with the new and old customers, and contribute to the rapid development of world's information industry!
![Page 4: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/4.jpg)
Building
![Page 5: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/5.jpg)
Front Desk
![Page 6: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/6.jpg)
Office
![Page 7: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/7.jpg)
Meeting Room
![Page 8: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/8.jpg)
Marketing Department
![Page 9: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/9.jpg)
Production Line
![Page 10: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/10.jpg)
Mounter Machine
![Page 11: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/11.jpg)
Humidity & Temperature Testing Machine
![Page 12: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/12.jpg)
Rectifier System For Testing Products
![Page 13: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/13.jpg)
Wave Soldering Machine
![Page 14: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/14.jpg)
Aging Testing Machine for High Voltage Products
![Page 15: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/15.jpg)
Battery Pack For Testing Products
![Page 16: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/16.jpg)
Solar Pump Inverter Testing System
5.5KW Solar Panels Planted On Roof of Our Building
![Page 17: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/17.jpg)
Solar Pump Inverter Testing System
Pipe and Wire Go Down Through Building
![Page 18: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/18.jpg)
Solar Pump Inverter Testing System
Pumping Water Cycling
![Page 19: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/19.jpg)
Solar Pump Inverter Testing System
Pumping Water Cycling
![Page 20: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/20.jpg)
Solutions for charging EV Commercial EV charging stations for public
![Page 21: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/21.jpg)
Solutions for charging EV Wall type for charging indoor/outdoor
![Page 22: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/22.jpg)
Solutions for charging EV Portable EV charger for charging on the road
and emergency use
![Page 23: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/23.jpg)
Solutions for charging EV Customized production
![Page 24: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/24.jpg)
Solutions for charging EV CHAdeMo (Japanese Nissan) EV fast charging station
![Page 25: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/25.jpg)
Solutions for charging EV CCS (Europea) EV fast charging station
![Page 26: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/26.jpg)
Solutions for charging EV GB/T (Chinese BYD)
EV fast charging station
![Page 27: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/27.jpg)
Certificate
ISO9001:2000
![Page 28: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/28.jpg)
Hi-tech & innovation enterprise authenticated certificate
![Page 29: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/29.jpg)
Certificate
CE:
![Page 30: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/30.jpg)
Product type certification
![Page 31: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/31.jpg)
Test report
![Page 32: shenzhen SETEC POWER company profile (ev fast charging station)](https://reader030.fdocuments.in/reader030/viewer/2022013104/58853b141a28ab26518b6ad1/html5/thumbnails/32.jpg)
Shenzhen SETEC Power Co., Ltd
Welcome visit and inquiry!
Email: [email protected]
Mobile: 86-134 2515 7873
Skype: evcharger