SHELL COVE BOATHARBOUR - STAGE 2 MONTHLY MONITORING SUMMARY February, 2016 COASTWIDE CIVIL PTY LTD ADDRESS: 19 CROOME LANE, ALBION PARK, 2527 POSTAL: P.O.BOX 116, KIAMA, 2533 E-MAIL: [email protected] ABN: 71 073 648 594 TELEPHONE: (02) 4256 1499 FAX: (02) 4256 5243 MOBILE: 0418 229 702 A.H.: (02) 4232 2173
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
2 | P a g e
Contents 1. Preliminaries ................................................................................................................................................ 3
1.1. Background .......................................................................................................................................... 3
1.2. Introduction ......................................................................................................................................... 3
2. Monitoring Requirements ........................................................................................................................... 4
2.1. Water Quality ...................................................................................................................................... 4
2.2. Noise .................................................................................................................................................... 6
2.3. Air Quality ............................................................................................................................................ 7
2.4. Vibration .............................................................................................................................................. 7
2.5. Blasting ................................................................................................................................................ 8
2.6. Acid Sulphate Soils ............................................................................................................................... 8
3. Water Quality .............................................................................................................................................. 9
3.1. Near Shore Monitoring – Monitoring Points 8, 9, 12 and 20 .............................................................. 9
3.2. Surface Water: Inbound flow– Monitoring Points 10, 11, 14, 21 and Outbound Flow – Monitoring Points 12 and 20 ............................................................................................................................................ 11
3.3. Storage Pond – Monitoring Point 7 ................................................................................................... 15
4. Air, Noise and Vibration Testing ................................................................................................................ 17
4.1. Noise Testing ..................................................................................................................................... 17
4.2. Air Quality .......................................................................................................................................... 19
4.3. Vibration ............................................................................................................................................ 19
4.4. Blasting .............................................................................................................................................. 19
5. Acid Sulphate Soils ..................................................................................................................................... 20
5.1. Odour Monitoring .............................................................................................................................. 20
Appendix A – Site Map Appendix B – Lab Testing Results Appendix C – Rainfall Monitoring Results
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
3 | P a g e
1. Preliminaries 1.1. Background
This project involves the construction of a boat harbour consisting of inner and outer harbour basins located behind an existing beach dune system in what is currently a degraded swamp, and an access channel across the beach. Included in the boat harbour project are:
• inner and outer harbour basins; • boardwalk/promenade surrounding the inner and outer harbours; • regional boat launching ramp located in the outer harbour; • 470m long rock breakwater on the northern side of the access channel; • 282m long rock groyne on the southern side of the access channel; • dune construction and beach nourishment; • land platform works for hotel, shopping centre, residential development, marina support facilities
and dry boat storage surrounding the boat harbour; • a staged 300 berth floating marina in the inner harbour; • vessel fuelling facilities and sewage pump out facilities in the outer harbour; and • a boat lift and hardstand area for vessel maintenance.
The works are to be conducted over multiple stages. Coastwide Civil have won the contract to conduct Stage 2 works. The main components of Stage 2 works are:
Excavation of the remainder of the Boatharbour which was not excavated in Stage 1
Surcharging (and removal) of the P2B Surcharge Area and any incomplete portions of the P3 Surcharge Area
Removal of the surcharge material from Surcharge P1A, P1B and P2A
Construct edge treatment for the Boatharbour
Install boardwalk piles
Construct boat ramp in the Outer Harbour 1.2. Introduction
This document provides a summary of monthly environmental performance on site. It includes the following:
Section 2 outlines monitoring requirements as per the conditions of the Environmental Protection Licence (EPL), the Site Environmental Management Plan (SEMP) and the Construction Environmental Management Plan (CEMP);
Sections 3 to 5 detail the results of environmental monitoring undertaken on site; and
Results of any lab testing are included as Appendix B. A copy of rainfall monitoring results for the month is attached as Appendix C.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
4 | P a g e
2. Monitoring Requirements 2.1. Water Quality
Water Quality Inbound and Outbound Channels Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3
Station no. Location Testing Required
10 Upstream Location – Runoff into site from West
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
11 Upstream Location– Runoff into site from North
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
12 Shellharbour Swamp – Discharge into near shore zone
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
14 Upstream Location – Runoff into site from South
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
20 Beach Zone Rectangular Pond – Discharge into near shore zone
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
21 Southern Channel – Downstream of Precinct B1 and C1
Oil and Grease, pH, Total Suspended Solids, Turbidity and Colour
Monitoring Requirements As nominated in EPL 12426, Section 5, M2. No limit values for monitoring of inflows and outflows are specified in the EPL.
Station no. Testing Requirement Compliance Criteria Frequency
10,11,12,14, 20,21
Oil and Grease Not specified in EPL
Special Frequency 2 – daily if turbidity >5NTU at MP8,9,12, otherwise weekly
pH Not specified in EPL
Total Suspended solids
Not specified in EPL
Turbidity Not specified in EPL
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
5 | P a g e
Near Shore Monitoring Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3 for MP8, 9 and 12, Section 8 E1.3 for MP20:
Station no. Location Testing Required
8 Surf zone, 100m south of groyne
Colour, Turbidity
9 Surf zone 100m north of breakwater
Colour, Turbidity
12 Surface Water leaving site into the near shore zone
Colour, Turbidity
20 Beach zone rectangular pond
Colour, Turbidity
Monitoring Requirements Limit criteria for points 8 and 9 are as established in the SEMP Section 7.4.4. The EPL establishes a 5 NTU turbidity trigger value at points 8, 9, 12 and 20 to initiate monitoring at monitoring points 10-14 as per special frequency 2.
Station no. Testing Requirement Compliance Criteria Frequency
8,9,12,20
Turbidity <5 NTU Special Frequency 1 – weekly during dry weather, daily during wet weather (>20mm rainfall within 24 hours in rain gauge), daily during any water break out on site Daily during marine works
Colour Visual Assessment
Storage Pond Monitoring Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.3:
Station no. Location Testing Required
7 Storage Pond Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD)
22 West of Boatharbour Excavation
Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD)
23 Outer Boatharbour Oil and Grease, Suspended Solids, Acidity, Turbidity, Nitrate, Nitrogen (Ammonia), Biochemical Oxygen Demand (BOD)
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
6 | P a g e
Monitoring Requirements As nominated in EPL 12426, Section 5, M2 for monitoring requirements and Section 3, L2 for concentration limits:
Station no. Testing Requirement Compliance Criteria Frequency
7, 22, 23
Oil and Grease Not visible
Prior to any release into the clean water system. Daily during any discharge from the storage pond.
Suspended Solids <50 mg/L
Acidity 4.0 – 8.5 pH
Turbidity Not specified in EPL /CEMP
Nitrate Not specified in EPL /CEMP
Nitrogen (Ammonia) Not specified in EPL /CEMP
Biochemical Oxygen Demand (BOD)
Not specified in EPL /CEMP
2.2. Noise
Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426, Section 2, P1.4:
Station no. Location
17 Southernmost property on Boollwarroo Parade
18 Nearest residence on Mary, William or Sophia Streets
19 Nearest residence on Whitsunday or Apollo Drives
Monitoring Requirements As nominated in EPL 12426, Section 3, L4: “For any exceedance of the background noise level by more than 10 dB(A) the licensee must undertake community liaison and consultation in order to identify and implement any additional reasonable and feasible noise mitigation options. L4.2 5dB(A) must be added to the measured noise levels if the noise is substantially tonal or impulsive in character.” Table 4.6 of the CEMP summarises noise trigger values based on background levels determined by Wilkinson Murray in 2005 as:
Parameter Trigger Value Measurement Location
Construction Noise
LAeq,15 min: 52 dBA Nearest residence on Boollwarroo Parade
LAeq,15 min: 44 dBA Nearest residence on Mary, William or Sophia Streets
LAeq,15 min: 44 dBA Nearest residence on Whitsunday or Apollo Drives
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
7 | P a g e
2.3. Air Quality
Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426 Section 2, P1.1:
Station no. Location
1 Southernmost property on Boollwarroo Parade
2 Nearest residence on Mary, William or Sophia Streets
3 Nearest residence on Whitsunday or Apollo Drives
Monitoring Requirements Compliance limit criteria are not specified in the EPL. As per SEMP, Section 8:
Station no. Testing Requirement Compliance Criteria Frequency
1,2,3 Dust <4g / m2 / month, or <2g / m2/ month over background levels
Monthly
2.4. Vibration
Monitoring Locations – See Appendix A - Site Map for location of monitoring points Monitoring Points are not specified in the EPL. Points as nominated in SEMP Section 8 are:
Station no. Location
1 Southernmost property on Boollwarroo Parade
2 Nearest residence on Mary, William or Sophia Streets
3 Nearest residence on Whitsunday or Apollo Drives
Monitoring Requirements As per CEMP, Section 4.7.4:
Station no.
Testing Requirement
Compliance Criteria Frequency
1,2,3 vibration Vibration dose: <0.4 m/s1.75
Once during initial stages of work by plant likely to cause vibration
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
8 | P a g e
2.5. Blasting
Monitoring Locations – See Appendix A - Site Map for location of monitoring points As nominated in EPL 12426 Section 5, M7.1:
Station no. Location
1 Southernmost property on Boollwarroo Parade
2 Nearest residence on Mary, William or Sophia Streets
3 Nearest residence on Whitsunday or Apollo Drives
Monitoring Requirements As nominated in EPL 12426 Section 3 L5.1 – 5.4 and Section 5, M7.2:
Station no. Testing Requirement Compliance Criteria Frequency
1,2,3 vibration <5mm/s for 95% of blasts <10mm/s for all blasts
During each blast
1,2,3 overpressure <115 dB for 95% of blasts <120 dB for 100% of blasts
During each blast
2.6. Acid Sulphate Soils
Monitoring Requirements As nominated in EPL 12426 Section 4, O5.11-5.14: “Any acid sulphate soils disturbed during the project must be managed in accordance with the document titled “ACID SULPHATE SOIL MANUAL, ASSMAC 1998”. From the time when the acid sulphate soil is exposed to the atmosphere: a) the licensee must complete a log of odour observations. These observations must continue for a duration of 20 consecutive days and be used to assess compliance with the odour condition/s of this licence and to assess the risks of odours impacting residential areas under worst-case wind conditions. b) the licensee has 30 days to submit the log of odour observations to the EPA together with an assessment of actual and potential odour impacts on the nearest residential areas.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
9 | P a g e
3. Water Quality 3.1. Near Shore Monitoring – Monitoring Points 8, 9, 12 and 20
Test Results Test frequency: Special Frequency 1 (Weekly in dry weather, daily in wet weather and daily during break out). To be completed daily during marine works.
Date Pollutant Point 8 Point 9 Point 12 Point 20
29/02/2016 Colour Clear Clear Clear Clear
Turbidity 12.39 14.22 18.14 15.25
26/02/2016 Colour Clear Clear Clear Clear
Turbidity 4.17 4.08 24.81 4.40
25/02/2016 Colour Clear Clear Clear Clear
Turbidity 4.35 7.07 38.44 10.26
24/02/2016 Colour Clear Clear V. light brown Clear
Turbidity 3.11 3.81 43.56 13.37
23/02/2016 Colour Clear Clear Clear Clear
Turbidity 2.26 3.79 41.32 13.37
22/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.95 7.54 40.54 28.15
19/02/2016 Colour Clear Clear Clear Clear
Turbidity 2.68 3.69 27.11 11.45
18/02/2016 Colour Clear Clear Clear Clear
Turbidity 2.1 3.36 16.65 4.67
17/02/2016 Colour Clear Clear Clear Clear
Turbidity 4.21 4.42 19.56 11.69
16/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.60 2.50 20.63 18.83
15/02/2016 Colour Clear Clear Clear Clear
Turbidity 1.85 4.06 17.84 8.12
12/02/2016 Colour Clear Clear Clear Clear
Turbidity 1.55 3.55 4.06 3.27
11/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.8 2.37 3.93 3.75
10/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.29 3.16 4.44 3.20
09/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.26 0.48 4.87 2.91
08/02/2016 Colour Clear Clear Clear Clear
Turbidity 1.65 0.85 17.46 20.55
05/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.91 2.12 2.36 4.31
04/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.88 4.13 20.10 31.51
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
10 | P a g e
Date Pollutant Point 8 Point 9 Point 12 Point 20
03/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.54 4.19 22.10 35.07
02/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.61 3.07 56 69
01/02/2016 Colour Clear Clear Clear Clear
Turbidity 3.79 2.93 4.46 3.73
CEMP Compliance Limit
Turbidity 5 5
EPL Special Frequency 2 Trigger Value
Turbidity 5 5 5
Comments on Results
The 5 NTU trigger value was exceeded on a number of occasions at MP8, MP9, MP12 and MP20. o Rough, large swell was observed in the ocean on 29/02/16. This was the cause of the
elevation in turbidity at MP8 and MP9. MP12 and MP20 were not open to the ocean at the time, however it is likely there was some interaction between the points at high tide. There were no other notable elevations in turbidity and MP8 and MP9.
o The majority of turbidity elevations were minor and are attributed to stormwater flows through the site clean water system following rainfall.
o Turbidity was elevated at MP12 and MP20 on 02/02/16 following 20mm rainfall and 8mm the previous day. This was attributable to intense rainfall causing increased stormwater flows through site. This did not have any impact on turbidity measured on the near shore points MP8 and MP9. Turbidity remained elevated but decreased gradually over the next few days.
o Turbidity was again elevated at MP12 and MP20 on 22/02/16 following 25.5mm rainfall. This was attributable to intense rainfall causing increased stormwater flows through site. This did not have any impact on turbidity measured on the near shore points MP8 and MP9. Turbidity remained elevated but decreased gradually over the next few days.
o Turbidity at MP12 was often higher than in previous months, particularly following rainfall. There has been no discharge from site into this channel during this month, nor have testable volumes of water been observed flowing at the inbound monitoring point MP11 in this channel. The most likely source of turbidity is works upstream from site at the Warrigal Care retirement village site, and construction of Harbour Boulevarde. It is possible that low volume flows over time have caused this elevation, while being too low to sample at the upstream point. Another consideration is that flow rate in this channel can decrease quickly over time, and may have already slowed to a trickle by the time a daily sample is taken, if rainfall occurs overnight or outside of working hours.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
11 | P a g e
3.2. Surface Water: Inbound flow– Monitoring Points 10, 11, 14, 21 and Outbound Flow – Monitoring Points 12 and 20
Test Results Test frequency: Special Frequency 2 (Weekly, or daily when turbidity at MP8, 9, 12 or 20 is greater than 5 NTU)
Date Pollutant Point 10 Point 11 Point 14 Point 21 Point 12 Point 20
29/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 7.82 7.97
Total Suspended Solids (mg/L)
Awaiting results
Awaiting results
Turbidity (NTU) 18.14 15.25
Colour Clear Clear
26/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 8.21 8.03
Total Suspended Solids (mg/L)
39 13
Turbidity (NTU) 24.81 4.4
Colour Clear Clear
25/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 8.04 7.80
Total Suspended Solids (mg/L)
60 19
Turbidity (NTU) 38.44 10.26
Colour Clear Clear
24/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 8.11 7.98
Total Suspended Solids (mg/L)
47 9
Turbidity (NTU) 43.56 13.37
Colour V. light brown
Clear
23/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 8.27 7.91
Total Suspended Solids (mg/L)
47 20
Turbidity (NTU) 41.32 13.37
Colour Clear Clear
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
12 | P a g e
Date Pollutant Point 10 Point 11 Point 14 Point 21 Point 12 Point 20
22/02/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 7.79 7.82 8.34 7.97
Total Suspended Solids (mg/L)
3 40 28 22
Turbidity (NTU) 7.58 46.49 40.54 28.15
Colour Clear Clear Clear Clear
19/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 7.88 8.12
Total Suspended Solids (mg/L)
27 9
Turbidity (NTU) 27.11 11.45
Colour Clear Clear
18/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
Not visible Not visible Not visible
pH 8.18 7.87 8.13
Total Suspended Solids (mg/L)
15 10 6
Turbidity (NTU) 19.09 16.65 4.67
Colour Clear Clear Clear
17/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 7.91 8.26
Total Suspended Solids (mg/L)
22 8
Turbidity (NTU) 19.56 11.69
Colour Clear Clear
16/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 7.80 8.17
Total Suspended Solids (mg/L)
17 4
Turbidity (NTU) 20.63 18.83
Colour Clear Clear
15/02/16
Oil and Grease
No water flowing
No water flowing
No water flowing
No water flowing
Not visible Not visible
pH 7.92 8.24
Total Suspended Solids (mg/L)
7 5
Turbidity (NTU) 17.84 8.12
Colour Clear Clear
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
13 | P a g e
Date Pollutant Point 10 Point 11 Point 14 Point 21 Point 12 Point 20
08/02/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 8.34 7.84 8.18 7.77
Total Suspended Solids (mg/L)
26 100 12 19
Turbidity (NTU) 23.71 85 17.46 20.55
Colour Clear V. light brown Clear Clear
04/02/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 8.14 7.33 8.18 7.96
Total Suspended Solids (mg/L)
1 29 15 33
Turbidity (NTU) 9.20 20.81 20.10 31.51
Colour Clear Clear Clear Clear
03/02/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 7.85 8.20 8.27 8.03
Total Suspended Solids (mg/L)
4 46 17 33
Turbidity (NTU) 11.91 34.50 22.10 35.07
Colour Clear Clear Clear Clear
02/02/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 7.34 8.14 8.02 7.96
Total Suspended Solids (mg/L)
6 41 54 51
Turbidity (NTU) 20.46 61 56 69
Colour Clear Clear Clear Clear
29/01/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 8.35 7.72 7.77 7.71
Total Suspended Solids (mg/L)
4 51 28 23
Turbidity (NTU) 5.65 53 26.70 24.32
Colour Clear Clear Clear Clear
28/01/16
Oil and Grease Not visible
No water flowing
No water flowing
Not visible Not visible Not visible
pH 8.01 7.84 7.81 8.11
Total Suspended Solids (mg/L)
<1 40 25 11
Turbidity (NTU) 4.77 29.52 21.32 10.94
Colour Clear Clear Clear Clear
27/01/16
Oil and Grease Not visible Not visible
No water flowing
Not visible Not visible Not visible
pH 7.69 7.41 7.72 8.08 7.88
Total Suspended Solids (mg/L)
2 20 162 36 34
Turbidity (NTU) 4.06 21.06 125 11.48 30.48
Colour Clear Clear Light brown Clear Clear
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
14 | P a g e
Comments on Results
Northern channel opening (MP12): o Mechanically opened 22/02/16 and closed naturally the next day
Southern channel opening (MP20): o Remained open naturally from last month and closed naturally 10/02/16 o Opened naturally 22/02/16 and closed naturally the next day o Opened naturally 25/02/16 and closed naturally the next day
Notable Rainfall Events: o 35mm recorded 01/02/16 – 04/02/16 (8.0mm on 01/02/16, 20mm on 02/02/16, 7.0mm on
04/02/16) o 25.5mm recorded 22/02/16 o Full rainfall records included in Appendix C
Turbidity was elevated slightly at MP12, MP20 and MP21 on 02/02/16, and decreased over the following days. This was due to rainfall and the subsequent stormwater flows through site.
Turbidity was elevated at MP20 in the days following 22/02/16, as discussed in Section 3.1. After 22/02/16, there were no collectable volumes of water flowing at MP21 towards MP20, and no water flowing out from MP20 to the ocean. Turbidity was retained at this location and settled over time.
This month, there were otherwise no significant elevations of turbidity at inbound and outbound streams. Some samples at MP21 exhibited unusual spikes in turbidity through the month. This is attributed to flows picking up sediment from within the channel, and difficulty in collecting representative samples during low flow periods. There were no uncontrolled discharges from the B1C1 Subdivision Site into this channel this month. All discharges from B1C1 complied with the total suspended solids discharge limit for that site.
Results for 29/02/16 were not received in time for inclusion with this report. These results will be included next month.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
15 | P a g e
3.3. Storage Pond – Monitoring Points 7, 22 and 23
Test Results Test frequency: Daily during discharge.
MP22
Pollutant
Date Oil and Grease
pH*
Tota
l
Susp
end
ed
Solid
s (m
g/L)
Turbidity* (NTU)
Bio
chem
ical
O
xyge
n
Dem
and
(BO
D)
(mg/
L)
Nitrate (mg/L)
Nitrogen (Ammonia
) (mg/L)
29/02/2016 Not Visible 7.13 Awaiting results 14.84 Awaiting results Awaiting results Awaiting results
26/02/2016 Not Visible 6.95 Awaiting results 12.01 Awaiting results Awaiting results Awaiting results
22/02/2016 Not Visible 7.46 Awaiting results 13.31 Awaiting results Awaiting results Awaiting results
18/02/2016 Not Visible 7.36 11 18.8 1.4 <0.005 0.003
16/02/2016 Not Visible 7.48 16 21.95 1.9 <0.005 0.028
15/02/2016 Not Visible 7.37 8 10.81 1.2 0.034 0.021
12/02/2016 Not Visible 7.45 6 4.98 1.5 0.006 0.004
11/02/2016 Not Visible 7.56 4 6.21 1.2 <0.005 0.002
10/02/2016 Not Visible 7.34 5 5.89 1.5 0.014 0.003
09/02/2016 Not Visible 7.72 2 8.72 <1 0.037 0.019
08/02/2016 Not Visible 7.88 5 6.72 2.3 <0.005 0.013
04/02/2016 Not Visible 7.75 10 11.49 1.2 0.011 0.021
03/02/2016 Not Visible 6.93 18 18.27 <1 0.021 0.009
02/02/2016 Not Visible 7.15 13 12.81 1.1 0.02 0.014
28/01/2016 Not Visible 7.07 16 13.42 <1 0.146 0.081
27/01/2016 Not Visible 6.23 42 25.61 <1 0.064 0.047
22/01/2016 Not Visible 6.68 35 28.74 <1 0.391 0.092
EPA Discharge
Criteria
4.0 – 8.5 50 - - - -
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
16 | P a g e
MP23
Pollutant
Date Oil and Grease
pH*
Tota
l
Susp
end
ed
Solid
s (m
g/L)
Turbidity* (NTU)
Bio
chem
ical
O
xyge
n
Dem
and
(BO
D)
(mg/
L)
Nitrate (mg/L)
Nitrogen (Ammonia
) (mg/L)
23/02/2016 Not Visible 8.01 Awaiting results 20.08 Awaiting results Awaiting results Awaiting results
22/02/2016 Not Visible 7.96 Awaiting results 12.39 Awaiting results Awaiting results Awaiting results
19/02/2016 Not Visible 8.28 14 13.58 1.5 <0.005 0.007
17/02/2016 Not Visible 8.15 8 8.11 1.4 <0.005 0.019
15/02/2016 Not Visible 8.08 10 5.03 2 <0.005 0.007
12/02/2016 Not Visible 8.04 5 5.99 1 0.02 0.034
11/02/2016 Not Visible 7.92 5 8.04 <1 0.022 0.016
10/02/2016 Not Visible 8.06 3 8.31 <1 0.019 0.025
09/02/2016 Not Visible 7.67 5 4.28 1.5 0.014 0.003
08/02/2016 Not Visible 8.2 12 18.07 <1 0.041 0.023
05/02/2016 Not Visible 7.78 15 21.17 <1 0.02 0.002
03/02/2016 Not Visible 7.81 5 21 <1 0.056 0.026
02/02/2016 Not Visible 7.89 9 30.84 <1 0.115 0.024
01/02/2016 Not Visible 8.21 9 21.01 <1 <0.005 0.036
28/01/2016 Not Visible 7.51 6 8.82 <1 0.093 0.034
27/01/2016 Not Visible 8.06 21 22.03 <1 0.132 0.049
22/01/2016 Not Visible 7.62 17 30.58 <1 0.691 0.034
19/01/2016 Not Visible 7.85 12 19.31 <1 0.154 0.044
18/01/2016 Not Visible 7.93 4 3.35 <1 0.236 0.09
EPA Discharge
Criteria 4.0 – 8.5 50 - - - -
*Tests undertaken on site by Coastwide Civil
Remarks – MP22
Discharge was undertaken on the above listed days. All site based monitoring and received lab testing results are compliant with discharge criteria.
Lab results for 22/02/16, 26/02/16 and 29/02/16 were not received in time for inclusion with this report. This will be included with next month’s report.
Remarks – MP23
Discharge was undertaken on the above listed days. All site based monitoring and received lab testing results are compliant with discharge criteria
Lab results for 22/02/16 and 23/02/16 were not received in time for inclusion with this report. This will be included with next month’s report.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
17 | P a g e
4. Air, Noise and Vibration Testing 4.1. Noise Testing
Test Results Test frequency: Weekly
Date Location Time Measured
Noise Levels Observed Noise Sources and notes (sound levels in dB)
Estimated LAeq
Contribution
CEMP Trigger Value
25
/02
/20
16
MP17 3:10pm – 3:25pm
LA10 = 66.1 LA90 = 49.3 LAeq = 64.2 Lmax = 82.6 Lmin = 46.9
Vehicles: 29 No., Av: 74.32 Birds: 4 No., Av: 55.48 Site: 5 No., Av: 60.54 Passing vehicles were the dominant noise source. Site noise was audible on only a few occasions. Site contribution = LAeq – 6dB
58.2 52.0
MP18 3:30pm – 3:45pm
LA10 = 60.1 LA90 = 48.4 LAeq = 58.7 Lmax = 81.4 Lmin = 45.3
Birds: 24 No., Av: 64.30 People: 60.8, 71.6, 62.8 Cars: 4 no., Av: 65.83 Site noise inaudible. Site contribution = LA90 – 10dB
38.4 44.0
MP19 3:50pm – 4:05pm
LA10 = 47.5 LA90 = 42.6 LAeq = 47.9 Lmax = 68.1 Lmin = 41.0
Site noise: 5 No., Av: 49.32 Birds: 4 no., Av: 47.23 Cars: 7 No., Av: 61.09 People: 4 No., Av: 61.33 Site noise was the same volume as other surrounding noise sources. Site contribution = LAeq – 6dB
41.9 44.0
19/
02/2
01
6
MP17 9:15am – 9:30am
LA10 = 58.6 LA90 = 48.3 LAeq = 60.5 Lmax = 84.1 Lmin = 46.3
Site noise: 48.7 Birds: 52.3, 53.5, 57.0 Wind: 51.0, 52.7 Plane: 58.5, 56.2, 60.7 Vehicles: 13 No., Av: 75.36 Passing traffic is the dominant noise source. Compactor on site was audible for approx.. 3 mins, otherwise site noise inaudible. Site contribution = LAeq – 10dB
50.5 52.0
MP18 10:05am – 10:20am
LA10 = 55.4 LA90 = 42.7 LAeq = 53.8 Lmax = 91.0 Lmin = 40.1
Birds: 5 No., Av: 52.90 Wind: 50.1 Lawnmower: 54.0, 55.3, 62.3 Traffic: 52.6, 55.3 Site noise inaudible. Site contribution = LA90 – 10dB
32.7 44.0
MP19 9:45am – 10:00am
LA10 = 51.4 LA90 = 42.9 LAeq = 49.4 Lmax = 91.0 Lmin = 40.0
Dog: 42.8, 47.1 Plane: 50.7 Vehicles: 5 No., Av: 60.30 Cyclist: 51.2 Site noise: 46.7 Wind: 48.3 Site noise inaudible. Site contribution = LA90 – 10dB
32.9 44.0
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
18 | P a g e
Comments on Results
At MP17, weekly LAeq exceeded the trigger value on 05/02/16, 12/02/16, 25/02/16.
At MP18, weekly LAeq did not exceed the trigger value.
At MP19, weekly LAeq did not exceed the trigger value.
Consultation with the community about the project has been ongoing. A community newsletter is being distributed monthly, explaining current works on site. The newsletter contains contact information to allow any residents to communicate concerns about noise levels.
No complaints have been received in this month about noise levels.
Site noise was audible at MP19 for the first time this month. This is due to works on the Harbour Boulevarde project. This project is adjacent to the boatharbour site and is closer to the measurement location.
Date Location Time Measured
Noise Levels Observed Noise Sources and notes (sound levels in dB)
Estimated LAeq
Contribution
CEMP Trigger Value
12
/02
/20
16
MP17 2:00pm – 2:15pm
LA10 = 64.5 LA90 = 50.4 LAeq = 61.2 Lmax = 76.1 Lmin = 45.6
Vehicles: 18 No., Av: 69.53 Lawnmower: 11 No., Av: 61.58 Site noise: 4 No., Av: 60.98 Plane: 4 No., Av: 68.4 Site noise only briefly audible. Vehicles and lawnmower were the dominant noise sources. Site contribution = LAeq – 6dB
55.2 52.0
MP18 2:20pm – 2:35pm
LA10 = 56.7 LA90 = 48.3 LAeq = 56.2 Lmax = 75.9 Lmin = 45.7
Birds: 19 No., Av: 63.15 Wind: 4 No., Av: 53.33 Site noise inaudible. Site contribution = LA90 – 10dB
38.3 44.0
MP19 2:40pm – 2:55pm
LA10 = 54.8 LA90 = 42.8 LAeq = 55.9 Lmax = 77.1 Lmin = 40.2
Vehicles: 16 No., Av: 66.24 Birds: 4 No., Av: 51.55 Plane: 51.7, 52.3, 54.8 Site noise inaudible. Site contribution = LA90 – 10dB
32.8 44.0
05
/02
/20
16
MP17 2:30pm - 2:45pm
LA10 = 66.2 LA90 = 58.4 LAeq = 62.4 Lmax = 91.5 Lmin = 51.6
Vehicles: 26 No., Av: 74.44 Site: 10 No., Av: 61.35 Wind: 4 No., Av: 61.48 Passing vehicles, wind noise and wind were perceived to be equally dominant noise sources. Site noise was constant throughout test. Site contribution = LAeq
62.4 52.0
MP18 2:50pm – 3:05pm
LA10 = 62.1 LA90 = 54.0 LAeq = 59.4 Lmax = 50.8 Lmin = 75.7
Wind: 16 No., Av: 63.42 Birds: 7 No., Av: 59.76 Site: 4 No., Av: 54.85 Vehicles: 60.88 Wind and birds were more dominant than site noise. Site contribution = LAeq – 10dB
44.0 44.0
MP19 3:10pm – 3:25pm
LA10 = 53.1 LA90 = 45.1 LAeq = 52.7 Lmax = 73.1 Lmin = 42.9
Wind: 19 No., Av: 54.25 Vehicles: 8 No., Av: 68.35 Site noise inaudible. Site contribution = LA90 – 10dB
35.1 44.0
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
19 | P a g e
4.2. Air Quality
Test Results Test frequency: Monthly
Date Pollutant Point 1 Point 2 Point 3
22/01/16 – 22/02/16
Ash Content (g/m2/ month) 0.8 0.9 0.7 Combustible Matter (g/m2/ month) 0.4 0.3 0.3
Total dust (g/m2/ month) 1.2 1.2 1.0 SEMP Compliance Limit Total dust (g/m2/ month) 4.0 4.0 4.0
Comments on Results
Dust results were below the compliance limits at all monitoring points. 4.3. Vibration
Test Results Test frequency: During initial stages of potentially vibratory work No testing has been required this month. 4.4. Blasting
Test Results Test frequency: During each blast
Blast # Blast Date Blast Vibration (mm/s) Blast Overpressure (dB)
MP1 MP2 MP3 MP1 MP2 MP3
046 17/02/2016 Nil trigger 0.25 Nil trigger Nil trigger 103.0 Nil trigger
EPL Compliance Limits 5 5 5 115 115 115
Comments on Results
Vibration and overpressure results were below compliance limits at all monitoring points during the blast.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
20 | P a g e
5. Acid Sulphate Soils 5.1. Odour Monitoring
The monitoring of odour from any encountered Acid Sulphate Soil areas is ongoing as per the requirements of the EPL. Completed odour monitoring logs have been forwarded to the EPA as required.
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
21 | P a g e
Appendix A – Site Map
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
22 | P a g e
Appendix B – Lab Testing Results
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 7 samples supplied by Coastwide Civil Pty Ltd on the 8th February, 2016 - Lab. Job No. E7604Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527).
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7
PARAMETER METHODS REFERENCEMP23 01/02/16 MP22 02/02/16 MP23 02/02/16 MP22 03/02/16 MP23 03/02/16 MP22 04/02/16 MP23 05/02/16
Job No. E7604/1 E7604/2 E7604/3 E7604/4 E7604/5 E7604/6 E7604/7
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 9 13 9 18 5 10 15
BIOCHEMICAL OXYGEN DEMAND5 (mg/L O2) APHA 5210-B <1.0 1.1 <1.0 <1.0 <1.0 1.2 <1.0
NITRATE (mg/L N) APHA 4500 NO3--F <0.005 0.020 0.115 0.021 0.056 0.011 0.020
NITRITE (mg/L N) APHA 4500 NO2--I 0.002 0.002 0.002 0.005 0.004 0.004 0.003
AMMONIA (mg/L N) APHA 4500 NH3-H 0.036 0.014 0.024 0.009 0.026 0.021 0.002
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.3. Analysis conducted between sample arrival date and Report provision date4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available5. .. Denotes not requested
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 12 samples supplied by Coastwide Civil Pty Ltd on the 8th February, 2016 - Lab. Job No. E7605Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527)
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 Sample 12
PARAMETER METHODS REFERENCEMP10
02/02/16MP12
02/02/16MP20
02/02/16MP21
02/02/16MP10
03/02/16MP12
03/02/16MP20
03/02/16MP21
03/02/16MP10
04/02/16MP12
04/02/16MP20
04/02/16MP21
04/02/16Job No. E7605/1 E7605/2 E7605/3 E7605/4 E7605/5 E7605/6 E7605/7 E7605/8 E7605/9 E7605/10 E7605/11 E7605/12
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 6 54 51 41 4 17 33 46 1 15 33 29
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. For conductivity - 1 dS/m = 1 mS/cm = 1000 µS/cm3. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.4. Analysis conducted between sample arrival date and Report provision date
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 9 samples supplied by Coastwide Civil Pty Ltd on the 15th February, 2016 - Lab. Job No. E7805Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527).
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9
PARAMETER METHODS REFERENCEMP22 8/2/16 MP23 8/2/16 MP23 9/2/16 MP22 10/2/16 MP23 10/2/16 MP22 11/2/16 MP23 11/2/16 MP22 12/2/16 MP23 12/2/16
Job No. E7805/1 E7805/2 E7805/3 E7805/4 E7805/5 E7805/6 E7805/7 E7805/8 E7805/9
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 5 12 2 5 3 4 5 6 5
BIOCHEMICAL OXYGEN DEMAND5 (mg/L O2) APHA 5210-B 2.3 <1.0 <1.0 1.5 <1.0 1.2 <1.0 1.5 1.0
NITRATE (mg/L N) APHA 4500 NO3--F <0.005 0.041 0.037 0.014 0.019 <0.005 0.022 0.006 0.020
NITRITE (mg/L N) APHA 4500 NO2--I <0.001 0.001 0.001 <0.001 0.001 <0.001 <0.001 <0.001 <0.001
AMMONIA (mg/L N) APHA 4500 NH3-H 0.013 0.023 0.019 0.003 0.025 0.002 0.016 0.004 0.034
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.3. Analysis conducted between sample arrival date and Report provision date4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available5. .. Denotes not requested
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 4 samples supplied by Coastwide Civil Pty Ltd on the 15th February, 2016 - Lab. Job No. E7806Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527)
Sample 1 Sample 2 Sample 3 Sample 4
PARAMETER METHODS REFERENCEMP10 8/2/16 MP12 8/2/16 MP20 8/2/16 MP21 8/2/16
Job No. E7806/1 E7806/2 E7806/3 E7806/4
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 26 12 19 100
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. For conductivity - 1 dS/m = 1 mS/cm = 1000 µS/cm3. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.4. Analysis conducted between sample arrival date and Report provision date
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 11 samples supplied by Coastwide Civil Pty Ltd on the 22nd February, 2016 - Lab. Job No. E7981Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527)
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11
PARAMETER METHODS REFERENCE
MP12 15/02/16
MP20 15/02/16
MP12 16/02/16
MP20 16/02/16
MP12 17/02/16
MP20 17/02/16
MP12 18/02/16
MP20 18/02/16
MP21 18/02/16
MP 19/02/16
MP20 19/02/16
Job No. E7981/1 E7981/2 E7981/3 E7981/4 E7981/5 E7981/6 E7981/7 E7981/8 E7981/9 E7981/10 E7981/11
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 7 5 17 4 22 8 10 6 15 27 9
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. For conductivity - 1 dS/m = 1 mS/cm = 1000 µS/cm3. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.4. Analysis conducted between sample arrival date and Report provision date
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 6 samples supplied by Coastwide Civil Pty Ltd on the 22nd February, 2016 - Lab. Job No. E7982Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour (19 Croome Lane, ALBION PARK NSW 2527).
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6
PARAMETER METHODS REFERENCEMP22 15/02/16 MP23 15/02/16 MP22 16/02/16 MP23 17/02/16 MP22 18/02/16 MP23 19/02/16
Job No. E7982/1 E7982/2 E7982/3 E7982/4 E7982/5 E7982/6
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 8 10 16 8 11 14
BIOCHEMICAL OXYGEN DEMAND5 (mg/L O2) APHA 5210-B 1.2 2.0 1.9 1.4 1.4 1.5
NITRATE (mg/L N) APHA 4500 NO3--F 0.034 <0.005 <0.005 <0.005 <0.005 <0.005
NITRITE (mg/L N) APHA 4500 NO2--I <0.001 <0.001 <0.001 <0.001 0.003 <0.001
AMMONIA (mg/L N) APHA 4500 NH3-H 0.021 0.007 0.028 0.019 0.003 0.007
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.3. Analysis conducted between sample arrival date and Report provision date4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available5. .. Denotes not requested
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 3 samples supplied by Coastwide Civil Pty Ltd on the 29th February, 2016 - Lab. Job No. E8234Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527).
Sample 1 Sample 2 Sample 3
PARAMETER METHODS REFERENCEMP23 22/02/16 MP23 23/02/16 MP22 26/02/16
Job No. E8234/1 E8234/2 E8234/3
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 12 12 21
BIOCHEMICAL OXYGEN DEMAND5 (mg/L O2) APHA 5210-B <1.0 <1.0 <1.0
NITRATE (mg/L N) APHA 4500 NO3--F <0.005 0.006 0.053
AMMONIA (mg/L N) APHA 4500 NH3-H 0.046 <0.005 <0.005
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.3. Analysis conducted between sample arrival date and Report provision date4. ** denotes these test procedure or calculation are as yet not NATA accredited but quality control data is available5. .. Denotes not requested
PAGE 1OF 1
Environmental Analysis Laboratory, Southern Cross University, Tel. 02 6620 3678, website: scu.edu.au/eal
checked: ...............Graham Lancaster
Laboratory Manager
RESULTS OF WATER ANALYSIS 12 samples supplied by Coastwide Civil Pty Ltd on the 29th February, 2016 - Lab. Job No. E8235Analysis requested by Nick Chalk. Your Project: Shell Cove Boat Harbour(19 Croome Lane, ALBION PARK NSW 2527)
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 Sample 12
PARAMETER METHODS REFERENCEMP10
22/02/16MP12
22/02/16MP20
22/02/16MP21
22/02/16MP12
23/02/16MP20
23/02/16MP12
24/02/16MP20
24/02/16MP12
25/02/16MP20
25/02/16MP12
26/02/16MP20
26/02/16Job No. E8235/1 E8235/2 E8235/3 E8235/4 E8235/5 E8235/6 E8235/7 E8235/8 E8235/9 E8235/10 E8235/11 E8235/12
TOTAL SUSPENDED SOLIDS (mg/L) GFC equiv. filter - APHA 2540-D 3 28 22 40 47 20 47 9 60 19 39 13
Notes: 1. 1 mg/L (milligram per litre) = 1 ppm (part per million) = 1000 µg/L (micrograms per litre)= 1000 ppb (part per billion)2. For conductivity - 1 dS/m = 1 mS/cm = 1000 µS/cm3. Analysis performed according to APHA, 2012, “Standard Methods for the Examination of Water & Wastewater”, 22nd Edition, except where stated otherwise.4. Analysis conducted between sample arrival date and Report provision date
Coastwide Civil Shell Cove Boat Harbour, Stage 2
Monthly Environmental Monitoring Report February, 2016
23 | P a g e
Appendix C – Site Rainfall Measurements
Rainfall Monitoring Sheet
Project: Shell Cove Boatharbour, Stage 2
Day Date Time of reading Rainfall (mm) Inspected by
Monday 01/02/2016 9:00 AM 8.0 Sean JolliffeTuesday 02/02/2016 9:00 AM 20.0 Sean JolliffeWednesday 03/02/2016 9:00 AM 0.0 Sean JolliffeThursday 04/02/2016 9:00 AM 7.0 Sean JolliffeFriday 05/02/2016 9:00 AM 0.0 Sean JolliffeSaturday 06/02/2016 9:00 AM * *Sunday 07/02/2016 9:00 AM * *Monday 08/02/2016 9:00 AM 0.0 Sean JolliffeTuesday 09/02/2016 9:00 AM 0.0 Sean JolliffeWednesday 10/02/2016 9:00 AM 0.0 Sean JolliffeThursday 11/02/2016 9:00 AM 0.0 Sean JolliffeFriday 12/02/2016 9:00 AM 0.0 Sean JolliffeSaturday 13/02/2016 9:00 AM * *Sunday 14/02/2016 9:00 AM * *Monday 15/02/2016 9:00 AM 0.0 Sean JolliffeTuesday 16/02/2016 9:00 AM 0.0 Sean JolliffeWednesday 17/02/2016 9:00 AM 0.5 Sean JolliffeThursday 18/02/2016 9:00 AM 0.0 Sean JolliffeFriday 19/02/2016 9:00 AM 0.0 Sean JolliffeSaturday 20/02/2016 9:00 AM * *Sunday 21/02/2016 9:00 AM * *Monday 22/02/2016 9:00 AM 25.5 Sean JolliffeTuesday 23/02/2016 9:00 AM 0.0 Sean JolliffeWednesday 24/02/2016 9:00 AM 0.0 Sean JolliffeThursday 25/02/2016 9:00 AM 0.0 Sean JolliffeFriday 26/02/2016 9:00 AM 0.0 Sean JolliffeSaturday 27/02/2016 9:00 AM * *Sunday 28/02/2016 9:00 AM * *Monday 29/02/2016 9:00 AM 0.5 Jess Jefferies
Coastwide Civil Pty Ltd Page 1 of 1 CWC-Form SP20 RMS-01 Issue 1 26/06/2012