Sheet Metal Forming
-
Upload
syedamiriqbal -
Category
Documents
-
view
66 -
download
6
description
Transcript of Sheet Metal Forming
PROJECT GROUP #12 BATCH 2006-07 KASHIF ASHHAR ARSALAN ZAHEER M. FAYZAN SYED WAQAS ALI (031) (032) (059) (060)
1
PROJECT GROUP #12
OBJECTIVEAPPLICATION OF NUMERICAL MODELING AND SIMULATION IN DESIGNING OF SHEET METAL DIES
2
PROJECT GROUP #12
INTRODUCTION
Flow chart of process planning and die design in traditional CAD environment
Workflow in simulation based process planning and die design
3
PROJECT GROUP #12
PARTMATERIALSACE 120 CR-DDQ-AL (JISG3314) (ASTM A 463)
Protector, Fuel tank (Corolla -242L)
THICKNESS0.5 mm
4
PROJECT GROUP #12
PHASE IIIMODELING & SIMULATIONOne step AnalysisTo conclude simply whether a product as designed is formable with ease, & if not, to identify areas on the geometry that lead to formability issues
Starting Final product geometry only with: Sheet Thickness Material Specifications Setting Parameters Die Tip Lubrication Edge Restraint Conditions5 PROJECT GROUP #12
ONE STEP ANALYSIS RESULT(Geometry 1)
6
PROJECT GROUP #12
Forming Limit Diagrams (Geometry 1)
7
PROJECT GROUP #12
8
PROJECT GROUP #12
Forming Limit Diagrams (Geometry 2)
9
PROJECT GROUP #12
INCREMENTAL ANALYSISA Full process model that simulates the forming stages as accurately as possible in logical order from blank holder closing to final flanging. With Capabilities to Analyze: Initial Deflection of Sheet due to gravity Blank holder Closing First Draws and Restrikes Cutting Operations Sheet Repositioning Flanging and Springback Hydro-Mechanical processes for Sheets and Tubes
10
PROJECT GROUP #12
FIRST CONCEPT
CAD Surface geometry Of Fuel tank protector
Boundary Fill(brown),Binder(reddish brown) and Addendum ( green) created with Autoform Die Designer
PROJECT GROUP #12 11
12
PROJECT GROUP #12
13
PROJECT GROUP #12
PRESS TONNAGECALCULATIONS:
PUNCH :DIE
From graph: Punch force = 300kN By rule of thumb: (300kN)(2.5) = 750kN = 75tonn(approx) BLANK HOLDER: From graph: blank holding force = 120kN By rule of thumb: (120kN)(2.5) = 300kN = 30tonn(approx) PRESS TONNAGE; Press tonnage = punch force + blank holding force = 75tonn + 30tonn = 105tonnPUNCH BLANK HOLDER
14
PROJECT GROUP #12
INCREMENTAL ANALYSIS
SECOND CONCEPT
15
PROJECT GROUP #12
16
PROJECT GROUP #12
Location of Wrinkles Planar/Flat areas Curved areas Areas under binder
Threshold value0.001 0.02 0.05
17
PROJECT GROUP #12
FIRST MODIFICATION IN PROCESS PARAMETERSModify Coefficient of friction from 0.15 to 0.12 and blank holder force from 120KN to 450KN.
DIE
BLANK HOLDER
PUNCH
18
PROJECT GROUP #12
SECOND MODIFICATION IN PROCESS PARAMETERSModify Coefficient of friction from 0.12 to 0.10 and blank holder force remains same.
19
PROJECT GROUP #12
CAD MODELING
20
PROJECT GROUP #12
MATERIAL /COST OPTIMIZATION Initial blank calculation based on part boundary Blank calculation based on the geometry of the drawing tool Embedding/Nesting
21
PROJECT GROUP #12
INITIAL BLANK CALCULATION BASED ON PART BOUNDARY
22
PROJECT GROUP #12
BLANK CALCULATION BASED ON THE GEOMETRY OF THE DRAWING TOOL
Punch opening line expanded 20mmPROJECT GROUP #12
23
EMBEDDING/NESTING
24
PROJECT GROUP #12
AREAS COVERED Project Scheduling. Study the Sheet Metal Forming Processes and its
25
characteristics. Study Forming and Drawing Dies. Learn CAD/CAM/CAE programs (PRO-E, AUTOFORM). Designing of Draw die using AUTOFORM and PRO/E. Process Simulation using AUTOFORM. Optimize process parameters using software. Material/Cost optimization (Blank calculation and Embedding/Nesting). Manufacturing of Designed die(Scaled) using CAM techniques. PROJECT GROUP #12 Report writing.
THANK YOU
26
PROJECT GROUP #12