Sharon tsoi portfolio

15
Architecture portfolio SELECTED WORKS 2013-2016 TSOI YUK YING SHARON

description

Architectural Design Selected works 2014-2016

Transcript of Sharon tsoi portfolio

Architecture portfolioSELECTED WORKS

2013-2016

TSOI YUK YING SHARON

SHAR

O

N

TSOI

EDUCATION 2013 - 2015High Diploma in Architectural Design in Hong Kong Design Institute2015 - 2016BA(Hons) Architecture in University of Lincoln

CONTACT + 852 [email protected] J 15/F Block 5, Tsui Lai Garden, 9 Fung Nam Road, Sheung Shui, NT, Hong Kong

Autocad, Sketchup, Rhino 3D, Grasshoper 3D,Adobe Photoshop, Adobe Illustrator, Adobe InDesign, Revit

COMPUTERSKILLS

LANGUAGE Cantonese, English& Mandarin

20/11/1993BIRTH

WORK EXPERIENCEJul 2015 - Aug 2015Meta4 Design Forum Ltd ( Summer Internship )

EXPERIENCE

STUDY TRIP

EXHIBITIONNov 2015Urban Regeneration Workshop with EMBT (Barcelona)

Jan - June 2015Competition Studio for Architectural Design with HALO

2015Interview with Perspective magazine

June 20151 : 1 Exhibition in HKDI

June 2015Exhibition in Comix Home Base

June 2015Exhibition in HKDI

June 2016 Graduation Exhibition in Comix Home Base

April 2014 Xian Nov 2014 Seoul, Korea Visit Seung, H-sang studio- IROJE

Jan 2015 Foshan Nov 2015 Barcelona Workshop with EMBT

Sharon Tsoi Yuk Ying

STREET LOOP THEATRE LIVE THEATRE IN YAU MA TEIYAU MA TEI / IDEOLOGY EXCHANGE COMMUNE

The design aims to preserve the street culture of Hong Kong and to promote the Cantonese street opera culture and other styles of informal performance. It extends the performance space of Temple Street to the upper levels whilst preserving the original street passage at the ground level. Indoor programmes are surrounded by the extended performance spaces.

Circulation Study

Illustrative Diagram

Temple Street

Stall

Street Performance

Large-Scale Stage

Tin Hau Temple

Lobby,F&B, Toilet

Exhibition

Black Box Theatre

Temple Street at the ground �oor Accessible entrances for formal performances

Public Walkway & Hard Landscapefacing the Temple Street

Informal street performance along the circulation

Workshop(Drama & Music)

Private Program & courtyardare facing Tin Hau Temple Black Box Theatre

Rehease Room (Troupe)

Studio (Artist,Troupe)

Exhibition Hall

Cafe & Reading Corner

Private Program

Public Program

Sky atrium is on the top of the highway, as the centre point of the building Zoning consideration

Version 1: Using one the ramp to connect all �oor Version 2: Provide other circulation options Final Version: Simplify the circulation as two facades

The interior view : From Cafe & bookshop to the Sky atrium

The ground floor level: The Extended Temple Street

Gathering SpaceGL + 8.00

Cafe & Book ShopGL + 22.00

Gathering SpaceGL + 16.00

WorkshopGL + 12.00

ExhibitionGL + 17.00

Sky Atrium

Large ScalePerformance Stage

West Knowloon CorridorGL +10.00

Gathering SpaceGL + 8.00

Cafe & Book ShopGL + 22.00

StudioGL + 18.00

StudioGL + 12.00

Rehearsal RoomGL + 6.00

Black Box TheatreGL + 00.00

ExhibitionGL + 17.00

Sky Atrium

Large ScalePerformance Stage

West Knowloon CorridorGL +10.00

Section AA’ Section BB’

West Knowloon CorridorGL +10.00

StudioGL + 18.00

StudioGL + 12.00

Rehearsal RoomGL + 6.00

Black Box TheatreGL + 00.00

WorkshopGL + 12.00

WorkshopGL + 16.00

Gathering SpaceGL + 16.00

Section CC’

Detail Drawing

Level 1Plan @ +0.0m 1:300

GL +0.00Lobby

F&BToilet

ExhibitionHall

Large ScalePerformance Stage

Black BoxTheatre

Black BoxTheatre

AB

C

D’

D

A’

B’

C’

Level 2 Plan @ +9.0m 1:300

GL +0.00GL +3.75

Rehearsal RoomGL + 6.00

Gathering SpaceGL + 8.00

Level 3 Plan @ +13.0m 1:300

West Knowloon CorridorGL +10.00

StudioGL + 12.00Workshop

GL + 12.00

Gathering SpaceGL + 8.00

PlatformGL +13.25

Exhibition HallGL +17.00

Level 4 Plan @ +21.0m 1:300

Sky Atrium

GL +16.00

GL +19.00

StudioGL + 12.00Gathering Space

GL + 16.00WorkshopGL + 16.00

CafeGL +22.00

Book ShopGL +22.00

Level 5 Plan @ +25.0m 1:300

Gathering SpaceGL + 16.00

BuildingStrcutureHigh WayStrcuture

Street performance stageGL +3.75

Temple streetGL +0.00

In order to create slender columnsthe design, the I-Sectionsteel member are selected

Independent structure of highway

Concrete Structureof Highway

Structure of the building

Building SteelColumn

650mm - 400mmConcrete Flat Slab

Steel memberswith lift & stair

Sky atriumGL +17.50

Slender columns susceptibility tobuckling therefore provide bracing

Typical twin frame ight steel wall construction

provide bracing to column

West Kowloon CorridorGL +10.00

Aluminium movementcover plate

Sound-Absorbing space

Double glazedFritting etching (Chemical)

Light steel separating wall

50mm thick densemineral wool board

Light steel framestuds isolated from

2 layers of 15mmgypsum based board

Metal compositeGlass reinforced concrete

cladding panels

High way structure Movement Joint

Isolation Wall of High Way

MULTI - VARIATE HOUSE group design by sharon tsoi, hourace yeungCOMPETITION STUDIO FOR ARCHITECTUREAL DESIGN / MOBILE MODULAR ARCHITECTURE

Mobile Modular ArchitectureThis project is to design a modular living unit of about 20-30 square metre that can be a plug-in module to a modular building as well as a standalone building. The module include a twin sleeping zone,and a wet area.

DESIGN APPROACH

DESIGN CONCEPT

Basic moduleRepeated trapezoid surface

Moduler unitStableGood spatial quality

3. Varied combinationSTRUCTURE

1. Geometic form Array to organize

FEATURE

2. Both side can change to concave or convex

We use movable joint to connect four surface Turn over to 180 degrees

Furniture scale scaled up to the size of a building.

CATALOGUE One module

Structure wall frame x4set2500

5100

4410

Facade x2set

Timber Steel

Interior panel

Frame x4set Window x4setThick 75

4400

44006000

4100

4100

560022004800

4200

Glass Frosted Glass Wood Timber

Wood & Glass Steel Timber with opening Glass with opening

Other material options:

Other material options:

4800

4200

2200

DRAWING 1:100

3 ModularElevation 11:100 1:100 1:100

Elevation A Section BStructural frame (Module 1)

Type 1Type 2Type 3

Steel bracket Type

Plywood

90°104°76°

Facade (Module 1)

Opening

Ele A2

Ele A2

Ele A1

Ele A1

Ele A3

Ele A4

Ele A3

Ele A4Detail 2

R:20mm *CHS

Typicalscrew interval(apply to all)

Nail

*CHS : circular hollow section

3618

3618

3000

3000

309

309

309

105°

76°

600

76°

309

18003300

Module 2

Module 2Module 1

Opening

Opening

Opening

Opening

Plywood

CONSTRUCTION SEQUENCE

10 Using crane to hang the window and install the frame by 3 worker

11 The triangle frame can fit in different kinds of material for client’s needs, it alsocan change the angle to concave or convex.

12 Complete9 The frame used to support the wall and become are window frame

7 Using supporter to fit the wall stiff 8 Using crane to hang the frame and install the frame by 3 worker

6 There are furniture folded inside, when hang up the wall, furniture will set up immediately

5 Using crane to hang 4 point of the roof1 Transportation - 1 truck(12mx2.5m) can loaded 2 units material and only need 4 workers to build

2 Deliver on site - 1 unit only need 9.6mx4.2m

3 Construction - Using crane sling two structure wall from truck to site+

4 Structure can fold it horizontal, so worker can joint it easily

4200

4800 4800

4200

1 module package1160

4500

4800

ONE EXPLODED DIAGRAM 1:300

Window Frame

Window Frame

Window

Window

Interior Wall

Interior Wall

Frame

Frame

Facade

Facade

CONSTRUCTION SEQUENCE

1:1 Modular Construction Exhibition in HKDI

Display model Interview with HALOInterior spaceHorace Yeung , Sharon TsoiConstruction Detail

We give full consideration of the construction sequence and materiality of the modular while designing. The module needs to be assembled easily and fast , the material needs to be lightweight and sustainable. Therefore we choose timber as the main material.

In addition, we design the façade pattern Aand openings by following the structural frame of the panels.

3 Existing Scaffolding Space

25%

75%

95%

Transparency

1 Seduction

2 Bath

3 Action

(Whorehouserequirement)

ProgramFabric

(Layer)

1 Layer

2 Layers

4 Layers

LAYERS OF SEDUCTIONCHUN YEUNG STREET / OPEN STUDIO : FORGOTTEN CITY

FABRIC FEATURETransparency - Layers

1 Layer 1 Layer 2 Layers 3 LayersNo Layers

Transparency *Elasticity *

Transparency ****Elasticity *****

Transparency *****Elasticity **

Legging

Legging

NylonNylon CurtainsCurtains

Transparency + Lighting -> Shadow

Lighting Fabric + Lighting IndistinctLayers

Prostitution (Sex worker)

What they need ?

PrivateWork

Attract

Rest Private

Printemp Hotel Apartment - Bamboo ScaffoldingSelected Site - Bamboo Scaffolding

In this project, we have to select a character who living/ working/ appear in Chun Yeung Street. They may just a little guys who was forgotten by the public. Study all about the character or create a life for him/her,than design a specific area for the him/her.

CONCEPT DIAGRAM

SEM

ESTE

R 3

ARC

HIT

ECTU

RAL

DES

IGN PO

RTFOLIO SHARON TSOI SELECTED WORKS 2013-2015 ARCHITEC

TURA

L DESIG

N PO

RTFOLIO

SHA

RON

TSOI SELECTED WORKS 2014-2015 ARCHITECTURAL D

ESIG

N

Roof, Floor

Building

Building Inside

Glass

Fabric

Frame

Bamboo Scaffolding

Fabric

Axonometric Section 1:100

Study Model1 : 20 Model1 : 20 Model

1 : 50 Site Model

Site plan 1:3000

PUBLIC

PRIVATE

REHABILITATION COMPLEX & HOME OF THE AGEDRESIDENTIAL

SWEIMMING POOLCHAPELOPEN SPACE

CAR ROAD

Surrounding Programme Function

SITE CONTEXT CONSIDERATIONAccessibility

The main circulation flow is generally following to the original southwest path, people can go downstairs to enjoiy with the sea view from time to time.

Context (Physical Conditions Of Surroundings)

HighestShortest

Medium

X

Y

X’

Y’

Building height In the west, the existing building is not too close with the back building.So main program could be located at west side and mass could be tall.

Sextion XX’

Sextion YY’

In the east, the existing building is close with the back building.So east side mass is designed to be short. (e.g. in form of platform)

Pedestrian Circulation Vehicular Circulation

In

Out

1 EXISTING SITE 2 TOWER HAS BEEN REMOVRD

DESIGN PROCESS

Connect two level of front and back

3 PLATFORM → SLOPE 4 RESIDENTIAL→ RESTAURANT

Free up the ground floorto become public space

There are some cylinderto be the structure wall,

it’s can provide a high transparentMove the floor plate to create balconies

6 ABOVEG → BELOW GROUND5 GROUND FLOOR → PUBLIC SPACE 8 STRUCTURE7 CYLINDER → BALCONIES

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

THE OVERLAPS PLATFORM CIRCLE JUMBO RESTAURANT ON THE SLOPEWONG CHUK HANG / PEOPLE MOUNTAIN PEOPLE SEA

L2/F +19.50L3/F +25.00

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

B3/F +4.00

B1/F +10.50

L1/F +15.00

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

SITE PLAN 1:1000

Fish Market & Roof Garden

Balconies

Skylight

SECTION BB’ 1:200

SECTION CC’ 1:200

SECTION AA’ 1:200

PRINCIPLE OF BUILDINGMATERIALS EXPERIMENT - FIBERGLASS TENTSEILE

Venice

Venice

Fiberglass

Fiberglass

LAYERS

Polyester Resin+

Catalysis

8 Bottle

Fabric

FabricSingle tentLayer 1 Layer 2 Layer 3 Layer 4

Layer 5 Layer 6

Separator

Separator

Polyester Resin + Catalysis + Hardener

MATERIAL

Single Tent Hardener

2 Bottle

6 LayersFinsh Product

WORKING PROCESS

FIBERGLASS TENTSEILE

High transparency

Fiberglass + Polyester resin = tough , high ultimate tensile strength

1 We use tent to be a mould 2 We use rope and fabric bundle on top of the tent to be a tensile structure

3 We wipe the oil and separator over the fabric 4 Put the �berglass on the mould

4 Put the �berglass on the mould 5 1 bottle polyester resin + 7.5ml hardener mix toagether N wait 2mins

6 When the polyester resin start to getting dark , wipe them over the tent and �berglass

7 Wait 0.5 hour -> repeats step 4-6 8 Demould -> Doen

Tough, can stand it without the mouldCreate a space under the tenseile

HAND DRAWING TECHNIQUEARCHITECTUREAL VISUALIZATION - Sem1