Sharon tsoi portfolio
-
Upload
sharon-tsoi -
Category
Documents
-
view
224 -
download
4
description
Transcript of Sharon tsoi portfolio
SHAR
O
N
TSOI
EDUCATION 2013 - 2015High Diploma in Architectural Design in Hong Kong Design Institute2015 - 2016BA(Hons) Architecture in University of Lincoln
CONTACT + 852 [email protected] J 15/F Block 5, Tsui Lai Garden, 9 Fung Nam Road, Sheung Shui, NT, Hong Kong
Autocad, Sketchup, Rhino 3D, Grasshoper 3D,Adobe Photoshop, Adobe Illustrator, Adobe InDesign, Revit
COMPUTERSKILLS
LANGUAGE Cantonese, English& Mandarin
20/11/1993BIRTH
WORK EXPERIENCEJul 2015 - Aug 2015Meta4 Design Forum Ltd ( Summer Internship )
EXPERIENCE
STUDY TRIP
EXHIBITIONNov 2015Urban Regeneration Workshop with EMBT (Barcelona)
Jan - June 2015Competition Studio for Architectural Design with HALO
2015Interview with Perspective magazine
June 20151 : 1 Exhibition in HKDI
June 2015Exhibition in Comix Home Base
June 2015Exhibition in HKDI
June 2016 Graduation Exhibition in Comix Home Base
April 2014 Xian Nov 2014 Seoul, Korea Visit Seung, H-sang studio- IROJE
Jan 2015 Foshan Nov 2015 Barcelona Workshop with EMBT
Sharon Tsoi Yuk Ying
STREET LOOP THEATRE LIVE THEATRE IN YAU MA TEIYAU MA TEI / IDEOLOGY EXCHANGE COMMUNE
The design aims to preserve the street culture of Hong Kong and to promote the Cantonese street opera culture and other styles of informal performance. It extends the performance space of Temple Street to the upper levels whilst preserving the original street passage at the ground level. Indoor programmes are surrounded by the extended performance spaces.
Circulation Study
Illustrative Diagram
Temple Street
Stall
Street Performance
Large-Scale Stage
Tin Hau Temple
Lobby,F&B, Toilet
Exhibition
Black Box Theatre
Temple Street at the ground �oor Accessible entrances for formal performances
Public Walkway & Hard Landscapefacing the Temple Street
Informal street performance along the circulation
Workshop(Drama & Music)
Private Program & courtyardare facing Tin Hau Temple Black Box Theatre
Rehease Room (Troupe)
Studio (Artist,Troupe)
Exhibition Hall
Cafe & Reading Corner
Private Program
Public Program
Sky atrium is on the top of the highway, as the centre point of the building Zoning consideration
Version 1: Using one the ramp to connect all �oor Version 2: Provide other circulation options Final Version: Simplify the circulation as two facades
The interior view : From Cafe & bookshop to the Sky atrium
The ground floor level: The Extended Temple Street
Gathering SpaceGL + 8.00
Cafe & Book ShopGL + 22.00
Gathering SpaceGL + 16.00
WorkshopGL + 12.00
ExhibitionGL + 17.00
Sky Atrium
Large ScalePerformance Stage
West Knowloon CorridorGL +10.00
Gathering SpaceGL + 8.00
Cafe & Book ShopGL + 22.00
StudioGL + 18.00
StudioGL + 12.00
Rehearsal RoomGL + 6.00
Black Box TheatreGL + 00.00
ExhibitionGL + 17.00
Sky Atrium
Large ScalePerformance Stage
West Knowloon CorridorGL +10.00
Section AA’ Section BB’
West Knowloon CorridorGL +10.00
StudioGL + 18.00
StudioGL + 12.00
Rehearsal RoomGL + 6.00
Black Box TheatreGL + 00.00
WorkshopGL + 12.00
WorkshopGL + 16.00
Gathering SpaceGL + 16.00
Section CC’
Detail Drawing
Level 1Plan @ +0.0m 1:300
GL +0.00Lobby
F&BToilet
ExhibitionHall
Large ScalePerformance Stage
Black BoxTheatre
Black BoxTheatre
AB
C
D’
D
A’
B’
C’
Level 2 Plan @ +9.0m 1:300
GL +0.00GL +3.75
Rehearsal RoomGL + 6.00
Gathering SpaceGL + 8.00
Level 3 Plan @ +13.0m 1:300
West Knowloon CorridorGL +10.00
StudioGL + 12.00Workshop
GL + 12.00
Gathering SpaceGL + 8.00
PlatformGL +13.25
Exhibition HallGL +17.00
Level 4 Plan @ +21.0m 1:300
Sky Atrium
GL +16.00
GL +19.00
StudioGL + 12.00Gathering Space
GL + 16.00WorkshopGL + 16.00
CafeGL +22.00
Book ShopGL +22.00
Level 5 Plan @ +25.0m 1:300
Gathering SpaceGL + 16.00
BuildingStrcutureHigh WayStrcuture
Street performance stageGL +3.75
Temple streetGL +0.00
In order to create slender columnsthe design, the I-Sectionsteel member are selected
Independent structure of highway
Concrete Structureof Highway
Structure of the building
Building SteelColumn
650mm - 400mmConcrete Flat Slab
Steel memberswith lift & stair
Sky atriumGL +17.50
Slender columns susceptibility tobuckling therefore provide bracing
Typical twin frame ight steel wall construction
provide bracing to column
West Kowloon CorridorGL +10.00
Aluminium movementcover plate
Sound-Absorbing space
Double glazedFritting etching (Chemical)
Light steel separating wall
50mm thick densemineral wool board
Light steel framestuds isolated from
2 layers of 15mmgypsum based board
Metal compositeGlass reinforced concrete
cladding panels
High way structure Movement Joint
Isolation Wall of High Way
MULTI - VARIATE HOUSE group design by sharon tsoi, hourace yeungCOMPETITION STUDIO FOR ARCHITECTUREAL DESIGN / MOBILE MODULAR ARCHITECTURE
Mobile Modular ArchitectureThis project is to design a modular living unit of about 20-30 square metre that can be a plug-in module to a modular building as well as a standalone building. The module include a twin sleeping zone,and a wet area.
DESIGN APPROACH
DESIGN CONCEPT
Basic moduleRepeated trapezoid surface
Moduler unitStableGood spatial quality
3. Varied combinationSTRUCTURE
1. Geometic form Array to organize
FEATURE
2. Both side can change to concave or convex
We use movable joint to connect four surface Turn over to 180 degrees
Furniture scale scaled up to the size of a building.
CATALOGUE One module
Structure wall frame x4set2500
5100
4410
Facade x2set
Timber Steel
Interior panel
Frame x4set Window x4setThick 75
4400
44006000
4100
4100
560022004800
4200
Glass Frosted Glass Wood Timber
Wood & Glass Steel Timber with opening Glass with opening
Other material options:
Other material options:
4800
4200
2200
DRAWING 1:100
3 ModularElevation 11:100 1:100 1:100
Elevation A Section BStructural frame (Module 1)
Type 1Type 2Type 3
Steel bracket Type
Plywood
90°104°76°
Facade (Module 1)
Opening
Ele A2
Ele A2
Ele A1
Ele A1
Ele A3
Ele A4
Ele A3
Ele A4Detail 2
R:20mm *CHS
Typicalscrew interval(apply to all)
Nail
*CHS : circular hollow section
3618
3618
3000
3000
309
309
309
105°
76°
600
76°
309
18003300
Module 2
Module 2Module 1
Opening
Opening
Opening
Opening
Plywood
CONSTRUCTION SEQUENCE
10 Using crane to hang the window and install the frame by 3 worker
11 The triangle frame can fit in different kinds of material for client’s needs, it alsocan change the angle to concave or convex.
12 Complete9 The frame used to support the wall and become are window frame
7 Using supporter to fit the wall stiff 8 Using crane to hang the frame and install the frame by 3 worker
6 There are furniture folded inside, when hang up the wall, furniture will set up immediately
5 Using crane to hang 4 point of the roof1 Transportation - 1 truck(12mx2.5m) can loaded 2 units material and only need 4 workers to build
2 Deliver on site - 1 unit only need 9.6mx4.2m
3 Construction - Using crane sling two structure wall from truck to site+
4 Structure can fold it horizontal, so worker can joint it easily
4200
4800 4800
4200
1 module package1160
4500
4800
ONE EXPLODED DIAGRAM 1:300
Window Frame
Window Frame
Window
Window
Interior Wall
Interior Wall
Frame
Frame
Facade
Facade
CONSTRUCTION SEQUENCE
1:1 Modular Construction Exhibition in HKDI
Display model Interview with HALOInterior spaceHorace Yeung , Sharon TsoiConstruction Detail
We give full consideration of the construction sequence and materiality of the modular while designing. The module needs to be assembled easily and fast , the material needs to be lightweight and sustainable. Therefore we choose timber as the main material.
In addition, we design the façade pattern Aand openings by following the structural frame of the panels.
3 Existing Scaffolding Space
25%
75%
95%
Transparency
1 Seduction
2 Bath
3 Action
(Whorehouserequirement)
ProgramFabric
(Layer)
1 Layer
2 Layers
4 Layers
LAYERS OF SEDUCTIONCHUN YEUNG STREET / OPEN STUDIO : FORGOTTEN CITY
FABRIC FEATURETransparency - Layers
1 Layer 1 Layer 2 Layers 3 LayersNo Layers
Transparency *Elasticity *
Transparency ****Elasticity *****
Transparency *****Elasticity **
Legging
Legging
NylonNylon CurtainsCurtains
Transparency + Lighting -> Shadow
Lighting Fabric + Lighting IndistinctLayers
Prostitution (Sex worker)
What they need ?
PrivateWork
Attract
Rest Private
Printemp Hotel Apartment - Bamboo ScaffoldingSelected Site - Bamboo Scaffolding
In this project, we have to select a character who living/ working/ appear in Chun Yeung Street. They may just a little guys who was forgotten by the public. Study all about the character or create a life for him/her,than design a specific area for the him/her.
CONCEPT DIAGRAM
SEM
ESTE
R 3
ARC
HIT
ECTU
RAL
DES
IGN PO
RTFOLIO SHARON TSOI SELECTED WORKS 2013-2015 ARCHITEC
TURA
L DESIG
N PO
RTFOLIO
SHA
RON
TSOI SELECTED WORKS 2014-2015 ARCHITECTURAL D
ESIG
N
Roof, Floor
Building
Building Inside
Glass
Fabric
Frame
Bamboo Scaffolding
Fabric
Axonometric Section 1:100
Study Model1 : 20 Model1 : 20 Model
1 : 50 Site Model
Site plan 1:3000
PUBLIC
PRIVATE
REHABILITATION COMPLEX & HOME OF THE AGEDRESIDENTIAL
SWEIMMING POOLCHAPELOPEN SPACE
CAR ROAD
Surrounding Programme Function
SITE CONTEXT CONSIDERATIONAccessibility
The main circulation flow is generally following to the original southwest path, people can go downstairs to enjoiy with the sea view from time to time.
Context (Physical Conditions Of Surroundings)
HighestShortest
Medium
X
Y
X’
Y’
Building height In the west, the existing building is not too close with the back building.So main program could be located at west side and mass could be tall.
Sextion XX’
Sextion YY’
In the east, the existing building is close with the back building.So east side mass is designed to be short. (e.g. in form of platform)
Pedestrian Circulation Vehicular Circulation
In
Out
1 EXISTING SITE 2 TOWER HAS BEEN REMOVRD
DESIGN PROCESS
Connect two level of front and back
3 PLATFORM → SLOPE 4 RESIDENTIAL→ RESTAURANT
Free up the ground floorto become public space
There are some cylinderto be the structure wall,
it’s can provide a high transparentMove the floor plate to create balconies
6 ABOVEG → BELOW GROUND5 GROUND FLOOR → PUBLIC SPACE 8 STRUCTURE7 CYLINDER → BALCONIES
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
THE OVERLAPS PLATFORM CIRCLE JUMBO RESTAURANT ON THE SLOPEWONG CHUK HANG / PEOPLE MOUNTAIN PEOPLE SEA
L2/F +19.50L3/F +25.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
B3/F +4.00
B1/F +10.50
L1/F +15.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
SITE PLAN 1:1000
Fish Market & Roof Garden
Balconies
Skylight
SECTION BB’ 1:200
SECTION CC’ 1:200
SECTION AA’ 1:200
PRINCIPLE OF BUILDINGMATERIALS EXPERIMENT - FIBERGLASS TENTSEILE
Venice
Venice
Fiberglass
Fiberglass
LAYERS
Polyester Resin+
Catalysis
8 Bottle
Fabric
FabricSingle tentLayer 1 Layer 2 Layer 3 Layer 4
Layer 5 Layer 6
Separator
Separator
Polyester Resin + Catalysis + Hardener
MATERIAL
Single Tent Hardener
2 Bottle
6 LayersFinsh Product
WORKING PROCESS
FIBERGLASS TENTSEILE
High transparency
Fiberglass + Polyester resin = tough , high ultimate tensile strength
1 We use tent to be a mould 2 We use rope and fabric bundle on top of the tent to be a tensile structure
3 We wipe the oil and separator over the fabric 4 Put the �berglass on the mould
4 Put the �berglass on the mould 5 1 bottle polyester resin + 7.5ml hardener mix toagether N wait 2mins
6 When the polyester resin start to getting dark , wipe them over the tent and �berglass
7 Wait 0.5 hour -> repeats step 4-6 8 Demould -> Doen
Tough, can stand it without the mouldCreate a space under the tenseile