SHADAB C.V.

11
CURRICULUM VITAE SHADAB HUSSAIN ADDRESS : C-58, DR.SUKUMAR SEN SARANI, SECTOR-2A, BIDHANNAGAR, DURGAPUR, DIST. – BURDWAN. PIN- 713212. STATE- WEST BENGAL COUNTRY- INDIA. Mobile No. +919933468277. Presently Contact At:- Email – [email protected] Mobile No. +971509295026 / +971562089778. SUMMERY : Executing and Managing the Insulation, Fireproofing, Refractory and Scaffolding activities on the site from the last 10(TEN) years. SPECIALIZATION : Hot & Cold Insulation, Fire Proofing, Refractory, Sand Blasting, Painting &Scaffolding. JOB RESPONSIBILITIES : Planning and scheduling of the job according to time schedule. Material and manpower management.

Transcript of SHADAB C.V.

Page 1: SHADAB C.V.

CURRICULUM VITAE

SHADAB HUSSAIN ADDRESS : C-58, DR.SUKUMAR SEN SARANI, SECTOR-2A, BIDHANNAGAR, DURGAPUR, DIST. – BURDWAN.

PIN- 713212. STATE- WEST BENGAL COUNTRY- INDIA. Mobile No. +919933468277.

Presently Contact At:- Email – [email protected]

Mobile No. +971509295026 / +971562089778.

SUMMERY:Executing and Managing the Insulation, Fireproofing, Refractory and Scaffolding activities on the site from the last 10(TEN) years.

SPECIALIZATION: Hot & Cold Insulation, Fire Proofing, Refractory, Sand Blasting, Painting &Scaffolding. JOB RESPONSIBILITIES:

Planning and scheduling of the job according to time schedule.

Material and manpower management.

Responsible in providing technical direction and assigning work toforemen and technicians in the execution of their responsibilities and duties.

Review and monitor the activities with proper safety & quality according to codes, standards, regulations & procedure.

Provide technical advice regarding field activities of application and if required modification.

Page 2: SHADAB C.V.

Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).

Monitoring progress of work with proper safety measures, taking measurement of the work done and certification of it from the Client.

According to specifications conducting the job on the site and checking the materials to be used.

Following the MSDS(Material Safety Data Sheet) on the site while handling the materiel.

Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.

Following the PTW rules and regulations on site.

Clearing the punch points before the completion of the work.

Studying and reviewing the P&ID’S and Isometrics drawings.

WORKING EXPERIENCE:

CURRENTLY WORKING: KAEFER L.L.C. (UAE).PERIOD: NOVEMBER 2012 TO TILL DATE.DESIGNATION: QA/QC SUPERVISOR.

ORGANISATION: M/S.IOT ENGINEERING PROJECTS LIMITED.DESIGNATION: INSULATION SUPERVISOR.PERIOD: MARCH 2012 to MAY 2012.LOCATION: 5*800MW POWER PLANT MUNDRA, DIST:-KUTCH, GUJARAT.

ORGANISATION: M/S.ASIAN INSULATION.PERIOD: APRIL 2005 to FEBRUARY 2012.DESIGNATION: INSULATION SUPERVISOR.

TOTAL WORK EXPERIENCE:

GULF EXPERIENCE----- 2Years 7months.INDIA EXPERIENCE----- 7Years 6months.

Page 3: SHADAB C.V.

DETAILS OF WORK EXPERIENCE.

WEST BENGAL: (INDIA)DURGAPUR PROJECTS LTD. DURGAPUR: As a junior Insulation supervisor of Boiler, ESP and its allied ducts.PERIOD- APRIL 02, 2005 to JULY 31, 2006.Responsibilities: Monitoring progress of work.Conducts Tool box talk.Arrangements of the Materials from yard to site location.

BAKRESHWAR THERMAL POWER PLANT,BAKRESHWAR: As an Insulation & ducting supervisor of Boiler, ESP,T.G. piping, equipments & control rooms.PERIOD- AUGUST 07, 2006 to DECEMBER 31, 2007.Responsibilities: Arrangements of the Materials from yard to site location.Monitoring progress of work with proper safety measures.Preparing the daily report, weakly report.

ULTRATECH CEMENT LTD.DURGAPUR: As a Painting &Insulation supervisor of ESP & Bag Filters.PERIOD- JANUARY 03, 2008 to MARCH 10, 2008.Responsibilities: Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.

DURGAPUR CEMENT WORKS (BIRLA CORPORATION LTD.) As a Ducting supervisor of control rooms & auditoriums.PERIOD- MARCH 20, 2008 to APRIL 30, 2008.Responsibilities: Conducts Tool box talk.Arrangements of the Materials.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.

Page 4: SHADAB C.V.

UTTAR PRADESH: (INDIA)OBRA THERMAL POWER STATION: As an Insulation supervisor of ESP and ducts.PERIOD- MAY 06, 2008 to AUGUST 31, 2008.

Responsibilities:Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).Clearing the punch points before the completion of the work.

ORISSA: (INDIA)VEDANTA ALUMINIUM LTD. JHARSUGUDA: As an Insulation & ducting supervisor of BOILER, ESP & control rooms. PERIOD- DECEMBER 08, 2009 to JUNE 30, 2010. (UNIT NO.2)PERIOD- NOVEMBER 01, 2010 to NOVEMBER 30, 2011. (UNIT NO.4)

Responsibilities:Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.Following the PTW rules and regulations on site.Studying and reviewing the P&ID’S and Isometrics drawings.Clearing the punch points before the completion of the work.

Page 5: SHADAB C.V.

GUJARAT: (INDIA)RELIANCE INDUSTRIES LTD. JAMNAGAR: As a Painting, insulation & fireproofing supervisor of piping, equipments, vessels, beams, columns.PERIOD- SEPTEMBER 10, 2008 to NOVEMBER 30, 2009.

COASTAL GUJARAT POWER LTD. (CGPL) MUNDRA, KUTCH-GUJARAT.As a Painting, insulation & scaffolding supervisor of ESP and ducts.PERIOD- JANUARY 07, 2012 to MAY 19, 2012.

Responsibilities:Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.Following the PTW rules and regulations on site.Studying and reviewing the P&ID’S and Isometrics drawings.Preparing of BOQ(Bill of Quantity) from the Isometrics drawings.Responsible in providing technical direction and assigning work to foremen in the execution of their responsibilities and duties.Clearing the punch points before the completion of the work.

UNITED ARAB EMIRATES (UAE): GULF PIPING COMPANY W.L.L (ABU DHABI):As an Insulation & Fireproofing supervisor of piping ,equipments, structures, beams, columns. PERIOD- NOVEMBER 01, 2012 to FEBRUARY 17, 2013.Responsibilities:Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.

Page 6: SHADAB C.V.

Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).

Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.Following the PTW rules and regulations on site.Studying and reviewing the P&ID’S and Isometrics drawings.Preparing of BOQ(Bill of Quantity) from the Isometrics drawings.Responsible in providing technical direction and assigning work to foremen in the execution of their responsibilities and duties.Review and monitor the activities with proper safety & quality according to codes, standards, regulations & procedure.Provide technical advice regarding field activities of application and if required modification.Clearing the punch points before the completion of the work.

SHAH GAS DEVELOPMENT PROJECT PACKAGE # 4 Utilities & Off sites: (ABU DHABI)As a Painting, Insulation, Refractory & Fireproofing supervisor of piping, equipments, beams, columns.PERIOD- FEBRUARY 18, 2013 to AUGUST 28, 2014.

Responsibilities:Conducts Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.Following the PTW rules and regulations on site.Studying and reviewing the P&ID’S and Isometrics drawings.Preparing of BOQ(Bill of Quantity) from the Isometrics drawings.Responsible in providing technical direction and assigning work to foremen in the execution of their responsibilities and duties.Review and monitor the activities with proper safety & quality according to codes, standards, regulations & procedure.Provide technical advice regarding field activities of application and if required modification.

Page 7: SHADAB C.V.

Clearing the punch points before the completion of the work.

Upper Zakum 750K Project P-7511-ZADCO OFFSHORE (ABU DHABI):As an Insulation QA/QC Supervisor of Hot &Cold Insulation of Equipments &Piping.PERIOD-SEPTEMBER 4, 2014 to TILL DATE.

Responsibilities:Conducting Tool box talk.Arrangements of the Materials.Following and explaining the MSDS(Material Safety Data Sheet) on the site while handling the materials.Monitoring progress of work with proper safety measures.According to specifications conducted the job on the site.Taking measurement of the work done and gets certified it from the Client.Conducts inspection as per I.T.P. (INSPECTION TEST PLAN).Preparing the daily report, weakly report, monthly report and annual report for the work status in Excel form.Following the PTW rules and regulations on site.Studying and reviewing the P&ID’S and Isometrics drawings.Preparing of BOQ(Bill of Quantity) from the Isometrics drawings.Responsible in providing technical direction and assigning work to foremen in the execution of their responsibilities and duties.Review and monitor the activities with proper safety & quality according to codes, standards, regulations & procedure.Provide technical advice regarding field activities of application and if required modification.Clearing the punch points before the completion of the work.

PLACES OF WORK:

GULF:UNITED ARAB EMIRATES (UAE):

GULF PIPING COMPANY W.L.L. (Abu Dhabi). SHAH GAS DEVELOPMENT PROJECT PACKAGE#4, UTILITIES & OFFSITES. ZAKUM FIELD OFFSHORE, Upper Zakum 750K PROJECT, Abu Dhabi.

INDIA:

WEST BENGAL

Page 8: SHADAB C.V.

DURGAPUR PROJECTS LTD.(D. P .L)DURGAPUR CEMENT WORKS (BIRLA CORPORATION LTD.)ULTRATECH CEMENT PLANT.BAKRESWAR THERMAL POWER PLANT.

ORISSA VEDANTA ALUMINIUM LTD.(JHARSUGUDA)

UTTAR PRADESH OBRA THERMAL POWER STATION.

GUJARATRELIANCE INDUSTRIES LTD. (JAMNAGAR)COASTAL GUJARAT PROJECTS LTD. (CGPL) MUNDRA.

EDUCATION QUALIFICATION:

TBOSIET COURSE FROM OPITO (OFFSHORE SURVIVAL) ABU DHABI, UAE.

MBA in Construction & Project Management. (PERSUING)

COMPUTER QUALIFICATION: Basic knowledge in M.S. OFFICE.

PERSONAL DETAILS: FATHER’S NAME : SHAKIR HUSSAIN.DATE OF BIRTH : 28-03-1985.LANGUAGES KNOWN : ENGLISH, HINDI, BENGALI, URDU.HOBBIES : ACQUIRING NEW TECHNIQUES OF CONSTRUCTION.SEX : MALE.MARITAL STATUS : UNMARRIED.RELIGION : ISLAM.NATIONALITY : INDIAN.PASSPORT NO. : J 1023059 VALID UPTO-24/11/2020.