SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor...

13
62 Annexure 4: Drawings

Transcript of SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor...

Page 1: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

62

Annexure 4: Drawings

Page 2: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

STOPSTOP

RWRW RW

RW

RW

RWRW

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\USE

RS\V

ICCI

.SMI

TH\D

OCUM

ENTS

\2503

10-3

PRE-

3DES

-DRG

-020

0-02

10.D

WG

2/12/2

016 1

:28:49

p.m.

NZAK

L

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSOVERALL KEY PLAN

250310 3PRE 3DES DRG 0200 E

NOT TO SCALEPRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 29.07.16 PRELIMINARY ISSUE G. MOOREB 09.09.16 REVISED ISSUE G. MOOREC 19.09.16 REVISED ISSUE G. MOORED 23.09.16 DESIGN FREEZE G. MOOREE 30.11.16 CONSENT ISSUE G. MOORE

SHEET 1

SHEET 2

SHEET 3SHEET 4

SHEET 5SHEET 6

SHEET 7

SHEET 8

SHEET 9

SHEET 10

TO WHANGAREI

TO AUCKLAND

ALBANY BUSSTATION

McCLYMONTS ROAD BRIDGEREPLACEMENT OVER SH1

BUSWAY BRIDGE OVER SH1& ALBANY PARK & RIDE

SPENCER ROADFOOTBRIDGE

BUSWAY BRIDGE OVERGREVILLE ROAD

GREVILLE ROAD BRIDGEWIDENING

ROSEDALE ROADBRIDGE WIDENING

BUSWAY BRIDGE OVERROSEDALE ROAD

BUSWAY BRIDGE OVERCONSTELLATION DRIVE

CONSTELLATIONBUS STATION

SH18 BRIDGE OVERPAUL MATTHEWSROAD OFF-RAMP

PAUL MATTHEWS ROADBRIDGE OVER SH18

CONSTELLATION DRIVEBRIDGE WIDENING

ALBANY HIGHWAY

ALBANY EXPRESSWAY

SH1 NORTHERN MOTORWAY

SH18 UPPER

HARBOUR HIGHWAY

TO WAITAKERE

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

PROPOSEDWATERCARE POND LINK

NEW SH 1 TO SH 18 RAMPBRIDGE OVER SH 1

AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
Page 3: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RW 1-3STEEL UC WALL WITH CONCRETE PANELS (CUT)

MAX H = 1.5mRW 1-1L SHAPED GRAVITY WALL (FILL)MAX H = 3.0m

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RW

RWRW RW RW RW RW RW RW

RW

RW

RW RW RW RW RW RWRW

RW

340

320

300

280

260

240

220

200

180

160

140

120

100

80

60

40

20

0

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW RW RW RW RW RWRW

11600

11650

11700

11750

11800

11850

11900

11950

12000

12050

12100

12150 12200 12250 12300 12350

00

50

100

150 200 250

300

350

400

450

500

550

GCN0

MATCHLINE JOINS SHEET 2

KEY PLAN

13 4 65

8

9

10

2 71

RW 1-5MSE BLOCK WALL (FILL)MAX H = 8.9m

PROJ

ECT

EXTE

NTS

PROJ

ECT

EXTE

NTS

SH1 NORTHERN MOTORWAY

OTEH

A VA

LLEY

ROA

D

CORNERSTONE DRIVE ELLIO

T ROS

E AVE

NUELUCAS CREEK

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G18

/4/20

17 11

:10:08

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 1

250310 3PRE 3DES DRG 0201 I

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

B 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 REVISED ISSUE G. MOOREH 30.11.16 DESIGN FREEZE G. MOOREI 13.04.16 REVISED ALBANY BUSWAY BRIDGE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

SHARED USE PATH RAMPCONNECTION TO OTEHAVALLEY ROAD

EXISTING OTEHA VALLEY ROADNORTHBOUND OFF-RAMPREALIGNED AND WIDENED TOTWO-LANE EXIT

NEW BUSWAY BRIDGE OVERSH1 TO ALBANY PARK N RIDE

RW 1-2

MSE BLOCK WALL (FILL)

MAX H = 10.0m

RW 1-4MSE BLOCK WALL (FILL)MAX H = 7.5m

RW 1-6MSE BLOCK WALL (FILL)MAX H = 9.7m

POTENTIAL CENTRELINEOF FUTURE EXTENSIONOF BUSWAY

RW 1-10L SHAPED GRAVITY WALL (FILL)MAX H = 1.5m

Page 4: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

SHARED USE PATH RAMP CONNECTIONTO McCLYMONTS ROAD

RW 2-1MSE BLOCK WALL (FILL)MAX H = 7.0m

RW 2-2BORED PILE WALL (CUT)MAX H = 4.2m

EXISTING BUS RAMP REMOVED

RW 2-3ANCHORED BORED PILE WALL (CUT)

MAX H = 8.31m

RW 2-5

ANCHORED BORED PILE WALL (CUT)

MAX H = 8.6m

RW 2-4MSE BLOCK WALL (FILL)

MAX H = 3.2m

RW 2-

10MS

E BL

OCK

WAL

L (FIL

L)MA

X H

= 5.1m

RW 2-7MSE BLOCK WALL (FILL)

MAX H = 3.0m

RW 2-9STEEL UC WALLWITH CONCRETEPANELS (CUT)MAX H = 3.0m

RWRW

RWRW

RWRW

RW

RWRW

RWRW

RW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RW

RW

RW

RW

RW

RWRW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

340

320

300

280

260

KEY PLAN

13 4 65

8

9

10

2 7MA

TCHL

INE

JOIN

S SH

EET

12

MATCHLINE JOINS SHEET 3

12350 12400 12450 12500

12550

12600

12650

12700

12750

12800

12850

12900

12950

13000

13050

13100

13150

550

600

650

700

750

800

850

900

950

1000

1050

1100

1150

1200

1250

1300

1350

PROJ

ECT

EXTE

NTS

ELLIO

T ROS

E AVE

NUE

SH1 NORTHERN MOTORWAY

DON MCKINNON DRIVE

ELLIOT ROSE AVENUE

DON MCKINNON DRIVE

MCCLYMONTS ROAD

MEDALLION DRIVE

SPENCER ROAD

CIVIC CRES

McCLYMONTS ROAD

COXTON LANE

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\USE

RS\V

ICCI

.SMI

TH\D

OCUM

ENTS

\NCI

\2503

10-5

DOC-

3DES

-DRG

-020

1-02

10.D

WG

13/4/

2017

3:05

:42 p.

m.AU

DC1

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 2

250310 3PRE 3DES DRG 0202 I

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

B 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 REVISED ISSUE G. MOOREH 30.11.16 DESIGN FREEZE G. MOOREI 13.04.17 REVISED ALBANY BUSWAY BRIDGE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

B0302

NEW SPENCER ROAD FOOTBRIDGE OVERSH1, BUSWAY AND SHARED USE PATH.OUTSIDE PROJECT SCOPE, SHOWN FORINFORMATION ONLY

SHARED USE PATH STAIRSCONNECTION TO SPENCER ROAD

RW 2-6BORED PILE WALL (CUT)

MAX H = 5.6m

RW 2-8

STEEL UC WALL WITH CONCRETE PANELS (CUT)

MAX H = 2.7m

NEW MAINTENANCE BAY

RW 1-6MSE BLOCK WALL (FILL)MAX H = 9.7m

REMOVAL OF EXISTINGBUS OFF-RAMP

EXISTING McCLYMONTS ROADBRIDGE TO BE REMOVED

NEW PROPOSED BRIDGETO REPLACE EXISTING

SHARED USE PATH RAMP CONNECTIONTO MEDALLION DRIVE

NEW PROPOSED PEDESTRIAN CROSSINGON McCLYMONTS ROAD TO PROPOSEDSHARED USE PATH RAMP CONNECTION(DETAIL TBC)

A0301

CSA4 - McCLYMONTS ROAD

Page 5: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RW

RWRW

RWRW

RWRW

RWRW

RW

RW RW RW RW

RW

RWRW

RWRW

RWRW

RWRW

RW RW RW RW RW RW RW RWRW RW RW

RW RW RW RW

RW

1400

1450

1500 1550 1600

1650

1700

1750

1800

1850

1900

1950

2000 2050

2100

2150

13150

13200

13250

13300 13350 13400 13450 13500

13550

13600

13650

13700

13750

13800

13850

13900

13950

SH1 NORTHERN MOTORWAY

ALBANY EXPRESSWAY

GREVILLE ROAD

TAWA DRIVE

RATH

MULL

EN P

LACE

COLLISTON RISE

COLLISTON RISE

CORINTHIAN

DRIVE

GREVILLE ROAD

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 4

3MA

TCHL

INE

JOIN

S SH

EET

2

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

39:39

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 3

250310 3PRE 3DES DRG 0203 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

EXISTING SH1 BRIDGE OVERGREVILLE ROAD. WIDENEDIN BOTH DIRECTIONS

SHARED USE PATH RAMPCONNECTION TO GREVILLE ROAD

NEW BUSWAY AND SHARED USEPATH BRIDGE OVER GREVILLE ROAD

EXISTING GREVILLEROAD NORTHBOUNDON-RAMP REALIGNED

MAINTAIN EXISTINGENFORCEMENT BAY

NEW MAINTENANCE BAY

NEW MAINTENANCE BAY

RW 3-3MSE BLOCK WALL (FILL)MAX H = 3.2m

RW 2-8STEEL UC WALL WITH CONCRETE PANELS (CUT)

MAX H = 2.7m

C0301

RW 3-1MSE BLOCK WALL (FILL)MAX H = 11.4m

STAIRS

RW 2-6BORED PILE WALL (CUT)

MAX H = 5.6m

CSA6 - GREVILLE ROAD EAST

CSA3 - GREVILLE ROAD WEST

Page 6: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RW

RW

RW RW RW RW RW

RWRW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RW

RW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW RW

RW RW RW RW RW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW RW

RW

RWRW

RWRW RW RW RW

RWRW

RWRW

RWRW

RW

RW 4-2BORED PILE WALL (CUT)MAX H = 4.7m

RW 4-9L-SHAPE GRAVITY WALL (FILL)MAX H = 2.0m

RW 4-10STEEL UC WALL WITH CONCRETE PANELS (CUT)

MAX H = 2.8m

RW 4-13MSE BLOCK WALL (FILL)MAX H = 4.6m

RW 4-1MSE BLOCK WALL (FILL)MAX H = 7.0m

RW 4-11MSE BLOCK WALL (FILL)MAX H = 2.8m

RW 4-3MSE BLOCK WALL (FILL)MAX H = 13.3m

2200

2250 2300 2350 2400 2450 2500 2550

2600

2650

2700

2750

2800

2850

2900 2950

13950

14000

14050

14100

14150 14200 14250 14300 14350 14400 14450

14500

14550 14600 14650 14700 14750

TAWA DRIVE

SH1 NORTHERN MOTORWAY

TAWA DRIVE

MIRO

PLA

CE

TITO

KI P

LACE

ROSE

DALE

ROA

D

TAWA DRIVE COWLEY PLACE

COWLEY PLACE

ROSEDALE ROAD

ARRENWAY DRIVE

TRITON DRIVE

DALL

AN P

LACE

COWLEY PLACE

OTEH

A VA

LLEY

STR

EAM

RW 4-4MSE BLOCK WALL (FILL)MAX H = 5.7m

RW 4-5ANCHORED BORED PILE WALL (FILL)MAX H = 6.8m

RW 4-6MSE BLOCK WALL (FILL)MAX H = 6.4m

RW 4-7MSE BLOCK WALL (FILL)MAX H = 2.4m

KEY PLAN

13 4 65

8

9

10

2 7MA

TCHL

INE

JOIN

S SH

EET

34

MATCHLINE JOINS SHEET 5

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

39:50

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 4

250310 3PRE 3DES DRG 0204 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

E0304

EXISTING GREVILLEROAD SOUTHBOUNDON-RAMP REALIGNED

NEW BUSWAY AND SHARED USE PATHBRIDGE OVER ROSEDALE ROAD

SHARED USE PATHRAMP CONNECTIONTO ROSEDALE ROAD

EXISTING GREVILLEROAD NORTHBOUNDOFF-RAMP REALIGNED

ROSEDALE ROAD LOWERED TO PROVIDEMINIMUM 4.9m HEADROOM UNDERWIDENED ROSEDALE ROAD BRIDGE

EXISTING ROSEDALEROAD BRIDGE WIDENEDIN BOTH DIRECTIONS

NEW MAINTENANCE BAY

NEW MAINTENANCE BAY

D0303

RW 4-12MSE BLOCK WALL (FILL)MAX H = 5.1m

F0304

RW 4-8STEEL UC WALL WITH CONCRETE PANELS (CUT & FILL)

MAX H = 1.8m

RW 4-14BORED PILE WALL (CUT)MAX H = 6.5m

CSA5 - ROSEDALE ROAD

Page 7: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RW RW RW

RW

RWRW

RW RW RW RW RW RW RW

RW RW RW RW

RWRW

RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW

RW RW RWRW

RW

RW

RW

RW RW RW RW RW RW RW

RWRW

RW RW RW RW RW RW

RWRW

RW

RW

RW RW RW RW RW RWRW RW RW RW RW

RW 5-3STEEL UC WALL (CUT)

MAX H = 2.4m

CH 15010 - CH 153101V:3H EARTHWORKS SLOPE WITH RIP-RAP ARMOUR

EXTENT AND DESIGN TO BE CONFIRMED AGAINST POND BATHYMETRY

00

50

100

150 200 250 300 350

400

2950 3000 3050 3100

3150

3200

3250

3300

3350

3400

3450

3500

3550

3600

3650

3700

14700 14750 14800

14850

14900

14950

15000

15050

15100

15150

15200

15250

15300

15350

15400

15450

15500

DALL

AN P

LACE

COWLEY PLACE

ARRENWAY DRIVE

CIVI

L PLA

CE

ARRE

NWAY

DRI

VE

SH1 NORTHERN MOTORWAY

CH 3370 - CH 3480

1V:3H EARTHWORKS SLOPE WITH RIP-RAP ARMOUR

EXTENT AND DESIGN TO BE CONFIRMED AGAINST POND BATHYMETRY

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 6

5MA

TCHL

INE

JOIN

S SH

EET

4

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

40:00

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 5

250310 3PRE 3DES DRG 0205 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

I0306

H0305

NEW SH18 SOUTHBOUND OFF-RAMP

NEW SH18 NORTHBOUND ON-RAMPNEW ENFORCEMENT BAY SIMILARIN LOCATION TO EXISTING

REMOVAL OF EXISTINGENFORCEMENT BAY

REMOVAL OF EXISTINGENFORCEMENT BAY

NEW MAINTENANCE BAY

NEW MAINTENANCE BAY

NEW MAINTENANCE BAY

RW 4-14BORED PILE WALL (CUT)MAX H = 6.5m

PROPOSED PONDLINK ALIGNMENT

WSL POND 1

WSL POND 2

SHARED USE PATHRAMP CONNECTIONTO ARRENWAY DRIVE

SHARED USE PATH RAMP CONNECTION TOBE USED FOR WETLAND MAINTENANCEACCESS ONLY. MAY BE CONVERTED TOSHARED USE PATH IN FUTURE

NEW ENFORCEMENT BAY

G0305

RW 5-5

MSE BLOCK WALL (FILL)

MAX H = 5.7m

RW 5-1ANCHORED BORED PILE WALL (CUT)

MAX H = 9.2mRW 5-2

BORED PILE WALL (CUT)MAX H = 5.6m

RW 5-4

STEE

L UC W

ALL W

ITH

CONC

RETE

PANE

LS

MAX H =

4.5m

RW 4-8STEEL UC WALL WITH CONCRETE PANELS (CUT & FILL)MAX H = 1.8m

RW 5-6

MSE BLOCK WALL (FILL)

MAX H = 3.3m

EXISTING VEHICULAR LINKTO BE ABANDONED ANDFILLED WITH CEMENTITIOUSBENTONITE

RW 5-7BORED PILE WALL (CUT)

MAX H = 2.6m

RW 5-8

MSE BLOCK WALL (FILL)

MAX H = 3.0m

RW 5-9MSE BLOCK WALL (FILL)

MAX H = 5.2m

PROPOSED WATERCAREPOND LINK BRIDGEUNDER SH1

Page 8: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RW RW RW RW RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RW RWRW

RWRW

RWRW

RW

RW RW RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW

RWRW RW

RW

RW

RWRW

RW 6-1

MSE BLOCK WALL (FILL)

MAX H = 8.2m

AD-4 (G)

RW 6-4

MSE BLOCK WALL (FILL)

MAX H = 5.5m

350

400

450

500

550

600

3650

3700

3750

3800

3850

3900

3950

4000

4050

4100

4150

4200

4250

4300

4350

4375.780

15450

15500

15550

15600

15650

15700

15750

15800

15850

15900

15950

16000

16050

16100

16150

16200

16250

PROJ

ECT

EXTE

NTS

PROJ

ECT

EXTE

NTS

CONS

TELL

ATIO

N DR

IVE

EXISTING SH18 UPPER HARBOUR HIGHWAY

SH1 NORTHERN MOTORWAY

SUNSET ROAD

MATC

HLIN

E JO

INS

SHEE

T 5

MATCHLINE JOINS SHEET 8

KEY PLAN

13 4 65

8

9

10

2 76MATCHLINE JOINS SHEET 7

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G2/1

2/201

6 10:1

3:18 a

.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 6

250310 3PRE 3DES DRG 0206 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

J0307

EXISTING CONSTELLATION DRIVESOUTHBOUND OFF-RAMP REALIGNED

NEW BUSWAY AND SHARED USE PATHBRIDGE OVER CONSTELLATION DRIVE

EXISTING CONSTELLATIONDRIVE NORTHBOUNDON-RAMP RECONFIGURED

EXISTING SH1 BRIDGE OVERCONSTELLATION DRIVEWIDENED IN BOTH DIRECTIONS

NEW SH1 TO SH18 RAMPBRIDGE OVER SH1

NEW ENFORCEMENT BAY

EXISTING BUS RAMP REMOVED

L0308

K0308

EXISTING BUS LANE REMOVED

EXISTING LANE WIDTHS TO BE REDUCEDTO PROVIDE INCREASED WIDTH FORPROPOSED SHARED USE PATH

EXISTING PLATFORMS AND BUSWAY AT CONSTELLATIONSTATION RECONFIGURED. REFER TO DRAWING250310-3PRE-3DES-DRG-3001 FOR PROPOSED STATIONLAYOUT

RW 6-2

MSE BLOCK WALL (FILL)

MAX H = 6.6m

RW 6-

5L-

SHAP

ED G

RAVI

TY W

ALL (

FILL

)MA

X H

= 2.3

m

RW 6-3

MSE BLOCK WALL (FILL)

MAX H = 4.9m

RW 6-6

L-SHAPED GRAVITY WALL (FILL)

MAX H = 1.3m

CSA2 - NORTH-FACING RAMPS

NZTA CONSTELLATION BUSSTATION DESIGNATION

MATCHLINE A-A

MATCHLINE A-A

AutoCAD SHX Text
P
Page 9: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

16200

16250

16300

16350

16400

16450

16500

16550

16600

16650

16700

16750

16800

16850

16900

16950

17000

PROJ

ECT

EXTE

NTS

SUNSET ROAD

MATC

HLIN

E JO

INS

SHEE

T 6

KEY PLAN

13 4 65

8

9

10

2 77

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

40:22

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 7

250310 3PRE 3DES DRG 0207 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

Page 10: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

STOP STOP RWRWRWRWRWRWRW

RW

RW RW RW RW RW RW RW RW RW RW RWRW

RWRW

RW RW RW RW

RW RW RW RW

RW

RWRW RW RW RW RW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RWRW

RWRW

RW

RWRWRWRWRWRWRW

AD-4

(G)

550

600

650

700

750

800

850 900 950 1000 1050 1100 1150

1200

1250

1300

1350

PROJE

CT

EXTE

NTS

EXISTING SH18 UPPER HARBOUR HIGHWAY

EXISTING SH18 UPPER HARBOUR HIGHWAY

BARBADOS DRIVE

SH18 UPPER HARBOUR HIGHWAY

CARRIBEAN DRIVE

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 9MA

TCHL

INE

JOIN

S SH

EET

68

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

40:33

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 8

250310 3PRE 3DES DRG 0208 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

M0309

NEW PAUL MATTHEWS ROADBRIDGE OVER SH18

RW 8-3MSE BLOCK WALL (FILL)MAX H = 8.0m

RW 8-6BORED PILE WALL (CUT)

MAX H = 7.5m

INDICATIVE LOCATION OFRELOCATED PYLON

PROPOSED BAY FOR PYLONMAINTENANCE ACCESS

RW 8-4MSE BLOCK WALL (FILL)

MAX H = 8.2m

RW 8-1MSE BLOCK WALL (FILL)

MAX H = 6.1m

RW 8-2

MSE BLOCK WALL (FILL)

MAX H = 4.8

RW 8-5MSE BLOCK WALL (FILL)

MAX H = 7.6m

RW 8-7MSE BLOCK WALL (FILL)

MAX H = 3.0m

RW 9-1BORED PILE CUT WALL (CUT)MAX H = 5.0m

CSA2 - NORTH-FACING RAMPS

CSA1 - PAUL MATTHEWS ROAD

AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
Page 11: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RWRW

RWRW

RW

RW

RW

RW

RW

RW

RW

RW

RWRW

RWRW RW RW RW RW RW RW RW RW RW RW RW RW RW

RWRW

RWRW

RW

RW

RW

RW

RW

RWRW

RWRW

RW

RW

RW

RWRW

RWRW

RW

RWRW

RWRW

RWRW

RWRW

RWRW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

1300

1350

1400

1450

1500

1550

1600

1650

1700 1750 1800 1850

1900

1950

2000

2050

2100

PROJ

ECT

EXTE

NTS

PROJECT

EXTENTS

PROJ

ECT

EXTE

NTS

SH18 UPPER HARBOUR HIGHWAY

PAUL MATTHEWS ROAD

SH18 UPPER HARBOUR HIGHWAY

SATURN PLACE

OMEGA STREET

WILLIAM PICKERING DRIVE

BLUEBIRD CRES

UNSW

ORTH

DRI

VE

ALEXANDRA CREEK

KEY PLAN

13 4 65

8

9

10

2 7

MATCHLINE JOINS SHEET 10MA

TCHL

INE

JOIN

S SH

EET

8

9

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 1:

35:23

p.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 9

250310 3PRE 3DES DRG 0209 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

SHARED USE PATH RAMP CONNECTIONTO PAUL MATTHEWS ROAD

RW 8-6BORED PILE WALL (CUT)

MAX H = 7.5m

RW 9-1BORED PILE CUT WALL (CUT)

MAX H = 5.0m

CLOSURE OF EXISTINGOFF-RAMP TO Z

RW 9-3L-SHAPE GRAVITY WALL (FILL)

MAX H = 3.0m

RW 9-4STEEL UC WALL WITHCONCRETE PANELS (CUT)

MAX H = 1.1m

EXISTING PEDESTRIAN UNDERPASSTO BE RETAINED

SHARED USE PATH RAMPCONNECTION TO EXISTINGPATH NETWORK

CLOSURE OF EXISTINGOFF-RAMP TOUNSWORTH DRIVE

O0307

RW 9-2STEEL UC WALL WITHCONCRETE PANELS (CUT)

MAX H = 1.6m

RW 9-6COMBINED TL5 CONCRETE BARRIER / RETAINING WALL (CUT)

MAX H = 1.1m

RW 9-5

L-SHAPED GRAVITY WALL (FILL)

MAX H = 1.7m

N0306

RW 9-9

STEEL UC WALL W

ITH

CONCRETE PANELS (CUT)

MAX H = 2.5m

RW 9-7L-SHAPED GRAVITYWALL (FILL)

MAX H = 2.0m

RW 9-8

MSE BLOCK WALL (FILL)

MAX H = 3.8m

AutoCAD SHX Text
P
Page 12: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

RWRW

RWRW

RWRW

RWRW

RW

2050

2100

2127.648

PROJ

ECT

EXTE

NTS

WILLIAM PICKERING DRIVE

SH18 UPPER HARBOUR HIGHWAY

BUSH ROAD

ALBANY HIGHWAY

ALEXANDRA STREAM TRIBUTARY

KEY PLAN

13 4 65

8

9

10

2 7

MATC

HLIN

E JO

INS

SHEE

T 9

10

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-0

200-

0210

.DW

G25

/11/20

16 9:

40:55

a.m.

NZAK

L

0

SCALE 1:1000

10 40m20

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 10

250310 3PRE 3DES DRG 0210 H

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

M. FRANCIS J.HIND

J. HIND03.10.16

A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE

LEGENDEXISTING DESIGNATION BOUNDARY

ALTERATION TO EXISTINGDESIGNATION BOUNDARY

PROPOSED SHARED USE PATH

PROPOSED BUSWAY

PROPOSED TRANSIT LANE

PROPOSED FOOTPATH

CONSTRUCTION SUPPORT AREAS

PROPOSED ON-ROAD CYCLE LANE

BRIDGE EXTENTS

PROPOSED RETAINING WALL

FILL SLOPE

CUT SLOPE

EXISTING CULVERT TO BE RETAINED

EXISTING CULVERT TO BE ABANDONED

PROPOSED CULVERT

RW

SHARED USE PATH CONNECTIONTO ALBANY HIGHWAY

RW 10-1

MSE BLOCK WALL (FILL)

MAX H = 3.8m

RW 9-6

CONCRETE BARRIER / RETAINING WALL (CUT)

MAX H = 1.1m

P0310

Page 13: SH1 NORTHERN MOTORWAY ALBANY EXPRESSWAY · 2/12/2016 1:28:49 p.m. nzakl northern corridor improvements general arrangements overall key plan 250310 3pre 3des drg 0200 e not to scale

RW RW RW RW RW RW

RW RW RW RW RW RW

RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW

RW

RW RW RW RWRW

RW RW RW RW

RW

RW

RW RW RW RW RW RW RW RW RW RW RW

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-3

001.D

WG

2/12/2

016 1

:49:12

p.m.

NZAK

L

NORTHERN CORRIDOR IMPROVEMENTS

GENERAL ARRANGEMENTSSHEET 6

250310 3PRE 3DES DRG 0201 C

1:1000PRELIMINARY

NOT FOR CONSTRUCTION

V. SMITH

M. FAN

A PRELIMINARY ISSUEB 01.07.16 REVISED ISSUEC 15.07.16 REVISED ISSUE -

CLIENT

DATE

TITLE

REVISION DETAILSDATEREV APPROVED

CHECKED

APPROVED

PROJECT

DRAWN

DESIGNED

PROJECT No. WP REVSTAGE TYPE NUMBER

DRAWING No.

SCALE SIZE

A1

.

CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)

Filen

ame:

Plot

Date:

Offic

e:C:

\PW

_WOR

K\D0

3150

96\25

0310

-3PR

E-3D

ES-D

RG-3

001.D

WG

2/12/2

016 1

:49:12

p.m.

NZAK

L

0

SCALE 1:250

2.5 5 10m

EXISTING STATION

NEW EXTENSION TOPLATFORM 2 AND CANOPY

NEW EXTENSION TO PLATFORM 2AND CANOPY

NEW STAIR WELL TOWER

NEW LIFT TOWERNEW EXTENSION TOGROUND FLOOR ROOF

NEW STAIR WELL TOWER

NEW LIFT TOWER

NORTHERN CORRIDOR IMPROVEMENTS

CONSTELLATION STATIONGENERAL ARRANGEMENT

250310 3PRE 3DES DRG 3001 A

1:250PRELIMINARY

NOT FOR CONSTRUCTION

C. LANE

T.WEDMAIER

M. LAING J. HIND

J. HIND20/10/16

A 20/10/16 PRELIMINARY ISSUE T. WEDMAIER

RELOCATE SERVICEVEHICLE BAY

SHARED USE PATH TOCONSTELLATION DRIVE

SHARED USE PATHTO ALBANY

NEW BUSWAY PAVEMENT

NEW MEDIAN ISLAND WITHPEDESTRIAN FENCING

SERVICE VEHICLE BAY

PLATFORM 3

PLATFORM 2

75.0m

2.6m 72.4m

3.1m

3.5m

75.0m

72.4m

PLATFORM 1

2.7m

RELOCATED TOILETS

RWRW

5.0m

3.0m

3.0m

5.0m

REMOVE EXISTING CONCRETE ISLAND

LEGENDEXISTING NZTA DESIGNATION BOUNDARY

ALTERATION TO EXISTING DESIGNATION BOUNDARY

PROPOSED LINEMARKING

PROPOSED KERB

PROPOSED RETAINING WALL

PROPOSED BUSWAY PAVEMENT

PROPOSED SHARED USE PATH/PLATFORMS

PROPOSED BUSWAY STATION STRUCTURES

PROPOSED ROOFED STRUCTURE

EXISTING ROOF STRUCTURE