SFX Renovation Project 2009

of 34 /34
How the International Community can preserve and enhance a place of worship and an historic landmark for future generations

Embed Size (px)

Transcript of SFX Renovation Project 2009

  • How the International Community can preserve and enhance a place of worship

    and an historic landmark for future generations

  • Those who came before us had the foresightand vision to create a beautiful place of worship

  • Project Summary

    What Enhance the renovation of SFX

    How much RMB 1,300,000

    When Sep to Dec 2009

    Why

    An historic opportunity to shape and influence the renovation of a religious and cultural landmark

  • In the next 5 minutes...

    A brief history of SFX

    Why renovate SFX now

    Our vision

    How we can help

  • A BRIEF HISTORY OF DONGJIADU CATHEDRAL

  • First Cathedral in Shanghai

    1847Construction begins

    1853Church is completed

    1911Dynasty overthrown

    1949PRC established

    2000SFX re-opens

    for worship

  • Replica of Romes Chiesa del Gsu

  • Integratestraditional Chinese Forms with Classic European design

  • Has inspired many Chinese Catholics to become priests

    and nuns

  • WHY NOW?

  • Growth of the International Parish

  • A tangible gift to our hosts and neighbors

  • A SPIRITUALLY & STRUCTURALLYRESTORED SFX

    Summer 2009 Fall 2009 Spring 2010?

  • Phase 1: RenovationMarble Floor

    Marble SkirtingWiring & Lighting

    Choir Loft StaircaseSpecial Pedant Lights

    Sound System & SpeakersAltar Platform & Icon wall

  • Phase 1: RenovationMarble Floor

    Marble SkirtingWiring & Lighting

    Choir Loft StaircaseSpecial Pedant Lights

    Sound System & SpeakersAltar Platform & Icon wall

    Phase 2: FurnishingsPews

    Statues & StandsBaptismal Fountain

    Choir Platform & ChairsAltar/Tabernacle/Ambo

  • Phase 1: RenovationMarble Floor

    Marble SkirtingWiring & Lighting

    Choir Loft StaircaseSpecial Pedant Lights

    Sound System & SpeakersAltar Platform & Icon wall

    Phase 2: FurnishingsPews

    Statues & StandsBaptismal Fountain

    Choir Platform & ChairsAltar/Tabernacle/Ambo

    Phase 3: ExteriorRectory

    External LightingLandscaping & Kiosk

    Stained Glass WindowsExternal Granite & Pavers

  • Stained Glass

    New Speakers, Sound System cabling & mics

    166 New Pews

    Cast-iron Stairs, Choir Platform & Chairs

    Altars, Tabernacle,Ambo, etc

    NeocatechumenalWay Icons

    Marble Flooring

    80cm tall Marble Skirt

    Cabling & New Pedant Fixtures

    Interior & Exterior Painting

  • NATURALLY, THIS RENOVATION WILL COST A GREAT DEAL

  • Basic Plan Approved by the Diocese

    New Marble FloorInterior Wall PaintingExterior Wall PaintingNeocatechumenal Way Icon PaintingsRepair of Large Lateral Structural Crack RMB 2,800,000

    Phase 1:Renovation

    Marble FloorMarble SkirtingWiring & LightingChoir Loft StaircaseSpecial Pedant LightsSound System & SpeakersAltar Platform & Icon Wall

    RMB 650,000

    RMB 300,000

    Phase 2:Furnishings

    150 New PewsStatues & StandsBaptismal FountainChoir Platform & ChairsAltar/Tabernacle/Ambo RMB 1,000,000

    Phase 3:Exterior

    RectoryExternal LightingLandscape & KioskStained Glass WindowsExternal Granite & Pavers

    Planned for future campaigns

  • Firm commitments already made

    New Sound System

    New Altar & Icons

    New Choir Loft

  • December

    January

    March

    April

    May

    June

    July

    August

    February

    September

    October

    November

    Se

    as

    on

    of

    Le

    nt

  • Phase 2 Priorities

    NOTE: these are illustrations and not the actual items that will be selected for SFX

  • Sponsor a Pew

    Our primary means of raising fundsSponsor nameplates attached to each pew

    NOTE: this is an illustration and not the actual pew selected for SFX

  • Commemorative Album

    NOTE: this is an illustration and not the actual album

  • Deposit to the Renovation Project Bank Account

    Beneficiary Bank

    INDUSTRIAL COMMERCIAL BANK OF CHINA

    Account Number

    6222081001004858365 (RMB)

    Account Name

    Connie Wing Mui WONG In favor of: SFX Renovation Project 2009

  • Deposit directly to the Renovation Project Bank account

    Inform us by writing to [email protected]

    Receive confirmation from the Fundraising Committee for a tax-deduction notice for your home country

  • Growing our Community with New Dynamism,

    Fresh Spirit,and a Lively Faith

    SPECIAL 2ND COLLECTION

    Give Generously

  • Several Fundraising Campaigns in the works

    PILGRIMAGE

    TO SHESHAN

    Special 2nd

    Collections

    at all masses

    of the

    International

    Parish

  • Several Fundraising Campaigns in the works

    WineOlive Oil Sculptured Relief Frames

    Mother & Child Last Supper

  • Spread the Message back home

    Download posters, handouts and presentation slides at

    fixSFX.com

  • We should do all we can to preserve and

    enhance this beautiful church

    It is a privilege afforded to few

  • Spread the Word:

    restoreSFX.com