Sfh Retune Proposal

15
www.huawei.com [email protected] Let’s Learn My City SFH Retune Proposal (step by step)

Transcript of Sfh Retune Proposal

www.huawei.com

[email protected]

Let’s Learn

My City

SFH Retune Proposal(step by step)

[email protected]

Introduction

The existing GSM hopping frequency plan is utilizing the lower 18 ARFCN for the hopping layer.

The hopping strategy adopted is 1/3, ie there will be 3 MAL, being used all through the

sites, with each sector having one MAL, assuming that all the sites are 3 sector sites. This

might have a number of limitations while looking at a broader aspect and the layering

concepts being used in the network. This planning provides an easy means for the

planning, having the standard allocation of MAL per sector. This has different pros and

cons from the planning and also the performance aspect.

This is capable of catering the 666 configurations utmost.

·Every cell is using the 3 MAL’s for the 3 sectors in an ordered pattern.

·When there is misaligned sector patterns this might create problems having the same hopping

channels in same area, thereby effectively affecting the re-use pattern.

The planning using the 1/3 plan will have lesser reuse pattern,

theoretically 3, but in a practical scenario it will be even less

considering the site to site distance and the sector azimuths.

Page 2

Current MAL allocation strategy

In this proposal, we will improve network performance with 1/1 strategy

(GSM & DCS).

[email protected]

GSM/DCS Frequency Allocation

Page 3

GSM:

DCS:

[email protected]

My City 2G carrier ARFCN Arrangement

Page 4

[email protected]

Current Frequency PlanGSM 900 : My City Network

A BC

DE

F G

1

2 11

1 1

1

1

2

2

2

2

2

3

3

3

GSM 900 Network

• 18 BCCH Channel for all Macro.

• 18 TCH Channel for MAL Macro,

• 1 TCH as Guard Band (ARFCN 106)

• No BCCH Grouping (Pattern)

• Maximum Total Config Is 4/4/4

• 1 x 3 SFH Strategy

BCCH PlanHopping (MAL) 1x3

1

23

1

23

1

23

1

23

[email protected]

Current Frequency PlanDCS 1800 My City Network

DCS 1800 Network

• 18 BCCH Channel for Macro.

• 18 TCH Channel for MAL Macro & IBC.

• 1 TCH as Guard Band (ARFCN 530)

• No BCCH Grouping.

• Maximum Total Config. is 4/4/4

• 1 x 1 SFH Strategy

BCCH Plan

Hopping (MAL) 1x1 Plan

1

11

1

11

1

11

1

11

[email protected] 7

HSN current strategy

SFH (RF Hopping):

• Still using HSN 0 in RF Hopping

• Nearby Co HSN & Co MAIO will create internal interference.

[email protected]

BCCH & MAL (1x1) Plan

•GSM900 :

- Grouping BCCH Planning

- Cluster site-Bases BCCH Retune

- Cluster Cell-Bases MAIO Retune

•DCS1800:

- Grouping BCCH Planning

- Cluster Site-Bases BCCH Retune

- Cluster Cell-Bases MAIO Retune

Page 8

[email protected]

My City MAIO Planning strategy

Page 9

[email protected] 10

My City BSIC and HSN Plan Strategy

BSIC is maintained the same in 1 site,

means 1 Site = 3 Cells = 1 BSIC.

Put the same BSIC as far as we can.

BSIC = HSN, with formula HSN=NCC*8 +

BCC, to ease Network Maintenance.

Keep BSIC and HSN = 55 – 77 in border

area to avoid Interference between BSC.

We have used HSN = 63 for NCC=0 and

BCC =0 sites.

GSM & DCS can use the same pattern for

easy maintenance.

Flex HSN & Flex MAIO as Yes.

[email protected]

My City BSIC & HSN Plan Strategy

Page 11

Step1. Design NCC Plan Distribution

Step2. Arrange BCC

Step3. Obtain HSN from NCC*8 + BCC

[email protected]

Comparison: BCCH distribution

Before retune After retune

Page 12

900MHz

1800MHz

Almost Flat

[email protected]

Summary

The network city wide SFH replanning will bring in many added advantages, some underlying

benefits also. The important highights in this rework will be:

1. The Frequency allocation reuse strategy brings in the advantage of the geographical

separation between the used frequencies, basically the MAL reuse in geographically

separated sites. Thus, to some extent, we can assure the minimal internal interference by

having a wider reuse for MALs.

2. Having the same BCCH distribution for both GSM & DCS network, it will improve quality in the

some areas.

3. Clusterization of BSIC brings in efficiency in planning: - this approach generally eases the

planning procedure, there by a common pattern can be followed for all the sites. The

collocated GSM and DCS sites are assigned with same BSIC there by reducing the

complexity and site by site BSIC assignment.

4. Easiness in future planning of sites: - the extensive adding up of new sites may make the

BSIC pattern to be scattered.

Page 13

[email protected]

NCCR Plan to Submit

Freq Cell Allocation:

Page 14

BCCH & BSIC:

HSN & TSC:

MAIO:

[email protected] Page 15