TOPIC Water Operators Partnership: Bulawayo Water and Sewage Emergency Response (BOWSER)
• Eng. Simela Dube PrEng
• Director Engineering Services
• City of Bulawayo
• Zimbabwe
-
State of Infrastructure 2009
BLOCKED SEWERS
BROKEN SEWER BRIDGES
WATER BURSTS AGED WATER TREATMENT EQUIPMENT
-
Bulawayo –eThekwini Partnership
TWINNING AGREEMENT SIGNED 2010
-
BOWSER PROJECT
• FUNDING AusAID and World Vision Australia
• OBJECTIVES
Improve hygienic conditions of communities
Improved sewage and water supply system
Capacity Building of City of Bulawayo (ESD)
-
Bulawayo –eThekwini Partnership
• Technical Exchange – BOWSER PROJECT FACILITATED EXCHANGE
• MASTER PLANNING
• GIS TRAINING
• SEWER MAINTENACE
• PARTICIPATORY HEALTH EDUCATION AND
HYGIENE
-
Water and Wastewater Master Plan
• eThekwini Municipality facilitated the preparation of the Master Plan through Bosch Stemele.
• Department of International Trade (RSA) provided 60% of funding while City of Bulawayo provided 40%
• BOWSER provided funding for the exchange visits for the technical teams
-
Water and Wastewater Master Plan
• Planning horizon 2013 -2033 covering
technical and institutional issues
– Immediate action plans (2013)
– Short term action plans (2014-2016)
– Long term action plans(2017-2033)
• BOWSER Project provided funding for the
exchange visits for the technical teams of
the two utilities
-
Outcomes (Funding)
-
Outcomes (Revenue)
$0.00
$10 000 000.00
$20 000 000.00
$30 000 000.00
$40 000 000.00
$50 000 000.00
$60 000 000.00
$70 000 000.00
$80 000 000.00
2 009 2 010 2 011 2 012 2 013 2014 2 015
COLLECTIONS FROM YR 2009 TO YR 2015
TOALS
-
Outcomes (GIS)
-
How Well are Ward Paying
-
Call Centre
-
Current Partnership Projects