Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd...

8
Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff Severn Tidal Power

Transcript of Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd...

Page 1: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Sustainable Development and Severn Tidal Power

7 March 2009

Peter Kydd

Director of Strategic Consulting

Parsons Brinckerhoff

Severn Tidal Power

Page 2: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Severn Tidal Power Context

Why is Severn Tidal Power being studied?

Security of Supply – tidal power is predictable

15% EU target for renewable energy by 2020– Severn tidal power costs are less than those required

to achieve the corresponding electricity target of 32%

80% reduction in CO2 emissions by 2050 – requires all electricity to be carbon free by 2030

Page 3: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Sustainable Development Definition

1987:"development that meets the needs of the present without compromising the ability of future generations to meet their own needs.” Our Common Future

1994: "Sustainable development is about ensuring a better quality of life for everyone, now and for generations to come." UK government

Page 4: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Triple Bottom Line

SUSTAINABLE DEVELOPMENT CONSIDERATIONS

ECONOMIC

SOCIALENVIRONMENT

THE OBJECTIVE:

To achieve the best balance between economic, environmental and social benefits and impacts

Page 5: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Key points in a sustainable context

Economics

• Higher Energy Costs than current electricity but predictable and renewable, lasts for 120 years

• How much energy to extract? The greater the energy extraction, the greater the impacts.

• How much to invest in one project? £30bn, £20bn, £5bn, £2bn

• Contributes to UK Government 80% reduction of carbon emissions by 2050.

• More Employment but also some losses also if ports are adversely affected

Page 6: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Key points in a sustainable context

Environment

• Potential for large scale low carbon generation in one location

• Displaces carbon emissions from other power stations

• Night time energy could be used for electric cars?

• Major impact on natural environment – potential loss of habitats / species, requiring significant mitigation / compensation

• Reduced tidal range, water quality changes

Page 7: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

Key points in a sustainable context

Social

• Flood Defence – barrages offer protection from surges and sea level rise but existing land drainage would require modification

• Impact of large transient construction labour force?

• Impact on Ports and associated local employment?

• Potential benefits – leisure, tourism, transport links?

Page 8: Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.

Severn Estuary Tidal Energy

All Engineering and SEA Reports are available on the public

consultation web-site.

http://severntidalpowerconsultation.decc.gov.uk

Severn Tidal Power Feasibility Study