LED versus HPS Lighting:A Shoot‐Out on the Nason Street Corral
Presented at theITE District 6 Annual Meeting
Phoenix, AZJuly 17, 2013
Authors:
Eric Lewis, P.E., T.E., City Traffic EngineerJohn Kerenyi, P.E., Senior Engineer
City of Moreno Valley
![Page 2: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/2.jpg)
Summary of Presentation
• Why is Nason Street a corral?• Comparison of Lighting Performance• Comparison of Electricity Consumption• Comparison of Costs
![Page 3: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/3.jpg)
Nason Street
• Connects hospitals • Direct freeway access• 1 mile of new roadway (no traffic)• $10 million construction cost• Vacant adjacent land (no stray light)• No moonlight
![Page 4: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/4.jpg)
Street Lighting System
![Page 5: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/5.jpg)
Analysis Area
Boundary betweencircuits
Current measurementsconducted here
Photometric grid
Limits of HPS vs. LED Analysis
![Page 6: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/6.jpg)
HPS Bulb Position Is Adjustable• Bulb position is adjustable in two dimensions
• Type 3 Medium Distribution assumes a certain bulb position
• Incorrect positioning can result in unsatisfactory performance
![Page 7: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/7.jpg)
LED Observed vs. Predicted
Observed Predicted
Average Illuminance: 15.7 luxAvg/Min Ratio: 16:1
Average Illuminance: 17.7 luxAvg/Min Ratio: 4:1
IES Recommendation:Average Illuminance: 9 lux (exceeded)Avg/Min Ratio: 3:1 (less than recommended)
![Page 8: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/8.jpg)
HPS Observed vs. Predicted
Observed Predicted
Average Illuminance: 13.0 luxAvg/Min Ratio: 13:1
Average Illuminance: 18.4 luxAvg/Min Ratio: 4:1
IES Recommendation:Average Illuminance: 9 lux (exceeded)Avg/Min Ratio: 3:1 (less than recommended)
![Page 9: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/9.jpg)
Observed: LED vs. HPS
LED Observed HPS Observed
Average Illuminance: 15.7 luxAvg/Min Ratio: 16:1
Average Illuminance: 13.0 luxAvg/Min Ratio: 13:1
IES Recommendation:Average Illuminance: 9 lux (exceeded)Avg/Min Ratio: 3:1 (less than recommended)
![Page 10: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/10.jpg)
Predicted: LED vs. HPS
LED Predicted HPS Predicted
Average Illuminance: 17.7 luxAvg/Min Ratio: 4:1
Average Illuminance: 18.4 luxAvg/Min Ratio: 4:1
IES Recommendation:Average Illuminance: 9 lux (exceeded)Avg/Min Ratio: 3:1 (less than recommended)
![Page 11: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/11.jpg)
Electrical Consumption
Circuit isolated – 5 lights total
185W LED – 2.12 kWh / night
200W HPS – 2.60 kWh / night
22.53% more energy consumed by HPS lights
![Page 12: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/12.jpg)
Comparison of Costs
Initial installation cost
LS-1 vs. LS-3
Replacement schedule
![Page 13: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/13.jpg)
Further research
Gather more data
Long term degradation
![Page 14: Session 8C - Lewis.pdf - ITE Western District](https://reader031.fdocuments.in/reader031/viewer/2022021210/620646848c2f7b17300624c0/html5/thumbnails/14.jpg)
Questions?