IMPLEMENTATION OF AN ISO - BASED PLAN-DO-CHECK-ACT CYCLE IN STATISTICS LITHUANIA
Session 1: ACT – Project cycle. Act Delivering through projects.
-
Upload
corey-johnston -
Category
Documents
-
view
212 -
download
0
Transcript of Session 1: ACT – Project cycle. Act Delivering through projects.
Session 1: ACT – Project cycle
Act
Delivering through projects
Effective Country Programme Effective Country Programme = Effective Projects Delivery= Effective Projects Delivery
What is important for FAO Effective projects delivery ?
Purpose of the New Project Cycle Purpose of the New Project Cycle (PC): Effective Projects Delivery (PC): Effective Projects Delivery New Project Cycle aims to:
• Improve strategic alignment of project and its contribution to country results
• Improve accountability
• Support decentralization
• Allow Results Based Management of projects
• Mainstreaming quality standards through the projects cycle steps including the mainstreaming of the UN common programming principles
Overview of the new PCOverview of the new PC• Upgrade of PC management based on
agreed best practices
• Applies to all projects, including emergency and UNJP.
• Supersedes previous Field Programme Circulars
and TC procedures concerning the Project Cycle.
• PC composed of guidelines, practical guidance, FPMIS web-based workflows and users manual.
• Support available: TCDM advice, training sessions, FPMIS help desk .
FAO Project Cycle - StepsFAO Project Cycle - Steps
Identification
Formulation
Appraisal and Approval
Implementation and Monitoring
Evaluation
Closure
Project document
Terminal report Concept Note
Progress reports
Five Steps:
1. Identification of a project
to adress specific problem/need of members and/or exploit opportunities to advance agenda of FAO
to support the achievement of agreed CPF outcomes
2. Establishment of a project Task force
3. Preparation of the concept Note
4. Appraisal and endorsement of the CN
5. Formalization of relation with Resource partners
Identification Steps Identification Steps
Roles and responsibilities of the PTF members and clarified
The PTF start operating at the identification stage
PTF under the authority of a Chair according to the new rules on responsibilities and relationships
It would evolve at subsequent stages into a fully-fledged structure with appropriate skill mix
Composition of the PTF
Identification: establishment of the Project Task Force (PTF)
Type of Project ChairpersonMembers
National FAO Representative Project formulator, LTO, Funding Liaison Officer, other relevant technical officers.
Subregional Subregional Representative/Coordinator
Regional Regional Representative
Interregional/Global Head of technical division
Emergency TCE Division Director
Designation of Lead Technical Officer (LTO) and Lead Technical Unit (LTU)
• Follows FAO Circular on Responsibilities and Relationships
• LTO is identified by the PTF chair as far as possible based on geographic proximity (from the nearest decentralized offices). LTU always consulted.
• ROs are accountable for assessing their capacity as LTU.
• Functional relationship is always maintained between LTO and technical divisions
Identification: establishment of Identification: establishment of the Project Task Force (PTF)the Project Task Force (PTF)
Identification Step - Concept Note
The Project Concept Note is necessary for all type of projects.
• Ensures strategic fit between a project idea and CPF or strategic framework.
• Structures preliminary stakeholders and problem analysis in terms of relevance, feasibility and potential sustainability including for key factors such as the UN CP.
• To be downloaded from FPMIS
Identification: the Concept Note
Concept Note Work Flow Concept Note Work Flow
__ Applies to regional, sub-regional and national projects Steps__ Applies to global and interregional projects Responsible officer__ Applies both
Endorsement of the CN
MDT officers and other representatives of technical divisions not represented in the MDT for all substantive issues which are relevant for the project ;NR officer validates the categorization
Technical divisions’ officers as well as DOs officers relevant for the project ; NR validates the categorization for categorization
Project formulator
PTF chairperson:
RR/SRC/FAOR or a delegated officer
Head of the technical division/service or delegated officer
Funding Liaison Officer
Project formulator
Peer Review of the CN
The CN is finalized and uploaded into FPMIS
Review of resource mobilization opportunities
Preparation of the CN
Group exercise Group exercise Take the CPF Ethiopia outcome 1.1 1. identify a project which will contribute to this CPF
outcome.2. propose a title and an outcome statement for your
project 3. From the 2011- 2012 WP list, identify an OR to
which this project will contribute to
The PD is formulated by the Project formulator with the full support of the PTF members.
A generic template generated in FPMIS should be used
The PD is further supported by FPMIS tools for the preparation of the logical framework matrix, results-based budget which feeds into Oracle, work plan and risk matrix.
FAO formulation Outputs: Project Document (25 pages + annexes) project agreement and funding agreement.
Formulation – the Project Formulation – the Project Document Document
Project Document TemplateProject Document Template
25 PAGES
The New Appraisal Process
• Applies to all projects including emergency and UNJP
• A two step process which cover all current technical, financial, operational and PPRC clearances
• FPMIS based transparent work flow
• Accountability rests with the PTF
• Support retrieval of lessons learned
Consists of:
1. Interdisciplinary Technical Review: the project document is submitted to MDT and other relevant officers.
2. Quality Assurance Review: the project is submitted to a project appraisal committee for financial, technical and operational clearance and adherence to the programming principles: one submission for all clearances.
3. Two reports per year are produced by TCDM in collaboration with ROs on the results of the appraisal providing a picture of the quality of project documents by quality criteria.
4. The lessons learned are available to inform future design of projects.
The New Appraisal Process
Work Flow for Project AppraisalWork Flow for Project Appraisal
__ Applies to regional, sub-regional and national projects Steps__ Applies to global and interregional projects Responsible officer__ Applies both
Project formulator
Project formulator
5 days
Revision of Project Document
Endorsement of PD
Approval of PD
Quality
Assurance
Review
Submission of the Project Document to the PAO
Review of the QAR criteria on line
Consolidation of the QAR on line and provision of a global rating
Project Formulator
PAC Regional Office
PAC HQ
PAO Regional Office
PAO HQ
Project Formulator
PAO Regional Office
PAO HQ
ADG RR
ADG TC
Rating?
Reformulation of project
OK
NO
NO
2. Some comments need to be addressed
3. The project is not ready for approval
1. The project is ready for approval
5 days
The project appraisal committee is coordinated by a project appraisal officer (PAO) based at regional office level for national, sub regional and regional projects.
The appraisal is done using a check list.
The New Appraisal Process: the quality assurance Review
Simulation Exercice
In you role of Project Appraisal officer:• read the extract of the project document provided. • review the text against the criteria ‘’ comparative
advantage‘’ .• provide a rating from 1 to 3. Briefly, Justify the rating
provided.1. The criteria is well addressed.2. Some comments need to be addressed 3. The section has to be reformulated.