European Organisation for the Safety of Air Navigation
Worldwide Symposium on enabling the Net-Centric information environment
2-4 June 2008
Bo RedebornDirector ATM Strategies
SESAR Definition PhaseTowards a New European ATM System
SESAR: Committing to Make Future Happen
SESARTechnical/operational change, supported by Single European Sky legislationDirect involvement of aviation industry in all phasesAddress European needs and Global interoperability
SESARTechnical/operational change, supported by Single European Sky legislationDirect involvement of aviation industry in all phasesAddress European needs and Global interoperability
Needs: Turn off fragmented approachAccelerate evolution in response to challengesSynchronise plans and actions
from research to operationsairborne and ground deployments
Needs: Turn off fragmented approachAccelerate evolution in response to challengesSynchronise plans and actions
from research to operationsairborne and ground deployments
European Challenges:Traffic forecast to double by 2025Growth must come with significant performance improvementIssues: ATC pushed to its limits; obsolescent technologies; airspace fragmentation
European Challenges:European Challenges:Traffic forecast to double by 2025Traffic forecast to double by 2025Growth must come with significant performance improvementGrowth must come with significant performance improvementIssues: Issues: ATC pushed to its limits; obsolescent technologies; airspace fraATC pushed to its limits; obsolescent technologies; airspace fragmentationgmentation
A new ATM System is required
2005 2010 2015 2020
2005 2010 2015 2020
SESAR Cohesive Programmefor Stepwise Implementation
DefinitionDefinition
DevelopmentDevelopment
DeploymentDeployment
SESAR Phases
Currentwork
Implementation
Development work
Planning work
European ATM Master Plan
European ATM Master Plan
AirTransport
Framework:The
CurrentSituation
ATM Performance
Targets
SESAR Definition Phase Main Milestones and Deliverables
ATM Target
Concept
ATMDeploymentSequence
D1D2
D3D4
ATMMaster Plan
D5
WorkProgramme
for 2008-2013
D6
T0: 6 March 2006
July 06 Dec 06 June 07 Nov 07 Mar 08
COMPLETED
COMPLETED
Reference to derive technical requirements
for architecture & enabling systems
Change steps with performance gains
from agreed baselines (now, 2013, 2020)
Actions of all stakeholders to achieve the performance
benefits
COMPLETED
COMPLETED
.
COMPLETED
COMPLETED
ATM MASTER PLANShorter term: Implementation actionsLonger term: R&D actions
Design for Growth –Deploy When & Where Needed
Performance targets derived from needs of society & airspace users
Design Goals for scalable future capability:Capacity: handle 3 times traffic
Safety: factor 10
Environment: - 10% effects / flight
Costs to airspace users: - 50%2020 targets:
Capacity: + 73% overallSafety: improvement factor 3Environment: max. contributionCosts to airspace users: - 50%
Progressive deployment, when/where needed
(Reference: 2005).
Design Goals for scalable future capability:Capacity: handle 3 times traffic
Safety: factor 10
Environment: - 10% effects / flight
Costs to airspace users: - 50%
Societal Outcome
Safety+
Security+
Environmental Sustainability
Operational PerformanceCost Effectiveness
+Capacity
+Efficiency
+Flexibility
+Predictability
PerformanceEnablers
Access & Equity+
Participation+
Interoperability
Design goals aligned on the 11 ICAO Key Performance Areas
SESAR Concept of Operations is a Paradigm Shift for ATC
Procedural ControlEstimate the current
and planneda/c positions
Past
Radar ControlKnow the current and estimate planned a/c
positions
Today
Trajectory ManagementKnow & share the current
& planned a/c positions
A320
Future
Concept of Operations• Enhanced automation• Human to remain central in the system as manager and decision-maker• New separation modes
• Enhanced automation• Human to remain central in the system as manager and decision-maker• New separation modes
• Defined in 4D, gate-to-gate, including turnaround operations• Executed as close as possible to the owner’s intention• User-preferred routing (except where capacity requires structured network)
• Defined in 4D, gate-to-gate, including turnaround operations• Executed as close as possible to the owner’s intention• User-preferred routing (except where capacity requires structured network)
• Collaborative Decision Making->better decisions & efficient operations• System Wide Information Management
• Collaborative Decision Making->better decisions & efficient operations• System Wide Information Management
• Starting in strategic planning phase • Dynamic airspace design & management• Continuously reflected in the “Network Operations Plan”
• Starting in strategic planning phase • Dynamic airspace design & management• Continuously reflected in the “Network Operations Plan”
A Net-centric system
Source RESPONSIBILITY Output
STORE
PROCESS
DISTRIBUTE
A/OOPS
ATFM
MET
CDM
World AIS
EADSupplies Traditional
AIS productsNAV
FIS
ATCOPS
FDM
EFB
CDM
FDM
AIS App
CHECKManageData
ATC
The ATM network=
A set of nodes (including the aircraft) providing orconsuming information
Enablers of the Operational Change
.
TechnicalCommon system architecture, service oriented
Reusable modules, reduced development costsNew CNS technologies
E.g. satellite navigation, new data link
Managerial & InstitutionalComprehensive business case to support decision making
Safety, security, environment, economical, human factorsChange management process
including human aspects & social dialogueTimely standardisation & rule makingEffective commitment of all actorsFinancial instruments
ATM Deployment Sequence Based on Capability & Service Levels
Implementation based on ATM Capability Levels: sets of functional evolutions for Aircraft, ATC Centres, Airports, Network Management
ACL #0 ACL #1 ACL #2 ACL #3 ACL #4 ACL #52008 2013 2017 2020 2025
• ASPA-S&M• UDPP• Improved
LVO• 3D-PTC on
predefined routes
• 2D-PTC on preferred routes
• …
• 3 Airspace categories
• Free routing from TOC -> ToD
• Revision of RBT/DL
• Multiple CTOs
• …
• 2 Airspace categories
• ASEP C&P• 3D-PTC on
preferred routes
• SVS• …
• ASAS-SSEP• 4D-PTC• Self
adjustment on WV
• …
• Curved approaches
• AMAN/DMAN integration
• ATSAW• …
• Implementing available technologies
&Best practicese.g. DMEA, Link
• …Ready for
implementationReady for
implementationReady for
implementationReady for
implementationReady for
implementationReady for
implementation
.
ATM Service Level delivered to the Airspace User:results from the lowest ATM Capability Level of the
different interacting Stakeholders
IP1 IP2 IP3
Performance Benefits by 2020.
• 16 M accommodated flights/year (73% more 2005)
• Average ATM delay: 0.5 min (Vs 2.2 min 2008)
• Fuel inefficiency reduction: ~ 25 %
• Significant direct and indirect cost savings
IP1 IP2With + implemented
.
ATM Service Levels
.
ATM Service = Service delivered to the Airspace User
Its level results from the individual ATM Capability Levels of the different interacting Stakeholders
ACL 3
ACL 3
ACL 3+ ATM Service Level
delivered: 3
D5 Preview –ATM Capability & ATM Service Levels
Full benefit only if all involved stakeholders consistently equipped
ATM Capability Level 3
+
Service achieved: Level 3Full benefit
Service achieved: Level 2Full benefit Not Realised
.
ATM Capability Level 2
Master Plan Overview
Trajectory based operations preparation
Net-centric trajectory management
Advanced automation in a shared trajectory environment
Full 4D-trajectory management & self separation
Best practices
Advancedseparation modes
R&DDeploymentOperations
Commitment to deployment now
Commitment to R&D Investment
Agreed way Forward
Provide different views:Roadmap for Operational EvolutionsPlans viewed from Stakeholders perspectivesRoadmap for “transversal” aspects (regulation, safety, environment)
Address full life cycle:R&D, Deployment, Innovative research
Soon available at: www.atmmasterplan.eu
.
The ATM Master Plan Portal
The
S ESA
R M
aste
r Pla
n
Prod
ucts
of t
heSE
SAR
Def
initi
on P
hase
The Master Plan content.
TaskDeliverables
Electronic Master Planwww.atmmasterplan.eu
Renewed ECIP/LCIP
D5Agreed strategic
guideline
Working andPlanning area
Derived agreed &committed actions
SESAR brings a new dimension to European ATM
A Key success factor:
All stakeholders’ commitment to the ATM Master Plan