ServiceKanban-SelfRegulNetwork-FeketeIstvanPic
-
Upload
istvan-fekete -
Category
Documents
-
view
21 -
download
0
Transcript of ServiceKanban-SelfRegulNetwork-FeketeIstvanPic
Elastic adaptability in production– Service Kanban, i.e. self-regulating,
adaptive network of thousands of employees
Istvan Fekete
Nokia 2009-2011
Service kanban
• Simple rules creating complex, adaptive behavior in network of 1000-2000 people in a production shift.
• Planned frames to create automatic escalation and adaptation– 10-15 Minutes
– Only 3 Service Cards
– Only 5 Cell Cards
– Only 2 Hooks, etc.
• While flexible behavior returns the system to original equilibrium, elastic behavior leads to adaptation to changes and to new equilibrium
Products groupped in blocks with dedicated cells, while flex cells provide machine elasticity
One or more but similar
products in one cluster
Cells dedicated to given cluster on daily level.
Changeovers are planned accordingly
Dedication for stability
Elasticity Pool
Non-dedicated, flex cells at the end of ech street allow
quick supply grow without disrupting the operations
Services adapt to changing demand, pulled by andonlamps and flags and controlled by service kanbans
Each street (group of cells)
has an owner of that service.
Owners watch cell andons
Service Leader watches Main
Street andons and helps in the
overloaded street
Main Street
Utc
aStr
eet
• Cell Operator calls the service with andon lamp and service flag
• Yellow andon gives 10-15 minutes window for service provider to deliver
• Red andon means immediate delivery requirement
• Red andon also calls the Cell Leader and Service Leader
• Flag color and symbol identify the required service
• Service Owner is for given street or group of cells
• Goes to cell of flashing andonand starts the service
• Service Leader• Helps in overloaded street or
allocates more resource (gemba approach)
Str
eet Str
eet
Str
eet
Str
eet
Str
eet
Str
eet
Service
OwnerService
Leader
Each service has its own color and symbol code consistently appearing everywhere
• Coat/Armband marking seen from
distance (7*7 cm)
• The Flags in the cell under Andon
lamp (15*20 cm)
• The big Flags in the main street
under big Andon lamp (20*30 cm)
• If Service Owner can’t fulfill the
demand immediately then there is
an exchange of cards:
• Service owner leaves 1 of his
Service Cards (3 per owner),
i.e. Who owes to cell?
• Service owner takes 1 of the
Cell cards (5 cell cards per
cell), i.e. Which cell I owe?
• Service owners hand over the
service at shift change in situ
Armband
Maual imput
in Line stop
ReportFlags in the Cell
Service kanban cards
Flags in the
Main Street
Flag 2Flag 1
Red and Yellow andon lamps in the front of the cell and 2 pairs of hooks for 2 flags only
Immediate service required,
otherwise the cell stops/the cell
has already stopped.
In 10-15 Minutes the service
required, otherwise the cell will
stop.
If more than 2 services are
pending, i.e. cell is in risky state
TT
AQK
SP
T
NEM TERVEZETT ÁLLÁS
SZÜNET
Product
Technician
Quality
Operator
1st Sales Pack
to checkNon-planned
brake
Material
HandlerFinished Goods
Shipping Operator
Maintenance
Technician
Brake
Service Kanban Flag/Card examples fromreal life
Andon Lamp Red & Yellow
Hook for 2 Flags
Flag holder
Andon Lamp Buttons Red & Yellow
Service Kanban Cards
Online Repair
Kanban Cards
Hook for 2 Flags
Examples from real life
Service Kanban Cards (5/5)
Online Repair
Kanban Cards (6/6)
Secondary Card of Cell Operators
Material Handler (Blue) exchanges her Card
with Cell Card to go and doing offline part of
her service ASAP
Examples from real life
Service Kanban Process (Doers’ view)P
rodu
ctio
n
Cell/
Lin
eS
erv
ice P
rovid
er
Production
Runs
Service
needs in 15
min.?
No
Switch on Yellow
Andon and hook
Service Flag on
Provide your
service in max
10 minutes and
check your
Andons
regularily
Yes
Is there
flashing Yellow
Andon with my
Flag?
Go to cell in
10 minutes
and clarify
the service
need with
cell
colleague
Can I serve
immediately?
1
1
No
Take off your
Flag and switch
off the Andon (if
only your flag
was on)
Go and fulfill
offline part of
your service and
return to Cell
Is there
flashing Red
Andon with my
Flag?
Go to cell
within 1
minute and
clarify the
service need
with cell
colleague
Yes
No
2
YesYes
Has Cell
stopped due to
my service
need?
Yes
No
No
Production
Runs
Service
needs now?
No
Switch on Red
Andon and hook
Service Flag on
Yes
2
Take off your Flag
and switch off the
Andon (if only your
flag was on)
Take 1 Cell Card
and put 1 of your
Kanban Card to
Cell Board
Take 1 Cell Card
and put 1 of your
Kanban Card to
Cell Board
Urgently fulfill
offline part of
your service,
return to Cell and
finish your work
Take of your Flag
and switch of the
Andon (if only
your flag was on)
Service Kanban Process (Leader’s view)P
rodu
ctio
n
Cell/
Lin
eC
ell/
Lin
e T
eam
Lea
de
r
/Se
rvic
e T
eam
Lea
de
r
Walk around and
check the status of
the Cells through
Andons and Flags
Are there
flashing Yellow
Andons with
same/my Flag?
Go to cells ASAP
and evaluate the
risk of overload in
service
Is the
Service
Provider
there?
1
No
Thank the perfect
work for both cell
personell and
service providerDiscuss the line
stop with your
Team Leader party
in 15 minutes
Is there
flashing Red
Andon (/with
my Flag)?
Go to cell within 1
minute and clarify
the service need
with cell colleagueYes
No
2
Yes
Yes
Has Cell
stopped due to
that service
need?
Yes
No
No
Find the person
and help him/her
to act
Consider
process
audit at cell
Production
Runs
Service
needs in 15
min.?
No
Switch on Yellow
Andon and hook
Service Flag on
Yes
1
Production
Runs
Service
needs now?
No
Switch on Red
Andon and hook
Service Flag on
Yes
2
Discuss the risk
with your customer
party in 15 minutes
Service Kanban Process (Escalation)S
erv
ice
Pro
vid
er
Se
rvic
e T
eam
Lea
de
r
Walk around and
check the status of
the Streets through
Andons and Flags
Is the
Service
Provider
there?
Consult with him/her
Discuss the
overload with
Cell/Line Team
Leader party in 15
minutes
Is there flashing
Big Red Andon
with my Flag?Go to overloaded
Street within 1
minute and clarify
the issue
Yes
No
3
Yes
No
Find the person
ASAP
Do my
service
Am I
overloaded?
No
Switch Big Red Andon on
and hook Big Service Flag
on in the Main Street
Yes
3
Decide on help,
additional service
allocation and act
immediately