Service Metered and Delivered at Voltages Above 50 Kv
-
Upload
genability -
Category
Documents
-
view
219 -
download
0
Transcript of Service Metered and Delivered at Voltages Above 50 Kv
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
1/40
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
2/40
Southern California Edison Revised Cal. PUC Sheet No. 48334-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48094-E
Schedule TOU-8 Sheet 3TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20113H18 Resolution
TERRITORY
Within the entire territory served.
RATES
The following rates are set forth for service metered and delivered at secondary, primary, andsubtransmission voltages. CPP Event Charges will apply during CPP Event Periods and CPP Non-Event Credits will apply to CPP Non-Event Periods, as described in Special Condition 1 below.
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Critical Peak Pricing Trans 1 Distrbtn2 NSGC 3 NDC4 PPPC 5 DWRBC6 PUCRF 7 Total 8 URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak ( 0.00060 ) (R) 0 .00250 ( R) 0 .0 0192 ( I) 0. 00009 ( R) 0 .0 1063 (I ) 0. 00505 0.00024 0.01983 ( R) 0.12613 ( R) 0 .0 3952Mid-Peak ( 0.00060 ) (R) 0 .00250 ( R) 0 .0 0192 ( I) 0. 00009 ( R) 0 .0 1063 (I ) 0. 00505 0.00024 0.01983 ( R) 0.07473 ( R) 0 .0 3952Off-Peak ( 0.00060 ) (R) 0 .00250 ( R) 0 .0 0192 ( I) 0. 00009 ( R) 0 .0 1063 (I ) 0. 00505 0.00024 0.01983 ( R) 0.04252 ( R) 0 .0 3952
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak ( 0.00060 ) (R) 0 .00250 ( R) 0 .0 0192 ( I) 0. 00009 ( R) 0 .0 1063 (I ) 0. 00505 0.00024 0.01983 ( R) 0.06402 ( R) 0 .0 3952Off-Peak ( 0.00060 ) (R) 0 .00250 ( R) 0 .0 0192 ( I) 0. 00009 ( R) 0 .0 1063 (I ) 0. 00505 0.00024 0.01983 ( R) 0.03901 ( R) 0 .0 3952
Customer Charge - $/Meter/Month 577.22 (I) 577.22 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.93 9.63 (R) 12.56 (R)
Time Related
Summer Season - On-Peak 0.00 0.00 16.08 (R)Mid-Peak 0.00 0.00 4.53 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00
Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.36229Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.47)
Maximum Available Credit - $/kW**On-Peak (19.30) (R)Mid-Peak (5.44) (R)
Delivery Service Generation 9
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge
4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as defined in and pursuant
to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in the
Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
3/40
Southern California Edison Revised Cal. PUC Sheet No. 48094-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47817-E*
Schedule TOU-8 Sheet 3TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 20113H14 Resolution E-3930
TERRITORY
Within the entire territory served.
RATES
The following rates are set forth for service metered and delivered at secondary, primary, andsubtransmission voltages. CPP Event Charges will apply during CPP Event Periods and CPP Non-Event Credits will apply to CPP Non-Event Periods, as described in Special Condition 1 below.
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Critical Peak Pricing Trans 1 Distrbtn 2 NSGC 3 NDC4 PPPC 5 DWRBC6 PUCRF 7 Total 8 URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00014 0.00295 0.00120 0.00064 0.00942 0.00505 0.00024 0.01964 0.14290 0.03952Mid-Peak 0.00014 0.00295 0.00120 0.00064 0.00942 0.00505 0.00024 0.01964 0.08570 0.03952Off-Peak 0.00014 0.00295 0.00120 0.00064 0.00942 0.00505 0.00024 0.01964 0.04958 0.03952
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00014 0.00295 0.00120 0.00064 0.00942 0.00505 0.00024 0.01964 0.07394 0.03952Off-Peak 0.00014 0.00295 0.00120 0.00064 0.00942 0.00505 0.00024 0.01964 0.04560 0.03952
Customer Charge - $/Meter/Month 573.02 573.02
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.93 (I) 9.69 12.62 (I)
Time Related
Summer Season - On-Peak 0.00 0.00 18.22Mid-Peak 0.00 0.00 5.13
Winter Season - Mid-Peak 0.00 0.00 0.00
Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.36229Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.47)
Maximum Available Credit - $/kW**On-Peak (21.87)Mid-Peak (6.16)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge
5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as defined in and pursuantto D.02-10-063, D.02-02-051, and D.02-12-082.
7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in the
Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
4/40
Southern California Edison Revised Cal. PUC Sheet No. 47817-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47295-E*
Schedule TOU-8 Sheet 3TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20113H17 Resolution
TERRITORY
Within the entire territory served.
RATES
The following rates are set forth for service metered and delivered at secondary, primary, andsubtransmission voltages. CPP Event Charges will apply during CPP Event Periods and CPP Non-Event Credits will apply to CPP Non-Event Periods, as described in Special Condition 1 below.
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Critical Peak Pricing Trans 1 Distrbtn 2 NSGC 3 NDC4 PPPC 5 DWRBC6 PUCRF 7 Total 8 URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.14290 0.03952 (I)Mid-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.08570 0.03952 (I)Off-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.04958 0.03952 (I)
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.07394 0.03952 (I)Off-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.04560 0.03952 (I)
Customer Charge - $/Meter/Month 573.02 573.02
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.77 9.69 12.46
Time Related
Summer Season - On-Peak 0.00 0.00 18.22Mid-Peak 0.00 0.00 5.13
Winter Season - Mid-Peak 0.00 0.00 0.00
Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.36229Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.47)
Maximum Available Credit - $/kW**On-Peak (21.87)Mid-Peak (6.16)
Delivery Service Generation 9
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge
4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as defined in and pursuant
to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in the
Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
5/40
Southern California Edison Revised Cal. PUC Sheet No. 48335-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48095-E
Schedule TOU-8 Sheet 4TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20114H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.09 02 7 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.06 78 2 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.04 111 (R) 0 .0 39 52
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.06 20 9 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.03 68 4 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 309.98 (I) 309.98 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 9.04 (R) 11.84 (R)
Time RelatedSummer Season - On-Peak 0.00 0.00 19.49 (R)
Mid-Peak 0.00 0.00 5.46 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.33322Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.20)
Maximum Available Credit - $/kW**On-Peak (19.49) (R)Mid-Peak (5.47) (R)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service customers.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is
calculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
6/40
Southern California Edison Revised Cal. PUC Sheet No. 48095-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47818-E*
Schedule TOU-8 Sheet 4TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 20114H13 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.09658 0.03952Mid-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.07645 0.03952Off-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.04798 0.03952
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.07175 0.03952Off-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.04314 0.03952
Customer Charge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 (I) 9.06 11.86 (I)
Time RelatedSummer Season - On-Peak 0.00 0.00 22.08
Mid-Peak 0.00 0.00 6.19
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.33322Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.20)
Maximum Available Credit - $/kW**On-Peak (22.08)Mid-Peak (6.19)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.
** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service customers.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is
calculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
7/40
Southern California Edison Revised Cal. PUC Sheet No. 47818-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47296-E*
Schedule TOU-8 Sheet 4TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20114H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.09658 0.03952 (I)Mid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.07645 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04798 0.03952 (I)
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.07175 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04314 0.03952 (I)
Customer Char ge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.64 9.06 11.70
Time RelatedSummer Season - On-Peak 0.00 0.00 22.08
Mid-Peak 0.00 0.00 6.19
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27CPP Event Energy Charge - $/kWh 1.33322Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (12.20)
Maximum Available Credit - $/kW**On-Peak (22.08)Mid-Peak (6.19)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service customers.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is
calculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
8/40
Southern California Edison Revised Cal. PUC Sheet No. 48336-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48096-E
Schedule TOU-8 Sheet 5TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20115H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.08 65 8 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.06 01 6 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 18 7 (R) 0 .0 39 52
Winter Season - Winter Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.05 36 6 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 14 9 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 2,376.08 (I) 2,376.08 (I)
Demand Charge-$/kW of Billing Demand/Meter/Month
Facilities Related 2.68 1.95 (R) 4.63 (R)
Time RelatedSummer Season -On-Peak 0.00 0.00 16.89 (R)
Mid-Peak 0.00 0.00 4.46 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32CPP Event Energy Charge - $/kWh 1.28157Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (13.02)
Voltage Discount, Demand 220 kV and above -$/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy 220 kV - $/kWh 0.00 0.00 (0.00064)
Maximum Available Credit - $/kW**On-Peak (16.89) (R)Mid-Peak (4.46) (R)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled as defined in and
pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) a customers.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is
calculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
9/40
Southern California Edison Revised Cal. PUC Sheet No. 48096-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47819-E*
Schedule TOU-8 Sheet 5TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 20115H13 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.08759 0.03952Mid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.06503 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03773 0.03952
Winter Season - Winter Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.06253 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03730 0.03952
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge-$/kW of Billing Demand/Meter/Month
Facilities Related 2.68 (I) 2.00 4.68 (I)
Time RelatedSummer Season -On-Peak 0.00 0.00 19.22
Mid-Peak 0.00 0.00 5.08
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32CPP Event Energy Charge - $/kWh 1.28157Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (13.02)
Voltage Discount, Demand 220 kV and above -$/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy 220 kV - $/kWh 0.00 0.00 (0.00064)
Maximum Available Credit - $/kW**On-Peak (19.22)
Mid-Peak (5.08)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled as defined in and
pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) a customers.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
10/40
Southern California Edison Revised Cal. PUC Sheet No. 47819-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47297-E*
Schedule TOU-8 Sheet 5TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20115H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Critical Peak Pricing Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.08759 0.03952 (I)Mid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.06503 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03773 0.03952 (I)
Winter Season - Winter Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.06253 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03730 0.03952 (I)
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.53 2.00 4.53
Time RelatedSummer Season -On-Peak 0.00 0.00 19.22
Mid-Peak 0.00 0.00 5.08
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32CPP Event Energy Charge - $/kWh 1.28157Summer CPP Non-Event CreditOn-Peak Demand Credit - $/kW (13.02)
Voltage Discount, Demand 220 kV and above -$/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy 220 kV - $/kWh 0.00 0.00 (0.00064)
Maximum Available Credit - $/kW**On-Peak (19.22)
Mid-Peak (5.08)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.** The Maximum Available Credit is the capped credit amount for CPP customers dual participating in other demand response programs.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
(I(I
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled as defined in and
pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.
8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) a customers.9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
11/40
Southern California Edison Revised Cal. PUC Sheet No. 48337-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48097-E
Schedule TOU-8 Sheet 6TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20116H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.34 07 9 (R) 0 .0 39 52Mid-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.12 16 9 (R) 0 .0 39 52Off-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.04 25 2 (R) 0 .0 39 52
Winter Season - Mid-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.06 40 2 (R) 0 .0 39 52Off-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.03 90 1 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 577.22 (I) 577.22 (I)
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 2.93 9.63 (R) 12.56 (R)
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct Access Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates that are applicable to both Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service) customers,
except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC as provided by Schedule DA-CRS orSchedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in theBilling Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
12/40
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
13/40
Southern California Edison Revised Cal. PUC Sheet No. 47820-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46874-E*
Schedule TOU-8 Sheet 6TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20116H17 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.38613 0.03952 (I)Mid-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.13891 0.03952 (I)Off-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.04958 0.03952 (I)
Winter Season - Mid-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.07394 0.03952 (I)Off-Peak 0.00014 (I) 0.00295 0.00120 0.00064 0.00942 (I) 0.00505 (R) 0.00024 0.01964 (I) 0.04560 0.03952 (I)
Customer Charge - $/Meter/Month 573.02 573.02
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related2.77 9.69 12.46
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
(
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct Access Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates that are applicable to both Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service) customers,
except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC as provided by Schedule DA-CRS orSchedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in theBilling Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
14/40
Southern California Edison Revised Cal. PUC Sheet No. 48338-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48098-E
Schedule TOU-8 Sheet 7TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20117H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.34 99 2 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.12 23 2 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.04 111 (R) 0 .0 39 52
Winter Season Mid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.06 20 9 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.03 68 4 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 309.98 (I) 309.98 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 9.04 (R) 11.84 (R)
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
15/40
Southern California Edison Revised Cal. PUC Sheet No. 48098-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47821-E*
Schedule TOU-8 Sheet 7TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 20117H10 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0. 00013 0. 00273 0. 00107 0.00064 0.00910 0. 00505 0.00024 0.01896 0.39077 0.03952Mid-Peak 0. 00013 0. 00273 0. 00107 0.00064 0.00910 0. 00505 0.00024 0.01896 0.13820 0.03952Off-Peak 0. 00013 0. 00273 0. 00107 0.00064 0.00910 0. 00505 0.00024 0.01896 0.04798 0.03952
Winter Season Mid-Peak 0. 00013 0. 00273 0. 00107 0.00064 0.00910 0. 00505 0.00024 0.01896 0.07175 0.03952Off-Peak 0. 00013 0. 00273 0. 00107 0.00064 0.00910 0. 00505 0.00024 0.01896 0.04314 0.03952
Customer Charge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 (I) 9.06 11.86 (I)
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
16/40
Southern California Edison Revised Cal. PUC Sheet No. 47821-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46875-E*
Schedule TOU-8 Sheet 7TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20117H17 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 KV TO 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.39077 0.03952 (I)Mid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.13820 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04798 0.03952 (I)
Winter Season Mid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.07175 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04314 0.03952 (I)
Customer Charge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.64 9.06 11.70
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
(I(I
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
17/40
Southern California Edison Revised Cal. PUC Sheet No. 48339-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48099-E
Schedule TOU-8 Sheet 8TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20118H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.30 06 0 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.10 17 1 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 18 6 (R) 0 .0 39 52
Winter Mid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.05 36 5 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 14 9 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 2,376.08 (I) 2,376.08 (I)
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.68 1.95 (R) 4.63 (R)
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand At 220 kV -$/kWFacilities Related (1.99) (1.99) 0.00
Time-RelatedSummer 0.00 0.00 0.00
Voltage Discount, Energy 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
18/40
Southern California Edison Revised Cal. PUC Sheet No. 48099-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47822-E*
Schedule TOU-8 Sheet 8TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 20118H10 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.33119 0.03952Mid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.11232 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03772 0.03952
Winter Mid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.06252 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03729 0.03952
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.68 (I) 2.00 4.68 (I)
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand At 220 kV -$/kWFacilities Related (1.99) (1.99) 0.00
Time-RelatedSummer 0.00 0.00 0.00
Voltage Discount, Energy 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
19/40
Southern California Edison Revised Cal. PUC Sheet No. 47822-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46876-E*
Schedule TOU-8 Sheet 8TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 20118H16 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option A Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.33119 0.03952 (I)Mid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.11232 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03772 0.03952 (I)
Winter Mid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.06252 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03729 0.03952 (I)
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.53 2.00 4.53
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand At 220 kV -$/kWFacilities Related (1.99) (1.99) 0.00
Time-RelatedSummer 0.00 0.00 0.00
Voltage Discount, Energy 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA)of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
20/40
Southern California Edison Revised Cal. PUC Sheet No. 48340-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48100-E
Schedule TOU-8 Sheet 9TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 20119H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWEnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.12 61 3 (R) 0 .0 39 52Mid-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.07 47 3 (R) 0 .0 39 52Off-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.04 25 2 (R) 0 .0 39 52
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.06 40 2 (R) 0 .0 39 52Off-Peak (0 .0 006 0) (R) 0 .0 025 0 (R) 0.00 19 2 (I) 0 .0 000 9 (R) 0.01 06 3 (I) 0.00 505 0.0 00 24 0.0 19 83 (R) 0.03 90 1 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 577.22 (I) 577.22 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.93 9.63 (R) 12.56 (R)
Time Related
Summer Season - On-Peak 0.00 0.00 16.08 (R)Mid-Peak 0.00 0.00 4.53 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission AccessCharge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct Access Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates that are applicable to both Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service) customers,
except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC as provided by Schedule DA-CRS orSchedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described in theBilling Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
21/40
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
22/40
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
23/40
Southern California Edison Revised Cal. PUC Sheet No. 48341-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48101-E
Schedule TOU-8 Sheet 10TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 201110H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 kV THROUGH 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.09 02 7 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.06 78 2 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.04 111 (R) 0 .0 39 52
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A NMid-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.06 20 9 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 022 7 (R) 0.00 16 9 (I) 0 .0 000 9 (R) 0.01 02 8 (I) 0.00 505 0.0 00 24 0.0 19 01 (R) 0.03 68 4 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 309.98 (I) 309.98 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 9.04 (R) 11.84 (R)
Time RelatedSummer Season - On-Peak 0.00 0.00 19.49 (R)
Mid-Peak 0.00 0.00 5.46 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment(RSBAA) of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution
3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
24/40
Southern California Edison Revised Cal. PUC Sheet No. 48101-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47824-E*
Schedule TOU-8 Sheet 10TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 201110H10 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 kV THROUGH 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.09658 0.03952Mid-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.07645 0.03952Off-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.04798 0.03952
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.07175 0.03952Off-Peak 0.00013 0.00273 0.00107 0.00064 0.00910 0.00505 0.00024 0.01896 0.04314 0.03952
Customer Charge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.80 (I) 9.06 11.86 (I)
Time RelatedSummer Season - On-Peak 0.00 0.00 22.08
Mid-Peak 0.00 0.00 6.19
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment(RSBAA) of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution
3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
25/40
Southern California Edison Revised Cal. PUC Sheet No. 47824-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46878-E*
Schedule TOU-8 Sheet 10TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 201110H17 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES FROM 2 kV THROUGH 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.09658 0.03952 (I)Mid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.07645 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04798 0.03952 (I)
Winter Season - On-Peak N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AMid-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.07175 0.03952 (I)Off-Peak 0.00013 (I) 0.00273 0.00107 0.00064 0.00910 (I) 0.00505 (R) 0.00024 0.01896 (I) 0.04314 0.03952 (I)
Customer Charge - $/Meter/Month 307.72 307.72
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.64 9.06 11.70
Time RelatedSummer Season - On-Peak 0.00 0.00 22.08
Mid-Peak 0.00 0.00 6.19
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00400 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment(RSBAA) of $0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
(I)(I)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA
Service) Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay theDWRBC as provided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
26/40
Southern California Edison Revised Cal. PUC Sheet No. 48342-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48102-E
Schedule TOU-8 Sheet 11TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 201111H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.08 65 8 (R) 0 .0 39 52Mid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.06 01 6 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 18 7 (R) 0 .0 39 52
Winter Season - On-PeakMid-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.05 36 6 (R) 0 .0 39 52Off-Peak (0 .0 006 1) (R) 0 .0 017 7 (R) 0.00 13 9 (I) 0 .0 000 9 (R) 0.00 82 3 (I) 0.00 505 0.0 00 24 0.0 16 16 (R) 0.03 14 9 (R) 0 .0 39 52
Customer Charge - $/Meter/Month 2,376.08 (I) 2,376.08 (I)
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.68 1.95 (R) 4.63 (R)
Time RelatedSummer Season - On-Peak 0.00 0.00 16.89 (R)
Mid-Peak 0.00 0.00 4.46 (R)
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand, 220 kV - $/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy, 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service)
Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC asprovided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
27/40
Southern California Edison Revised Cal. PUC Sheet No. 48102-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47825-E*
Schedule TOU-8 Sheet 11TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 201111H10 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.08759 0.03952Mid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.06503 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03773 0.03952
Winter Season - On-PeakMid-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.06253 0.03952Off-Peak 0.00013 0.00223 0.00091 0.00064 0.00723 0.00505 0.00024 0.01643 0.03730 0.03952
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge - $/kW of Billing Demand/Meter/MonthFacilities Related 2.68 (I) 2.00 4.68 (I)
Time RelatedSummer Season - On-Peak 0.00 0.00 19.22
Mid-Peak 0.00 0.00 5.08
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand, 220 kV - $/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy, 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service)
Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC asprovided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
28/40
Southern California Edison Revised Cal. PUC Sheet No. 47825-E*Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46879-E*
Schedule TOU-8 Sheet 11TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2536-E-A Akbar Jazayeri Date Filed Dec 23, 2010Decision 10-12-006 Vice President Effective Jan 1, 201111H16 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES ABOVE 50 KV
Option B Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.08759 0.03952 (I)Mid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.06503 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03773 0.03952 (I)
Winter Season - On-PeakMid-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.06253 0.03952 (I)Off-Peak 0.00013 (I) 0.00223 0.00091 0.00064 0.00723 (I) 0.00505 (R) 0.00024 0.01643 (I) 0.03730 0.03952 (I)
Customer Charge - $/Meter/Month 2,358.79 2,358.79
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 2.53 2.00 4.53
Time RelatedSummer Season - On-Peak 0.00 0.00 19.22
Mid-Peak 0.00 0.00 5.08
Winter Season - Mid-Peak 0.00 0.00 0.00Off-Peak 0.00 0.00 0.00
Power Factor Adjustment - $/kVAR 0.32 0.32
Voltage Discount, Demand, 220 kV - $/kWFacilities Related (1.99) (1.99)
Time-RelatedSummer 0.00 0.00 (0.15)
Voltage Discount, Energy, 220 kV - $/kWh 0.00000 0.00000 (0.00064)
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00322 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the
Transmission Revenue Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of$0.00004 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct
Access Customers, as defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates are applicable to Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service)
Customers, except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC asprovided by Schedule DA-CRS or Schedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion iscalculated as described in the Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
29/40
Southern California Edison Revised Cal. PUC Sheet No. 48343-E**Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48103-E
Schedule TOU-8 Sheet 12TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2577-E-A Akbar Jazayeri Date Filed May 2, 2011Decision 11-04-006 Vice President Effective Jun 1, 201112H18 Resolution
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
O tion R Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak (0 .0 00 60) (R) 0 .0 189 5 (R) 0.001 92 (I) 0.00 009 (R) 0.010 63 (I) 0 .0 050 5 0 .0002 4 0 .0 36 28 (R) 0.3 40 79 (R) 0.03 952Mid-Peak (0 .0 00 60) (R) 0 .0 189 5 (R) 0.001 92 (I) 0.00 009 (R) 0.010 63 (I) 0 .0 050 5 0 .0002 4 0 .0 36 28 (R) 0.1 21 69 (R) 0.03 952Off-Peak (0 .0 00 60) (R) 0 .0 189 5 (R) 0.001 92 (I) 0.00 009 (R) 0.010 63 (I) 0 .0 050 5 0 .0002 4 0 .0 36 28 (R) 0.0 42 52 (R) 0.03 952
Winter Season - Mid-Peak (0 .0 00 60) (R) 0 .0 189 5 (R) 0.001 92 (I) 0.00 009 (R) 0.010 63 (I) 0 .0 050 5 0 .0002 4 0 .0 36 28 (R) 0.0 64 02 (R) 0.03 952Off-Peak (0 .0 00 60) (R) 0 .0 189 5 (R) 0.001 92 (I) 0.00 009 (R) 0.010 63 (I) 0 .0 050 5 0 .0002 4 0 .0 36 28 (R) 0.0 39 01 (R) 0.03 952
Customer Charge - $/Meter/Month 577.22 (I) 577.22 (I)
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.93 3.05 (R) 5.98 (R)
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of ($0.00038) per kWh. (R)
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct Access Customers, as
defined in and pursuant to D.02-10-063, D.02-02-051, and D.02-12-082.7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E.8 Total = Total Delivery Service rates that are applicable to both Bundled Service, Direct Access (DA) and Community Choice Aggregation Service (CCA Service) Customers,
except DA and CCA Service Customers are not subject to the DWRBC rate component of this Schedule but instead pay the DWRBC as provided by Schedule DA-CRS orSchedule CCA-CRS.
9 Gen = Generation The Gen rates are applicable only to Bundled Service Customers. When calculating the Energy Charge, the Gen portion is calculated as described inthe Billing Calculation Special Condition of this Schedule.
-
8/13/2019 Service Metered and Delivered at Voltages Above 50 Kv
30/40
Southern California Edison Revised Cal. PUC Sheet No. 48103-ERosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 47826-E*
Schedule TOU-8 Sheet 12TIME-OF-USE - GENERAL SERVICE - LARGE
(Continued)
(Continued)
(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2558-E Akbar Jazayeri Date Filed Feb 28, 2011Decision Vice President Effective Mar 1, 201112H10 Resolution E-3930
RATES (Continued)
SERVICE METERED AND DELIVERED AT VOLTAGES BELOW 2 KV
Option R Trans Distrbtn NSGC NDC PPPC DWRBC PUCRF Total URG* DWREnergy Charge - $/kWh/Meter/Month
Summer Season - On-Peak 0.00014 0.01827 (I) 0.00120 0.00064 0.00942 0.00505 0.00024 0.03496 (I) 0.38613 0.03952Mid-Peak 0.00014 0.01827 (I) 0.00120 0.00064 0.00942 0.00505 0.00024 0.03496 (I) 0.13891 0.03952Off-Peak 0.00014 0.01827 (I) 0.00120 0.00064 0.00942 0.00505 0.00024 0.03496 (I) 0.04958 0.03952
Winter Season - Mid-Peak 0.00014 0.01827 (I) 0.00120 0.00064 0.00942 0.00505 0.00024 0.03496 (I) 0.07394 0.03952Off-Peak 0.00014 0.01827 (I) 0.00120 0.00064 0.00942 0.00505 0.00024 0.03496 (I) 0.04560 0.03952
Customer Charge - $/Meter/Month 573.02 573.02
Demand Charge-$/kW of Billing Demand/Meter/MonthFacilities Related 2.93 (I) 3.21 (R) 6.14 (I)
Power Factor Adjustment - $/kVAR 0.27 0.27
Delivery Service Generation
* The ongoing Competition Transition Charge (CTC) of $0.00458 per kWh is recovered in the URG component of Generation.1 Trans = Transmission and the Transmission Owners Tariff Charge Adjustments (TOTCA) which are FERC approved. The TOTCA represents the Transmission Revenue
Balancing Account Adjustment (TRBAA) of $(0.00027) per kWh, Reliability Services Balancing Account Adjustment (RSBAA) of $0.00005 per kWh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $0.00036 per kWh.
2 Distrbtn = Distribution3 NSGC = New System Generation Charge4 NDC = Nuclear Decommissioning Charge5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.)6 DWRBC = Department of Water Resources (DWR) Bond Charge. The DWR Bond Charge is not applicable to exempt Bundled Service and Direct Access Customers, as
defined in and pursu