Service Change Summary
Transcript of Service Change Summary
-
8/6/2019 Service Change Summary
1/150
Service Change SummaryShakeup
DateCategory Action Line Service Changes Outcome
6/25/06Route
NetworkNew 4 DX
Implement shuttle operation between Highland and
Vermont during mid-day.Completed
6/25/06Route
NetworkTerminal 20 All Move layover to Veteran/Wilshire Completed
6/25/06RouteNetwork
Cancel 26 ALL Remove AM service along Franklin avenue Completed
6/25/06Route
NetworkModification 28 ALL
Re-route northbound service in Downtown LA contingent
on closure of Spring St. contra flow lane. Newnorthbound route would use regular route to Olympic &
Olive, then via L-Hill, R-1st St. , l-Broadway to Cesar
Chavez and regular route. Southbound route to remain
unchanged.
Completed
6/25/06 RouteNetwork
Modification 38 All Move NB service from Spring St. to Main St. Completed
6/25/06RouteNetwork
Extend 60Extend Pacific / Slauson shortlines- remove Metro H.S.school trip.
Completed
6/25/06Route
NetworkTerminal 60 Establish new layover at Elm & Broadway. Completed
6/25/06Route
NetworkShorten 62 ALL Consider new shortline at Rosecrans Blvd. Completed
6/25/06RouteNetwork
Modification 65 Remove Central Ave. time point east & west. Completed
6/25/06 Route Modification 70 ALL Re-route northbound service in Downtown LA contingent Completed
-
8/6/2019 Service Change Summary
2/150
Network on closure of Spring St. contra flow lane. New routewould duplicate 76, 78, 79 & 378 routes downtown.
6/25/06Route
NetworkModification 76 ALL
Consider moving Local/Limited headway split point from
Main/Griffin to Valley/Garfield to alleviate departure
differentials from El Monte Station (bi-directional DX).
Completed
6/25/06
Route
Network Modification 90 ALL
Change L.A. route segment from Spring/Main St. to
travel via Hill St. Completed
6/25/06Route
NetworkTerminal 92 ALL
Relocate terminal from Venice & Main (Ter28) to Main
and 11th Streets..Completed
6/25/06Route
NetworkModification 94 ALL
Relocate route segment from Spring/Main St. to travel via
Hill St.Completed
6/25/06RouteNetwork
Extend 102 ALL Extend east terminal to Palm & Seville via Florence Ave. Completed
6/25/06Route
NetworkExtend 105 ALL Extend selected AM & PM trips to Atlantic Blvd. Completed
6/25/06Route
NetworkModification 108 DX Review shortlines on both east and west legs
Extended more service east of Paramount Bl.
and all service west to Fox Hills Mall.
6/25/06RouteNetwork
Modification 117 ALLAdd stops on Erickson Av overpass to serve Rancho LosAmigos when gates are closed
Completed, all trips via Erickson Av overpass
6/25/06Route
NetworkExtend 158 ALL
Extend route to Moorpark & Van Nuys to facilitate
interlining and to abandon layover at Ventura Cyn &Ventura Blvd.
ROUTE EXTENDED.
6/25/06Route
NetworkExtend 161 SA-SU
Extend two morning and two afternoon trips from
Ventura & Topanga to Warner Center to connect with
ParkLink Shuttle serving Santa Monica MountainRecreation Center.
TRIPS EXTENDED.
6/25/06Route
NetworkTerminal 170
Re-route east terminal to Lower Level El Monte Station
currently on detour, modify variants, trips and tripCompleted
-
8/6/2019 Service Change Summary
3/150
patterns.
6/25/06RouteNetwork
Terminal 176 DXRe-route east terminal to Lower Level El Monte Stationcurrently on detour, modify variants, trips trip patterns
and GEO map.
Completed
6/25/06RouteNetwork
Cancel 220 SUN Delete all service Not Completed
6/25/06Route
NetworkCancel 220
DX
SAT
Delete service south of Venice/Culver and operate on 40"
headwayNot Completed
6/25/06RouteNetwork
Cancel 225 DXTransfer provision of service to the Palos VerdesPeninsula TA.
Completed - Routes 225 and 226 operated by
PVPTA under agreement with Metro Contract
Services
6/25/06RouteNetwork
Modification 233 DXReschedule midday day service to eliminate shortlines atVan Nuys and Roscoe Bl. Widened headways from 8 to
10 mins.
MIDDAY SERVICE RESCHEDULED.
6/25/06RouteNetwork
Modification 258 DXModify variant to utilize new layover zone currently ondetour.
Completed
6/25/06 RouteNetwork
Terminal 258 DX
Consider changing pattern of short/long trips to
accommodate operator restroom needs at Goodrich/Union
shortline.
Not Completed
6/25/06Route
NetworkTerminal 260 ALL
Modify variants utilizing the Mendocino layover to the
new Woodbury layover currently on detour.Completed
6/25/06RouteNetwork
Modification 267 DX SA
Re-route south terminal to Lower Level El Monte Station
currently on detour, modify variants, trips and trip
patterns.
Completed
6/25/06Route
NetworkModification 268 DX
Re-route south terminal to Lower Level El Monte Stationcurrently on detour, modify variants, trips and trip
patterns.
Completed
6/25/06 Route Cancel 439 ALL Transfer service south of LAX City Bus Center to Beach Completed, shuttle operated until BCT 109
-
8/6/2019 Service Change Summary
4/150
Network Cities Transit. Coordinate for timed transfers at LAX. began service
6/25/06Route
NetworkTerminal 439 ALL
Change south terminal to LAX area. Beach Cities Transit
to operate service from LAX area to Redondo Beach.
Line 439 segmented in the LAX area. Peakhour trips operate to Aviation/LAX Station,
midday to LAX City Bus Center. MTA to
operate south end shuttle service with time-
transfer. Beach Cities Transit to take-over
August 2006.
6/25/06Route
NetworkModification 442 DX
Reroute to Figueroa and Flower to serve 7th/Metro
Center and attract new ridership.Added to program. Completed
6/25/06Route
NetworkModification 444 ALL
Reroute to Figueroa and Flower to serve 7th/Metro
Center and attract new ridership.
Added to program. Completed, ridership
increased
6/25/06RouteNetwork
Modification 446 ALLReroute to Figueroa and Flower to serve 7th/MetroCenter and attract new ridership.
Added to program. Completed, ridershipincreased
6/25/06Route
NetworkModification 446 ALL Reroute service to serve 7th/Metro Station. Added to program. Completed.
6/25/06Route
NetworkExtend 612 ALL
Extend clockwise trips around Industry Way to serve
Sheriff Detention Center.Completed
6/25/06Route
NetworkExtend 612 ALL Extend route to Sante Fe via Florence Ave. Completed
6/25/06Route
NetworkNew 634 DX
Consider adding all-day shuttle route between Sylmar
Station and Mission College and operate on 30 minute
frequency.
SHUTTLE TO BE OPERATED BY MTA
CONTRACT SERVICES.
6/25/06Route
NetworkCancel 652 ALL Do not run Hollywood Bowl Service Completed
6/25/06RouteNetwork
Cancel 717 DXSan Gabriel will combine with 780. Route will berenumbered 780.
Completed
6/25/06Route
NetworkTerminal 720 All Eliminate short-turns at Westwood and 6th/Main Completed
-
8/6/2019 Service Change Summary
5/150
6/25/06Route
NetworkNew 734 DX
Implement new Metro Rapid Service along SepulvedaBlvd. between Ventura Blvd. and Sylmar MetrolinkStation.
IMPLEMENTED
6/25/06Route
NetworkBus Stop 740 DX Evaluate for additional stop at Manhattan Bch. Bl. Completed. Stop added.
6/25/06Route
NetworkTerminal 745 ALL Relocate Broadway & Florence short line layover. Completed
6/25/06Route
NetworkTerminal 757 ALL
Evaluate shortline operation at Wilshire Bl. and retie
schedule.All trips extended to Franklin Ave.
6/25/06Route
NetworkModification 780 ALL
Combine Rapid lines 780 and 717 from West L.A.
Transit Center to Colorado/Hill.Completed
6/25/06ServiceLevel
Maintenance 28 ALLEvaluate service levels leaving Century City (DX only)between 430pm and 500pm.
Completed
6/25/06Service
LevelMaintenance 28 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06Service
LevelMaintenance 40 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06ServiceLevel
Maintenance 42 ALLPrepare headway sheets and analyze data; make necessaryadjustments.
Completed
6/25/06Service
LevelMaintenance 70 DX
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments. Addedone am westbound trip between 9 ~ 10 to ease overloads.
Completed
6/25/06Service
LevelMaintenance 76 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06Service
LevelMaintenance 78 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments. No
sign of showing overloading after reviewing APC point
check data.
Completed
-
8/6/2019 Service Change Summary
6/150
6/25/06ServiceLevel
Maintenance 81 DX Re-tie interlining trips to reduce deadhead mileage. Completed
6/25/06Service
LevelMaintenance 81 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06ServiceLevel
Maintenance 108 ALLPrepare headway sheets and analyze data; make necessaryadjustments.
Completed
6/25/06Service
LevelMaintenance 110 ALL
Prepare headway sheets and analyze data. Analyze for
shortline operation to relieve overcrowding at Blue Line
Station.
Completed
6/25/06Service
LevelMaintenance 111 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06ServiceLevel
Maintenance 115 ALLPrepare headway sheets and analyze data; make necessaryadjustments.
Completed
6/25/06Service
LevelMaintenance 117 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06Service
LevelMaintenance 120 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06ServiceLevel
Addition 161 DXAdd eastbound pm trip departing Agoura Rd. and LostHills Rd. approximately 3:38pm to reduce passenger
overloads .
TRIP ADDED
6/25/06ServiceLevel
Maintenance 164 DXEvaluate passenger loads and consider adjustments onVictory Blvd.
IMPLEMENTED ADJUSTMENTS.
6/25/06Service
LevelAddition 166 SA
Improve headway from 30 to 20 minutes and shortline
every other trip at Nordhoff St. and Tampa Ave.HEADWAYS IMPROVED,
6/25/06Service
LevelMaintenance 204 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06Service
Level
Maintenance 206 ALLPrepare headway sheets and analyze data; make necessary
adjustments.
Completed
-
8/6/2019 Service Change Summary
7/150
6/25/06ServiceLevel
Maintenance 207 ALLPrepare headway sheets and analyze data; make necessaryadjustments.
Completed
6/25/06Service
LevelAddition 209 DX Restore midday service per Special Master's ruling. Completed. Midday service restored.
6/25/06ServiceLevel
Maintenance 210 ALLPrepare headway sheets and analyze data; make necessaryadjustments.
Completed
6/25/06Service
LevelMaintenance 212 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06Service
LevelReallocation 234 DX
Reallocate 1/3 of local service on Sepulveda Blvd to
operate Sepulveda Blvd Rapid Bus service.
TRIPS REALLOCATED TO LINE 734
SEPULVEDA METRO RAPID &
RESCHEDULED LINE 234 LOCAL BUS
SERVICE.
6/25/06Service
LevelAddition 243 DX Consider adding school tripper to reduce passenger load. TRIPS ADJUSTED
6/25/06ServiceLevel
Maintenance 251 DXReview current passenger data for compliance w/120%loading standard and make necessary adjustments.
Completed
6/25/06
Service
Level Maintenance 260 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments. Completed
6/25/06Service
LevelMaintenance 267 DX SA
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06ServiceLevel
Maintenance 268 DXReview current passenger data for compliance w/120%loading standard and make necessary adjustments.
Completed
6/25/06Service
LevelMaintenance 444 ALL
Prepare headway sheets and analyze data; make necessary
adjustments. Review shortlines.Completed
6/25/06Service
LevelMaintenance 445 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06Service
Level
Maintenance 446 ALLPrepare headway sheets and analyze data; make necessary
adjustments.
Completed
-
8/6/2019 Service Change Summary
8/150
6/25/06ServiceLevel
Maintenance 450 DX Staff to conduct ride check. Analyze added trips.
Checks revealed significant increase inridership. Headways changed from every30min. to every 20 min. Also added earlier
northbound AM trip.
6/25/06ServiceLevel
Addition 484 DX
Improving peak-direction headways for DX peak hours. 5
min. headways between -484- & -490- westbound from7:20am ~ 8:40am; eastbound 4:30pm ~ 5:30pm; 6 min.
headways outside time period specified above.
Completed
6/25/06Service
LevelAddition 484 SA
Retie am schedule to eliminate long deadheads. Added 2
am trips eastbound between 8 ~ 10am.Completed
6/25/06Service
LevelMaintenance 484 ALL
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06Service
LevelMaintenance 485 DX
Review current passenger data for compliance w/120%
loading standard and make necessary adjustments.Completed
6/25/06ServiceLevel
Addition 490 DX
Improving peak-direction headways for DX peak hours. 5
min. headways between -484- & -490- westbound from7:20am ~ 8:40am; eastbound 4:30pm ~ 5:30pm; 6 min.
headways outside time period specified above.
Completed
6/25/06ServiceLevel
Maintenance 490 ALLReview current passenger data for compliance w/120%loading standard and make necessary adjustments.
Completed
6/25/06Service
LevelMaintenance 710 DX Adjust span of service per Special Master's ruling.
Increased span of service to operate 5AM-
9PM.
6/25/06Service
LevelMaintenance 711 DX
Adjust span of service per Special Master's ruling.
Implement 45ft buses on the line.
Increased span of service to operate 5AM-
9PM. and 45 foot buses deployed on line.
6/25/06Service
LevelReallocation 720 All Deploy articulated buses Completed
6/25/06Service
LevelMaintenance 734 DX Establish 10 minute peak and 20 minute base headways. Completed
-
8/6/2019 Service Change Summary
9/150
6/25/06ServiceLevel
Maintenance 740 DXAdjust span of service per Special Master's ruling.Implement 45ft buses on the line.
Increased span of service to operate 5AM-9PM. and 45 foot buses deployed on line.
6/25/06Service
LevelMaintenance 750 DX Evaluate passenger loads and consider adjustments. WIDEN MIDDAY HEADWAYS
6/25/06ServiceLevel
Reallocation 750 DXReschedule service to reflect the operation of 45 footbuses and save 3,000 annualized Revenue Service Hours.
Completed
6/25/06ServiceLevel
Maintenance 751 DXReview current passenger data for compliance w/120%loading standard and make necessary adjustments.
Completed
6/25/06Service
LevelMaintenance 754 DX Adjust span of service per Special Master's ruling.
Increased span of service to operate 5AM-
9PM.
6/25/06Service
LevelMaintenance 754 ALL
Prepare headway sheets and analyze data; make necessary
adjustments.Completed
6/25/06Service
LevelMaintenance 757 DX Adjust span of service per Special Master's ruling.
Increased span of service to operate 5AM-
9PM.
6/25/06Service
LevelReallocation 761 DX
Reschedule to reflect the operation of articulated buses
and to reduce 4,000 annual Revenue service hours.CONVERTED
6/25/06 ServiceLevel Maintenance 780 ALL Review current passenger data for compliance w/120%loading standard and make necessary adjustments. Completed
6/25/06Service
QualityMaintenance 2 DX Review schedule and adjust as necessary. Completed
6/25/06ServiceQuality
Maintenance 4 DX Review schedule and adjust as necessary Completed
6/25/06Service
QualityMaintenance 10 SAT Review schedules and adjust as necessary Completed
6/25/06Service
QualityMaintenance 14 All Review schedule and adjust as necessary Completed
6/25/06 Service Maintenance 16 All Review schedules and adjust as necessary Completed
-
8/6/2019 Service Change Summary
10/150
Quality
6/25/06ServiceQuality
Runtime 18 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06Service
QualityMaintenance 20 All Review schedules and adjust as necessary Completed
6/25/06
Service
Quality Maintenance 20 All Review schedules and adjust as necessary Completed
6/25/06ServiceQuality
Runtime 26 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06Service
Quality
Trip
Adjustment26 ALL
Review OWL service to ensure efficient running time and
recovery timeCompleted
6/25/06Service
QualityMaintenance 33 All Review schedules and adjust as necessary Completed
6/25/06ServiceQuality
Maintenance 38 SUN Review schedule and adjust as necessary Completed
6/25/06Service
Quality
Maintenance 42 DX Verify consistency for routes 42 & 42A Verified - No changes necessary
6/25/06Service
QualityRuntime 45 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06Service
QualityRuntime 53 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06Service
Quality
Trip
Adjustment53 ALL
Review OWL service to ensure efficient running time and
recovery timeCompleted
6/25/06ServiceQuality
Maintenance 55 Apply proper bus bay numbers to run boards Completed
6/25/06Service
QualityRuntime 55 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
-
8/6/2019 Service Change Summary
11/150
6/25/06ServiceQuality
Maintenance 60 Establish new time point at Firestone & Long Beach. Completed
6/25/06Service
QualityRuntime 60 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06ServiceQuality
Runtime 62 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06ServiceQuality
Runtime 65 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06Service
QualityRuntime 66 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06Service
QualityMaintenance 68 SAT Review schedule and adjust as necessary Completed
6/25/06Service
QualityRuntime 70 DX
Analyze latest runtime data, especially for segment
between El Monte Station and Garvey/Rosemead - adjust
as necessary (DX). Runtime increased by about 3 min. amwestbound after reviewing ATMS data.
Completed
6/25/06
Service
Quality Maintenance 76 ALL
Consider changing timetable header from Valley/Fremont
to Valley/Garfield (ALL). Completed
6/25/06Service
QualityRuntime 76 ALL
Analyze latest running time data and make necessary
adjustments. (DX).Completed
6/25/06ServiceQuality
TripAdjustment
78 DXAdjust local & limited trip routes among 6am ~ 620am,3:30pm and 6pm to even passenger loads.
Completed
6/25/06Service
QualityRuntime 92 DX Implement new run time and retie existing trips. Completed
6/25/06Service
Quality
Trip
Adjustment92 DX
Adjust 9:00pm southbound trip to eliminate gap in
service.Completed
6/25/06Service
QualityRuntime 94 DX Analyze run time, apply to existing trips and retie. Completed
-
8/6/2019 Service Change Summary
12/150
6/25/06ServiceQuality
Runtime 102 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06Service
QualityRuntime 105 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06ServiceQuality
Runtime 108 SA Analyze runtime and adjust or retie schedule. Added to program. Runtime added.
6/25/06 ServiceQuality
Runtime 110 SU Analyze runtime and adjust or retie schedule. Completed. Runtime added.
6/25/06Service
QualityRuntime 111 SA Analyze run time and adjust accordingly. Completed. Runtime added.
6/25/06Service
QualityRuntime 117 DX Analyze runtime and adjust or retie schedule. Completed. Runtime added.
6/25/06Service
QualityRuntime 120 DX Analyze run time and adjust accordingly. Completed. Runtime added.
6/25/06Service
Quality
Trip
Adjustment150 ALL
Adjust late night run time and retie for scheduling
efficiencies.COMPLETED night ADJUSTMENTS.
6/25/06 ServiceQuality
TripAdjustment
150 SA-SU Interline selected trips with Line 161 at Warner Center toreallocate layover and allow for the extension of Linetrips.
COMPLETED INTERLINES
6/25/06Service
Quality
Trip
Adjustment152 DX
Convert pm pull-in trips from N. Hollywood Station to
operate in-service to Tuxford and San Fernando Rd.ADDED NIGHT TRIP.
6/25/06Service
Quality
Trip
Adjustment154 DX
Shift selected trips and interline with Line 152 shuttle to
produce scheduling efficiencies.Completed
6/25/06ServiceQuality
Runtime 156 SA-SU Analyze and evaluate run time and apply to existing trips. RUN TIME IMPLEMENTED.
6/25/06Service
QualityRuntime 163 SU Analyze and evaluate run time and apply to existing trips. NO ADJUSTMENTS REQUIRED.
-
8/6/2019 Service Change Summary
13/150
6/25/06ServiceQuality
TripAdjustment
164 DXCancel selected school trippers on Victory Blvd andadjust hdwys.
COMPLETED.
6/25/06Service
Quality
Trip
Adjustment166 DX
Consider converting pm pull-in trips from N. Hollywood
Station to operate in-service to Lankershim and San
Fernando Rd.
TRIPS CONVERTED.
6/25/06Service
Quality
Runtime 168 DX Analyze run time, apply to existing trips and retie. Completed.
6/25/06ServiceQuality
Runtime 175 DX
Analyze latest running time data and make necessary
adjustments. Investigate specific operator complaintsregarding the segment between Marshall High and
Vermont/Sunset.
Completed
6/25/06Service
QualityRuntime 180 DX
Analyze latest running time data and make necessaryadjustments. Review current passenger data for
compliance w/120% loading standard and make
necessary adjustments.
Completed
6/25/06ServiceQuality
Runtime 200 ALLAnalyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06 ServiceQuality Runtime 207 DX Analyze runtime and adjust or retie schedule. Added to program. Runtime added.
6/25/06Service
QualityMaintenance 217 SAT Review schedule and adjust as necessary Completed
6/25/06ServiceQuality
Runtime 230 DX Analyze and evaluate run time and apply to existing trips. RUN TIME COMPLETED.
6/25/06Service
Quality
Trip
Adjustment230 DX
Modify first northbound Line 230 trip to depart Ventura
Pl. & Ventura Bl. at 5:02am to accommodate early
morning commuters
FIRST TRIP EXTENDED.
6/25/06Service
Quality
Trip
Adjustment236 ALL
Modify schedule to create interlines with route 158
Sched. 20 min. hdwy on northbound rte 237 trips from
INTERLINES ESTABLISHED WITH LINE
158 TRIPS. HDWY IMPROVED.
-
8/6/2019 Service Change Summary
14/150
7:20-8:00am
6/25/06ServiceQuality
Runtime 243 DX Consider minor running time adjustments.
6/25/06Service
QualityRuntime 245 SU
Consider adjusting eastbound runtime to provide required
time to travel from Owensmouth/Oxnard to TopangaCyn/Ventura.
MINOR RUN TIME ADJUSTED.
6/25/06Service
QualityRuntime 251 DX
Analyze latest running time data and make necessaryadjustments, specifically investigate operator complaints
regarding lack of running time between Division 3 andHuntington Park.
Completed
6/25/06Service
Quality
Trip
Adjustment251 DX
Consider changing base pattern to allow for through trips
between Division 3 and the Green Line, bi-directional.Completed
6/25/06Service
QualityRuntime 260 ALL
Analyze latest running time data and make necessary
adjustments, in particular investigate lack of running time
in late PM.
Completed
6/25/06Service
Quality
Trip
Adjustment260 ALL
Consider timing transfers between
Northbound/Southbound trips at the Woodbury layover.Completed
6/25/06 ServiceQuality
Runtime 265 ALL Analyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06Service
QualityRuntime 267 DX SA
Analyze latest running time data and make necessary
adjustments.Completed
6/25/06Service
QualityRuntime 268 DX
Analyze latest running time data and make necessary
adjustments.Completed
6/25/06Service
QualityRuntime 275 DX
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06Service
QualityRuntime 439 ALL
Analyze run time and adjust accordingly for entire length
of current service. Change south terminal to LAX City
Bus Center.
Completed. Service between Redondo Beach
and LAX transferred to Beach Cfities Transit.
-
8/6/2019 Service Change Summary
15/150
6/25/06ServiceQuality
Runtime 439 DX Analyze runtime and retie schedule. Added to program. Completed.
6/25/06Service
QualityRuntime 444 ALL
Analyze run time and adjust accordingly esp. new
"limited stop" service area.Completed
6/25/06ServiceQuality
Runtime 446 ALLAnalyze run time and adjust accordingly esp. south ofATC.
Adjustments completed.
6/25/06 ServiceQuality
Runtime 460 ALL Analyze in-service run times, pulls and deadhead timesand adjust as required
Completed
6/25/06ServiceQuality
Maintenance 484 ALL
Eliminate time points at Olive/7th - eastbound, and
Spring/1st - westbound from Running Boards & TOS
summaries.
Completed
6/25/06Service
QualityRuntime 484 DX
Review latest running time data involving the El MonteStation time point for any needed redistribution.
Redistribute runtime eastbound 3pm to 6pm from El
Monte Station, Valley/Garvey, to 2nd/Stimson.
Completed
6/25/06ServiceQuality
Runtime 485 DX
Added 5 ~ 7 min. in runtime throughout the day. Increase
one bus all day as a result of adding runtimes. Layover
also improved.
Completed
6/25/06ServiceQuality
Runtime 485 DXAnalyze latest running time data and make necessaryadjustments.
Completed
6/25/06Service
QualityMaintenance 490 ALL
Eliminate time points at Olive/7th - eastbound, and
Spring/1st - westbound from Running Boards & TOSsummaries.
Completed
6/25/06Service
Quality
Recovery
Time490 DX
Eastbound trip leaving Terminal 28 at 6:49am always
runs late at MSAC. Retie to allow more layover.Completed
6/25/06Service
QualityMaintenance 534 All Review schedules and adjust as necessary Completed
6/25/06 Service Runtime 611 ALL Analyze in-service run times, pulls and deadhead times Completed
-
8/6/2019 Service Change Summary
16/150
Quality and adjust as required
6/25/06ServiceQuality
Maintenance 612 ALL Apply proper bus bay numbers to run boards Completed
6/25/06Service
QualityRuntime 612 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06
Service
Quality
Trip
Adjustment 645 DX
Shift selected trips and interline with Line 152 shuttle to
produce scheduling efficiencies. Completed
6/25/06Service
QualityRuntime 705 DX
Analyze in-service run times, pulls and deadhead timesand adjust as required. Remove excess run time and retie
schedule for efficiency.
Complete
6/25/06Service
QualityMaintenance 714 DX Review schedule and adjust as necessary. Completed
6/25/06Service
QualityMaintenance 720 All Review schedules and adjust as necessary. Completed
6/25/06Service
QualityRuntime 745 ALL
Analyze in-service run times, pulls and deadhead times
and adjust as requiredCompleted
6/25/06Service
Quality Runtime 751 DXAnalyze latest running time data and make necessary
adjustments. Completed
6/25/06Service
QualityMaintenance 757 ALL Evaluate for additional stop at Adams Bl. Completed. Stop added.
6/25/06ServiceQuality
Runtime 757 ALL Analyze run time and adjust accordingly. No data available.
6/25/06ServiceQuality
Runtime 780 ALL
Analyze latest running time data and make necessary
adjustments. Review current passenger data forcompliance w/120% loading standard and make
necessary adjustments.
Completed
6/25/06Service
QualityRuntime 901 DX
Implement new run time and adjust trips for, improved
layover .
NEW RUN TIME AND IMPROVED
LAYOVER TIME ADDED.
-
8/6/2019 Service Change Summary
17/150
12/17/06RouteNetwork
Terminal 18 ALL Modify variant to show new layover at Oxford/Wilshire Completed
12/17/06Route
NetworkNew 28 ALL Consider running Limited 328 mid-day. Completed
12/17/06RouteNetwork
New 28 ALLOperate Line 85 as a shuttle from Glendale City Collegeto Cypress & Division St. renumbering as Line 685.
Completed
12/17/06 RouteNetwork
New 53 DX Implement new limited-stop service Line 350 Completed
12/17/06Route
NetworkNew 55 DX Implement new limited-stop service Line 355 Completed
12/17/06Route
NetworkTerminal 78 ALL
Ending late night Rte. -79- trips at Westfield Mall.
Eliminate time point @ Las Tunas/San Gabriel bothdirections.
Completed
12/17/06Route
NetworkShorten 81 ALL Consider shortline at Adams or other potential places. Completed. No shortlines at Adams.
12/17/06Route
NetworkBus Stop 94 ALL
Add Rte 394 limited stop at S. Fernando Rd. & Roscoe
Bl. To establish connections to trains serving Sun Valley
Metrolink Sta.
Completed
12/17/06Route
NetworkModification 94 ALL
Operate as two separate lines: Line 94A via regular route
from Olive View Medical Center to Sun Valley, then via
Lankershim Bl. To N. Hollywood Station (see Line 166)
and Line 94B via regular reroute from Sun Valley todowntown Los Angeles
Completed
12/17/06Route
NetworkNew 94 ALL
Operate Line 394 all day between Sylmar Metrolink
Station and downtown Los Angeles.Completed
12/17/06Route
NetworkRelief Point 105 ALL Move D2 relief point to Vernon Yard Completed
12/17/06 Route Shorten 111 ALL Consider changing east terminal to Norwalk Station. Completed. New route 121 to be extended to
-
8/6/2019 Service Change Summary
18/150
Network Service from Norwalk to Whittwood Center to beoperated by alternate service.
Whittwood and operated by Gateway Cities.
12/17/06Route
NetworkModification 120 ALL
Segment service at Rosa Parks Station operating each
route independently. Time transfer at the station with
Route 121 which will be extended to cover Line 111
portion from Norwalk to Whittwood Center. Route 121 tobe transferred and scheduled by Gateway Cities.
Demonstaration Project.
Route modification completed.
12/17/06Route
NetworkNew 121 ALL
Implement new Line 121 between Imperial Station and
Whittwood Center.Completed
12/17/06Route
NetworkConversion 150 ALL
Convert selected Route 240 weekday trips to proposed
new Line 741 Metro Rapid service along Reseda Bl.
between Devonshire St. and Ventura Bl.
12/17/06Route
NetworkModification 152 DX
Operate as two separate lines; Line 152A from new
terminal at Warner Center then via Victory Bl. To
Fallbrook Av. And regular route to N. Hollywood Stationand Line 152B (or new Line 155 ) via regular route from
N. Hollywood Station to downtown Burbank. Operate
new Line 153 as a branch of Line 152A via San FernandoRd. instead of Glenoaks Bl. Between Tuxford St. andSunland Bl.
Completed
12/17/06Route
NetworkModification 156 ALL
Reroute segment between Vineland Av. And Cahuenga
Bl. To Lankershim Blvd., replacing Line 166 segmentCompleted
12/17/06Route
NetworkNew 156 ALL
Operate Line 156 Owl as a separate line and renumber as
Line 356. (See Line 166)Completed
12/17/06Route
NetworkTerminal 158 DX
Relocate western terminal from Devonshire St. and
Valley Circle to Chatsworth Metrolink Station.Completed
12/17/06Route
NetworkCancel 166 ALL
Cancel Sun Valley to Universal City Segment and replace
Lankershim Bl. Segment with (option 1) Proposed LineCompleted
-
8/6/2019 Service Change Summary
19/150
94a and new Line 766 between Sylmar and N. HollywoodStation; or (option 2) alternate proposal for new Line 394and rerouted segment of Line 156.
12/17/06Route
NetworkConversion 166 ALL
convert selected trips to provide proposed new Line 364
Limited Stop service along same alignment.Completed
12/17/06Route
NetworkShorten 166 ALL
Shorten line in Sun Valley at Glenoaks Bl. And
Brandford St.Completed
12/17/06Route
NetworkCancel 201 ALL Cancel service east of the Glendale Adventist Hospital. Completed
12/17/06Route
NetworkModification 201 ALL
Modify route at California/Glendale Aves. due to safety
of turn , to continue on Broadway and left on Chevy
Chase then regular route. Improve service levels along theremaining portion of route. Consider layover possibilities.
Completed
12/17/06Route
NetworkModification 206 ALL
Shorten turnaround loop in Hollywood, relocate layover
to Hollywood & Vermont
Completed, layover moved from Fountain Av
and savings created by shorter turnaround
loop
12/17/06Route
NetworkShorten 207 SA
Establish new shortline terminal at Western & Gage SA
onlyCompleted
12/17/06RouteNetwork
Shorten 210 ALLCancel service west of Hollywood & Vine to HighlandAv to avoid duplication
Completed, shorter route implemented
12/17/06Route
NetworkShorten 212 ALL
Operate shorter route in Hollywood to Highland Av after
7 PM to avoid congestion on Hollywood Bl. east ofHighland Av
Analysis completed and necessary
adjustments made. Shorter route implementedin Hollywood
12/17/06Route
NetworkExtension 224 ALL
extend Line 224 service from Lankershim Bl. & San
Fernando Bl. along San Fernando Rd. to Olive View
Hospital.
Completed
12/17/06Route
NetworkNew 224 ALL
Replace Line 166 service along Lankershim Bl between
Universal and S. Fernando Rd & Lankershim with newCompleted
-
8/6/2019 Service Change Summary
20/150
Line 224
12/17/06RouteNetwork
Cancel 255 ALL Cancel Line. Completed
12/17/06Route
NetworkShorten 260 ALL Consider possible shortlines at Florence or Imperial. Completed
12/17/06Route
NetworkModification 353 DX
Re-route service to Sherman Way and Lankershim Bl.
between Van Nuys and N. Hollywood Stations. Cancelsegments between Van Nuys and N. Hollywood Stations.
Cancel segments along Van Nuys Bl., Victory Bl., LaurelCanyon Bl. And Oxnard Street.
Completed
12/17/06Route
NetworkNew 364 DX
Operate new limited stop service along Nordhoff St.
between Chatsworth Metrolink Sta and Osborne /Glenoaks Bl.
Completed
12/17/06Route
NetworkCancel 484 ALL
Cancel 484B Route to Industry Metrolink Station.
Possibly create Busway shuttle.Completed
12/17/06Route
NetworkModification 487 ALL
Break line into two separate routes both ending at Sierra
Madre Villa Station. Segment from El Monte Station to
Sierra Madre Villa Station would be renumbered 287.
Consider layover possibilities.
Completed
12/17/06Route
NetworkShorten 490 ALL
Consider shortline at Eastland Mall. Possibly create
Busway shuttle.Completed. No Busway shuttle.
12/17/06RouteNetwork
Modification 705 DX Move entire operation to D1 Completed
12/17/06Route
NetworkShorten 740 SA Establish new shortline terminal at 7th & Broadway Completed for SA
12/17/06RouteNetwork
New 741 DX
Operate new Metro Rapid service along Reseda Bl.
between Devonshire St. And Ventura Bl. On weekdays
only.
Completed
-
8/6/2019 Service Change Summary
21/150
12/17/06RouteNetwork
Modification 901 ALL Modify schedule to serve Canoga Ave. Park/Ride lot. Completed
12/17/06Service
LevelMaintenance 18 ALL
Retie schedule if necessary to comply with Work Order
#9.Completed
12/17/06Service
LevelAddition 26 DX
Implement two additional trips to accommodate studentoverloads from Santee High. Consider adding a
northbound trip in the 6:00 pm period and a southbound
trip in the 8:00 pm period to ease overcrowding.
Completed
12/17/06ServiceLevel
Maintenance 26 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 40 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 42 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06ServiceLevel
Maintenance 45 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
Level
Addition 53 DXConsider adding a trip northbound in the 8:00 pm period
from CSUDH to ease overcrowding
Completed
12/17/06Service
LevelAddition 55 DX
Consider adding a trip northbound in the 8:00 pm period
from Imperial Station to ease overcrowding.Completed
12/17/06ServiceLevel
Maintenance 60 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 62 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 65 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 66 ALL Retie schedule if necessary to comply with WO #9. Completed
-
8/6/2019 Service Change Summary
22/150
12/17/06ServiceLevel
Maintenance 102 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 105 ALL
Retie schedule if necessary to comply with WO #9. Move
entire non-owl operation to D2Completed
12/17/06ServiceLevel
Maintenance 108 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06 ServiceLevel
Maintenance 110 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 111 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 115 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 117 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 120 ALL Prepare headway analysis sheets on Route 120 portion. Completed. Necessary adjustments made.
12/17/06
Service
Level Maintenance 124 DX Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 200 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06ServiceLevel
Maintenance 202 DX Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 204 ALL
Reschedule daily, Saturday and Sunday services with
wider headways to reflect articulated buses with largerseating capacity.
Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 206 DX Prepare headway analysis sheets. Completed. Necessary adjustments made.
-
8/6/2019 Service Change Summary
23/150
12/17/06ServiceLevel
Maintenance 206 SA/SU Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 207 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06ServiceLevel
Maintenance 210 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06 ServiceLevel
Maintenance 212 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06ServiceLevel
Maintenance 234 ALL
Reschedule daily, Saturday and Sunday services with
wider headways to reflect articulated buses with larger
seating capacity.
Completed
12/17/06ServiceLevel
Addition 245 SUAdd on Topanga and De Soto one southbound am trip toaccommodate school travel and reduce overloading.
Completed
12/17/06Service
LevelMaintenance 265 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 275 DX Retie schedule if necessary to comply with WO #9. Completed
12/17/06 ServiceLevel
Maintenance 305 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 444 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 445 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06ServiceLevel
Maintenance 460 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 550 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
-
8/6/2019 Service Change Summary
24/150
12/17/06ServiceLevel
Maintenance 611 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 612 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06ServiceLevel
Maintenance 705 DX Retie schedule if necessary to comply with WO #9. Completed
12/17/06 ServiceLevel
Maintenance 710 SA Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 711 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 740 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelMaintenance 745 ALL Retie schedule if necessary to comply with WO #9. Completed
12/17/06Service
LevelMaintenance 754 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06
Service
Level Maintenance 757 ALL Prepare headway analysis sheets. Completed. Necessary adjustments made.
12/17/06Service
LevelAddition 901 ALL
Improve headways between 6 and 7:00pm to reduce
passenger loads.Completed
12/17/06ServiceQuality
Runtime 2 ALLAnalyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
12/17/06Service
QualityRuntime 4 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06Service
QualityRuntime 10 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.
12/17/06 Service Runtime 14 ALL Analyze latest running time data and make necessary Completed
-
8/6/2019 Service Change Summary
25/150
Quality adjustments. Review schedule and adjust as necessary.
12/17/06ServiceQuality
Runtime 16 ALLAnalyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
12/17/06Service
QualityRuntime 18 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06Service
Quality
Runtime 20 ALLAnalyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.
Completed
12/17/06ServiceQuality
Runtime 26 ALLAnalyze latest ATMS run time data and adjustaccordingly.
Completed
12/17/06Service
QualityRuntime 28 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 30 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06ServiceQuality
Runtime 33 ALLAnalyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
12/17/06Service
QualityRuntime 38 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06Service
QualityRuntime 45 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06Service
QualityRuntime 53 ALL
Analyze latest ATMS run time data and adjust
accordingly. Retie schedule if necessary to comply withWO #9.
Completed
12/17/06Service
QualityRuntime 55 ALL
Analyze latest ATMS run time data and adjust
accordingly. Retie schedule if necessary to comply withWO #9.
Completed
12/17/06Service
QualityRuntime 60 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
-
8/6/2019 Service Change Summary
26/150
12/17/06ServiceQuality
Runtime 62 ALLAnalyze latest ATMS run time data and adjustaccordingly.
Completed
12/17/06Service
QualityRuntime 65 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06ServiceQuality
Runtime 66 ALLAnalyze latest ATMS run time data and adjustaccordingly.
Completed
12/17/06 ServiceQuality
Runtime 68 ALL Analyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
12/17/06Service
QualityMaintenance 70 ALL
Eliminate time point @ Chavez/Alameda from trips
westbound onlyCompleted
12/17/06Service
QualityRuntime 70 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityMaintenance 76 ALL Eliminate time point @ Valley/Rosemead eastbound only Completed
12/17/06Service
QualityRuntime 76 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06
Service
Quality Runtime 78 ALL
Analyze latest running time and passenger data and make
necessary adjustments. Completed
12/17/06Service
QualityRuntime 81 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 90 ALLAnalyze run time for daily, Saturday and SundaySchedules and
Completed
12/17/06Service
Quality
Trip
Adjustment90 SA
Rescheduled for consistency (Rte 90 to / from Olive View
Hosp)Completed
12/17/06Service
QualityRuntime 94 ALL Analyze run time and apply to existing trips. Completed
12/17/06 Service Trip 94 ALL Interline late night and early morning trips to provided Completed
-
8/6/2019 Service Change Summary
27/150
Quality Adjustment continuous service between downtown L. A. and OliveView Medical Ctr.
12/17/06Service
QualityRuntime 102 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06ServiceQuality
Runtime 105 ALLAnalyze latest ATMS run time data and adjustaccordingly.
Completed
12/17/06 ServiceQuality Runtime 108 DX/SU Analyze runtime and retie accordingly. Analysis completed and necessaryadjustments made.
12/17/06Service
QualityRuntime 110 SA Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 111 DX/SU Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 115 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 117 SA/SU Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06
Service
Quality Runtime 120 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 124 DX Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06ServiceQuality
Maintenance 150 ALL Convert owl work assignments from BDOF to Regular. Completed
12/17/06Service
QualityRuntime 152 ALL Analyze and implement new run time. Completed
12/17/06Service
QualityMaintenance 154 DX-SA Establish new interline trips for increased efficiency. Completed
12/17/06 Service Maintenance 156 ALL Add notes to facilitate owl transfer connections with Line Completed
-
8/6/2019 Service Change Summary
28/150
Quality 150.
12/17/06ServiceQuality
Maintenance 156 ALL Convert owl work assignments from BDOF to Regular. Completed
12/17/06Service
QualityRuntime 161 DX Analyze run time and apply to existing trips. Completed
12/17/06Service
Quality
Runtime 163 ALL Analyze run time and apply to existing trips. Completed
12/17/06ServiceQuality
Runtime 170 DXAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 175 DX
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 176 DX
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 180 ALLAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 200 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06Service
QualityRuntime 201 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 202 DX Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 204 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06ServiceQuality
Runtime 206 DX Analyze runtime and retie accordingly.Analysis completed and necessaryadjustments made.
12/17/06Service
QualityRuntime 206 SA/SU Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
-
8/6/2019 Service Change Summary
29/150
12/17/06ServiceQuality
Runtime 207 ALL Analyze runtime and retie accordingly.Analysis completed and necessaryadjustments made.
12/17/06Service
QualityRuntime 210 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 212 ALL Analyze runtime and retie accordingly.
Analysis completed and necessaryadjustments made. Shorter route implemented
in Hollywood
12/17/06Service
QualityRuntime 217 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06Service
QualityRuntime 230 DX Analyze run time and apply to existing trips. Completed
12/17/06ServiceQuality
TripAdjustment
230 SAEstablish transfer connections with Lancaster Metrolinktrain at Sylmar Metrolink Station.
Completed
12/17/06Service
QualityRuntime 234 ALL Analyze and implement new run time. Completed
12/17/06Service
Quality
Trip
Adjustment243 DX
Adjust am southbound headways to equalize passenger
loads on Winnetka Ave.Completed
12/17/06 ServiceQuality
TripAdjustment
245 SU Incorporate into permanent schedule pm round tripcurrently operating on temporary letter.
Completed
12/17/06Service
QualityRuntime 251 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 252 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 258 DXAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 260 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
-
8/6/2019 Service Change Summary
30/150
12/17/06ServiceQuality
Runtime 265 ALLAnalyze latest ATMS run time data and adjustaccordingly.
Completed
12/17/06Service
QualityRuntime 267 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 268 ALLAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06 ServiceQuality Runtime 275 DX Analyze latest ATMS run time data and adjustaccordingly. Completed
12/17/06Service
QualityRuntime 305 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityMaintenance 353 DX Convert work assignments from BDOF to Regular. Completed
12/17/06Service
QualityRuntime 364 DX Analyze run time and apply to existing trips. Completed
12/17/06Service
QualityRuntime 445 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
QualityRuntime 460 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06Service
QualityRuntime 484 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 487 ALLAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 489 DX
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 490 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06 Service Runtime 534 ALL Analyze latest running time data and make necessary Completed
-
8/6/2019 Service Change Summary
31/150
Quality adjustments. Review schedule and adjust as necessary.
12/17/06ServiceQuality
Runtime 550 ALL Analyze runtime and retie accordingly.Analysis completed and necessaryadjustments made.
12/17/06Service
QualityRuntime 611 ALL
Analyze latest ATMS run time data and adjust
accordingly.Completed
12/17/06Service
Quality
Runtime 612 ALLAnalyze latest ATMS run time data and adjust
accordingly.
Completed
12/17/06ServiceQuality
Runtime 620 DXAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 684 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06Service
QualityRuntime 686 ALL
Analyze latest running time and passenger data and make
necessary adjustments.Completed
12/17/06ServiceQuality
Runtime 687 ALLAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 705 DX
Analyze latest ATMS run time data and adjust
accordingly. Retie schedule if necessary to comply with
WO #9.
Completed
12/17/06Service
QualityRuntime 710 SA Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06ServiceQuality
Runtime 711 ALL Analyze runtime and retie accordingly.Analysis completed and necessaryadjustments made.
12/17/06Service
QualityRuntime 714 DX
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06Service
QualityRuntime 720 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
12/17/06 Service Runtime 745 ALL Analyze latest ATMS run time data and adjust Completed
-
8/6/2019 Service Change Summary
32/150
Quality accordingly.
12/17/06ServiceQuality
Runtime 751 DX SAAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
12/17/06Service
QualityRuntime 754 ALL Analyze runtime and retie accordingly.
Analysis completed and necessary
adjustments made.
12/17/06Service
Quality
Runtime 757 ALL Analyze runtime and retie accordingly.Analysis completed and necessary
adjustments made.
12/17/06ServiceQuality
Runtime 780 DXAnalyze latest running time and passenger data and makenecessary adjustments.
Completed
6/24/07Route
NetworkCancel 4 ALL
Discontinue limited stop 304. To be replaced by Rapid
Express 704. Retain evening/owl service to Santa Monica
on Line 4 as close to today as possible.
Completed
6/24/07Route
NetworkCancel 10 Sat. Discontinue Route 11, consolidate trips into Line 10. Completed
6/24/07Route
NetworkCancel 10 DX Discontinue Route 11, consolidate trips into Line 10. Completed
6/24/07Route
NetworkExtension 16 DX Extend limited stop area to La Brea. Completed
6/24/07Route
NetworkShorten 16 ALL Shorten route at Maple Avenue. Completed
6/24/07RouteNetwork
Cancel 20 DX, Sat Discontinue Route 21. Completed
6/24/07Route
NetworkShorten 20 ALL
Shorten route at Wilshire/Westwood. Retain late
evening/owl service to Santa Monica from approximately10 p.m. to 6 a.m.
Completed
6/24/07Route
NetworkModification 33 ALL
Operate select pull-out and pull-in trips from Patsaouras
Plaza.Completed
-
8/6/2019 Service Change Summary
33/150
6/24/07RouteNetwork
Cancel 60 DXCancel Route 360 in conjunction with the implementationof Line 760
Completed
6/24/07Route
NetworkCancel 60 ALL
Cancel segment south of Artesia Blvd except for owl trips
which will continue to LB Transit Mall. Coordinate timed
transfer with LBT 51/52 at Long Beach/Artesia. New
south terminal to be at either Artesia Blue Line Station orat Artesia Blvd/Long Beach Blvd. Review latest
passenger data and adjust schedule accordingly inconjunction with new Rapid Line 760.
ESTABLISHED AT ARTESIA STATION.
6/24/07RouteNetwork
Modification 60 ALL Consider moving owl runs) from Div. 1 to Div. 2 Completed
6/24/07Route
NetworkCancel 65 ALL
Cancel Line in conjunction with the implementation of
new Line 665.Completed
6/24/07Route
NetworkCancel 76 ALL Eliminate limited line 376. Completed
6/24/07RouteNetwork
Modification 90 ALLModify route to operate between downtown Los Angelesand Foothill & Fenwick.
Routes 90 & 91 truncated at Foothill &
6/24/07Route
NetworkModification 92 ALL
Modify route to operate between downtown Los Angeles
and Burbank Metrolink Station.
Truncated at Burbank Metro-link station.
Base service widened from 20 to 25 minutes.
6/24/07Route
NetworkModification 115 ALL
Cancel service west of Sepulveda and replace with
extension of Line 625PROPOSAL WITHDRAWN BY STAFF.
6/24/07Route
NetworkCancel 119 DX
Cancel Service. Alternatives include Line 117 (Century
Bl.) and Line 120 (Imperial Highway).
IMPLEMENTED LINE 119CANCELLATION ON 108TH STREET.
CONTINUE TO OPERATE ROUTE 126
UNTIL TRANSITIONED TO ANOTHER
PROVIDER.
6/24/07Route
NetworkModification 120 ALL
Make permanent Demonstration Project. Implement two
separate routes.
APPROVED SEPARATION OF ROUTE
120 AND ROUTE 121.
-
8/6/2019 Service Change Summary
34/150
6/24/07RouteNetwork
Cancel 124 DX Cancel Service.
CONTINUE TO OPERATE ROUTE 124UNTIL TRANSITIONED TO ANOTHERPROVIDER (new GA Line 5 created June
09)
6/24/07Route
NetworkCancel 155 DX Cancel selected late night trips due to low ridership. Completed
6/24/07
Route
Network Modification 155 DX
Modify route in downtown Burbank & Media District to
match Line 96. Completed
6/24/07RouteNetwork
Cancel 156 ALLCancel Route 656 segment operating between Highlandand downtown Los Angeles
Truncated downtown L.A. to S. Monica &Highland segment.
6/24/07Route
NetworkNew 156 ALL
Operate Route 656 trips between Tobias / Parthenia and
Highland and Santa MonicaRoute 656 trips shortlined as proposed
6/24/07Route
NetworkExtension 161 SA
Trip extended to Warner Center Transit Center &
rescheduled.Completed
6/24/07RouteNetwork
Modification 161 SUInterlined with Line 254 trips operating along TopangaCyn Bl.
Completed. Abandoned Ventura / Topangashortline.
6/24/07Route
NetworkCancel 168 DX Cancel line due to low ridership. Retained Line 168 weekday service.
6/24/07Route
NetworkCancel 170 DX Cancel Line. Completed
6/24/07RouteNetwork
Modification 175 DXConsider route of line modification at Marshall HighSchool area.
Completed
6/24/07Route
NetworkModification 175 DX Make route modification at Marshall High School area. Completed
6/24/07Route
NetworkModification 176 DX
Discontinue service between Highland Park Station and
Glassell Park.Completed
6/24/07Route
NetworkShorten 176 DX
Shortline at Mission & Broadway area. Consider
turnaround loop possibilities.Completed
-
8/6/2019 Service Change Summary
35/150
6/24/07RouteNetwork
Terminal 176 DX Layover at York & Figueroa. Completed
6/24/07Route
NetworkCancel 202 DX
Cancel Service. Alternates include Metro Blue Line, the
Hahn Trolley, Compton Renaissance and Line 205.
NOT APPROVED BY GOVERNANCE
COUNCIL. CONTINUE TO OPERATE.
6/24/07Route
NetworkModification 214 DX
Cancel service on Broadway. Continue service on MainSt. and extend to Western Ave. A;lternatives for
Broadway include Torrance Transit Line 1 on Figueroa
with 30 min. service or Line 214 on Main St.
PROPOSAL WITHDRAWN BY STAFF.
6/24/07RouteNetwork
Cancel 230 DXCancel Route 239 midday and Saturday Service due tolow ridership.
Route 239 Saturday service canceled.
6/24/07Route
NetworkCancel 234 SA-SU
Cancel route between Alameda Ave./ San Fernando Rd.
and Glendale Metrolink StationGlendale Segment Cancelled on weekends
6/24/07Route
NetworkNew 234 DX-SA
Operate Route 183 service between Ventura / Sepulveda
and
Route 183 headways widened between
Sherman Oaks and Burbank.
6/24/07RouteNetwork
Cancel 265 ALLCancel segment north of Rosemead/Whittier andrestructure variants to improve efficiency.
Completed
6/24/07Route
NetworkModification 267 ALL
Consider re-routing 267 line at Del Mar/Sierra Madre
Villa Ave. to Del Mar/Rosemead.Completed
6/24/07Route
NetworkModification 267 ALL Re-route 264 line into Sierra Madre Villa Station. Completed
6/24/07RouteNetwork
Cancel 275 DX Cancel Line Completed
6/24/07Route
NetworkNew 290 DX-SA
Operate new Route 290 service between Foothill &
Fenwick and Olive View Medical Center.
Established new Route 290 operating on 35 to
45 minute frequency.
6/24/07Route
NetworkNew 292 ALL
Operate new Route 292 service between Burbank
Metrolink Sta.
Established new Route 292 service operating
on 20 to 30 minute frequencies.
6/24/07Route
NetworkCancel 353 DX Route 353 trips incorporated into Line 152
Route 353 trips incorporated into Line 152
and extended to terminal at Fallbrook &
-
8/6/2019 Service Change Summary
36/150
Ventura Bl.
6/24/07RouteNetwork
Cancel 442 DX Cancel Service.APPROVED BY COUNCIL BUT NOTIMPLEMENTED. CONTINUE TO
OPERATE SERVICE.
6/24/07RouteNetwork
Extension 484 ALLExtend DX short line from Valley Blvd. & Azusa Ave. toValley Blvd. & Lemon Ave. or farther and retie.
Completed
6/24/07Route
Network Modification 487 ALLBreak line into two separate routes. Line 287 will
continue through El Monte Station and replace line 170. Completed
6/24/07Route
NetworkTerminal 487 ALL
Consider layover possibilities at Montebello Town Center
and at Sierra Madre Villa Station.Completed
6/24/07Route
NetworkShorten 534 DX, Sat
Short-line select trips from Trancas Canyon to Malibu
Civic CenterCompleted
6/24/07Route
NetworkCancel 622 ALL Cancel Service. Owl service serving Green Line Stations. Completed
6/24/07Route
NetworkModification 625 ALL
Extend service to Playa del Rey to replace segment of
Line 115.PROPOSAL WITHDRAWN BY STAFF.
6/24/07
Route
Network New 665 ALL
Implement new line between CSULA and
Olympic/Indiana. Service to operate to Olympic & SotoSt. during the weekday peak hours only.
Completed
6/24/07Route
NetworkCancel 684 ALL Cancel Line in September. Completed
6/24/07Route
NetworkShorten 684 ALL
Shorten line to operate from Cal Poly Pomona to Brea
Mall. Consider layover possibilities and/or turnaround
loop. Cancel Line in September.
Completed
6/24/07Route
Network686 ALL Combine with line 686 and modify south end of route. Completed
6/24/07Route
Network687 ALL Combine with line 686 and modify south end of route. Completed
-
8/6/2019 Service Change Summary
37/150
6/24/07RouteNetwork
New 704 ALLImplement rapid service on Santa Monica Blvd. Replaceroute 304. Operate 704 into Patsaouras Plaza.
Completed
6/24/07Route
NetworkShorten 710 ALL
Shorten service. Change north terminal from Hollywood
and Vine to Wilshire & Western (6th & Private Right of
Way).
Completed
6/24/07Route
NetworkModification 714 DX Make permanent, stop at Doheny. Completed
6/24/07Route
NetworkTerminal 720 ALL Implement short turns at Westwood and 6th/Main. Completed
6/24/07Route
NetworkShorten 751 DX SA
Cancel segment of route south of Long Beach Blvd. &
Palm Pl. to the Long Beach Blvd. Green Line Station.Completed
6/24/07Route
NetworkNew 760 ALL
Implement new Rapid line between Artesia Blue LineStation and 5th/Beaudry. DX headways to be 8' in peaks,
15' in base. SA headways to be 15'. SU headways to be
20'.
Completed
6/24/07Route
NetworkNew 920 DX
Implement Wilshire Rapid Express from
Wilshire/Vermont station to Santa Monica. Peak hour
only with stops at Vermont, Western, Fairfax, Beverly,
Westwood and 4th.
Completed
6/24/07Route
NetworkNew 940 DX
Initiate new Hawthorne Rapid Express over route of 740
Rapid Bus during peak hours and peak direction only.Completed
6/24/07ServiceLevel
Maintenance 18 ALLReview latest passenger data and adjust scheduleaccordingly.
Completed
6/24/07Service
LevelMaintenance 26 ALL
Consider restructuring variants to improve efficiency.
Review latest passenger data and adjust schedule
accordingly.
Completed
6/24/07Service
LevelMaintenance 45 ALL
Review latest passenger data and adjust schedule
accordingly.
-
8/6/2019 Service Change Summary
38/150
6/24/07ServiceLevel
Maintenance 53 ALLReview latest passenger data and adjust scheduleaccordingly.
6/24/07Service
LevelMaintenance 55 ALL
Review latest passenger data and adjust schedule
accordingly.TERMINAL TO FIGUEROA/CHAVEZ
6/24/07ServiceLevel
Maintenance 62 ALLReview latest passenger data and adjust scheduleaccordingly.
6/24/07Service
Level Reduction 90 SA Widen all day headways from 15 to 20 minutes. Headways widened.
6/24/07Service
LevelReduction 90 DX Widen midday headways from 20 to 25 minutes. Headways widened.
6/24/07Service
LevelMaintenance 94 ALL
Evaluate passenger loads and eliminate unproductive trips
and adjust headways as required.Run time added on Route 394 between
6/24/07Service
LevelReduction 102 DX Consider widening base headway & after 7:30 pm to 45' Completed
6/24/07Service
LevelMaintenance 105 ALL
Analyze latest passenger data and adjust schedule
accordingly.
6/24/07
Service
Level Maintenance 120 ALL
Prepare passenger analysis and adjust headways
accordingly. Coordinate with Gateway Cities for timedtransfer at Rosa Parks Station with Line 121. Completed
6/24/07Service
LevelAddition 121 DX
Consider adding one AM & one PM school trippers to
protect loadsCompleted
6/24/07Service
LevelMaintenance 121 DX
Consider adjusting headways to 30' in peaks and 45' in
baseCompleted
6/24/07ServiceLevel
Maintenance 121 SA/SU Consider adjusting headways to 45' Completed
6/24/07Service
LevelMaintenance 150 ALL
Evaluate passenger loads and eliminate unproductive trips
and adjust headways as required.Widened base headway from 15 to 20
-
8/6/2019 Service Change Summary
39/150
6/24/07ServiceLevel
Reallocation 150 SAReallocate service from Ventura Blvd. to Reseda Blvd. toreduce passenger overloads.
Ventura Bl. Hdwy widened to 20 mins.Reseda Bl. Hdwy improved to 15 mins.
6/24/07Service
LevelMaintenance 152 DX
Evaluate passenger loads and eliminate unproductive trips
and adjust headways as required.
Incorporated Route 353 service into Line
152/153 and eliminated unproductive trips.
6/24/07ServiceLevel
Reduction 154 DX-SA Cancel midday and Saturday Service due to low ridership.Retained weekday service, with 60 min.hdwys; Canceled and Saturday service.
6/24/07
Service
Level Reduction 155 SA-SU Cancel weekend service due to low ridership. Completed
6/24/07Service
LevelMaintenance 156 ALL
Complete headway sheets on all services using APC
Ridership.Widened A.M. hwys to 15 min
6/24/07Service
LevelMaintenance 156 ALL
Evaluate passenger loads and eliminate unproductive trips
and adjust headways as required.Completed
6/24/07Service
LevelMaintenance 161 DX
Complete headway sheets on all services using APC
Ridership.Headway Sheet completed.- no
6/24/07Service
LevelMaintenance 161 DX Evaluate passenger loads and eliminate unproductive trips schedule changes required.
6/24/07Service
Level
Maintenance 163 ALL Evaluate passenger loads and eliminate unproductive tripsIncorporated Route 363 service into 163
schedule and eliminated unproductive trips.
6/24/07Service
LevelReduction 200 ALL
Consider widening late night headways and reinvest
hours where needed to ease overloads.Completed
6/24/07ServiceLevel
Maintenance 224 ALL Evaluate passenger loads and eliminate unproductive tripsA.M. school trip moved 5 minutes earlier toaccommodate Reed Jr. High
6/24/07Service
LevelMaintenance 233 ALL Evaluate passenger loads and eliminate unproductive trips Selected trips canceled & hdwys adjusted.
6/24/07Service
LevelMaintenance 234 ALL Evaluate passenger loads and eliminate unproductive trips Trips eliminated and headways adjusted.
6/24/07 Service Maintenance 243 DX Evaluate passenger loads and eliminate unproductive trips Selected trips canceled and headways
-
8/6/2019 Service Change Summary
40/150
Level adjusted.
6/24/07ServiceLevel
Maintenance 245 SA Evaluate passenger loads and eliminate unproductive tripsLine 245 trips interlined with Line 161trips atVentura Bl. And Topanga Cyn.
6/24/07Service
LevelMaintenance 245 SA Evaluate passenger loads and eliminate unproductive trips Line 245 hdwys widened to 60 minutes.
6/24/07Service
LevelMaintenance 260 ALL
Review current passenger data and make necessary
adjustments.Completed
6/24/07ServiceLevel
Reduction 260 ALLReduce service levels to Artesia Station with shortlines atCecilia & Atlantic.
Completed
6/24/07Service
LevelMaintenance 265 ALL
Analyze latest passenger data and adjust schedule
accordingly.
6/24/07Service
LevelReduction 265 DX Consider widening base headways to 50'
6/24/07Service
LevelMaintenance 353 DX Evaluate passenger loads and eliminate unproductive trips
Route 363 trips incorporated into Line 163service and extended to West Hills Medical
Center
6/24/07Service
Level
Maintenance 439 ALLPrepare passenger analysis and adjust headways
accordingly.
Minor Trip Adjustments.
6/24/07Service
LevelAddition 460 SU
Consider adding one roundtrip between 1:30 pm and 6:00
pm.Completed
6/24/07ServiceLevel
Addition 460 DXConsider adding one trip e/b (7-8 am) and one trip w/b (5-6 pm)
Completed
6/24/07Service
LevelAddition 460 SA
Consider improving headways from 30' to 25' (7a-5p) e/b,
extend shortline to Downtown & widen headways toDisneyland after 8pm
Completed
6/24/07Service
LevelMaintenance 485 ALL
Review schedule and adjust as necessary. Review DX
ridership based on data "Trip Level Summaries FY 2007
Q2" and make headway adjustments accordingly.
Completed
-
8/6/2019 Service Change Summary
41/150
6/24/07ServiceLevel
Maintenance 487 SA Adjust headways on line 487 SA schedule. Completed
6/24/07Service
LevelReduction 612 DX
Consider widening headways to 40' in AM & Base and
35' in PM.Completed
6/24/07ServiceLevel
Reduction 612 SA/SU Consider widening headways to 45' all day. Completed
6/24/07
Service
Level Reduction 612 ALL Consider widening headways to 60' after 8:30 pm.
6/24/07Service
LevelMaintenance 645 DX Evaluate passenger loads and eliminate unproductive trips
Canceled one pm school tripper serving El
Camino High School.
6/24/07Service
LevelReduction 684 ALL Reduce frequency of line during weekdays. Completed
6/24/07Service
LevelAddition 705 DX
Improve AM headways to 10' n/b (6:30-7:00a) & s/b
(6:30-7:30a)
6/24/07Service
LevelMaintenance 710 DX
Review passenger analysis by trip on early AM and late
PM service.Span of service reduced slightly.
6/24/07Service
Level
Maintenance 711 DXReview passenger analysis by trip on early AM and late
PM service.
Span of service reduced slightly.
6/24/07Service
LevelMaintenance 734 DX
Complete headway sheets on all services using APC
Ridership.Canceled five trips and adjusted headways.
6/24/07ServiceLevel
Maintenance 734 DXComplete headway sheets on all services using APCRidership.
Add Rapid Stop at Parthenia.
6/24/07Service
LevelMaintenance 740 DX
Review passenger analysis by trip on early AM and late
PM service.Span of service reduced slightly.
6/24/07Service
LevelAddition 745 SA
Consider improving headways from 15' to 12' between
6:30 am and 9:30 am.Completed
6/24/07 Service Maintenance 750 ALL Evaluate passenger loads and eliminate unproductive trips Widen base headway from 15 to 20 minutes
-
8/6/2019 Service Change Summary
42/150
Level on daily, Saturday & Sunday
6/24/07ServiceLevel
Maintenance 754 DXReview passenger analysis by trip on early AM and latePM service.
Span of service reduced slightly.
6/24/07Service
LevelMaintenance 757 DX
Review passenger analysis by trip on early AM and late
PM service.Span of service reduced slightly.
6/24/07Service
LevelMaintenance 901 DX Evaluate passenger loads and eliminate unproductive trips Headway improvements implemented
6/24/07ServiceQuality
Runtime 2 ALLAnalyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
6/24/07Service
QualityRuntime 14 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
6/24/07Service
QualityMaintenance 18 ALL Consider restructuring variants to improve efficiency.
6/24/07Service
Quality
Trip
Adjustment26 ALL
Consider adjusting one or both of trippers implementedlast shake-up to accommodate student overloads from
Santee High.
Completed
6/24/07Service
Quality
Maintenance 28 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityRuntime 30 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
6/24/07ServiceQuality
Runtime 38 ALLAnalyze latest running time data and make necessaryadjustments. Review schedule and adjust as necessary.
Completed
6/24/07Service
QualityMaintenance 45 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
Quality
Trip
Adjustment45 DX
Consider adjusting tripper implemented last shake-up to
accommodate student overloads from Santee High.Completed
6/24/07 Service Maintenance 53 ALL Consider restructuring variants to improve efficiency. Completed
-
8/6/2019 Service Change Summary
43/150
Quality
6/24/07ServiceQuality
Runtime 53 SUAnalyze latest ATMS run time data and adjustaccordingly.
6/24/07Service
QualityMaintenance 55 ALL Consider restructuring variants to improve efficiency. COMPLETED - ALSO MOVED NORTH
6/24/07Service
Quality
Trip
Adjustment55 ALL Move owl run from Div. 1 to Div. 2
6/24/07ServiceQuality
Maintenance 60 ALL Consider restructuring variants to improve efficiency. COMPLETED - SOUTH TERMINAL
6/24/07Service
QualityMaintenance 62 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
QualityMaintenance 66 ALL
Analyze latest ATMS run time data and passenger data
and adjust schedule accordingly.
6/24/07ServiceQuality
Maintenance 66 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
QualityRuntime 68 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
6/24/07 ServiceQuality
Maintenance 70 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 76 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 78 ALL Review schedule and adjust as necessary. Completed
6/24/07ServiceQuality
Maintenance 81 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
Quality
Trip
Adjustment81 ALL
Extend one late night trip to downtown L.A. currently on
pink.Completed
-
8/6/2019 Service Change Summary
44/150
6/24/07ServiceQuality
Maintenance 102 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
QualityRuntime 102 ALL
Analyze latest ATMS run time data and adjust
accordingly.
6/24/07ServiceQuality
Maintenance 105 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07
Service
Quality
Trip
Adjustment 105 ALL Move owl run from Division 1 to Division 2.
6/24/07Service
QualityMaintenance 121 ALL
Analyze latest ATMS run time and passenger data and
adjust accordingly.
6/24/07Service
QualityMaintenance 121 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
QualityRuntime 125 ALL Review runtime and passenger analysis by trip. COMPLETED. RUNTIME ADDED.
6/24/07Service
QualityRuntime 130 ALL Review runtime and passenger analysis by trip. COMPLETED. RUNTIME ADDED.
6/24/07Service
Quality
Trip
Adjustment156 ALL
Schedule convenient transfer connections with Line 4-
304 (Santa Monica Bl.).scheduled to connect with Line 4.
6/24/07Service
QualityMaintenance 176 DX Review schedule and adjust as necessary. Completed
6/24/07ServiceQuality
Maintenance 180 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 200 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07Service
QualityRuntime 200 ALL
Analyze latest ATMS run time data and adjust
accordingly.
6/24/07 Service Maintenance 201 ALL Review schedule and adjust as necessary. Completed
-
8/6/2019 Service Change Summary
45/150
Quality
6/24/07ServiceQuality
Maintenance 204 ALL Review Operator comments and adjust as necessary. Completed
6/24/07Service
QualityRuntime 205 ALL Review runtime and passenger analysis by trip. COMPLETED. RUNTIME ADDED.
6/24/07Service
QualityMaintenance 206 ALL Review Operator comments and adjust as necessary. Completed
6/24/07ServiceQuality
Maintenance 207 ALL Review Operator comments and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 210 ALL Review Operator comments and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 212 ALL Review Operator comments and adjust as necessary. Completed
6/24/07ServiceQuality
Runtime 214 DX Review runtime and passenger analysis by trip. COMPLETED. RUNTIME ADDED.
6/24/07Service
QualityRuntime 217 ALL
Analyze latest running time data and make necessary
adjustments. Review schedule and adjust as necessary.Completed
6/24/07 ServiceQuality
Runtime 232 ALL Review runtime and passenger analysis by trip. COMPLETED. RUNTIME ADDED.
6/24/07Service
QualityRuntime 233 ALL Analyze and implement new run time if warranted..
Run Time analysis completed and additional
runtime added on all weekday trips.
6/24/07Service
QualityRuntime 236 ALL Analyze and implement new run time if warranted..
Run time added and selected trip inter-lined at
Sylmar Station with new Line 292 trips
operating to Burbank.
6/24/07Service
QualityRuntime 243 DX Analyze and implement new run time if warranted.. Weekday Run time added -
6/24/07 Service Maintenance 251 ALL Review schedule and adjust as necessary. Completed
-
8/6/2019 Service Change Summary
46/150
Quality
6/24/07ServiceQuality
Maintenance 252 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 258 DX Review schedule and adjust as necessary. Completed
6/24/07Service
QualityRuntime 260 ALL
Analyze latest running time data and make necessary
adjustments.Completed
6/24/07ServiceQuality
Runtime 265 SA/SUAnalyze latest ATMS run time data and adjustaccordingly.
6/24/07Service
QualityMaintenance 267 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 268 ALL Review schedule and adjust as necessary. Completed
6/24/07ServiceQuality
TripAdjustment
439 ALLTime transfer with Beach Cities Transit at LAX City BusCenter.
Completed
6/24/07Service
QualityMaintenance 460 ALL Consider restructuring variants to improve efficiency. Completed
6/24/07 ServiceQuality
Maintenance 484 ALL Review schedule and adjust as necessary. Completed
6/24/07Service
Quality
Trip
Adjustment484 ALL
Modify schedule to dovetail with Line 490 at El Monte
Station.Completed
6/24/07Service
QualityMaintenance 487 ALL Review schedule and adjust as necessary. Completed
6/24/07ServiceQuality
Maintenance 489 DX Review schedule and adjust as necessary. Completed
6/24/07Service
QualityMaintenance 490 ALL