Sericulture
description
Transcript of Sericulture
1
Sericulture
Sericulture
2
Sericulture industry in Jammu & Kashmir State is of very old origin. The department of
sericulture was created in the year 1889 under the monopolistic control of government to
promote silk industry in the state. In this regard a very good infrastructure including
mulberry nurseries, silkworm seed stations and silk reeling/weaving factories were
established. Due to these efforts Jammu and Kashmir became one of the leading silk
producing states. During those days sericulture was the only cash crop available to the
farmers. By 1940, about 52000 families were engaged in this activity and the production of
cocoon was as high as 15.00 lac kgs. Silk yarn apart from its use as a textile fibre, was
being utilized as material for parachutes. Department of Sericulture functions under the
control of Ministry of Agriculture, Govt of Jammu and Kashmir
3
VISION Transform Sericulture and Silk Industry into a truly
viable, profitable and sustainable enterprise
MISSIONAchieve green cocoon production of 1750 MT and Raw Silk Production of 270 MT at the end of 12th plan (2012-17) and 18000 MT & 2400 MT at the end of 15th plan (2027-31) with value addition and coupled with more and more employment generation.
ROAD MAP TO ACHIEVE TARGET OF 1750 MT OF COCOON
PRODUCTION AT THE END OF 12th PLAN &12000 MT AT THE END OF 15th PLAN
This will be achieved by vertical and horizontal expansion of Sericulture in the State.
5
• Support for Raising Mulberry Tree Plantation in Cluster Form
• Cluster development of Mulberry Plantation/Departmental Land
• Supply of Rearing Appliance• Assistance for construction of Rearing Houses• Health Insurance Scheme for Women• Establishment of Hot Air Dryers.• Establishment of Reeling units• Incentive on Silk Yarn.• Establishment of Cocoon Bank• Establishment of Silk Exchange• Corpus funds for market intervention
SCHEMES UNDER IMPLEMENTION
6
• Ideal climatic conditions for quality Bivoltine cocoon production.
• Sericulture a traditional practice. Rearing, reeling and weaving have been a tradition since ages
• Availability of basic infrastructure with the state sericulture department.
• Low level of industrialization- availability of farm/family labor
• Increasing market demand for quality silk
SERICULTURE IN J&K
7
• Silkworm rearing a part time occupation- only a single crop is raised
• Poor quality of mulberry leaf, as leaf is harvested from scattered unmaintained mulberry trees
• Poor infrastructure/inadequate rearing space with farmers• Huge yield gaps between lab and land• Knowledge deficit among farmers and weak extension• Lack of proper training among the basic extension workers• Lack of proper marketing of cocoons• Lack of good post cocoon sector- production of low grade silk
from good quality silk cocoons• Incomplete value addition - inadequate backward and forward
linkages • Non-involvement of Private Sector especially in mulberry sapling
and silkworm seed production.
Weakness
8
32 35 35 37 37 UP 192 300 410 350 397 UP
455.67 800 1100 963 1193 UP 738 810 860 917 901 UP
2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
0
5000
10000
15000
20000
25000
30000
35000Silkworm rearers population (Nos.)
Silkworm rearers population (Nos.)
9
Present Status of Sericulture in the StateMULBERY SECTOR
Departmental Nurseries 173
Total area under Nurseries 963 Acres
Production capacity of Saplings/Year 30 Lac
Present Annual Sapling production in Departmental Nurseries 20 Lac
Total available mulberry tress in the State 100 Lac
SEED SECTOR
Grainages 6
Basic Seed Stations 9
Annual DFL Production 17 Lac
Annual DFL Consumption 25 Lac
10
COMMERCIAL SILKWORM REARINGCocoon Rearers 28,000 No. of Sericulture Villages 2500Annual Cocoon Production (MT) 900Income Generation (Lac) 1193
POST COCOON SECTOR
Silk Reeling Units 34 (11 functional) +3 New
11
Year Cocoon Prod.(MT)
Income generatio
n( Lac Rs.)
Avg. Price for “A” grade
(Rs.)
Productivity per Oz.
(Kg)
Silkworm rearers
population (Nos.)
2008-09 738 455.67 192.00 32.00 19700
2009-10 810 800.00 300.00 35.00 22800
2010-11 860 1100.00 410.00 35.00 25500
2011-12 917 963.00 350.00 37.00 27000
2012-13 901 1193.00 397.00 37.00 28000
ACHIEVEMENTS-SERICULTURE
12
• Leaf shortage• Low survival of mulberry saplings in field• Poor leaf quality• Lack of chawki gardens• Shortage of rearing houses• Poor rearing conditions• Non-availability of CRCs• Lack of training among farmers• Low returns from sericulture• Low land holding• Poor Quality of human resource• Lack of sound post-cocoon sector
CONSTRAINTS
13
• Quality leaf production: • Rearing infrastructure: • Training for farmers• Mass disinfection drive:• Quality seed supply: • Silkworm hybrid for second rearing• Silkworm brushing calendar• Chawki rearing• Establishment of Chawki gardens• Disease monitoring and management:• Crop monitoring and marketing: • Model silk villages/clusters• Sound post cocoon sector• Mounting and seriposition• Skill development programs • Outsource major activities of DOS such as mulberry sapling production and silkworm seed
production
FUTURE STRATGIES
14
Action plan for bivoltine cocoon /raw silk production for XII plan
YEAR-WISE TARGET FOR 12TH PLAN as per State resources
Unit
PresentStatus at end of XI
Plan 2012-13 2013-14 2014-15 2015-16 2016-17Mulberry area required 6000 6500 7000 7500 8000 8500Cocoon Production MT 917 1080 1247 1426 1617 1750Seed Distribution ozs 25000 27000 29000 31000 33000 35000Productivity/ozs. Kg. 37 40 43 46 49 50Raw silk production MT 115 139 160 196 231 270Renditta Kg 8 7.75 7.50 7.25 7.00 6.50Rearers population Nos. 27000 28600 30200 31800 33400 35000
15
Activity Unit Present Status of 11th Plan
12th Plan Target
13th Plan Target
14th Plan Target
15th Plan Target
Mulberry area required
Hectare 6000 8500 10000 13000 17500
Cocoon Production MT 917 1750 3400 7425 18000
Seed Distribution Oz 25000 35000 61000 135000 300000
Productivity /oz Kg 37 50 55 60 65
Raw silk production MT 115 270 510 1050 2400
Renditta Kg 8 7 7 6.5 6.5
Rearers population No 27,000 50,000 90,000 1,80,000 4,00,000
Action plan for bivoltine cocoon /raw silk production for next 20 years
16
Year Activity Quantity (Lac No.)
Mandays generation (Lac No.)
Financial involvement
(Lac Rs.)
3rd Year Plant Production 10 0.96 150
4th Year Plant Production 10 0.96 150
5th Year Plant Production 10 0.96 150
30 3.48 450
Year wise action plan for additional production of mulberry plants 12th Plan
17
Plan Activity Quantity (Lac No.)
Financial involvement (Lac Rs.)
12th Plant propagation 30 45013th Plant Propagation 50 100014th Plant Production 50 100015th Plant Production 50 1000
180 3450
Action plan for additional production of of mulberry saplings during next 20 years
18
Year Activity Quantity (Lac No.)
Mandays generation (Lac No.)
Man-year Generation
(Nos.)
Financial involvement
(Lac Rs.)
1st Year Plant distribution - - - -
2nd Year Plant distribution - - - -
3rd Year Plant distribution - - - -
4th Year Plant distribution - - - -
5th Year Plant distribution 10.00 1.33 444 200
Year wise proposed distribution of mulberry plants among farmers/departmental farms
19
Year No Cost Rs lac
12th plan 10.00 200
13th plan 50.00 1000
14th plan 50.00 1000
15th plan 50.00 1000
160.00 3200
Plan wise action plan for additional distribution of mulberry plants among farmers/departmental farms for plantation
20
SOME TIPS FOR MULBERRY SAPLINGS PRODUCTION
Dept does have sufficient land to produce mulberry saplings while production cost is high. Establishment of Kisan nurseries in private sector is the option. Initially Dept can purchase saplings from Kisan Nurseries and supply to farmersDept can also lease some land to SHGs for production of mulberry saplings, purchase and supply to farmers Dept can provide infrastructure and technology support to Kisan Nurseries or SHGs to produce quality mulberry saplings
21
ESTABLISHMENT OF KISSAN NURSERIES/OUSOURCING OF PLANT PRODUCTION.
• Land Holding 2 KANAL
• Cost for establishment of Poly House: (One time Investment) 50,000
• Plant Production per year: 3000
• Production cost for 2 years @Rs 12/Plant: 36000
• Returns on sale of 3000 Plants@Rs25/Plant: 75,000
• Net earning from 1 Kanal of land (2yrs) on rotation basis : 39000
22
• Cost for Establishment of poly house: Rs 100,000 (One time Investment)• Plant Production per year: Rs 6000 • Production cost for 2 years @Rs 12/Plant: Rs 72000• Returns after sale of 3000 Plants @Rs25/Plant: Rs 150,000• Net earning from 2 Kanal of land: Rs 78,000
LAND holding - 4 KANAL
23
Year Activity Quantity (Lac dfls)
Mandays generation (Lac No.)
Man-year Generation (Nos.)
Financial involvement (Lac Rs.)
1st Year Seed Production 0 0 0 0
2nd Year Seed Production 0 0 0 0
3rd Year Seed Production 31000 0.93 310 139.5
4th Year Seed Production 33000 0.99 330 148.5
5th Year Seed Production 35000 1.05 350 157.5
Total 99000 2.97 990 445.5
Year wise action plan for production of silkworm seed
24
Plan Quantity(Lac oz) Cost(Rs. )
12th Plan 0.99 445.50
13th Plan 2.40 1080.00
14th Plan 4.90 2205.00
15th Plan 10.87 4891.50
Plan wise action plan for production of silkworm seed
25
SUGESSIONS TO OUTSOURCE SILKWOM SEED PRODUCTION AND CHAWKIE REARING
• Dept does not have enough manpower and infrastructure to produce silkworm seed as per the estimated demand
• The production cost is already high as compared to private sector
• Dept must outsource silkworm seed production and provide infrastructure and technology support to private entrepreneurs for seed production with check on quality standards
• Similarly CRCs can be established in private sector for supply of chawki worms to farmers
• All these initiatives will reduce burden on Govt and will bring in efficiency in the system and will make sericulture a self sustaining enterprise
26
(Rs lac)• Construction of Seed House : 3.00• Equipment : 1.00• PRODUCTION COST for 800 oz(Rs 300/oz) 2.40 • Procurement of 400 kg of seed cocoons for production of 800 oz of hybrid silkworm seed 1.00• Labor for production of 800 oz of seed @ 1.0 M.D./oz
1.20 • Disinfectants /waste paper/craft paper etc 0.20 • Sale of 1 oz of Hybrid silkworm seed 0.00
45• Net earnings from 800 oz of Seed 1.20 • (@Rs 150/-oz.)• ONE TIME INVESTMANT FOR ESTABLISHMENT OF SEED HOUSE IN PRIVATE SECTOR : 4.00
27
Year Quantity
(Ozs)
CRCs to be setup
Cost(Rs lac)
Amount Available
(Rs lac)
Cost(Rs lac)
1st Year 0 0 0 - -
2nd Year 0 0 0 - -
3rd Year 31000 620 62.00 40.0 22.00
4th Year 33000 660 66.00 40.0 26.00
5th Year 35000 700 70.00 40.0 30.00
33300 1980 198.00 120.00 78.00
Year wise action plan for setting-up of additional incubation cum chawki rearing centres
28
S.No
Plan Activity Quantity (Oz)
CRCs to be setup
Financial involvement (Lac Rs.)
Amt Available Lac Rs
Amt required Lac Rs
01. 12th Plan
Seed to be incubated
99000 1980 198.00 120.00 78.00
02. 13th Plan
Seed to be incubated
240000 4800 480.00 200.00 280.00
03. 14th Plan
Seed to be incubated
490000 9800 980.00 200.00 780.00
04. 15th Plan
Seed to be incubated
1087500 21750 2175.00 200.00 1975.00
Plan wise action plan for setting-up of incubation cum chawki rearing centres
29
• ESTABLISHMENT OF CRC’S IN PRIVATE SECTOR• ONE TIME INVESTMANT = Rs 4.15 Lac• Construction of Chawki Rearing House = Rs 3.00 Lac• Equipment for CRC: Rs 1.00 Lac• Establishment of Chawki Rearing Garden of 2 kanal with
1800 Plants( Plant Spacing 2 x 3) : Rs 0.150 Lac • 3 year maintenance of garden = Rs 0.060 Lac • production cost for 100 oz of chawki reared worms = Rs 0.55
Lac (Rs 550/oz of Seed including cost of seed Rs 450/oz)• Sale of 1 oz of Chawki reared worms : Rs 800• Net earnings from 100 oz of Chawki worms = Rs 25000
30
Unit1st
Year2nd year 3rd year
4th
year5th
year
Estimated Cocoon Production MT - - 1426 1617 1750 Reeling units to be established for projected cocoon production Nos. - - 47-34=13 54-47=7 58-54=4Estimated Raw Silk Production MT - - 196 231 270Expected income generation from Raw Silk Lac Rs. - - 3920 4620 5400Estimated Mandays Generation by way of Raw Silk Production Lac No. - - 0.28 1.00 2.46Power looms to be established Nos. - - 650 770 900
Estimated Fabric Production Lac Mtr. - - 29.40 34.65 40.50Estimated income generation from Fabric Prod. Lac Rs. - - 8820 10395 12150
Establishment of additional Reeling, Weaving, Dyeing, Printing and Designing units 12th PLan
31
Particulars Unit12th
Plan13th Plan
14th Plan
15thPlan
Estimated Cocoon Production (5 yrs) MT 4800* 12875 25000 52000
Reeling units to be established Nos. 58 113 247 600Estimated Raw Silk Production MT 650 1900 3500 8000
Expected income generation from Raw Silk Lac Rs. 13000 38000 70000 160000
Power looms to be established Nos. 900 1700 3500 8000
Estimated Fabric Production Lac Mtr. 97.50 285 525 1200Estimated income generation from Fabric Prod. Lac Rs. 29250 85500 175500 360000
* 3 yrs
Establishment of Reeling, Weaving, Dyeing, Printing and Designing units in the State during next 20 years
32
ACTIVITY UNIT 12th PLAN 13th PLAN 14th PLAN 15th PLAN
Phy Fin Phy Fin Phy Fin Phy FinProduction of mulberry saplings
Lac 30.00 450 50.00 1000 50.00 1000 50 1000
Distribution of saplings
Lac 10.00 200 50.00 1000 50.00 1000 50 1000
Up gradation of nurseries (Bore well, fencing etc)
No 18.00 360 40.00 800 40.00 800 30 600
Establishment of Kisan nurseries
No 4 2.0 20 10.0 20 10.0 20 10.0
Total 1012 2810 2810 2610
MULBERRY SECTOR
33
Activity Unit 12th PLAN 13th PLAN 14th PLAN 15th PLANPhy Fin Phy Fin Phy Fin Phy Fin
Production of silkworm seed
Lac 0.99 445.5 2.40 1080.0 4.90 2205.0 10.87 4891.5
Basic seed stations
No - - 2 200.0 2 200.0 - -
Seed Grainages 2 300 2 300 2 300Establishment of cold storage
No 1 150 4 600 4 600 4 600
Purchase Refrigerated Van
No 2 20.0 - - 2 20.0 - -
Incubation cum Chawki centre’s
No 1980 198 4800 480 9800 980 21750 2175
CRC buildings No 20 200 40 400 40 400 40 400SPC in Private Sec
- - 6 18 20 60 40 120
CRCs in Pvt Sec 10 30 30 90 60 180Total 1013.5 3108 4855 8666.5
SILKWORM SEED SECTOR
34
Activity Unit 12th PLAN 13th PLAN 14th PLAN 15th PLANCOCOON PRODUCTION SECTOOR
Phy Fin Phy Fin Phy Fin Phy Fin
Rearing houses for farmers No 3000 2700 7500 6750 10000 13500 10000 13500Rearing kit for farmers No 6000 1500 10000 2500 10000 2500 10000 2500Total 4200 9200 16000 16000POST COCOON SECTORCocoon auction markets No 4 200 8 400 8 400 4 200Cocoon ware house No 2 200 4 400 4 400 4 400Reeling units No 58 580 113 1130 247 2470 600 6000Twisting Units No 8 48 20 120 20 120 20 120Power looms No 900 1350 1700 2550 3500 5250 8000 12000CFCs No 1 3000 1 3000 2 6000 2 6000Total 5378 7600 14640 24720HUMAN RESOURCE DEVTraining Institute for technical staff and Farmers
2 300 _ - -
Hostel for students of training institute
- 2 300 - -
Hostel for farmers - 2 300 - -Training/Capacity Building/Awareness
60 60 100 100 100 100 100 100
Total 360 700 100 100
35
12th Plan 13th Plan 14th Plan 15th PlanPhy Fin Phy Fin Phy Fin Phy Fin
Purchase of light vehicle
4 28 8 56 8 56 - -
Heavy vehicle 2 24 4 48 4 48 - -POL etc 40 50 50 60Outsource upkeep
500 1500 1500 2000
Total 592 1650 1650 2060
MISCELENIOUS EXPENDITURE
36
12th PLAN 13th PLAN 14th PLAN 15th PLAN
Exp Income Exp Income Exp Income Exp Income
125.5 292.5 250.7 855.0 400.5 1755.0 541.6 3600.0
Financial implications for Action plan for 20 years (Rs crore)
Joint Director
Dy. Director Post Cocoon (Jammu) Dy. Director Post Cocoon (Kashmir)
Total Office wise Staff Requirement (Fig in Nos.)S.No
Nomenclature Joint Directorate J&K Post Cocoon sector
Dy. Director Post Cocoon (Jammu)
Dy. Director Post Cocoon (Kashmir)
Total Post requirement
1.2.3.4.5.6.7.8.
Textile EngineerTechnicianSection OfficerHead AssistantSericulture AssistantSenior AssistantJunior AssistantClass IV
--111122
12111122
12111122
24333366
HUMAN RESOURCE REQUIRED FOR THE DEVELOPMENT OF POST COCOON SECTOR
37
38
TRANSFER OF TECHNOLOGY
Under transfer of technology Rearing Kits and Rearing Houses will be provided to farmers to increase cocoon production both quantitatively as well as qualitatively.
39
40
41
42
43
44