Erection Clearance Certificate
Erection WalkdownContractor ConstructionContractor CommissioningOPGC ConstructionOPGC Commissioning
Contractor Tests Witnessed by OPGC Commissioning Team
Erection Phase Civil/Mechanical/Electrical Works. Equipment erection and alignment
Pre Commissioning Phase Loop Checks/Flushing/Cold equipment checks
![Page 2: Sequence of Commissioning](https://reader036.fdocuments.in/reader036/viewer/2022082218/577c84091a28abe054b74e4f/html5/thumbnails/2.jpg)
![Page 3: Sequence of Commissioning](https://reader036.fdocuments.in/reader036/viewer/2022082218/577c84091a28abe054b74e4f/html5/thumbnails/3.jpg)
Safety Rules Clearance Certificate Performance Test
Commissioning WalkdownContractor ConstructionContractor CommissioningOPGC constructionOPGC CommissioningOPGC O&M
Contractor Tests Witnessed by OPGC Commissioning and
O&M Team
Pre Commissioning Phase Loop Checks/Flushing/Cold equipment checks
Commissioning & Function Tests Phase Function Tests/ Load Rejection/ System Tuning/ Plant Operation
![Page 4: Sequence of Commissioning](https://reader036.fdocuments.in/reader036/viewer/2022082218/577c84091a28abe054b74e4f/html5/thumbnails/4.jpg)
Operation by OPGC O&M