Sequa Otto Systain Case Studies v2 · 2018. 5. 2. · Sequa_Otto_Systain_Case Studies_v2 Created...
1
Improving chemical management in the textile supply chain FACTORY 04 FACTORY PROFILE: LOCATION: Savar / Bangladesh PRODUCTION PROCESS: Yarn Dyeing NUMBER OF WORKERS: 600 PRODUCTION VOLUME: 9.000 t/year WASTE WATER TREATMENT PLANT: Off-Site ETP BEFORE AFTER IMPLEMENTED IMPROVEMENT MEASURES: GHS pictograms displayed in relevant production areas EXAMPLES MSDS including short summary and displayed in front of every chemical container
Transcript of Sequa Otto Systain Case Studies v2 · 2018. 5. 2. · Sequa_Otto_Systain_Case Studies_v2 Created...
Improving chemical management in the textile supply chain
FACTORY 04
FACTORY PROFILE:
LOCATION: Savar / Bangladesh
PRODUCTION PROCESS: Yarn Dyeing
NUMBER OF WORKERS: 600
PRODUCTION VOLUME: 9.000 t/year
WASTE WATER TREATMENT PLANT: Off-Site ETP
BEFORE AFTER
IMPLEMENTED IMPROVEMENT MEASURES:
GHS pictograms displayed in relevant production areas
EXAMPLES
MSDS including short summary and displayed in front of every chemical container