September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n....

15
September 19, 2017 CALL NO. 301 CONTRACT ID NO. 171239 ADDENDUM # 1 Subject: Menifee County, FD04 SPP 083 0036 002-005 Letting September 29, 2017 (1)Revised – Plans – R2D, R5, R9, R23, R44, & R45 (2)Revised – Bid Items – Pages 74-75 of 75 Proposal revisions are available at http://transportation.ky.gov/Construction- Procurement/. Plan revisions are available at http://www.lynnimaging.com/kytransportation/. If you have any questions, please contact us at 502-564-3500. Sincerely, Rachel Mills, P.E. Director Division of Construction Procurement RM:ks Enclosures

Transcript of September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n....

Page 1: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

September 19, 2017

CALL NO. 301

CONTRACT ID NO. 171239

ADDENDUM # 1

Subject: Menifee County, FD04 SPP 083 0036 002-005

Letting September 29, 2017

(1)Revised – Plans – R2D, R5, R9, R23, R44, & R45

(2)Revised – Bid Items – Pages 74-75 of 75

Proposal revisions are available at http://transportation.ky.gov/Construction-

Procurement/.

Plan revisions are available at http://www.lynnimaging.com/kytransportation/.

If you have any questions, please contact us at 502-564-3500.

Sincerely,

Rachel Mills, P.E.

Director

Division of Construction Procurement

RM:ks

Enclosures

Page 2: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

PIPE DRAINAGE SUMMARY

SH

EET

NO.

SKEW

TOTAL PROJECT

UNIT TO BID

ITEM CODE

REMARKS

CO

VE

R

HEIG

HT

DESIG

N p

H

LE

VE

L

R5

R5

R5 28+14.60 2°49'44" LT.

KY 36 - SECTION A

PIPEENTRANCE

15"

CULVERT PIPE

440

LINEAR FEET

20+41.00 18°52'13" RT.

EACH

24" 30" 42"

CL

AS

S III

CH

AN

NE

L

LININ

G

2484

TONS

8100

CU YD

CL

AS

S "A

"

CO

NC

RE

TE

LINEAR FEET

R5

1

SUITER ROAD

R7

IN

LE

T-

OU

TL

ET

30"

S

&

F

BO

X

EACH

R7

KY 36 - SECTION G

4°18'25" LT.R7

110+63.80 51°59'54" LT.

115+70.80

91

EACH

1

1

1451466 1452494464 469 1453

19+42.00

24+80.00

M

M

M

M

M

M

M

M

1.0

12.6

3.8

1.0

0.5

2.0

1.0

1.9

61

LINEAR FEET

M7.0

STONEQUARRY ROAD

R5 5651+78.11

TONS

10

54

13

1 1 156549156 10 404

5°35'00" LT.

56

CL

AS

S I A

CH

AN

NE

L

LININ

G

2482

R5

LIN FT

IN

LE

T-

OU

TL

ET

24"

S

&

F

BO

X

A

A

A

EQUIV.

48"

EQUIV.

30"60"

499 472

100

TONS

2483

117

39

CL

AS

S II

CH

AN

NE

L

LININ

G

33 1.99

32+51.77 25°20'41" RT. 54 38

50+63.64 25°01'37" LT. 69

69 117

22533EN

IN

SP

EC

TIO

N

PIP

ELIN

E

24814EC

36

36

135

135100

(1) 24" STD. HEADWALL

EACH EACH EACH EACH EACH

HE

AD

WA

LL - 30 IN

PIP

E

CU

LV

ER

T

HE

AD

WA

LL - 42 IN

PIP

E

CU

LV

ER

T

HE

AD

WA

LL - 60 IN

PIP

E

CU

LV

ER

T

1210 1211 1214 1217 1220

HD

WL - 30 IN

EQ

UIV

PIP

E

CU

LV

ER

T

HD

WL - 48 IN

EQ

UIV

PIP

E

CU

LV

ER

T

2

2

1

1

2

1 1 2 2 1 1.99

166

HE

AD

WA

LL - 24 IN

PIP

E

CU

LV

ER

T

1208

EACH

2

2

CU YD

EX

CA

VA

TIO

N

DIT

CH

20597EC

124

45

40

209

22

67.5

30.5

19.5

45.5

34.5

28

247.5

(MO

DIFIE

D)

IN

LE

T-

OU

TL

ET

36"

S

&

F

BO

X

CU YD

FIL

L

FL

OW

AB

LE

2220

2

2

8

7

3

6

28

(7'-3"X5'-11")

ARCH

PIPE

PLATE

STRUCT

ALLOY

ALUMINUM

CAPACITY OF 4,000 PSF BELOW THE STRUCTURE.

BY THE PROJECT ENGINEER. ALSO INCLUDED IN THIS BID ITEM ARE ALL WORK AND MATERIALS REQUIRED TO OBTAIN A MINIMUM BEARING

HEADWALLS/WINGWALLS DEPICTED IN THIS PLAN SET ARE INFORMATIONAL ONLY, DRAWINGS SHOULD BE SUBMITTED TO AND APPROVED

STRUCTURE: STRUCTURE EXCAVATION, BACKFILL, AND ALL ITEMS NECESSARY TO CONSTRUCT CONCRETE HEADWALLS/WINGWALLS.

OF THE ALUMINUM ALLOY STRUCTURAL PLATE PIPE-ARCH. THE FOLLOWING ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE

THIS BID ITEM INCLUDES, BUT IS NOT LIMITED TO, FLOWABLE FILL, BEDDING, AND ALL ITEMS NECESSARY FOR THE CONSTRUCTION

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R0020

DS

UMicro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R2d

PIPE DRAINAGE SUMMARY

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R0020

DS

U.

DG

NFIL

E

NA

ME:

Page 3: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

PIPE DRAINAGE SUMMARY

SH

EET

NO.

SKEW

TOTAL PROJECT

UNIT TO BID

ITEM CODE

REMARKS

CO

VE

R

HEIG

HT

DESIG

N p

H

LE

VE

L

R5

R5

R5 28+14.60 2°49'44" LT.

KY 36 - SECTION A

PIPEENTRANCE

15"

CULVERT PIPE

440

LINEAR FEET

20+41.00 18°52'13" RT.

EACH

24" 30" 42"

CL

AS

S III

CH

AN

NE

L

LININ

G

2484

TONS

8100

CU YD

CL

AS

S "A

"

CO

NC

RE

TE

LINEAR FEET

R5

1

SUITER ROAD

R7

IN

LE

T-

OU

TL

ET

30"

S

&

F

BO

X

EACH

R7

KY 36 - SECTION G

4°18'25" LT.R7

110+63.80 51°59'54" LT.

115+70.80

91

EACH

1

1

1451466 1452494464 469 1453

19+42.00

24+80.00

M

M

M

M

M

M

M

M

1.0

12.6

3.8

1.0

0.5

2.0

1.0

1.9

61

LINEAR FEET

M7.0

STONEQUARRY ROAD

R5 5651+78.11

TONS

10

54

13

1 1 156549156 10 404

5°35'00" LT.

56

CL

AS

S I A

CH

AN

NE

L

LININ

G

2482

R5

LIN FT

IN

LE

T-

OU

TL

ET

24"

S

&

F

BO

X

A

A

A

EQUIV.

48"

EQUIV.

30"60"

499 472

100

TONS

2483

117

39

CL

AS

S II

CH

AN

NE

L

LININ

G

33 1.99

32+51.77 25°20'41" RT. 54 38

50+63.64 25°01'37" LT. 69

69 117

22533EN

IN

SP

EC

TIO

N

PIP

ELIN

E

24814EC

36

36

135

135100

(1) 24" STD. HEADWALL

EACH EACH EACH EACH EACH

HE

AD

WA

LL - 30 IN

PIP

E

CU

LV

ER

T

HE

AD

WA

LL - 42 IN

PIP

E

CU

LV

ER

T

HE

AD

WA

LL - 60 IN

PIP

E

CU

LV

ER

T

1210 1211 1214 1217 1220

HD

WL - 30 IN

EQ

UIV

PIP

E

CU

LV

ER

T

HD

WL - 48 IN

EQ

UIV

PIP

E

CU

LV

ER

T

2

2

1

1

2

1 1 2 2 1 1.99

166

HE

AD

WA

LL - 24 IN

PIP

E

CU

LV

ER

T

1208

EACH

2

2

CU YD

EX

CA

VA

TIO

N

DIT

CH

20597EC

124

45

40

209

22

67.5

30.5

19.5

45.5

34.5

28

247.5

(MO

DIFIE

D)

IN

LE

T-

OU

TL

ET

36"

S

&

F

BO

X

CU YD

FIL

L

FL

OW

AB

LE

2220

2

2

8

7

3

6

28

(7'-3"X5'-11")

ARCH

PIPE

PLATE

STRUCT

ALLOY

ALUMINUM

CAPACITY OF 4,000 PSF BELOW THE STRUCTURE.

BY THE PROJECT ENGINEER. ALSO INCLUDED IN THIS BID ITEM ARE ALL WORK AND MATERIALS REQUIRED TO OBTAIN A MINIMUM BEARING

HEADWALLS/WINGWALLS DEPICTED IN THIS PLAN SET ARE INFORMATIONAL ONLY, DRAWINGS SHOULD BE SUBMITTED TO AND APPROVED

STRUCTURE: STRUCTURE EXCAVATION, BACKFILL, AND ALL ITEMS NECESSARY TO CONSTRUCT CONCRETE HEADWALLS/WINGWALLS.

OF THE ALUMINUM ALLOY STRUCTURAL PLATE PIPE-ARCH. THE FOLLOWING ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE

THIS BID ITEM INCLUDES, BUT IS NOT LIMITED TO, FLOWABLE FILL, BEDDING, AND ALL ITEMS NECESSARY FOR THE CONSTRUCTION

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R0020

DS

UMicro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R2d

PIPE DRAINAGE SUMMARY

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R0020

DS

U.

DG

NFIL

E

NA

ME:

darren.back
Polygon
darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
Page 4: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

CONC

HOOP

FORD

KY-36

SIGN

SIGN

SIGN

LOG CABI

N

SHED

CRUSHED

STONE

SHED

FRAME1-S

FRAME1-

S

GRAVEL

PAVILLION

ROOF

FIELD

GATE TO

DISH

SATELLITECABLE

BURIED

FRAME1-S

SHED

FRAME1-S

FRAME1-S

BARN

FRAME1-S

SHED

CR

US

HE

D

ST

ON

E

AS

PH

AL

T

LIGHTPOLE

CO

NC. B

OX

4x3

15" RCP

48" RCP

24"

RC

P

24"

RC

P

18" R

CP

15" R

CP

48" RCP

BOX CULV.

3x3

CONC.

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

2 - T

2 - T

1 -

T

1 - E

4 - E

4 - E

4 - E

1 - E

1 - E

4 - E

1 - E

1 - E4 - E

4 - E

4 - E

1 - E

1 - CATV

1 -

CA

TV

1 - CATV1 - CATV

1 - CATV

1 - CATV

1 - CATV

1 -

CA

TV

1 - CATV

1 -

CATV

6"

PV

C

POND

PINE

TREE

1 - C

ATV1 - T

GONE

GONE

CONC

OB

OB

DECK

GR

AV

EL GRAVEL

GRAVEL

GRAVEL

DIRT

CR. ST

ONE

60" CMP

AS

PH

AL

TS

TO

NE

QU

AR

RY

RO

AD

STONEQ

UARRY CREEK

CREEK

STONEQUARRY

TRIBUTARY OF

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

11'

STATION WIDTH ENTRANCE PAVEMENT

ENTRANCES - STONEQUARRY ROAD

PROP. STONEQUARRY ROAD

PROP. KY 36

PROP. KY 36

PROP. KY 36

!KY 36

11'

13'

2'

2'

10' F.B. DT.

R=50'

R=50'

10'10'

18'

STATION WIDTH ENTRANCE PAVEMENT

12'

69 S.Y. - ASPHALTRt. 27+59

Rt. 30+88 60 S.Y. - ASPHALT

ENTRANCES - KY 36

835.01

Ex. I.E.

834.27

Ex. I.E.

840.86

Ex. I.E.

841.15

Ex. I.E.

817.20

Ex. I.E. 819.67

Ex. I.E.

807.60

Ex. I.E.

809.26

Ex. I.E.

808.67

Ex. I.E.

813.91

Ex. I.E.

814.89

Ex. I.E.

807.73

Ex. I.E.

812.53

Ex. I.E.

812.34

Ex. I.E.

821.71

Ex. I.E.

820.68

Ex. I.E.

824.96

Ex. I.E. 825.76

Ex. I.E.

PROP.40:1 Taper 11'

11'

2'

2'

13' Lt.

+54.48

40:1 Ta

per

40:1 Ta

per

13' Rt.

+83.42

13' Lt.

+83.42

73' Rt.

+64.66

61' Rt.

+75.89

23' Rt.

+09.36

Widening

End Curve

+34.48, 11' Lt.

EX. R/

W

EX. R/

W

10' Rt.

+59.36

10' Lt.

+59.36

TYPE OF DITCHSTATION TO STATION

DITCH CONSTRUCTION

CONSTRUCTION NOTES

CHANNEL LINING

Disturb Limit

Disturb Limit

*

*CONSTRUCTED IN ROCK

1

P

3

P

4

P

DB. 91 Pg. 498

Lowell Keaton

James Hall

8

P

DB. 58 Pg. 501

James H. Cassidy

Paul J. Cassidy

DB. 98 Pg. 256

Susan Lacy

6

P

DB. 27 Pg. 402

Noah Triplett

7

P

DB. 71 Pg. 630

Ronald Mullins

9

P

DB. 91 Pg. 331

Mark Sands

KY36109

KY36108

0' 100' 200'50'

10' F.B. DT.

STA. 32+82

END CONSTRUCTION

w/ 2 - Terminal Section No. 1

Const. 187.5 L.F. Steel "W" Beam Guardrail (SF)

Rt. Sta. 30+96 to Sta. 32+82

w/ 2 - Terminal Section No. 1

Const. 325 L.F. Steel "W" Beam Guardrail (SF)

Rt. Sta. 27+73 to Sta. 30+80

PR

OP. !

ST

ON

EQ

UA

RR

Y

RO

AD

w/ 2 - Terminal Section No. 1

Const. 100 L.F. Steel "W" Beam Guardrail (SF)

Stonequarry Road Rt. Sta. 51+35 to Sta. 52+13

STA. 52+23

END CONSTRUCTION

END PVMT.

STA. 32+65

END PVMT.

STA. 51+95

e = 6.23%

E = 64.89'

R = 900.00'

L = 663.90'

T = 347.87'

D = 42°15'54" (LT)

P.I. Sta. 23+38.45

e = 4.90%

E = 25.93'

R = 1,350.00'

L = 525.03'

T = 265.88'

D = 22°16'59" (LT)

P.I. Sta. 29+20.36

e = 3.63%

E = 54.35'

R = 2,000.00'

L = 922.12'

T = 469.41'

D = 26°25'01" (LT)

P.I. Sta. 37+32.83

e = NC

E = 7.77'

R = 200.00'

L = 109.73'

T = 56.29'

D = 31°26'11" (LT.)

P.I. Sta. 51+05.91

ELEV. 819.54

121.74' RT. STA. 24+69.21

MONUMENT - KY36109

CONTROL POINTRt. 51+25

ELEV. 840.80

18.69' RT. STA. 33+52.81

MONUMENT - KY36109

CONTROL POINT

Disturb Limit

Disturb Limit

*

*

LT. 20+00 TO 20+50 4' F.B. SPEC.

LT. 20+50 TO 21+00 SPEC. "V"

LT. 21+00 TO 24+50 10' F.B.

LT. 24+50 TO 26+00 10' F.B. SPEC.

LT. 26+00 TO 31+50 10' F.B.

LT. 31+50 TO 32+00 10' F.B. SPEC.

SPEC. "V"LT. 32+00 TO 32+50

Sta. 32+65 Const. 23' Edge Key

Sta. 51+95 Const. 18' Edge Key

ECB - EROSION CONTROL BLANKET

TRM - TURF REINFORCEMENT MAT 1

90 SY TRM

68 SY TRM

124 SY ECB

69 SY ECB

"V" D

T.

SP

EC.

"V" DT.SPEC.

4' F.B. DT.

10' F.B. SPEC. DT.

Owin

gsville

French

burg

EX. R/W

EX. R/W

EX. R/W

EX. R/

W

EX. R/

W

EX. R/

W

90'+00

2'11'

2'

13'

1 - Terminal Section No. 1

w/ 1 - Guardrail End Treatment Type 7 &

Const. 50 L.F. Steel "W" Beam Guardrail (SF)

Stonequarry Road Lt. Sta. 51+18 to Sta. 52+23

DB. 87 Pg. 799

DB. 42 Pg. 669

Shanda M. Cobbs (1/4 Interest)

Dora M. Turner (1/4 Interest)

Mary J. Couch (1/2 Interest)

DB.97 Pg. 337

Anthony Allen Smith

Amy Reffitt (Single)

EX. R/W

DB. 70 Pg. 288

Harry Wright

P1 and P4

Disputed Area Between

DB. 60 Pg. 239

DB. 59 Pg. 734

Dennis Thomas

Rita Thomas

R/W REV. NO. 2, MARCH 13, 2013

191.93'

+09.52

119.79'

+22.66

SHEET R12

INFORMATION SEE

FOR ADDITIONAL R/W

145 S.Y. - ASPHALT

25' R 2

5' R2

5' R

20'

R

25'

R

25' R

General Notes For More Details

Along The Proposed R/W Line - See

White Pines & 4 Saucer Magnolias)

(4 American Hollys, 4 Eastern

Plant 12 Trees @ 15' Spacing

Rt. Sta. 21+75 to Sta. 23+20

42" PIP

E

24"

PIP

E

24"

48"

C

C

20

+00

25

+00

PC

C 26

+54.48

90°

51+00

52+00

53+00

PC Sta. 50+49.63

PT Sta. 5

1+59.36

PT 31+

79.51

PC 32+63.42

30

+00

C

C

C

C

C

C

PI Sta. 2

3+38.4

5

PI Sta. 29+20.36

S 7°31'5

0" E

S 49°47'44" E

S 49°47'44" E

S 72°0

4'43" E

PROP. R/W

PROP. R/W105'

+00

135'

+85

245'

+50

240'

+75

155'

+00

125'

+00

80'

+75.31

49.91'

+70.73

50'

+15

50'

+65

50'

+10

50'

+65

30.06'

+10

30.08'

+65

33.67'

+65

31.63'

+15

50'

+00

30'

+30

30'

+00

30'

+30

88.44'

+52.28

PROP. R/W

15.20'

+3014.81'

+30

PROP. R/

W

75'

+30

90'

+75.10100'

+50

100'

+00

75'

+30

ESMT.DRAIN

.PERM.

ENTR. CONST.FORTEMP. ESMT.

DETOUR CONST.

FOR

TEMP. ESMT.

IMPROVEMENTS

FOR DRAINAGE

TEMP. ESMT.

QLDQLD

Culvert Details, See R44-R45

NOTE: For Stonequarry Rd.

Be Replaced Immediately.

Disturbed On Parcel 3 Shall

NOTE: Any Fence That Is

KY 36 STA. 20+00 TO STA. 32+82

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R00500

PL

Micro

Statio

n v8.11.9.714

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R5

STONEQUARRY ROAD

STA. 50+00 TO STA. 52+23

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R00500

PL.

DG

NFIL

E

NA

ME:

Page 5: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

CONC

HOOP

FORD

KY-36

SIGN

SIGN

SIGN

LOG CABI

N

SHED

CRUSHED

STONE

SHED

FRAME1-S

FRAME1-

S

GRAVEL

PAVILLION

ROOF

FIELD

GATE TO

DISH

SATELLITECABLE

BURIED

FRAME1-S

SHED

FRAME1-S

FRAME1-S

BARN

FRAME1-S

SHED

CR

US

HE

D

ST

ON

E

AS

PH

AL

T

LIGHTPOLE

CO

NC. B

OX

4x3

15" RCP

48" RCP

24"

RC

P

24"

RC

P

18" R

CP

15" R

CP

48" RCP

BOX CULV.

3x3

CONC.

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

2 - T

2 - T

1 -

T

1 - E

4 - E

4 - E

4 - E

1 - E

1 - E

4 - E

1 - E

1 - E4 - E

4 - E

4 - E

1 - E

1 - CATV

1 -

CA

TV

1 - CATV1 - CATV

1 - CATV

1 - CATV

1 - CATV

1 -

CA

TV

1 - CATV

1 -

CATV

6"

PV

C

POND

PINE

TREE

1 - C

ATV1 - T

GONE

GONE

CONC

OB

OB

DECK

GR

AV

EL GRAVEL

GRAVEL

GRAVEL

DIRT

CR. ST

ONE

60" CMP

AS

PH

AL

TS

TO

NE

QU

AR

RY

RO

AD

STONEQ

UARRY CREEK

CREEK

STONEQUARRY

TRIBUTARY OF

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

11'

STATION WIDTH ENTRANCE PAVEMENT

ENTRANCES - STONEQUARRY ROAD

PROP. STONEQUARRY ROAD

PROP. KY 36

PROP. KY 36

PROP. KY 36

!KY 36

11'

13'

2'

2'

10' F.B. DT.

R=50'

R=50'

10'10'

18'

STATION WIDTH ENTRANCE PAVEMENT

12'

69 S.Y. - ASPHALTRt. 27+59

Rt. 30+88 60 S.Y. - ASPHALT

ENTRANCES - KY 36

835.01

Ex. I.E.

834.27

Ex. I.E.

840.86

Ex. I.E.

841.15

Ex. I.E.

817.20

Ex. I.E. 819.67

Ex. I.E.

807.60

Ex. I.E.

809.26

Ex. I.E.

808.67

Ex. I.E.

813.91

Ex. I.E.

814.89

Ex. I.E.

807.73

Ex. I.E.

812.53

Ex. I.E.

812.34

Ex. I.E.

821.71

Ex. I.E.

820.68

Ex. I.E.

824.96

Ex. I.E. 825.76

Ex. I.E.

PROP.40:1 Taper 11'

11'

2'

2'

13' Lt.

+54.48

40:1 Ta

per

40:1 Ta

per

13' Rt.

+83.42

13' Lt.

+83.42

73' Rt.

+64.66

61' Rt.

+75.89

23' Rt.

+09.36

Widening

End Curve

+34.48, 11' Lt.

EX. R/

W

EX. R/

W

10' Rt.

+59.36

10' Lt.

+59.36

TYPE OF DITCHSTATION TO STATION

DITCH CONSTRUCTION

CONSTRUCTION NOTES

CHANNEL LINING

Disturb Limit

Disturb Limit

*

*CONSTRUCTED IN ROCK

1

P

3

P

4

P

DB. 91 Pg. 498

Lowell Keaton

James Hall

8

P

DB. 58 Pg. 501

James H. Cassidy

Paul J. Cassidy

DB. 98 Pg. 256

Susan Lacy

6

P

DB. 27 Pg. 402

Noah Triplett

7

P

DB. 71 Pg. 630

Ronald Mullins

9

P

DB. 91 Pg. 331

Mark Sands

KY36109

KY36108

0' 100' 200'50'

10' F.B. DT.

STA. 32+82

END CONSTRUCTION

w/ 2 - Terminal Section No. 1

Const. 187.5 L.F. Steel "W" Beam Guardrail (SF)

Rt. Sta. 30+96 to Sta. 32+82

w/ 2 - Terminal Section No. 1

Const. 325 L.F. Steel "W" Beam Guardrail (SF)

Rt. Sta. 27+73 to Sta. 30+80

PR

OP. !

ST

ON

EQ

UA

RR

Y

RO

AD

w/ 2 - Terminal Section No. 1

Const. 100 L.F. Steel "W" Beam Guardrail (SF)

Stonequarry Road Rt. Sta. 51+35 to Sta. 52+13

STA. 52+23

END CONSTRUCTION

END PVMT.

STA. 32+65

END PVMT.

STA. 51+95

e = 6.23%

E = 64.89'

R = 900.00'

L = 663.90'

T = 347.87'

D = 42°15'54" (LT)

P.I. Sta. 23+38.45

e = 4.90%

E = 25.93'

R = 1,350.00'

L = 525.03'

T = 265.88'

D = 22°16'59" (LT)

P.I. Sta. 29+20.36

e = 3.63%

E = 54.35'

R = 2,000.00'

L = 922.12'

T = 469.41'

D = 26°25'01" (LT)

P.I. Sta. 37+32.83

e = NC

E = 7.77'

R = 200.00'

L = 109.73'

T = 56.29'

D = 31°26'11" (LT.)

P.I. Sta. 51+05.91

ELEV. 819.54

121.74' RT. STA. 24+69.21

MONUMENT - KY36109

CONTROL POINTRt. 51+25

ELEV. 840.80

18.69' RT. STA. 33+52.81

MONUMENT - KY36109

CONTROL POINT

Disturb Limit

Disturb Limit

*

*

LT. 20+00 TO 20+50 4' F.B. SPEC.

LT. 20+50 TO 21+00 SPEC. "V"

LT. 21+00 TO 24+50 10' F.B.

LT. 24+50 TO 26+00 10' F.B. SPEC.

LT. 26+00 TO 31+50 10' F.B.

LT. 31+50 TO 32+00 10' F.B. SPEC.

SPEC. "V"LT. 32+00 TO 32+50

Sta. 32+65 Const. 23' Edge Key

Sta. 51+95 Const. 18' Edge Key

ECB - EROSION CONTROL BLANKET

TRM - TURF REINFORCEMENT MAT 1

90 SY TRM

68 SY TRM

124 SY ECB

69 SY ECB

"V" D

T.

SP

EC.

"V" DT.SPEC.

4' F.B. DT.

10' F.B. SPEC. DT.

Owin

gsville

French

burg

EX. R/W

EX. R/W

EX. R/W

EX. R/

W

EX. R/

W

EX. R/

W

90'+00

2'11'

2'

13'

1 - Terminal Section No. 1

w/ 1 - Guardrail End Treatment Type 7 &

Const. 50 L.F. Steel "W" Beam Guardrail (SF)

Stonequarry Road Lt. Sta. 51+18 to Sta. 52+23

DB. 87 Pg. 799

DB. 42 Pg. 669

Shanda M. Cobbs (1/4 Interest)

Dora M. Turner (1/4 Interest)

Mary J. Couch (1/2 Interest)

DB.97 Pg. 337

Anthony Allen Smith

Amy Reffitt (Single)

EX. R/W

DB. 70 Pg. 288

Harry Wright

P1 and P4

Disputed Area Between

DB. 60 Pg. 239

DB. 59 Pg. 734

Dennis Thomas

Rita Thomas

R/W REV. NO. 2, MARCH 13, 2013

191.93'

+09.52

119.79'

+22.66

SHEET R12

INFORMATION SEE

FOR ADDITIONAL R/W

145 S.Y. - ASPHALT

25' R 2

5' R2

5' R

20'

R

25'

R

25' R

General Notes For More Details

Along The Proposed R/W Line - See

White Pines & 4 Saucer Magnolias)

(4 American Hollys, 4 Eastern

Plant 12 Trees @ 15' Spacing

Rt. Sta. 21+75 to Sta. 23+20

42" PIP

E

24"

PIP

E

24"

48"

C

C

20

+00

25

+00

PC

C 26

+54.48

90°

51+00

52+00

53+00

PC Sta. 50+49.63

PT Sta. 5

1+59.36

PT 31+

79.51

PC 32+63.42

30

+00

C

C

C

C

C

C

PI Sta. 2

3+38.4

5

PI Sta. 29+20.36

S 7°31'5

0" E

S 49°47'44" E

S 49°47'44" E

S 72°0

4'43" E

PROP. R/W

PROP. R/W105'

+00

135'

+85

245'

+50

240'

+75

155'

+00

125'

+00

80'

+75.31

49.91'

+70.73

50'

+15

50'

+65

50'

+10

50'

+65

30.06'

+10

30.08'

+65

33.67'

+65

31.63'

+15

50'

+00

30'

+30

30'

+00

30'

+30

88.44'

+52.28

PROP. R/W

15.20'

+3014.81'

+30

PROP. R/

W

75'

+30

90'

+75.10100'

+50

100'

+00

75'

+30

ESMT.DRAIN

.PERM.

ENTR. CONST.FORTEMP. ESMT.

DETOUR CONST.

FOR

TEMP. ESMT.

IMPROVEMENTS

FOR DRAINAGE

TEMP. ESMT.

QLDQLD

Culvert Details, See R44-R45

NOTE: For Stonequarry Rd.

Be Replaced Immediately.

Disturbed On Parcel 3 Shall

NOTE: Any Fence That Is

KY 36 STA. 20+00 TO STA. 32+82

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R00500

PL

Micro

Statio

n v8.11.9.714

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R5

STONEQUARRY ROAD

STA. 50+00 TO STA. 52+23

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R00500

PL.

DG

NFIL

E

NA

ME:

darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
Page 6: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

STONEQUARRY ROAD SUITER ROAD

STA. 52+50.00

END CONSTRUCTION

800

805

810

815

820

825

830

835

840

845

850

800

805

810

815

820

825

830

835

840

845

850850

870

875

880

885

890

895

900

905

910910

870

875

880

885

890

895

900

905

910910

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

DATUM

DATUM

Elev. 840.82

Low Wire

Sta. 51+44

STA. 52+23.00

END CONSTRUCTION

SUITER ROAD STA. 50+00.00

KY 36 STA. 112+54.14 =

50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00

866.4

826.8

821.

31

819.28

816.64

815.01

814.71

822.96

824.48

821.

98

818.97

815.248

SUITER ROAD

Sta. 50+00 to 52+50Earthwork Quantities

552=Emb0=RDZ39=Com0=Emb Bench

Sta. 50+00 to 52+23Earthwork Quantities

STONEQUARRY ROAD

Existing Ground

Existing Ground

Grade

ProposedGrade

Proposed

HORIZONTAL 50'SCALE: 1" =

1" = 5' VERTICAL

66=Emb0=RDZ773=Com0=Emb Bench

EX. 60" CMP

EX. 48" RCP

PVI S

TA. 50

+00.00

PVI S

TA. 50

+23.00

PV

C

ST

A. 50

+25.00

HP

ST

A. 50

+38.50

PVI S

TA. 50

+50.00

PV

T

ST

A. 50

+75.00

2.23%

-6.03%

VC = 50'

SD = 164'

PV

T

ST

A. 51+

95.00

SD = Unlimited

PV

C

ST

A. 51+

45.00

PVI S

TA. 51+

70.00

EL

EV. = 822.96

EL

EV. = 824.39

EL

EV. = 824.99

EL

EV. = 819.27

EL

EV. = 816.82

EL

EV. = 817.76

EL

EV. = 824.44

EL

EV. = 824.59

EL

EV. = 823.49

6.23

%

VC = 50'

-3.75%

@ 2.40%

Spec. "V" Dt.

4.30% Above Datum)

(Plotted 25'

813.42

+50 Lt.

Above Datum)

(Plotted 25'

814.90

+66 Lt.

Above Datum)

(Plotted 25'

815.85

+38 Lt.

PVI S

TA. 50

+00.00

PV

C

ST

A. 50

+15.00

PVI S

TA. 50

+50.00

HP

ST

A. 50

+73.39

PV

T

ST

A. 50

+85.00

PV

C

ST

A. 51+

05.00

LP

ST

A. 51+

40.99

PVI S

TA. 51+

70.00

PV

T

ST

A. 52

+35.00

PVI S

TA. 52

+50.00

6.85

%

-1.36%

3.56%

VC = 70'

SD = 166'

VC = 130'

SD = 164'

Ele

v.= 890.05

Ele

v.= 889.30

Ele

v.= 890.73

Ele

v.= 889.65

Ele

v.= 886.62

Ele

v.= 889.05

Ele

v.= 891.

26

Ele

v.= 889.57

Ele

v.= 887.65

Ele

v.= 888.41

50+00 50+50 51+00 51+50 52+00 52+50

885.4

880.1

886.0

887.3

889.3

819.26

886.62

889.33

889.37

889.07

889.71

891.

26

STRUCT PLATE PIPE-ARCH

7'-3" X 5'-11" ALUMINUM

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

STONEQUARRY ROAD

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R00900

PF

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R9

STA. 50+00 TO STA. 52+23

SUITER ROAD STA 50+00 TO STA 52+50

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R00900

PF.

DG

NFIL

E

NA

ME:

Page 7: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

STONEQUARRY ROAD SUITER ROAD

STA. 52+50.00

END CONSTRUCTION

800

805

810

815

820

825

830

835

840

845

850

800

805

810

815

820

825

830

835

840

845

850850

870

875

880

885

890

895

900

905

910910

870

875

880

885

890

895

900

905

910910

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

DATUM

DATUM

Elev. 840.82

Low Wire

Sta. 51+44

STA. 52+23.00

END CONSTRUCTION

SUITER ROAD STA. 50+00.00

KY 36 STA. 112+54.14 =

50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00

866.4

826.8

821.

31

819.28

816.64

815.01

814.71

822.96

824.48

821.

98

818.97

815.248

SUITER ROAD

Sta. 50+00 to 52+50Earthwork Quantities

552=Emb0=RDZ39=Com0=Emb Bench

Sta. 50+00 to 52+23Earthwork Quantities

STONEQUARRY ROAD

Existing Ground

Existing Ground

Grade

ProposedGrade

Proposed

HORIZONTAL 50'SCALE: 1" =

1" = 5' VERTICAL

66=Emb0=RDZ773=Com0=Emb Bench

EX. 60" CMP

EX. 48" RCP

PVI S

TA. 50

+00.00

PVI S

TA. 50

+23.00

PV

C

ST

A. 50

+25.00

HP

ST

A. 50

+38.50

PVI S

TA. 50

+50.00

PV

T

ST

A. 50

+75.00

2.23%

-6.03%

VC = 50'

SD = 164'

PV

T

ST

A. 51+

95.00

SD = Unlimited

PV

C

ST

A. 51+

45.00

PVI S

TA. 51+

70.00

EL

EV. = 822.96

EL

EV. = 824.39

EL

EV. = 824.99

EL

EV. = 819.27

EL

EV. = 816.82

EL

EV. = 817.76

EL

EV. = 824.44

EL

EV. = 824.59

EL

EV. = 823.49

6.23

%

VC = 50'

-3.75%

@ 2.40%

Spec. "V" Dt.

4.30% Above Datum)

(Plotted 25'

813.42

+50 Lt.

Above Datum)

(Plotted 25'

814.90

+66 Lt.

Above Datum)

(Plotted 25'

815.85

+38 Lt.

PVI S

TA. 50

+00.00

PV

C

ST

A. 50

+15.00

PVI S

TA. 50

+50.00

HP

ST

A. 50

+73.39

PV

T

ST

A. 50

+85.00

PV

C

ST

A. 51+

05.00

LP

ST

A. 51+

40.99

PVI S

TA. 51+

70.00

PV

T

ST

A. 52

+35.00

PVI S

TA. 52

+50.00

6.85

%

-1.36%

3.56%

VC = 70'

SD = 166'

VC = 130'

SD = 164'

Ele

v.= 890.05

Ele

v.= 889.30

Ele

v.= 890.73

Ele

v.= 889.65

Ele

v.= 886.62

Ele

v.= 889.05

Ele

v.= 891.

26

Ele

v.= 889.57

Ele

v.= 887.65

Ele

v.= 888.41

50+00 50+50 51+00 51+50 52+00 52+50

885.4

880.1

886.0

887.3

889.3

819.26

886.62

889.33

889.37

889.07

889.71

891.

26

STRUCT PLATE PIPE-ARCH

7'-3" X 5'-11" ALUMINUM

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

STONEQUARRY ROAD

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R00900

PF

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R9

STA. 50+00 TO STA. 52+23

SUITER ROAD STA 50+00 TO STA 52+50

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R00900

PF.

DG

NFIL

E

NA

ME:

darren.back
Polygon
darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
Page 8: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

!KY 36PROP.

PHASE 2 CONSTRUCTION

20

+00

25

+00

30

+00

0' 100' 200'50'

LEGEND

PHASE 2 CONSTRUCTION

UNDER TRAFFICPHASE 2A CONSTRUCTION

TRAFFIC THIS PHASE

BARREL @ 20' O.C.

0 10 20 30 40 50-10-20-30-40-50-60-70-80

TRAFFIC ONLY

FOR MAINTENANCE OF

CONSTRUCTED DURING PHASE 1

(NTS)27+00 CRITICAL SECTION

810

820

830

840

850

860

870

880

810

820

830

840

850

860

870

880

STA. 52+23.00

END CONSTRUCTION

STA. 32+82

END CONSTRUCTION

CONC

HOOP

FORD

KY-36

SIGN

SIGN

BARN

SIGN

LOG CABI

N

SHED

CRUSHED

STONE

FRAME1-

S

GRAVEL

PAVILLION

ROOF

FIELD

GATE TO

DISH

SATELLITECABLE

BURIED

FRAME1-S

BARN

FRAME1-S

SHED

AS

PH

AL

T

LIGHTPOLE

15" RCP

48" RCP

24"

RC

P

24"

RC

P

18" R

CP

15" R

CP

48" RCP

BOX CULV.

3x3

CONC.

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

2 - T

2 - T

1 -

T

1 - E

4 - E

4 - E

1 - E

1 - E

1 - E4 - E

4 - E

4 - E

1 - E

1 - CATV

1 -

CA

TV

1 - CATV1 - CATV

1 - CATV

1 - CATV

1 - CATV

1 -

CA

TV

1 - CATV

1 -

CATV

6"

PV

C

POND

PINE

TREE

1 - C

ATV1 - T

GONE

GONE

CONC

OB

OB

DECK

GRAVEL

GRAVEL

DIRT

CR. ST

ONE

60" CMP

AS

PH

AL

TS

TO

NE

QU

AR

RY

RO

AD

STONEQ

UARRY CREEK

CREEK

STONEQUARRY

TRIBUTARY OF

42" PIP

E

24"

PIP

E

24"

48"

C

C

C

PC

C 26

+54.48

90°

51+00

52+00

53+00

PC Sta. 50+49.63

PT Sta. 5

1+59.36

PC 19

+90.5

8

PT 31+

79.51

PC 32+63.42

C

C

C

C

C

C

PI Sta. 2

3+38.4

5

PI Sta. 29+20.36

S 7°31'5

0" E

S 49°47'44" E

S 49°47'44" E

S 72°0

4'43" E

10'

10'

9' 9'

10'

10'

10'

10'

QLDQLD

MATERIALS SHALL BE INCIDENTAL TO THE BID ITEM FOR MAINTAIN AND CONTROL TRAFFIC.

OF THE ALUMINUM PIPE-ARCH. THE DETOUR CONSTRUCTION, INCLUDING ALL LABOR AND

PROPOSED "TEMPORARY EASEMENT FOR DETOUR CONSTRUCTION" TO PHASE CONSTRUCTION

NOTE: THE CONTRACTOR SHALL BUILD A TEMPORARY DETOUR WITHIN THE LIMITS OF THE

KY 36 & STONEQUARRY ROAD

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R02300

MT

Micro

Statio

n v8.11.9.714

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R23

STA. 20+00 TO STA. 32+82

PHASE 2 MAINTENANCE OF TRAFFIC

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R02300

MT.

DG

NFIL

E

NA

ME:

Page 9: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

STONEQUARRY ROAD STA. 50+00.00

KY 36 STA. 24+19.36 =

!KY 36PROP.

PHASE 2 CONSTRUCTION

20

+00

25

+00

30

+00

0' 100' 200'50'

LEGEND

PHASE 2 CONSTRUCTION

UNDER TRAFFICPHASE 2A CONSTRUCTION

TRAFFIC THIS PHASE

BARREL @ 20' O.C.

0 10 20 30 40 50-10-20-30-40-50-60-70-80

TRAFFIC ONLY

FOR MAINTENANCE OF

CONSTRUCTED DURING PHASE 1

(NTS)27+00 CRITICAL SECTION

810

820

830

840

850

860

870

880

810

820

830

840

850

860

870

880

STA. 52+23.00

END CONSTRUCTION

STA. 32+82

END CONSTRUCTION

CONC

HOOP

FORD

KY-36

SIGN

SIGN

BARN

SIGN

LOG CABI

N

SHED

CRUSHED

STONE

FRAME1-

S

GRAVEL

PAVILLION

ROOF

FIELD

GATE TO

DISH

SATELLITECABLE

BURIED

FRAME1-S

BARN

FRAME1-S

SHED

AS

PH

AL

T

LIGHTPOLE

15" RCP

48" RCP

24"

RC

P

24"

RC

P

18" R

CP

15" R

CP

48" RCP

BOX CULV.

3x3

CONC.

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

1 - T

2 - T

2 - T

1 -

T

1 - E

4 - E

4 - E

1 - E

1 - E

1 - E4 - E

4 - E

4 - E

1 - E

1 - CATV

1 -

CA

TV

1 - CATV1 - CATV

1 - CATV

1 - CATV

1 - CATV

1 -

CA

TV

1 - CATV

1 -

CATV

6"

PV

C

POND

PINE

TREE

1 - C

ATV1 - T

GONE

GONE

CONC

OB

OB

DECK

GRAVEL

GRAVEL

DIRT

CR. ST

ONE

60" CMP

AS

PH

AL

TS

TO

NE

QU

AR

RY

RO

AD

STONEQ

UARRY CREEK

CREEK

STONEQUARRY

TRIBUTARY OF

42" PIP

E

24"

PIP

E

24"

48"

C

C

C

PC

C 26

+54.48

90°

51+00

52+00

53+00

PC Sta. 50+49.63

PT Sta. 5

1+59.36

PC 19

+90.5

8

PT 31+

79.51

PC 32+63.42

C

C

C

C

C

C

PI Sta. 2

3+38.4

5

PI Sta. 29+20.36

S 7°31'5

0" E

S 49°47'44" E

S 49°47'44" E

S 72°0

4'43" E

10'

10'

9' 9'

10'

10'

10'

10'

QLDQLD

MATERIALS SHALL BE INCIDENTAL TO THE BID ITEM FOR MAINTAIN AND CONTROL TRAFFIC.

OF THE ALUMINUM PIPE-ARCH. THE DETOUR CONSTRUCTION, INCLUDING ALL LABOR AND

PROPOSED "TEMPORARY EASEMENT FOR DETOUR CONSTRUCTION" TO PHASE CONSTRUCTION

NOTE: THE CONTRACTOR SHALL BUILD A TEMPORARY DETOUR WITHIN THE LIMITS OF THE

KY 36 & STONEQUARRY ROAD

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R02300

MT

Micro

Statio

n v8.11.9.714

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R23

STA. 20+00 TO STA. 32+82

PHASE 2 MAINTENANCE OF TRAFFIC

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R02300

MT.

DG

NFIL

E

NA

ME:

darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
Page 10: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

GENERAL NOTES

SIGN

SIGN

DISH

SATELLITE

24"

RC

P

PT Sta. 5

1+59.36

C

1 - T

6"

PV

C

1 -

CA

TV

809.26

Ex. I.E.

808.67

Ex. I.E.

807.60

Ex. I.E.

807.73

Ex. I.E.

1 - CATV

!

ST

ON

EQ

UA

RR

Y

RO

AD

C

C

C

C PI Sta. 50

+98.40

PI Sta. 50

+26.84

PI Sta. 48+91.35

PI Sta. 48+59.41

Scale 1" = 10'

GENERAL PLAN

CULVERT SECTION

SK. LT.

5°35'00"

52+00

SITUATION SURVEY STA. 50+00.00

M.L. STA. 51+78.11 =

EX. 48" RCP

EX. 60" CMPC

(NOT TO SCALE)

US & DS

Pipe-Arch Aluminum Structural Plate

7' 3"

5' 11"

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

7'-3" X 5'-11", LISTED FLOW AREA OF 34.3 SQ. FT.

CONTECH ALUMINUM STRUCTURAL PIPE-ARCH (OR EQUIVALENT STRUCTURE)

SHOWN IN THESE DRAWINGS IS:

CULVERT AT STA. 51+78.11

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R04400

PD

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R44

SITUATION SURVEY SHEET

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R04400

PD.

DG

NFIL

E

NA

ME:

WINGWALL ANGLES SHALL BE DETERMINED AND APPROVED BY THE PROJECT ENGINEER.

CAST IN PLACE REINFORCED CONCRETE AND THE DESIGN SHALL BE BASED FROM RDH-400-02 OF THE 2016 STANDARD DRAWINGS.

THE BID ITEM "7'-3" X 5'-11" ALUMINUM ALLOY STRUCTURAL PLATE PIPE-ARCH." HEADWALLS AND WINGWALLS SHALL BE

ALL ITEMS ASSOCIATED WITH THE DESIGN AND CONSTRUCTION OF HEADWALLS AND WINGWALLS SHALL BE INCIDENTAL TO11.

ALLOW 4 WEEKS TIME FOR REVIEW OF THIS MATERIAL.

FOR REVIEW AND ARCHIVAL PURPOSES. THIS INFORMATION WILL BE SUBMITTED TO THE DIVISION OF CONSTRUCTION.

ROAD AND BRIDGE CONSTRUCTION SHOULD BE SUPPLIED AS WELL. INCLUDE ONE SET OF STRUCTURAL DESIGN CALCULATIONS

PROJECT. BACKFILL REQUIREMENTS AND ANY SPECIFICATIONS THAT ARE CONTRARY TO THE KYTC STANDARD SPECIFICATIONS FOR

THE MANUFACTURER OR SUPPLIER MUST PROVIDE 6 COPIES OF DETAILED SHOP DRAWINGS FOR FINAL APPROVAL FOR USE ON THIS 10.

PROJECT ENGINEER.

WILL BE SIGNED BY THE CONTRACTOR AND THE MANUFACTURER OF THE STRUCTURE AND WILL BE SUBMITTED TO THE

CONSTRUCTION WILL REQUIRE A CERTIFICATION LETTER STATING THAT THE BACKFILL WAS CONSTRUCTED PROPERLY. THE LETTER

STRUCTURES THAT REQUIRE SPECIAL BACKFILL CONTRARY TO KYTC STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE 9.

REQUIREMENT.

COMPLY WITH SECTION 106.04 OF THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION BUY AMERICAN 8.

CONSTRUCTION, THE KYTC LIST OF APPROVED MATERIALS, AND ALL APPLICABLE ASTM AND AASHTO STANDARDS.

ALL MATERIALS USED MUST BE IN CONFORMANCE WITH KYTC STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE 7.

ALL FOUNDATION DESIGNS MUST BE IN ACCORDANCE WITH THE APPROPRIATE PROJECT GEOTECHNICAL INVESTIGATION.6.

BE PERFORMED AND STAMPED BY A QUALIFIED PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF KENTUCKY.

LOAD IN AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, WITH INTERIMS. ALL DESIGNS SUBMITTED FOR CONSIDERATION MUST

ALL COMPONENTS MUST BE DESIGNED TO MEET STRUCTURAL REQUIREMENTS AS SET FORTH FOR EARTH, DEAD, AND HL-93 LIVE5.

ITEM IS ALL WORK AND MATERIALS REQUIRED TO OBTAIN A MINIMUM BEARING CAPACITY OF 4,000 PSF.

EXCAVATION, BACKFILL, AND ALL ITEMS NECESSARY TO CONSTRUCT HEADWALLS AND WINGWALLS. ALSO INCLUDED IN THIS BID

THE FOLLOWING ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE STRUCTURE: STRUCTURE MANUFACTURER'S SPECIFICATIONS.

PIPE-ARCH." THIS BID ITEM IS A LINEAR FOOT BID ITEM THAT COVERS ALL WORK TO CONSTRUCT AND INSTALL THE CULVERT TO

ALL WORK TO CONSTRUCT THE CULVERT IS PAID FOR UNDER THE BID ITEMS "7'-3" X 5'-11" ALUMINUM ALLOY STRUCTURAL PLATE 4.

INCIDENTAL TO THE STRUCTURE.

IF A PRECAST CONCRETE STRUCTURE IS SELECTED AS AN ALTERNATE, A STRUCTURAL BASE SLAB SHALL BE REQUIRED, AND IS3.

NO PAYMENT ADJUSTMENTS WILL BE ALLOWED.

IF AN ALTERNATE IS USED THAT REQUIRES MODIFICATIONS TO LAYOUT OR ROADWAY PROFILE,2.

LAYOUT, NO PAYMENT ADJUSTMENTS WILL BE ALLOWED.

DEVELOP DETAIL STRUCTURAL DRAWINGS, AND BIDDING DOCUMENTS. IF CONTRACTOR DESIRES TO MODIFY THIS

DIMENSIONS SHOWN ARE APPROXIMATE AND INTENDED TO CONVEY ENOUGH INFORMATION TO 1.

Page 11: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

GENERAL NOTES

SIGN

SIGN

DISH

SATELLITE

24"

RC

P

PT Sta. 5

1+59.36

C

1 - T

6"

PV

C

1 -

CA

TV

809.26

Ex. I.E.

808.67

Ex. I.E.

807.60

Ex. I.E.

807.73

Ex. I.E.

1 - CATV

!

ST

ON

EQ

UA

RR

Y

RO

AD

C

C

C

C PI Sta. 50

+98.40

PI Sta. 50

+26.84

PI Sta. 48+91.35

PI Sta. 48+59.41

Scale 1" = 10'

GENERAL PLAN

CULVERT SECTION

SK. LT.

5°35'00"

52+00

SITUATION SURVEY STA. 50+00.00

M.L. STA. 51+78.11 =

EX. 48" RCP

EX. 60" CMPC

(NOT TO SCALE)

US & DS

Pipe-Arch Aluminum Structural Plate

7' 3"

5' 11"

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

7'-3" X 5'-11", LISTED FLOW AREA OF 34.3 SQ. FT.

CONTECH ALUMINUM STRUCTURAL PIPE-ARCH (OR EQUIVALENT STRUCTURE)

SHOWN IN THESE DRAWINGS IS:

CULVERT AT STA. 51+78.11

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R04400

PD

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R44

SITUATION SURVEY SHEET

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R04400

PD.

DG

NFIL

E

NA

ME:

WINGWALL ANGLES SHALL BE DETERMINED AND APPROVED BY THE PROJECT ENGINEER.

CAST IN PLACE REINFORCED CONCRETE AND THE DESIGN SHALL BE BASED FROM RDH-400-02 OF THE 2016 STANDARD DRAWINGS.

THE BID ITEM "7'-3" X 5'-11" ALUMINUM ALLOY STRUCTURAL PLATE PIPE-ARCH." HEADWALLS AND WINGWALLS SHALL BE

ALL ITEMS ASSOCIATED WITH THE DESIGN AND CONSTRUCTION OF HEADWALLS AND WINGWALLS SHALL BE INCIDENTAL TO11.

ALLOW 4 WEEKS TIME FOR REVIEW OF THIS MATERIAL.

FOR REVIEW AND ARCHIVAL PURPOSES. THIS INFORMATION WILL BE SUBMITTED TO THE DIVISION OF CONSTRUCTION.

ROAD AND BRIDGE CONSTRUCTION SHOULD BE SUPPLIED AS WELL. INCLUDE ONE SET OF STRUCTURAL DESIGN CALCULATIONS

PROJECT. BACKFILL REQUIREMENTS AND ANY SPECIFICATIONS THAT ARE CONTRARY TO THE KYTC STANDARD SPECIFICATIONS FOR

THE MANUFACTURER OR SUPPLIER MUST PROVIDE 6 COPIES OF DETAILED SHOP DRAWINGS FOR FINAL APPROVAL FOR USE ON THIS 10.

PROJECT ENGINEER.

WILL BE SIGNED BY THE CONTRACTOR AND THE MANUFACTURER OF THE STRUCTURE AND WILL BE SUBMITTED TO THE

CONSTRUCTION WILL REQUIRE A CERTIFICATION LETTER STATING THAT THE BACKFILL WAS CONSTRUCTED PROPERLY. THE LETTER

STRUCTURES THAT REQUIRE SPECIAL BACKFILL CONTRARY TO KYTC STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE 9.

REQUIREMENT.

COMPLY WITH SECTION 106.04 OF THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION BUY AMERICAN 8.

CONSTRUCTION, THE KYTC LIST OF APPROVED MATERIALS, AND ALL APPLICABLE ASTM AND AASHTO STANDARDS.

ALL MATERIALS USED MUST BE IN CONFORMANCE WITH KYTC STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE 7.

ALL FOUNDATION DESIGNS MUST BE IN ACCORDANCE WITH THE APPROPRIATE PROJECT GEOTECHNICAL INVESTIGATION.6.

BE PERFORMED AND STAMPED BY A QUALIFIED PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF KENTUCKY.

LOAD IN AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, WITH INTERIMS. ALL DESIGNS SUBMITTED FOR CONSIDERATION MUST

ALL COMPONENTS MUST BE DESIGNED TO MEET STRUCTURAL REQUIREMENTS AS SET FORTH FOR EARTH, DEAD, AND HL-93 LIVE5.

ITEM IS ALL WORK AND MATERIALS REQUIRED TO OBTAIN A MINIMUM BEARING CAPACITY OF 4,000 PSF.

EXCAVATION, BACKFILL, AND ALL ITEMS NECESSARY TO CONSTRUCT HEADWALLS AND WINGWALLS. ALSO INCLUDED IN THIS BID

THE FOLLOWING ITEMS SHALL BE CONSIDERED INCIDENTAL TO THE STRUCTURE: STRUCTURE MANUFACTURER'S SPECIFICATIONS.

PIPE-ARCH." THIS BID ITEM IS A LINEAR FOOT BID ITEM THAT COVERS ALL WORK TO CONSTRUCT AND INSTALL THE CULVERT TO

ALL WORK TO CONSTRUCT THE CULVERT IS PAID FOR UNDER THE BID ITEMS "7'-3" X 5'-11" ALUMINUM ALLOY STRUCTURAL PLATE 4.

INCIDENTAL TO THE STRUCTURE.

IF A PRECAST CONCRETE STRUCTURE IS SELECTED AS AN ALTERNATE, A STRUCTURAL BASE SLAB SHALL BE REQUIRED, AND IS3.

NO PAYMENT ADJUSTMENTS WILL BE ALLOWED.

IF AN ALTERNATE IS USED THAT REQUIRES MODIFICATIONS TO LAYOUT OR ROADWAY PROFILE,2.

LAYOUT, NO PAYMENT ADJUSTMENTS WILL BE ALLOWED.

DEVELOP DETAIL STRUCTURAL DRAWINGS, AND BIDDING DOCUMENTS. IF CONTRACTOR DESIRES TO MODIFY THIS

DIMENSIONS SHOWN ARE APPROXIMATE AND INTENDED TO CONVEY ENOUGH INFORMATION TO 1.

darren.back
Polygon
darren.back
Polygon
darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
darren.back
Polygon
Page 12: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

820

810

800

@ 5°35'00" SKEW LT

STONEQUARRY ROAD 51+78.11

CULVERT @

820

810

800

Ex. 48" RCP & 60" CMP

817.45

817.51

815

805

815

805

50+0049+7549+25 49+50 50+25 50+50

SCALE: 1" =

1" =

5' HORIZONTAL

5' VERTICAL

50+75

SC

AL

E: 1" =

1" = 10'

HO

RIZ

ON

TA

L

10'

VE

RTIC

AL

800

810

820

800

810

820

810

820

830

810

820

830

800

800

800

810

820

800

810

820

790

800

810

820

790

800

810

820

010

20

30

40

50

-10

-20

-30

-40

-50

49

+50

010

20

30

40

50

-10

-20

-30

-40

-50

49

+75

010

20

30

40

50

-10

-20

-30

-40

-50

50

+00

010

20

30

40

50

-10

-20

-30

-40

-50

50

+25

010

20

30

40

50

-10

-20

-30

-40

-50

50

+50

800

810

820

800

810

820

I.E. 802.64

I.E. 808.66D = 2.0', T = 0.75'

Class I A Ch. Lining

CONST. 25 Tons

CONST. 56 LF 7'-3

" X 5'-11" ALUMINUM STRUCTURAL PLATE PIPE-ARCH @ 10.75

%

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

CULVERT AT STA. 51+78.11

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R04500

PD

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R45

SITUATION SURVEY SHEET

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R04500

PD.

DG

NFIL

E

NA

ME:

Page 13: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

820

810

800

@ 5°35'00" SKEW LT

STONEQUARRY ROAD 51+78.11

CULVERT @

820

810

800

Ex. 48" RCP & 60" CMP

817.45

817.51

815

805

815

805

50+0049+7549+25 49+50 50+25 50+50

SCALE: 1" =

1" =

5' HORIZONTAL

5' VERTICAL

50+75

SC

AL

E: 1" =

1" = 10'

HO

RIZ

ON

TA

L

10'

VE

RTIC

AL

800

810

820

800

810

820

810

820

830

810

820

830

800

800

800

810

820

800

810

820

790

800

810

820

790

800

810

820

010

20

30

40

50

-10

-20

-30

-40

-50

49

+50

010

20

30

40

50

-10

-20

-30

-40

-50

49

+75

010

20

30

40

50

-10

-20

-30

-40

-50

50

+00

010

20

30

40

50

-10

-20

-30

-40

-50

50

+25

010

20

30

40

50

-10

-20

-30

-40

-50

50

+50

800

810

820

800

810

820

I.E. 802.64

I.E. 808.66D = 2.0', T = 0.75'

Class I A Ch. Lining

CONST. 25 Tons

CONST. 56 LF 7'-3

" X 5'-11" ALUMINUM STRUCTURAL PLATE PIPE-ARCH @ 10.75

%

DESIGN

CHECK

RUNOFF

(cfs)

STORM

(YR)

FLOOD DATA

(ft)

HEADWATER ELEV

10 180 813.02

100 322 815.92

CULVERT AT STA. 51+78.11

Se

pte

mber 18, 2017

DA

TE P

LO

TT

ED:

darre

n.back

US

ER:

E-S

HE

ET

NA

ME:

R04500

PD

Micro

Statio

n v8.11.9.832

COUNTY OF ITEM NO. SHEET NO.

MENIFEE 10-8001.10 R45

SITUATION SURVEY SHEET

C:\

PW

WO

RK\

DA

RR

EN.B

AC

K\

D12

92529\

R04500

PD.

DG

NFIL

E

NA

ME:

darren.back
Polygon
darren.back
Polygon
darren.back
Polygon
darren.back
Polygon
darren.back
Typewritten Text
REVISED 09/18/2017
Page 14: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

2

MENIFEE COUNTYFD04 SPP 083 0036 002-005

Contract ID: 171239Page 74 of 75

REVISED ADDENDUM #1: 9-19-17

Page 15: September 19, 2017 - Home | KYTC...s e p t e m b e r 18, 2 0 17 d a t e p l o t t e d: d a r r e n. b a c k u s e r: e-s h e e t n a m e: r 0 0 2 0 d s u m ic r o s t a t io n v 8.

2

MENIFEE COUNTYFD04 SPP 083 0036 002-005

Contract ID: 171239Page 75 of 75

REVISED ADDENDUM #1: 9-19-17