Sept. 28, 2007Interim Update
Load Response Survey
![Page 2: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/2.jpg)
Interim UpdateSept. 28, 2007 2
Background
• PUC Subst. Rule §25.505(e)(5):– Load serving entities (LSEs) shall provide ERCOT with complete
information on load response capabilities that are self-arranged or pursuant to bilateral agreements between LSEs and their customers.
• ERCOT Staff, with help from DSWG, developed questions for the initial survey in Spring 2007
• Questionnaire was sent to all ERCOT LSEs via Market Notice on June 1, 2007– Online platform Survey Monkey
• Deadline for returning surveys was June 30, 2007
![Page 3: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/3.jpg)
Interim UpdateSept. 28, 2007 3
Responses
• A total of 267 LSEs received the survey– Competitive Retailers and Non-Opt In Entities– Includes all LSEs registered in the ERCOT system (unique
DUNS numbers)• Some parent companies have multiple DUNS
• Tally to date:– Surveys received or inactive status confirmed for 259 of the LSE
DUNS– 8 still outstanding
• LSE numbers in this report refer to parent companies
• Vast majority of total ERCOT load is accounted for
![Page 4: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/4.jpg)
Interim UpdateSept. 28, 2007 4
Additional Notes….
• Survey is a snapshot in time in an evolving market
• ERCOT intends to re-issue the survey annually– Lessons learned can be applied– New load response products will emerge
• These results are preliminary– Will be updated when all LSEs are accounted for– Have not been scrubbed for anomalies and inconsistencies
• Accuracy was the goal, but in some cases best estimates were used
WARNING
![Page 5: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/5.jpg)
Interim UpdateSept. 28, 2007 5
Types of Programs Surveyed
• Time of Use (TOU) Pricing• Real Time Pricing (RTP)
– ‘MCPE’ price plans• Four Coincident Peak (4CP) Load Shedding• Critical Peak Pricing (CPP)• Direct Load Control (DLC)
• 40 LSEs report some type of load response offering to their customers
![Page 6: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/6.jpg)
Interim UpdateSept. 28, 2007 6
Results: General
• 118 LSEs report serving load to 8.6 million customers
Large C&I11,201
Midsize Commerial
117,872
Small Commerial1,076,440
Residential7,356,182
![Page 7: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/7.jpg)
Interim UpdateSept. 28, 2007 7
Time of Use (TOU) Pricing
• TOU:– Time-differentiated pricing based on schedules known in
advance and recorded on time-of-use meters– Does not apply to seasonal fuel factor-related rate adjustments
• LSEs’ primary factors in decisions to offer TOU:– Additional product offering (74%)– Wholesale cost of electricity (47%)
![Page 8: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/8.jpg)
Interim UpdateSept. 28, 2007 8
Time of Use (TOU) Pricing
• 1,998 TOU customers reported across all categories:
Large C&I563
Residential445
Small Commercial
426
Midsize Commercial
564
![Page 9: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/9.jpg)
Interim UpdateSept. 28, 2007 9
Time of Use (TOU) Pricing
• At least 184 MW* of demand capable of shifting:
* LSEs offering TOU to small commercial and residential customers were reluctant to estimate potential MW of load shifting
Large C&I117
Midsize Commercial
66
Small Commercial1
![Page 10: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/10.jpg)
Interim UpdateSept. 28, 2007 10
Real-Time Pricing (RTP or MCPE)
• RTP:– Retail prices that change continuously based on the ERCOT
Market Clearing Price of Energy (MCPE) or other real-time wholesale price indicator
• 12,258 total customers reported on RTP Plans:
Residential607Large C&I
830
Small Commercial
3422
Midsize Commercial
7399
![Page 11: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/11.jpg)
Interim UpdateSept. 28, 2007 11
Real-Time Pricing (RTP or MCPE)
• 4,074 MW of combined peak demand for customers on RTP Plans:
Large C&I2654 Midsize Commercial
1325
Residential11
Small Commercial85
![Page 12: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/12.jpg)
Interim UpdateSept. 28, 2007 12
Real-Time Pricing (RTP or MCPE)
• 431 MW of total curtailable load on RTP plans:
69% of responding LSEs reported that load-shedding is manually activated (not automated)
Midsize Commercial
11Small Commercial
10
Large C&I410
![Page 13: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/13.jpg)
Interim UpdateSept. 28, 2007 13
Real-Time Pricing (RTP or MCPE)
• MW of curtailable load on RTP plans by strike price:
All RTP plans are reported ‘voluntary’ – no other incentive or penalty applies beyond exposure to high prices
0
20
40
60
80
100
120
140
160
180
<$300
$301-$400
$401-$500
$501-$600
$601-$700
$701-$800
$801-$900
$901-$1,000
>$1,000
![Page 14: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/14.jpg)
Interim UpdateSept. 28, 2007 14
Real-Time Pricing (RTP or MCPE)
• RTP concerns cited by LSEs & customers (in order of frequency):
1. Insufficient prior notice of price • 58% of respondents said 8-10 minutes notice is insufficient
• 21% said it is sufficient
2. Lack of price certainty (post-mitigation)
3. Unpredictability of high-price periods – Other comments:
• 1 hour+ pricing duration is a necessary incentive to shed load
• Profiled (non-IDR) loads cannot benefit
• Day Ahead market needed
• ‘At least one hour, preferably day-ahead’ advance notice needed
• Subscription service for electronic notification of high prices would help
![Page 15: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/15.jpg)
Interim UpdateSept. 28, 2007 15
Real-Time Pricing (RTP or MCPE)
• Would guaranteed high prices during scarcity or emergency conditions provide more incentive for customers to respond to price?– 32% Yes– 37% No– 32% N/A
![Page 16: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/16.jpg)
Interim UpdateSept. 28, 2007 16
Four Coincident Peak (4CP) Load Shedding
• 4CP:– Interval-metered (IDR) customers’ transmission rates are based
on their consumption during the ERCOT system peak intervals in June, July, August & September
• Shedding load during 4CP intervals can reduce future transmission charges by up to $20,000 per MW/year– Benefits accrue only to customers with IDR meters – IDR is required at 700kW of peak demand– Also applies to NOIE service areas
• Several market products are now available to help customers predict 4CP intervals
• This survey is limited to LSE-based products – Does not extend to 4CP predictor services offered by third party
providers
![Page 17: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/17.jpg)
Interim UpdateSept. 28, 2007 17
Four Coincident Peak (4CP) Load Shedding
• LSEs report 172 subscribed 4CP customers:
Large C&I63
Midsize Commercial
109
![Page 18: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/18.jpg)
Interim UpdateSept. 28, 2007 18
Four Coincident Peak (4CP) Load Shedding
• These 172 customers have a reported 484 MW of peak demand
Midsize Commercial
20
Large C&I464
![Page 19: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/19.jpg)
Interim UpdateSept. 28, 2007 19
Four Coincident Peak (4CP) Load Shedding
• These customers have the capability of shedding a reported 223 MW of peak load:
Large C&I205
Midsize Commercial
17
![Page 20: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/20.jpg)
Interim UpdateSept. 28, 2007 20
Critical Peak Pricing (CPP)
• CPP:– Special, typically very high prices communicated to customers a
limited number of times per year as incentives for them to reduce their load
• Questions sought information on individual customers who curtail load voluntarily in response to prices
• Not applicable to group load curtailment or mass market direct load control programs
• LSEs report:– Total of 20 Large C&I customers on CPP products– Combined peak demand of 341 MW– Curtailable load of 91 MW at various $ trigger points
![Page 21: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/21.jpg)
Interim UpdateSept. 28, 2007 21
Direct Load Control (DLC)
• DLC:– Programs in which customers agree to allow their load to be
remotely curtailed by another party (LSE, TDSP or other third party) under defined circumstances.
– Also called Group Load Curtailment programs – Typically, groups of like customers whose load is aggregated to
achieve a particular load reduction goal. – Key element: Customers’ load is curtailed remotely by another
party and not by the customers themselves
![Page 22: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/22.jpg)
Interim UpdateSept. 28, 2007 22
Direct Load Control (DLC)
• 73,120 DLC subscribers reported across all customer categories
Midsize Commercial
300
Large C&I107
Small Commercial
5054
Residential67659
![Page 23: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/23.jpg)
Interim UpdateSept. 28, 2007 23
Direct Load Control (DLC)
• DLC subscribers have a reported 119 MW of curtailable load
Sm
all C
om
mercia
l 5
Midsize Commercial
10
Large C&I42
Residential62
![Page 24: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/24.jpg)
Interim UpdateSept. 28, 2007 24
Direct Load Control (DLC)
• DLC technologies in use:– Air conditioner switches– Water heater switches– Smart thermostats– Light dimmer controls– Under-frequency relay switches
• DLC incentives provided:– Financial (lower prices, one-time bonus or credit)– Free technology
![Page 25: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/25.jpg)
Interim UpdateSept. 28, 2007 25
Feedback on EILS
• 21 LSEs report current or future interest in participating in Emergency Interruptible Load Service (EILS)
• Reasons cited for inability to subscribe program to date (in order of frequency from 91 LSE responses):– Not enough time to put technology in place (32%)– Not enough time to develop contracts/legal agreements (26%)– Not enough time to market the program (25%)– Insufficient financial incentive (24%)– Long-term uncertainty (17%)– Prospects already committed to other programs (15%)
• Other drawbacks cited:– 500 MW minimum threshold for program is too high– Prefer electronic notification to verbal dispatch– Not open to residential customers
![Page 26: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/26.jpg)
Interim UpdateSept. 28, 2007 26
Miscellaneous
• 29 LSEs report they are planning to introduce new load reduction programs to their customers
• Most popular:– RTP/MCPE 44%– TOU 44%– Other 41%– 4CP 18%– DLC 18%– CPP 12%
![Page 27: Sept. 28, 2007 Interim Update Load Response Survey.](https://reader036.fdocuments.in/reader036/viewer/2022062409/5697c0051a28abf838cc4bdf/html5/thumbnails/27.jpg)
Interim UpdateSept. 28, 2007 27
Next Steps
• All LSEs will be accounted for• Results will be reviewed for anomalies and inconsistencies• Results will be shared internally within ERCOT, with potential
value for:– Long-term load forecasting– Mid-term load forecasting– Grid operations– Market operations support – Commercial operations & data aggregation
• Results will be communicated to PUC and IMM