04/19/23 393SYS 1
Quality Management Tools
04/19/23 393SYS 2
1 Modern Quality Management
Modern quality management requires customer satisfaction prefers prevention to inspection recognizes management responsibility for quality
Noteworthy quality experts include Deming, Juran, Crosby, Ishikawa, Taguchi, and Feigenbaum
Quality; Who’s who
04/19/23 393SYS 3
Quality Experts
Deming was famous for his work in rebuilding Japan and his 14 points
Juran wrote the Quality Control Handbook and 10 steps to quality improvement
Crosby wrote Quality is Free and suggested that organizations strive for zero defects
Ishikawa developed the concept of quality circles and using fishbone diagrams
Taguchi developed methods for optimizing the process of engineering experimentation
Feigenbaum developed the concept of total quality control
04/19/23 393SYS 4
Fishbone or Ishikawa Diagram
04/19/23 393SYS 5
Malcolm Baldrige Award and ISO 9000
The Malcolm Baldrige Quality Award was started in 1987 to recognize companies with world-class quality
ISO 9000 provides minimum requirements for an organization to meet their quality certification standards
HKMA Quality Award
http://www.hkma.org.hk/qa/award.htm
04/19/23 393SYS 6
2. Quality Planning
It is important to design in quality and communicate important factors that directly contribute to meeting the customer’s requirements
Design of experiments helps identify which variables have the most influence on the overall outcome of a process
Many scope aspects of IT projects affect quality like functionality, features, system outputs, performance, reliability, and maintainability
04/19/23 393SYS 7
Quality Assurance
Quality assurance includes all the activities related to satisfying the relevant quality standards for a project
Another goal of quality assurance is continuous quality improvement
Benchmarking can be used to generate ideas for quality improvements
Quality audits help identify lessons learned that can improve performance on current or future projects
04/19/23 393SYS 8
Quality Control What it is:
*** The main outputs of quality control are
acceptance decisions rework process adjustments
Some tools and techniques include pareto analysis statistical sampling quality control charts testing
04/19/23 393SYS 9
3. Pareto Analysis
Pareto analysis involves identifying the vital few contributors that account for the most quality problems in a system
Also called the 80-20 rule, meaning that 80% of problems are often due to 20% of the causes. It is the fundamental postulates underlie the rational for the Statistical SW Quality Assurance.
Pareto diagrams are histograms that help identify and prioritize problem areas.
04/19/23 393SYS 10
80% of the contribution comes from 20% of the contributors:- 80% of the engineering is consumed by 20% of
the requirements 80% of the software cost is consumed by 20% of
the components 80% of the errors are caused by 20% of the
components 80% of software scrap and rework is caused by
20% of the errors 80% of the progress is made by 20% of the
people. …
04/19/23 393SYS 11
Sample Pareto Diagram
04/19/23 393SYS 12
Statistical SQA
SQA & Traceability as example on SQA & FTR notes L14
p209, Pressman.
04/19/23 393SYS 13
Statistical Sampling and Standard Deviation
Statistical sampling involves choosing part of a population of interest for inspection
The size of a sample depends on how representative you want the sample to be
Sample size formula:
Sample size = .25 X (certainty Factor/acceptable error)2
04/19/23 393SYS 14
Commonly Used Certainty Factors
Desired Certainty Certainty Factor
95% 1.960
90% 1.645
80% 1.281
95% certainty: Sample size = 0.25 X (1.960/.05)2 = 38490% certainty: Sample size = 0.25 X (1.645/.10)2= 6880% certainty: Sample size = 0.25 X (1.281/.20)2 = 10
04/19/23 393SYS 15
Standard Deviation
Standard deviation measures how much variation exists in a distribution of data
A small standard deviation means that data cluster closely around the middle of a distribution and there is little variability among the data
A normal distribution is a bell-shaped curve that is symmetrical about the mean or average value of a population
04/19/23 393SYS 16
Normal Distribution and Standard Deviation
04/19/23 393SYS 17
Sigma and Defective UnitsSpecification Range
(in +/- Sigmas)
Percent ofPopulation
Within Range
Defective Units
Per Billion
1 68.27 317,300,000
2 95.45 45,400,000
3 99.73 2,700,000
4 99.9937 63,000
5 99.999943 57
6 99.9999998 2
04/19/23 393SYS 18
Quality Control Charts and the Seven Run Rule A control chart is a graphic display of data that
illustrates the results of a process over time. It helps prevent defects and allows you to determine whether a process is in control or out of control
The seven run rule states that if seven data points in a row are all below the mean, above the mean, or increasing or decreasing, then the process needs to be examined for non-random problems
04/19/23 393SYS 19
Control Chart of 12” ruler
04/19/23 393SYS 20
Control Chart contiu.
The output of a production process will fluctuate. The causes of fluctuation can just be random or non-random due to desirable/undesirable process change. Control charts graph and measure process data against control limits. Control charts can distinguish the random variation from assignable causes or non-random causes.
We cannot adjust random variation out of a process. Process adjustments for random variation are neither necessary nor desirable. This is over-adjustment or tempering, and it makes the process worse.
We can and must investigate assignable causes (or non-random causes). Points outside the control limits are evidence of process problems. Analyst must investigate every out of control point for an assignable cause. They must record their findings and any corrective actions. For example, a tool adjustment, or change in Formal Technical Review format or worn tooling, may correct the problem.
04/19/23 393SYS 21
Pattern analyzing of Control Chart 7-Run rule
7-run-rule is used to filter out the random variation in a production process. shows the ‘trends’ that are caused by the ‘assignable causes’ or non-random causes that required investigation and possible corrective action to be taken.
7-run-rule pattern: seven points above mean value; seven points below mean value; seven points or all increasing ; or seven points all decreasingthe patterns are indicators of non-random problems which
can be symptom of process out of control.
04/19/23 393SYS 22
To develop a Control Chart to determine project
stability
Plot individual metric values on a chart. Compute the mean value for the metrics value and
plot the line. Plot the Upper Control Limit and Lower Control
Limit. Compute a standard deviation as (Upper-control-
limit - mean)/3. Plot lines one and two standard deviation above and below Am. If any of the standard deviation lines is less than 0.0, it need not be plotted unless the metric being evaluated takes on values that are less than 0.0.
The Std Dev.# is then plotted on the control chart.
04/19/23 393SYS 23
Statistical Testing
Statistical testing is a system testing process in which the objective is to measure the reliability of a system rather than to discover faults. Statistical testing can be combined with reliability growth modeling. Predictions of the final system reliability and when that will be achieved can be made. As failures are discovered, the underlying faults causing these failures are repaired so that the reliability of the system can improve in the course of the testing processA lot of airlines manage dispatch reliability with statistical testing approach.
04/19/23 393SYS 24
The Cost of Quality
The cost of quality is the cost of conformance or delivering products
that meet requirements and fitness for use the cost of nonconformance or taking
responsibility for failures or not meeting quality expectations
04/19/23 393SYS 25
Total Quality Cost
Price of nonconformance PONC Price of Conformance (POC)
peer walkthroughs, inspections development & impl. QMS, standards, training setting up & running of quality program
Cost of Quality (COQ) = POC + PONC
04/19/23 393SYS 26
Costs Per Hour of Downtime Caused by Software Defects
Business Cost per Hour Downtime
Automated teller machines (medium-sized bank) $14,500
Package shipping service $28,250
Telephone ticket sales $69,000
Catalog sales center $90,000
Airline reservation center (small airline) $89,500
04/19/23 393SYS 27
Five Cost Categories Related to Quality
Prevention cost: the cost of planning and executing a project so it is error-free or within an acceptable error range
Appraisal cost: the cost of evaluating processes and their outputs to ensure quality
Internal failure cost: cost incurred to correct an identified defect before the customer receives the product
External failure cost: cost that relates to all errors not detected and corrected before delivery to the customer
Measurement and test equipment costs: capital cost of equipment used to perform prevention and appraisal activities
04/19/23 393SYS 28
Organization Influences, Workplace Factors, and Quality Study by DeMarco and Lister showed that organizational
issues had a much greater influence on programmer productivity than the technical environment or programming languages
Programmer productivity varied by a factor of one to ten across organizations, but only by 21% within the same organization
Study found no correlation between productivity and programming language, years of experience, or salary
A dedicated workspace and a quiet work environment were key factors to improving programmer productivity