Planogram Excellence Program Namir Hakem
Department of industrial Engineering
Senior Design / BS / MS Project may - 2020
Abstract
The production of service sector industries is very important in such a competitive environment. There are some important parameters that effect the production rate such as waiting time, delays and machine utilization etc. In this study, we reduce the delays in Planogram Excellence program and increases the productivity of this services.
IntroductionIncreasing productivity is the important issue in all manufacturer companies and service sector industries. There are several factors that affect the productivity and by focusing on these factors will increase efficiency of production. In our case the main problem in Planogram Excellence Program is handling the materials at the working areas, and saving time of handling mean save time of resources and lead to have more productivity and customer satisfaction.
Simulation Simulation model give us clear figure of how the work done and by changing elements in model will affect results. In addition, changing in simulation model will not affect the real work at store and solutions applied will help managers to take actions to increase the production based on results of this simulation..
Methods | Design | Analysis
Results
As waiting time at each zone scanning machine is shown in figure. It is clearly
displayed that waiting time at zone three machine is much larger than other machine
.
References
ConclusionDelays at scanning machine at zone three is large as compare to other scanning machine. So a suggestion was made to increase the number of workers at that station. The effect of this improvement is shown below
▪ Waiting time of the zone reduces from 44 minutes to 16 minutes
▪ ARENA simulation software is helpful tool to analysis the current
system and find out the ways to increase the productivity.
Lau, H. Y., & Woo, S. O. (2008). An agent-based dynamic routing strategy for automated material handling systems. International Journal of Computer Integrated Manufacturing, 21(3), 269 288.https://doi.org/10.1080/09511920701241624
Taghaboni-Dutta, F., & Tanchoco, J. M. A. (1995). Comparison of dynamic routeing techniques for automated guided vehicle system. International Journal of Production Research, 33(10), 2653-2669. https://doi.org/10.1080/00207549508945352
Put pictures, illustrations, figures, or diagrams here. Make sure they communicate the important aspects of the project and/or key principles you want your
audience to know.
Acknowledgments
I am deeply grateful to American office supply company retailing company headquarter, for their guidance, assistance and technical support throughout this project. I am also very thankful to all faculty and staff members for their support and in office Boca Ration, Florida
Put CAD drawings and photographs here. Keep the text to a minimum but make sure
things are clearly labeled.
Develop a simulation model which focus in materials handling between empty shelf spaces on their sales floor and other stations.
▪ The system to be modeled consists of part arrivals called products from trucks after
scanning and assume parts arrive directly as finished parts.
Wai$ng$me
0
12.5
25
37.5
50
ZoneoneMachine zonethreeMachine zonefivemachine
CurrentcasemodelWai$ng$me(mint) ImprovedmodelWai$ng$me(mint)
Physical Inventory control process flow chart
Order arrive
POG excellence scan before closing Key Record Truck after closing
Fullfil PM processing criteria ?
Short and stock freight
Work Fill report
Work POG excellence Batch
Print and work POG excellence
Clean and Reset Reveibing for tomarrow
Order out
YESNo