Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4...
Transcript of Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4...
![Page 1: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/1.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Baruch College
17 Lex Field Building Renovation, Phase IA Construction $109,756 $109,756 2020
Energy and Controls (Phase I Upgrades) Construction $13,805 $13,805 2018
ITB Student Computer Lab Rehab Construction $2,576 $1,792 2017
NVC Performing Arts Center (BPAC) Accessibility + Terrazzo Construction $2,466 $1,713 2018
17 Lex Ave FA Upgrade Construction $1,300 $1,300 2018
North Campus Exterior Lighting Construction $709 $709 2017
NVC FA Panel Upgrade (Admin Building FA) Construction $610 $578 2018
Admin Bldg Sidewalk Replacement Construction $300 $237 2018
Repair Damage from 26th st water main Break Construction $103 $103 2017$131,625 $129,993Sub-Total
25th Street Plaza Bid $2,700 $6,000 2019
Admin Bldg ADA Bid $2,700 $2,600 2019
ITB Skylight Panel Replacement Bid $2,350 $2,325 2018
NVC Atrium Doors Hardware Bid $226 $209 2018$7,976 $11,134Sub-Total
NVC & ITB Window Washing Equip and Flooring Design $4,150 $3,368 2018
ITB Roof Replacement Design $3,350 $3,229 2019
ITB Elevator Modernization Design $2,544 $9,778 2019
17 Lex Mason Hall Water Damage Design $1,000 $961 2018
Admin Bldg Water Tank Replacement Design $969 $969 2018
Campus Wide Door Replacement Design $832 $832 2019
Admin Bldg Window Replacment Design $510 $6,985 2018
NVC - Steam Condensate Receiver Tank Design $350 $350 2019
NVC / ITB Replace RPZ valves Design $275 $215 2018$13,980 $26,687Sub-Total
ITB Cooling Towers 4 & 5 Pre-Design $758 $758 2020$758 $758Sub-Total
23 $154,339Project Count and Funding Total $168,572
11/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 2: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/2.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Brooklyn College
(Tow) Performing Arts Center Construction $100,500 $100,500 2018
Ingersoll Reno Lab/Vent System Construction $42,000 $42,000 2019
Fire Alarm & Security Project Construction $16,376 $16,376 2018
ADA Upgrades (Multiple Lecture Halls) Construction $12,097 $12,097 2018
Whitman Hall - Reconstruction of Ramps and Interiors Construction $10,271 $10,271 2018
2020: Vessel Construction $3,000 $3,000 2017
Whitehead Window Replacement Construction $3,000 $3,000 2018
Whitman Hall Parapets & Roof Construction $1,216 $1,216 2018
James Hall Concrete Cornice Construction $914 $914 2018
Boylan Ansul System Construction $200 $175 2018$189,574 $189,549Sub-Total
Drain and Paving Repair Bid $883 $883 2018$883 $883Sub-Total
Roosevelt Science Building (New Building) Design $132,000 $377,000 2025
2020: AREAC labs Design $2,500 $3,400 2019
Ingersoll Hall Extension Roof Replacement Design $2,011 $3,611 2019
2020: Resiliency Center @ Jamaica Bay Design $2,000 $32,000
Meat Market (Roosevelt Science building) Design $1,200 $1,200 2018
Lab Reno - Ingersoll Hall Geology Lab Design $1,200 $1,200 2019
Aquatics Lab Renovation Design $1,100 $1,100 2018
Campus-wide Fire Protection Design $1,000 $1,200 2018
Chiller Plant Design $800 $3,100 2018
West Quad Air Distribution Design $750 $750 2018
Ingersoll Hall Pump Replacement Design $500 $500 2019
Campus-Wide Cornice Reconstruction Design $500 $500 2018
Whitehead TV Center (Production Lab) - HVAC Design $330 $330 2018$145,891 $425,891Sub-Total
Boiler Replacement Pre-Design $4,255 $22,000 2023
Fire Alarm Rehabilitation at Roosevelt Hall Pre-Design $0 $2,300 2019$4,255 $24,300Sub-Total
Steiner Studios - Equipment for Graduate Film School of Cinema Equipment Purchase
$1,000 $1,000 2018
$1,000 $1,000Sub-Total
27 $341,603Project Count and Funding Total $641,623
21/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 3: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/3.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
City College
Marshak Science Bldg (HVAC Ph. II & IIIA-C) Construction $71,838 $71,838 2019
NAC Central Chiller Upgrade Construction $33,796 $33,796 2018
NAC Central Plant, Ph 2A and 2B Construction $25,298 $25,298 2018
Shepard Hall Ph 11 & 12 Construction $22,845 $22,845 2017
Steinman/Shepard Elevator Construction $12,100 $12,100 2019
Sophie Davis Interiors (Medical School) Construction $10,250 $10,250 2017
Daycare Center Renovation Construction $7,958 $7,958 2018
NAC Controls Replacement Construction $4,000 $12,000 2019
Shepard Hall Room 350 Renovation Construction $2,800 $2,800 2017
NAC Lib. Active Learning Center Construction $1,124 $1,124 2017
Steinman Hall First Floor Parapet Wall Construction $920 $920 2018
ASRC Interior Renovations Construction $0* $5,000 2019$192,929 $205,929Sub-Total
Library WHCR Cooling Syst Bid $9,200 $9,200 2019
Baskerville Hall Student Clubs and Lecture Hall Bid $5,300 $6,458 2019$14,500 $15,658Sub-Total
Steinman Hall HVAC Design $15,246 $24,000 2019
Marshak Pool and Locker Room Renovation Design $14,000 $14,000 2019
Marshak Plaza Replacement Design $6,137 $23,500 2020
Marshak-Hall-Steinman IT Modernization Design $6,007 $6,007 2019
Campus-Wide Accessibility Design $3,753 $7,253 2019
Firehouse -MFA Renovation Design $3,285 $6,000 2019
Marshak Emergency Generator Design $2,445 $2,445 2019
Lab Reno 2014 (Marshak 503/504, 507/511) Design $2,400 $2,400 2019
Spitzer Fabrication Lab Design $1,000 $1,000 2018
Shepard Hall Rm 15 Design $500 $500 2018
Aronow Theater Renovation Design $339 $4,000 2020
NAC Culinary Art Design $300 $1,500 2019
Wingate Locker Room Project Design $130 $1,100 2019
Shepard Music Library Roof Replacement Design $50 $500 2019$55,592 $94,205Sub-Total
Pre-Design $350 $3,000 2019
Pre-Design $350 $8,000 2020
Pre-Design $350 $350 TBD
Pre-Design $347 $347 TBD
ASRC/CDI Retrocommissioning
Aaron Davis Hall ADA Upgrade and Theater Renovation Shepard 51 Smart Classroom Project
NAC Hurricane Sandy Repairs
NAC Escalators
*Funded through another project.
Pre-Design $300 $2,000 TBD$1,697 $13,697Sub-Total
33 $264,718Project Count and Funding Total $329,489
31/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 4: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/4.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
College of Staten Island
2M Renovation Construction $19,048 $19,048 2018
Campus Roadway Reconstruction Construction $9,047 $9,047 2018
Site Hardscape Reconstruction Phase 1 Construction $7,652 $7,652 2018
2M Renovation Phase 3 Construction $5,000 $5,000 2018
Oil Tank Replacement at Central Plant Building 1M Construction $4,400 $4,400 2018
6S Chemical Waste Construction $2,900 $2,900 2018
1R Pool Dehumidification and Water Filtration System Construction $2,818 $2,818 2019$50,865 $50,865Sub-Total
IHPCC Electrical Substation Upgrade Design $39,000 $35,000 2020
Interdisciplinary High Performance Computational Center Design $39,000 $274,000 TBD
2020: Big Data Design $7,600 $7,600 2019
1M Cental Htg & Cooling Design $2,660 $2,660 2019
Soccer field improvements Design $1,500 $1,500 2018
Campus-wide Emergency Generator/automatic transfer switch Design $1,050 $1,050 2019
New Garage for vehicle storage Design $700 $700 2019
Media Culture Screening room renovation Design $510 $550 2019$92,020 $323,060Sub-Total
15 $142,885Project Count and Funding Total $373,925
41/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 5: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/5.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
CUNY Law
Trial Courtroom Pre-Design $1,250 $1,250 2019$1,250 $1,250Sub-Total
Omnia-Media Technology System Equipment Purchase
$0 $1,548 2019
$0 $1,548Sub-Total
2 $1,250Project Count and Funding Total $2,798
51/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 6: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/6.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
CUNY-Wide Senior
CUNY Data Center Ph. 2 Construction $32,621 $32,621 2018
Water Treatment Pro Construction $2,900 $2,900 2025$35,521 $35,521Sub-Total
Sub-metering: EO-88 Senior Colleges Design $8,988 $8,988 2021
Boiler Reconstruction (CUNY Managed) Design $6,700 $6,700 2025
Boiler Diagnostics Program Design $4,925 $4,925 2022
Solid State Lighting Project Design $4,450 $4,450 2019
Emergency Façade Repair Queens and CCNY Design $3,980 $3,980 2020
PA CCNY, Queens Design $3,300 $3,300 2018
Energy & Greenhouse Design $3,090 $3,090 2025
LL 87/EO 88 Compliance Design $1,685 $1,685 2018
PA Permits Design $1,502 $1,502 2020
Local Law 11 Cycle 8 Design $864 $864 2020$39,484 $39,484Sub-Total
12 $75,005Project Count and Funding Total $75,005
61/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 7: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/7.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Graduate Center
Elevator Upgrade Project Construction $3,418 $3,418 2018
Security System Upgrade Construction $1,007 $1,007 2017$4,425 $4,425Sub-Total
Ninth Floor Renovation Design $5,530 $5,530 2019
2020: Big Data Design $4,260 $4,260 2019
VFD Cooling Tower Upgrade Design $2,000 $2,000 2018
Bathroom Upgrades Design $1,000 $1,500 2018$12,790 $13,290Sub-Total
Library Upgrades Pre-Design $500 $500 TBD$500 $500Sub-Total
7 $17,715Project Count and Funding Total $18,215
71/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 8: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/8.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Hunter College
North Bldg Roof Construction $8,290 $8,290 2019
North Bldg Elevator Upgrade Construction $6,050 $6,050 2019
Lab Renovations 2014 Construction $5,701 $5,701 2018
North Bldg Boiler Plant Construction $4,551 $4,551 2017
Thomas Hunter Hall 2nd floor Student Union Construction $3,289 $3,300 2019
East Bldg 8th Fl Roof Construction $1,839 $1,839 2018
East Bldg. Leak Construction $420 $420 2018
East/West Bldg. Sump Pumps Construction $350 $350 2018$30,490 $30,501Sub-Total
West Bldg. Plaza Design $2,258 $2,258 2019
Cooperman/Baker Walkway Design $1,245 $1,245 2019
Kaye Playhouse Entrance Design $1,176 $1,176 2019
North and West Bldg. Acid Neutralization Design $650 $650 2019
North Bldg. Stairwell Doors Design $537 $537 2019
West 8th floor Terrace Fence Design $400 $400 2019
West Bldg. Hot Water Heaters Replacement Design $300 $300 2019$6,566 $6,566Sub-Total
Thomas Hunter HVAC Pre-Design $8,700 $17,000 2020
MFA Visual&Perform Arts, Ph1 Pre-Design $6,000 $6,000 2020
Emergency Generator Upgrades Pre-Design $1,000 $1,000 2019
North Bldg. Facade and Window Replacement Pre-Design $1,000 $1,000 2020
Various Mechanical Work in the North Bldg. Pre-Design $750 $750 2018
Kaye Playhouse Dehumidification and HVAC Upgrades Pre-Design $400 $400 2020
THH Bathroom Upgrades Pre-Design $300 $300$18,150 $26,450Sub-Total
Roosevelt House HVAC Upgrade Equipment Purchase
$499 $499 2019
North Bldg.Gas Detection Equipment Purchase
$70 $110 2018
$569 $609Sub-Total
24 $55,775Project Count and Funding Total $64,126
81/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 9: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/9.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
John Jay College of Criminal Justice
Haaren Hall Façade Restoration Project Construction $15,238 $15,800 2019
Haaren Hall – Swimming Pool/ Natatorium Rehabilitation Construction $8,300 $8,500 2019
ADA Upgrades Construction $850 $650 2018
New Building Vending Alcove Conversion Construction $250 $250 2018
Haaren Hall Library Rehabilitation Construction $215 $550 2018$24,853 $25,750Sub-Total
Haaren Hall Toilet Renovation Design $4,000 $4,200 2019
Haaren Athletic Facility Design $3,700 $4,800 2021
Haare Hall Lighting Upgrades Design $2,193 $0 2019
Campus Door Upgrages Design $1,000 $0 2019
PH II Retro-Commissioning Design $450 $150 2017$11,343 $9,150Sub-Total
Library Renovation Pre-Design $10,913 $50,000 2021$10,913 $50,000Sub-Total
11 $47,109Project Count and Funding Total $84,900
91/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 10: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/10.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Lehman College
Utilities Plant Expansion Construction $42,000 $42,000 2017
Fire Alarm/Security Construction $21,870 $21,870 2011
Concert Hall Addition and ADA Construction $15,316 $15,316 2019
APEX Bird Proofing Construction $7,742 $7,000 2018
Bookstore Relocation Construction $4,252 $4,252 2019
Gillet & Davis Halls Façade Renovation Construction $3,963 $3,500 2017
Elevator Upgrade Ph II (APEX, Old Gym, Fine Arts, Music) Construction $2,850 $2,500 2017
Old Gym Roofs Construction $1,300 $1,000 2018
Standpipe Inspection Construction $500 $500 2018$99,793 $97,938Sub-Total
College Labs Round III Bid $6,927 $6,927 2019$6,927 $6,927Sub-Total
Nursing Education, Research and Practice Center Design $53,150 $61,000 2021
Library Ventilation and Renovation Design $17,900 $17,900 2019
Oil Tank Room and Music Plaza Renovation Design $11,000 $11,000 2019
Dept. Social Work Design $4,811 $4,811 2020
Teaching and Learning Commons Design $3,670 $4,500 2020
Emergency Power Network Design $2,836 $3,000 2020
S&T Amphitheater Design $2,762 $3,000 2019
Lovinger Theater ADA Design $2,504 $2,504 2020
Music Building Chimney Design $1,500 $1,500 2019
Shuster Hall and Fine Arts Envelope Design $1,013 $6,000 2022
Science Hall Greenhouse Truss Replacement Design $928 $0 2018
Hub Rooms HVAC Design $750 $750 2019
Library Windows Replace Design $700 $550 2018
2020: New Media Job Incubator Design $30 $1,700 2019$103,554 $118,215Sub-Total
24 $210,274Project Count and Funding Total $223,080
101/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 11: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/11.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Macaulay Honors College
Replace HVAC Construction $4,400 $4,216 2018$4,400 $4,216Sub-Total
Server Room HVAC Upgrade Design $605 $450 2019
2020: New Media Jobs Incubator Design $30 $5,500 2020$635 $5,950Sub-Total
Fire Alarm Replacement Pre-Design $412 $412 2018$412 $412Sub-Total
4 $5,447Project Count and Funding Total $10,578
111/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 12: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/12.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Medgar Evers College
AB1 + Bedford Heating Cooling Cross Connection Construction $19,000 $17,305 2018
Campus Wide Security Upgrade Construction $2,496 $2,764 2018
Carroll St. Façade Repairs & Site Work, Ph II Construction $1,325 $1,035 2018$22,821 $21,104Sub-Total
Bedford Building - Lobby Reconstructions Bid $5,391 $7,400 2019$5,391 $7,400Sub-Total
Carroll St. Building Egress and ADA Design $8,000 $8,000 2019
Carroll St. Athletic Cntr Upgrades & ADA Bathrooms Design $7,435 $7,435 2019
Bedford Avenue Building- Site Reconstruction Site Work. Design $6,800 $5,200 2018
Carroll St. Fire Alarm and Egress Design $3,280 $1,369 2018
Carroll Street Building Energy Upgrade Phase 1 Design $2,750 $34,000 2018
AB1 SSB Energy Reconstruction Project Design $1,000 $700 2019
Bedford Building Roofing Reconstruction Design $300 $2,200 2019$29,565 $58,904Sub-Total
Master Plan Pre-Design $300 $300 2017$300 $300Sub-Total
12 $58,077Project Count and Funding Total $87,708
121/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 13: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/13.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
New York City College of Technology
Academic Bldg. 1 Construction $410,000 $410,000 2018
Allied Health (Pearl St) 1st Fl Reno Construction $14,252 $15,852 2018
Voorhees Hall Interior Reno & Exterior Site Improvements Construction $3,900 $3,900 2018
Campus-wide Roof and Plaza Replacement Construction $3,856 $3,830 2018
Misc. Campus-wide MEP Upgrades Construction $780 $575 2018$432,788 $434,157Sub-Total
Installation of Permanent Piping for Temp. Boilers in Namm Hall Bid $475 $1,200 2018$475 $1,200Sub-Total
Voorhees MEP Upgrade Design $24,200 $28,900 2018
Namm Hall Vestibule Renovation Design $6,250 $6,089 2019
Campus-wide Elevator Modernization Design $4,100 $4,100 2019
Replace 5 Existing Air Units Design $3,950 $3,700 2018
Namm Hall Loading Dock Renovations Design $3,427 $2,465 2019
Lab Renovations (Namm & E Bldg) Design $475 $2,500 2018$42,402 $47,754Sub-Total
Namm Hall Replacement of Cooling Systems in Server Rooms Pre-Design $1,250 $1,250 2019
Allied Health Building Renovations Pre-Design $1,185 $1,185 2018
Allied Health Building Electrical Upgrades Pre-Design $313 $49 2019
Voorhees Hall 3rd Floor Renovation Pre-Design $275 $15,000 2018$3,023 $17,484Sub-Total
16 $478,688Project Count and Funding Total $500,595
131/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 14: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/14.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Queens College
Campus Chiller Plant, Phase I Construction $31,811 $29,350 2018
Louis Armstrong Education Center Construction $23,900 $25,000 2019
Kiely Hall Energy Reconstruction, Phase I Construction $15,539 $15,500 2018$71,250 $69,850Sub-Total
Gym Roof Replacement Bid $12,075 $12,000 2020
Storm Damage Restoration (Kupferberg Roof Railings) Bid $650 $650 2018$12,725 $12,650Sub-Total
Central Chiller Plant Phase 2 Design $11,780 $23,240 2019
Steamline Distribution Reconstruction Design $6,317 $5,383 2019
Boiler Plant Reconstruction Phase 1 Design $5,000 $5,000 2019
Campus Wide Fire Alarm Project Ph 2 Design $5,000 $22,000 2022
Powdermaker Hall Lighting Upgrade Design $4,450 $4,450 2021
Gertz Hall Speech Hearing Learning Design $4,390 $4,390 2019
Razran Lab Renovations (Razran 4 Labs) Design $4,265 $4,265 2019
Local Law 11: Kiely and Rosenthal Design $3,100 $3,083 2019
Sci Labs 2015 (Avella) Renovation Design $2,000 $2,000 2019
Outdoor Athletic Facility Reconstruction Design $1,500 $7,200 2019
Perimeter Sidewalk Reconstruction Design $1,000 $1,000 2019
Perimeter Fence Design $950 $950 2020
CUNY- wide Public Assembly Project Design $671 $671 2019
Gym Sills & Façade Reconstruction Design $480 $1,230 2020
Campuswide Security Camera Project Design $400 $400 2019
Behavioural Neuroscience and Molecular Cellular Design $372 $2,784 2020
IT Bldg/Dining Hall Roofing Reconstruction Design $350 $2,000 2019
Rosenthal Library Renovation, Phase II Design $266 $2,000 2019
Environmental Labs Renovation Design $242 $2,000 2019
Gym Pool Filtration System Reconstruction Design $230 $1,100 2019$52,763 $95,146Sub-Total
One Stop Student Services Center Pre-Design $12,000 $15,200 TBD
ADA Bathroom Upgrade Phase 2 Pre-Design $108 $1,200 2020$12,108 $16,400Sub-Total
27 $148,846Project Count and Funding Total $194,046
141/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 15: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/15.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
School of Professional Studies
31 Street Lobby Expansion Construction $250 $250 2018
IT Center HVAC Modifications Construction $75 $75 2018$325 $325Sub-Total
2 $325Project Count and Funding Total $325
151/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 16: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/16.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
York College
Computer & Multimedia (Faculty Dining Room) Construction $1,883 $1,883 2019
Sci Bldg FA Upgrade Construction $250 $250 2019
Academic Core Water Main Leak Construction $193 $193 2017$2,326 $2,326Sub-Total
Campus Wide Escalators and Elevator Upgrades Bid $14,803 $14,803 2019$14,803 $14,803Sub-Total
Academic Village & Conference Cntr Design $41,000 $287,000
Groundwater Infiltration at Academic Core Design $13,097 $13,097 2018
BMS Controls Upgrade Design $10,731 $10,731 2020
Campus Wide MEP Upgrades Design $8,820 $8,820 2019
PAC Renovations/Upgrade/Improvements Design $7,734 $7,734 2021
Track & Field Upgrade Design $7,225 $12,800 2020
PAC Roof Upgrades and Facade Repairs Design $4,049 $5,000 2020
PAC- Various Interior Upgrades (Design) Design $4,000 $4,000 2021
Chemistry and Biology Lab Renovations Design $3,046 $3,046 2019
Ac Core Lecture Hall Upgrade Design $2,765 $2,765 2020
Ac Core Building Entrance Door Restoration Design $2,000 $2,000 2019
Replacement of Pool Dehumidification Unit Pool Pak Design $1,500 $2,200 2019
Campus Wide A/C IT Closets Design $1,000 $1,000 2019$106,967 $360,193Sub-Total
Ac Core Building Roof Pre-Design $1,000 $1,000 2020
Bathroom Upgrades Pre-Design $500 $500
PAC Passenger Elevator Expansion Pre-Design $500 $1,300 2020
Fuel Oil Tank Pre-Design $400 $0 2018$2,400 $2,800Sub-Total
21 $126,496Project Count and Funding Total $380,122
161/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 17: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/17.jpg)
Phase
Senior Colleges Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
260Senior CollegeProject Count and Funding Total $2,128,552 $3,155,107
171/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 18: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/18.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
BMCC
HVAC and Controls Upgrade Construction $22,095 $22,095 2018
ADA Bathrooms Upgrades Ph. II Construction $16,328 $16,328 2019
Roof Replacement and Photovoltaic Installation Construction $12,000 $12,000 2018
Pool Deck Restoration Construction $11,500 $11,500 2018
Emergency Generator Construction $7,400 $7,400 2018
ADA Bathrooms Upgrades Ph. I Construction $6,300 $16,328 2017
Façade Restoration & Ancillary Exterior Improvements Construction $5,687 $5,687 2018
Gym HVAC Upgrade Construction $3,000 $2,900 2018
Chamber St. Hurricane Sandy - North & South Feeders Construction $2,750 $2,750 2018
West Street Façade Windows Construction $800 $800 2018$87,860 $97,788Sub-Total
Chambers St. Ramp & Plaza Paver Replacement Bid $9,121 $11,900 2019
70 Murray Street, Seond and Third Floor Expansion Bid $0 $0 2018$9,121 $11,900Sub-Total
Student Commons Expansion Design $11,000 $11,000 TBD
Theatres 1, 2 and 3 Upgrades Design $3,042 $3,042 TBD
Battery Interconnect Design $300 $600 2018$14,342 $14,642Sub-Total
Gym LED Lighting Pre-Design $249 $249 2019
Cooling Tower Replacement Pre-Design $0 $3,600 2019$249 $3,849Sub-Total
17 $111,572Project Count and Funding Total $128,179
11/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 19: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/19.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Bronx Community College
Campus Utility Upgrade, Phase IV Distribution Construction $27,000 $27,000 2018
Fire Alarms - Meister GML CPH & New Halls Construction $4,995 $4,995 2018
Alumni Gym Pool Rehabilitation Construction $4,846 $4,113 2018
Havemeyer Roof Construction $2,160 $2,160 2018
New Hall Roof - Upper Roof Replacement Construction $500 $500 2018$39,501 $38,768Sub-Total
Student Center Roof Replacement & Façade Repair Bid $4,900 $5,374 2018
New Hall Data Center Air Conditioning Bid $700 $700 2019
Alumni Gym Bridge Replacement Bid $618 $618 2018
Dominican Veterans Memorial fka Monument Hill Bid $295 $295 2017$6,513 $6,987Sub-Total
Campus Utility Upgrade, Phase V Electric Design $69,632 $69,632 2021
2020: Automotive & Fuel Technology Design $9,000 $9,000 2020
Gould Memorial Library Dome Roof & Oculus Design $5,320 $11,600 2020
Gould Memorial Library Egress Stairs Design $855 $855 2019
Community Hall LL11 Design $250 $1,500 2018
Snow Hall Elevator Design $210 $1,700 2020
Ohio Field Track Restoration Design $150 $2,500 2019
Nichols Hall ADA Entrance Ramp Design $87 $512 2019
Bliss ADA Restrooms & Entrance Ramp Design $80 $680 2019
Alumni Gym Locker Room Restrooms Design $67 $567 2019$85,651 $98,546Sub-Total
New Hall Roof - Plaza & Facade Pre-Design $3,000 $3,000 2020
Loew Hall Accessibility & Elevator Pre-Design $113 $900 2019
Bronx Express, aka Student Success Center Pre-Design $100 $14,170 2021$3,213 $18,070Sub-Total
22 $134,878Project Count and Funding Total $162,371
21/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 20: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/20.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
CUNY-Wide Community
CC Solid State Lighting Pre-Design $528 $528 2025
CUNY LL87 Compliance (Retrocommissioning) Pre-Design $300 $300 2025
Boiler Reconstruction (CUNY Managed) Pre-Design $68 $68 2025
CC Water Treatment Program Pre-Design $0 $0 2025$896 $896Sub-Total
4 $896Project Count and Funding Total $896
31/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 21: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/21.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Guttman Community College
North Hall Condition Assessment and Programming Study Pre-Design $1,898 $1,898 2018$1,898 $1,898Sub-Total
1 $1,898Project Count and Funding Total $1,898
41/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 22: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/22.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Hostos Community College
VFD Installation Construction $2,257 $2,257 2017
Savoy Manor Roof Construction $1,800 $1,800 2017
450 GC FA Upgrade Construction $650 $650 2018$4,707 $4,707Sub-Total
500 GC Window Replacement Bid $6,000 $6,000 2019
500 GC Emergency Generator and Sub-Cellar Renovation Bid $5,900 $5,900 2018$11,900 $11,900Sub-Total
New Allied Health & Science Building Complex Design $2,000 $239,000 TBD
500 GC 3rd Floor Renovation Design $850 $12,000 2019
HVAC Upgrade 475 GC and Admin Bldg Design $800 $2,800 2019
475 GC Replacement of (9) Air Handling Units Design $250 $6,450 2018
300-Ton Chiller Replacement at 475 Grand Concourse Design $245 $3,245 2018
Summer Boiler Design $237 $237 2018$4,382 $263,732Sub-Total
Retaining Wall Pre-Design $30 $2,000 TBD$30 $2,000Sub-Total
12 $21,019Project Count and Funding Total $282,339
51/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 23: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/23.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Hunter College Campus Schools
HVAC & Boiler Upgrade Bid $12,565 $12,565 2019$12,565 $12,565Sub-Total
Athletic Facilities Renovation Design $1,333 $1,629 2019$1,333 $1,629Sub-Total
2 $13,898Project Count and Funding Total $14,194
61/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 24: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/24.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Kingsborough Community College
LED Lighting Conversion Bid $3,369 $6,500 2019
Fire Alarms U & P Building Bid $2,998 $2,998 2018
Student Conference Ctr Bid $2,491 $2,900 2019$8,858 $12,398Sub-Total
T7 Ph 1 Electrical and HVAC Design $3,298 $3,298 2018
Bursar Renovation Design $1,581 $1,581 2019
T4 Roof Replacement Design $1,233 $3,000 2019
KGBCC Performing Arts Design $1,138 $14,900 2019
Storm Sandy HVAC T2,T3,T4 Buildings Design $1,068 $1,368 2019
Marina Rehabilitation Design $600 $9,800 2019
West Academic Cluster Setback Roof Replacement Design $0 $350 2019$8,918 $34,297Sub-Total
Pool Renovation Pre-Design $810 $5,000 2020
Physical Sciences Equipment Pre-Design $0 $227 2019
Library Roof Partial Replacement Pre-Design $0 $1,100 2020
Gas Booster Pump Upgrade Pre-Design $0 $252 2019$810 $6,579Sub-Total
14 $18,586Project Count and Funding Total $53,274
71/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 25: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/25.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
LaGuardia Community College
Center 3 Façade Construction $116,000 $116,000 2018
2020: Goldman Sachs 10,000 Small Businesses Ed Cntr Construction $5,000 $5,000 2018
Building E Fire Alarm Construction $3,461 $3,414 2018$124,461 $124,414Sub-Total
Business, Entrepreneurial & Career Center Design $1,220 $15,074 2021
Library Expansion and Renovation Phase II Design $1,185 $6,000 2020
Boiler & Chiller Centralization Design $650 $8,880 2020
E Building Roof Replacement Design $483 $5,300 2019
Fire Alarm replacement in Shenker Hall Design $0 $4,500 2019$3,538 $39,754Sub-Total
Center 3 Infrastructure Pre-Design $3,172 $30,000 2022$3,172 $30,000Sub-Total
9 $131,171Project Count and Funding Total $194,168
81/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 26: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/26.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
Queensborough Community College
Campus-Wide Electrical Reconstruction Construction $42,100 $37,733 2018
Medical Arts, Science and Admin Bldgs - Roof Replacements Construction $8,900 $7,725 2018$51,000 $45,458Sub-Total
Humanities Building - Performing Arts Center Upgrades Bid $9,500 $9,500 2019
Medical Arts Bldg Sprinkler/Standpipe Bid $2,300 $1,300 2018$11,800 $10,800Sub-Total
Central Plant Chiller Reconstruction - Phase II Design $21,164 $21,164 2018
Cafeteria and Kitchen - Phase II Design $9,500 $9,034 2019
Lab Renovations Design $316 $3,100 2019$30,980 $33,298Sub-Total
Ph II Fire Alarm Pre-Design $2,928 $2,652 2018
W Building- ASAP Expansion Pre-Design $366 $2,990 2019$3,294 $5,642Sub-Total
9 $97,074Project Count and Funding Total $95,198
91/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.
![Page 27: Senior Colleges Active Projects - City University of … › wp-content › uploads › sites › 4 › page...Phase Senior Colleges Active Projects Funded Budget Anticipated Project](https://reader033.fdocuments.in/reader033/viewer/2022052801/5f17810bff5f5d45cd2e0706/html5/thumbnails/27.jpg)
Phase
Community College Active Projects
Funded Budget
Anticipated Project Cost
Anticipated Year of Project
Completion(in thousands)
90 $530,992 $932,517Community Colleges Project Count and Funding Total
101/24/2018 Office of Facilities Planning, Construction and Management
The projects listed in this report are active FPCM projects. Projects recently completed, under consideration, without CPs,on-hold, and projects managed by the campuses are not included in this report.