SEMI Standards

15
Staff Report - SEMICON West 2012 SEMI Standards Staff Report SEMICON Taiwan 2012

description

SEMI Standards. Staff Report SEMICON Taiwan 2012. SEMI Global 2012 Calendar of Events. SEMI Global 2013 Calendar of Events (through early March). NA Standards Fall 2012 Meetings. October 29 – November 1 SEMI Headquarters in San Jose, California. - PowerPoint PPT Presentation

Transcript of SEMI Standards

Page 1: SEMI Standards

Staff Report - SEMICON West 2012

SEMI Standards

Staff ReportSEMICON Taiwan 2012

Page 2: SEMI Standards

SEMI Global2012 Calendar of Events

Event Name Event Details

SOLARCON IndiaSeptember 3-5, 2012Bangalore

SEMICON TaiwanSeptember 5-7, 2012Taipei

SEMICON EuropaOctober 9-11, 2012Dresden

PE2012 – Plastic Electronics Exhibition and

Conference

October 9-11, 2012Dresden

SEMICON JapanPV Japan

December 3-5, 2012Chiba

Staff Report - SEMICON West 2012

Page 3: SEMI Standards

SEMI Global2013 Calendar of Events (through early March)

Event Name Event Details

European 3D TSV SummitJanuary 22-23, 2013Grenoble, France

ISS Europe 2013(Industry Strategy

Symposium)

February 24-26, 2013Milan, Italy

7th PV Fab Managers Forum

March 10-12, 2013Berlin, Germany

Staff Report - SEMICON West 2012

Page 4: SEMI Standards

NA Standards Fall 2012 Meetings

• October 29 – November 1• SEMI Headquarters in San Jose,

California

Staff Report - SEMICON West 2012

Page 5: SEMI Standards

2012 Critical Dates for SEMI Standards Ballots

Staff Report - SEMICON West 2012

No.Ballot Submission

Due DateVoting Period

StartsVoting Period

Ends

Cycle 1 January 3 January 17 February 16

Cycle 2 February 3 February 17 March 19

Cycle 3 April 13 April 27 May 29

Cycle 4 May 16 May 30 June 29

Cycle 5 July 27 August 10 September 11

Cycle 6 August 29 September 12 October 12

Cycle 7 October 8 October 22 November 21

Guide on How to Vote on Standards Ballots now available on the Standards website

Page 6: SEMI Standards

SEMI Standards Publications [1/3]

• June 2012 Cycle– New Standards: 3– Revised Standards: 5– Reapproved Standards: 0– Withdrawn Standards: 0

• Total SEMI Standards in portfolio: 845– Includes 83 Inactive Standards

Page 7: SEMI Standards

SEMI Standards Publications [2/3]

• July 2012 Cycle– New Standards: 6– Revised Standards: 6– Reapproved Standards: 4– Withdrawn Standards: 2

Staff Report - Spring 2012

Page 8: SEMI Standards

SEMI Standards Publications [3/3]

• August 2012 Cycle– New Standards: 0– Revised Standards: 16– Reapproved Standards: 7– Withdrawn Standards: 0

• Total SEMI Standards in portfolio: 849– Includes 91 Inactive Standards

Page 9: SEMI Standards

9

New Ballot Formatting Templates• Updated 2010 versions to

comply with Style Manual and Procedure Guide changes.

• Templates by Document subtypes are available, includes the mandatory sections for each type:http://downloads.semi.org/web/wstandards.nsf/templates

Staff Report - October 6 2011

Page 10: SEMI Standards

10

Style Manual and Compilation of Terms

• Style Manual– Version 5 published in August 2011

http://www.semi.org/en/sites/semi.org/files/Style%20Manual_Version%205_August%202011.pdf

– Major changes: Required sections information moved to the Procedure Guide; Notices updated.

– The Style Manual contains terminology formatting information; the Procedure Guide contains information about writing/attributing definitions.

• Compilation of Terms (COT)– Updated and published after each publication cycle is completed:

http://www.semi.org/Standards/StandardsPublications– Contains all Abbreviations, Acronyms, Definitions and Symbols

listed in the terminology section of Standards and Safety Guidelines.

Staff Report - October 6 2011

Page 11: SEMI Standards

Taiwan Members for ISC Audits and Reviews (A&R) Subcommittee• The A&R SC conducts procedural review of all ballots

approved by technical committees. Ballots must pass this procedural review prior to being published. The A&R SC typically has five two-week review periods per year.

• Regulations 5.4.4.2 Membership — The ISC A&R SC shall be composed of:– c. From each locale having one or more local technical

committees… up to one member for the first two technical committees or up to two members if there are three or more technical committees (voting). From such locales, the number of device-maker members shall not exceed the number of supplier members.

Staff Report - August 2012

Page 12: SEMI Standards

Standards New Member Training

Document Development Path

• Technology TrendsTechnology Trends• SuppliersSuppliers• UsersUsers• Other StakeholdersOther Stakeholders

INDUSTRY NEEDS

Use

AuthorizeAuthorizeActivityActivity

DocumentDocumentDevelopmentDevelopment

Idea toIdea toCommitteeCommittee

BallotBallotVoting /TallyingVoting /Tallying

PublishingPublishing

BallotBallotAdjudicationAdjudication

Procedural Procedural ReviewReview

BallotBallotSubmissionSubmission

Page 13: SEMI Standards

2012 Karel Urbanek AwardThe SEMI Standards Program’s most prestigious award

• Dr. Tzeng-Yow “Victor” Lin/ITRI– Pioneer of SEMI Standards

activity in Taiwan• 8 Standards originated from

Taiwan now published• Committees highly active in

FPD Metrology, 3DS-IC, and PV

• Procedural training now regularly held in Taiwan

Page 14: SEMI Standards

SEMI has switched web meeting services from MS Live Meeting to Citrix GoToMeeting

GoToMeetingContact Staff if needed

The Power ofStandards Meetings

Staff Report - August 2012

Page 15: SEMI Standards

Staff Report - SEMICON Taiwan 2012

Thank you