SEMI Standards
description
Transcript of SEMI Standards
Staff Report - SEMICON West 2012
SEMI Standards
Staff ReportSEMICON Taiwan 2012
SEMI Global2012 Calendar of Events
Event Name Event Details
SOLARCON IndiaSeptember 3-5, 2012Bangalore
SEMICON TaiwanSeptember 5-7, 2012Taipei
SEMICON EuropaOctober 9-11, 2012Dresden
PE2012 – Plastic Electronics Exhibition and
Conference
October 9-11, 2012Dresden
SEMICON JapanPV Japan
December 3-5, 2012Chiba
Staff Report - SEMICON West 2012
SEMI Global2013 Calendar of Events (through early March)
Event Name Event Details
European 3D TSV SummitJanuary 22-23, 2013Grenoble, France
ISS Europe 2013(Industry Strategy
Symposium)
February 24-26, 2013Milan, Italy
7th PV Fab Managers Forum
March 10-12, 2013Berlin, Germany
Staff Report - SEMICON West 2012
NA Standards Fall 2012 Meetings
• October 29 – November 1• SEMI Headquarters in San Jose,
California
Staff Report - SEMICON West 2012
2012 Critical Dates for SEMI Standards Ballots
Staff Report - SEMICON West 2012
No.Ballot Submission
Due DateVoting Period
StartsVoting Period
Ends
Cycle 1 January 3 January 17 February 16
Cycle 2 February 3 February 17 March 19
Cycle 3 April 13 April 27 May 29
Cycle 4 May 16 May 30 June 29
Cycle 5 July 27 August 10 September 11
Cycle 6 August 29 September 12 October 12
Cycle 7 October 8 October 22 November 21
Guide on How to Vote on Standards Ballots now available on the Standards website
SEMI Standards Publications [1/3]
• June 2012 Cycle– New Standards: 3– Revised Standards: 5– Reapproved Standards: 0– Withdrawn Standards: 0
• Total SEMI Standards in portfolio: 845– Includes 83 Inactive Standards
SEMI Standards Publications [2/3]
• July 2012 Cycle– New Standards: 6– Revised Standards: 6– Reapproved Standards: 4– Withdrawn Standards: 2
Staff Report - Spring 2012
SEMI Standards Publications [3/3]
• August 2012 Cycle– New Standards: 0– Revised Standards: 16– Reapproved Standards: 7– Withdrawn Standards: 0
• Total SEMI Standards in portfolio: 849– Includes 91 Inactive Standards
9
New Ballot Formatting Templates• Updated 2010 versions to
comply with Style Manual and Procedure Guide changes.
• Templates by Document subtypes are available, includes the mandatory sections for each type:http://downloads.semi.org/web/wstandards.nsf/templates
Staff Report - October 6 2011
10
Style Manual and Compilation of Terms
• Style Manual– Version 5 published in August 2011
http://www.semi.org/en/sites/semi.org/files/Style%20Manual_Version%205_August%202011.pdf
– Major changes: Required sections information moved to the Procedure Guide; Notices updated.
– The Style Manual contains terminology formatting information; the Procedure Guide contains information about writing/attributing definitions.
• Compilation of Terms (COT)– Updated and published after each publication cycle is completed:
http://www.semi.org/Standards/StandardsPublications– Contains all Abbreviations, Acronyms, Definitions and Symbols
listed in the terminology section of Standards and Safety Guidelines.
Staff Report - October 6 2011
Taiwan Members for ISC Audits and Reviews (A&R) Subcommittee• The A&R SC conducts procedural review of all ballots
approved by technical committees. Ballots must pass this procedural review prior to being published. The A&R SC typically has five two-week review periods per year.
• Regulations 5.4.4.2 Membership — The ISC A&R SC shall be composed of:– c. From each locale having one or more local technical
committees… up to one member for the first two technical committees or up to two members if there are three or more technical committees (voting). From such locales, the number of device-maker members shall not exceed the number of supplier members.
Staff Report - August 2012
Standards New Member Training
Document Development Path
• Technology TrendsTechnology Trends• SuppliersSuppliers• UsersUsers• Other StakeholdersOther Stakeholders
INDUSTRY NEEDS
Use
AuthorizeAuthorizeActivityActivity
DocumentDocumentDevelopmentDevelopment
Idea toIdea toCommitteeCommittee
BallotBallotVoting /TallyingVoting /Tallying
PublishingPublishing
BallotBallotAdjudicationAdjudication
Procedural Procedural ReviewReview
BallotBallotSubmissionSubmission
2012 Karel Urbanek AwardThe SEMI Standards Program’s most prestigious award
• Dr. Tzeng-Yow “Victor” Lin/ITRI– Pioneer of SEMI Standards
activity in Taiwan• 8 Standards originated from
Taiwan now published• Committees highly active in
FPD Metrology, 3DS-IC, and PV
• Procedural training now regularly held in Taiwan
SEMI has switched web meeting services from MS Live Meeting to Citrix GoToMeeting
GoToMeetingContact Staff if needed
The Power ofStandards Meetings
Staff Report - August 2012
Staff Report - SEMICON Taiwan 2012
Thank you