SEMANA DE LA BIOENERGÍA BIOENERGY WEEKS...Our parameter 20 Manure 79% Scrap alim. 15% Scrap mills...
Transcript of SEMANA DE LA BIOENERGÍA BIOENERGY WEEKS...Our parameter 20 Manure 79% Scrap alim. 15% Scrap mills...
OCTUBRE 2018
1
“La experiencia en Argentina”
“The experience in argentina”
SEMANA DE LA BIOENERGÍA
BIOENERGY WEEKS
SCHEDULE
Schedule• Presentation ADECO • Milk Model
• Introduction to the dairy model• Introduction to the energy model• Our Project • Our Results
• Conclusions
3v
About us
A team in South America leader in food production and renewable energy
profitability through efficiency, low cost production and sustainability
8.000 employees
450.000 hectare(55% own)
3 sugar cane mill3 rice mill7 milking cows
4
Company Timeline
5v
Business lines
Crops & Milk
Rice
Sugar &
ethanol
230 K hectare
7.5 K milking cows
682 K tons
50 K hect.
3 mills
242 K tons
170 K hectare
3 mills
1.3 M tons
6
Leche
Milk
Dairy Production SystemTransforming vegetal protein into animal protein
7
clean and dry spaces
Refrigeration system
Sand Beds
The food represents 60% Costs
We achieve 1.45 liters per kg of food
Healthy animals
Produce aprox. 37 liters/cow/day
Quality milk
Traceability and stability
97 millons de liters/year ( +1% country) 8
We build a very efficient model
9
Our system
We generate 160 direct jobs
A professional and consolidated team
10
Leche + Energía
Milk + Energy
Biologycal process!!!!
Chart
Typical project
Fisrt Biogigester
Production of electricity from the Biogas generated from the effluents
Biodigester Chart
29
Caracteristic principal
Calor
POTENCY 1,4MwINJET IN THE
GRID
HEAT10%
REUSEPOTENCIAL
USES
BIOIFERTILIZER300.000
Tn/yearSPREAD
Input Output
COWS MANURE
SCRAP
BIOFERTILIZERBIOGAS
ELECTRICITY
HEATDIGESTOR
ALIMENTATION PIT
Our project is located in the heart of the Humidity Pampa
Christophersen, General López, Santa Fe
Distancias desde Tambos:• Chistophersen
• Venado Tuerto
• Rosario
• Buenos Aires
13
EstanciaCarmen
10.000ha
Dairy1
Dairy2
Dairy3&4
generates stability in the GRID
we are end of line
SADI
Stages of the generation projectB
EG
INN
ING
S
ALW
AY
S W
AS
TH
OU
GH
T A
S A
MO
DE
L2
00
4
RE
SO
LU
TIO
NS
10
8
Pre
se
nta
tion
20
15
Ne
w L
aw
RE
NO
VA
R R
ON
DA
12
01
6
SIG
NIN
G O
F C
ON
TR
AC
T
Con
str
uctio
na
nd
sta
rtu
p2
01
7
CO
MM
ER
CIA
LIZ
AT
IÓN
Le
arn
ing
20
18
CO
NT
RA
CT
LE
AR
NIN
G2
01
8
Hystory Expectation
tod
ay
It was notviable
Construction of the project
JAN- 2017 FEB - 2017
MAR - 2017APR - 2017
JUN - 2017 JUL - 2017
FEB - 2017
We enter the grid before the obligation
16
SEP – 2017Start of generation
NOV – 2017Start whith the conttact
17
Our Generation
18
Biodigester nutrition
19
Our Problems
Our parameter
20
Manure79%
Scrap alim.15%
Scrap mills4%
Scrap Ind.2%
Total Nutrition : 40.369 tn
nov-17 dic-17 ene-18 feb-18 mar-18 abr-18 may-18 jun-18 jul-18ago-18(parc)
Generación 521 536 669 730 921 873 822 667 867 683
Objetivo 703 779 779 703 779 754 779 754 779 553
0100200300400500600700800900
1000
MW
H (
tota
l me
s)
Generation Days Geneartion: 293
Total Generation: 7.290
MWh
Contract:
7.360 MWh
600 m3 Biogas (CH4 52/54%) 1MW
1 tn manure 100 m3 biogas
6 tn manure 1MW
1 tn mix alimentation 108 m3 biogas
Design data for a biodigester ...
BIOMASSE
Estiercol de VO
Vacas en ordeñe N° 5
Producción Kg/día 68
Cantidad ton/año 124
% massa % 100,0%
Cantidad Kg/día 340
Sólidos Totales % 10,4%
Sólidos Totales Kg/día 35
Solidos Volátiles % S.S. 80,0%
Solidos Volátiles Kg/día 28
Residuos kg/día 7
BIOMASSE
BIOGAS Potencial m3/dia 11
% Metano te v 55%
METANO m3 6
Horas de producción hrs/yr 8760
TOTALE BIOGAS PRODUCIDO m3/yr 4.130
Energy content CH4 Kcal/m3 8.500
Unit Conversion kcal/kwh 860
Electricity content Kwh/m3 CH4 9,89
% CH4 nel BIOGAS % 54,00%
FUNZIONAMENTO MOTORE hrs/yr 8000
POTENZA INTRODOTTA kW 3
RENDIMENTO ELETTRICO % 41,00%
POTENZA ELETTRICA GENERATA kW 1,1
INPUTS
DIGESTION
BIOMASSE
Restos de Silo
Vacas en ordeñe N°
Producción Kg/día 100%
Cantidad ton/año 20
% massa % 100,0%
Cantidad Kg/día 55
Sólidos Totales % 32,0%
Sólidos Totales Kg/día 18
Solidos Volátiles % S.S. 96,0%
Solidos Volátiles Kg/día 17
Residuos kg/día 1
BIOMASSE
BIOGAS Potencial m3/dia 11
% Metano te v 53%
METANO m3 6
Horas de producción hrs/yr 8760
TOTALE BIOGAS PRODUCIDO m3/yr 3.994
Energy content CH4 Kcal/m3 8.500
Unit Conversion kcal/kwh 860
Electricity content Kwh/m3 CH4 9,89
% CH4 nel BIOGAS % 54,00%
FUNZIONAMENTO MOTORE hrs/yr 8000
POTENZA INTRODOTTA kW 3
RENDIMENTO ELETTRICO % 41,00%
POTENZA ELETTRICA GENERATA kW 1,1
INPUTS
DIGESTION
Does a digester make sense?
• Maturation of the LAW
• Project scale
• Maturation of suppliers
• Project financing
• Return of the project• Social responsability.
• Economic benefit.• Growth Sustainability.
Paradigm shift
Milk
Beef
Milk
Beef
Energy
Biofertilizer
History
Actualy