SEM14-05 Approving your draft ETSI Seminar © ETSI 2010. All rights reserved.
-
Upload
owen-bruce -
Category
Documents
-
view
217 -
download
1
Transcript of SEM14-05 Approving your draft ETSI Seminar © ETSI 2010. All rights reserved.
SEM14-05
Approving your draft
ETSI Seminar© ETSI 2010. All rights reserved
SEM14-05
The ETSI standards process
2
Work Item
introduced
Approval of draft by technical
committee
PublicationIMMEDIATE
If Technical Specification or Technical
Report
Drafting Approval
6 – 12 MONTHS
If European Standard
NSO Enquiry
and Vote
90 DAYS
If ETSI Standard or ETSI Guide
ETSI Member
vote
Drafting in technical committee, working
group
or Specialist Task Force
SEM14-05
Who approves what?
Technical Body ETSI Technical Reports (TR) ETSI Technical Specifications (TS)
Members ETSI Guides (EG) ETSI Standards (ES)
Public (National Standards Organizations) EN (telecommunications series)
• including Harmonized Standards and Community Specifications
Industry Specification Group ETSI Group Specifications (GS)
3
SEM14-05
What’s different for 3GPP?
Technical Specifications Technical Reports
approved by the relevant TSG by consensus if possible placed under Change Control
• subsequent development achieved by Change Requests approved by the TSG
4
SEM14-05
ETSI Technical Body approval
ETSI Technical Reports (TR) ETSI Technical Specifications (TS)
approval can be instantaneous 60 days to publication
• draft sent to ETSI Secretariat within 30 days of TB approval• publication within 30 days
• provided draft complies with ETSI Drafting Rules
5
SEM14-05
Industry Specification Group approval
ETSI Group Specifications (GS) decision-making procedures defined in Group’s Terms of Reference
• draft sent to ETSI Secretariat within 30 days of TB approval• publication within 30 days
• provided draft complies with ETSI Drafting Rules
6
SEM14-05
ETSI Membership approval (MAP)
ETSI Guides (EG) ETSI Standards (ES)
19 weeks to publication• draft sent to ETSI Secretariat within 30 days of TB approval• ETSI Secretariat prepares draft for vote within 30 days• 60 day voting phase• weighted individual voting by Full & Associate Members• voting report by Secretariat within 15 days• if successful, publication within 15 days
• without modification, except editorial changes
7
SEM14-05
Public Approval
EN (telecommunications series) involves National Standards Organizations involves “Public Enquiry” and “public” Vote
• weighted national voting
Two-step procedure (TAP) 11,5 months
One-step procedure (OAP) 6 months draft must be non-contentious
• suits conversion from ES to EN• or the deliverable has a high degree of maturity
8
SEM14-05
9
The Two-step approval procedure - for ENs
Drafting byTechnical
Body
ETSIprocessing
1 Month 2 Weeks 1 Month 2 Weeks
4 Months 2 Months 2 Months 2 Weeks
11,5 Months
Tech
nica
l Bod
y A
ppro
val
Dra
ft r
ecei
ved
by S
ecre
tari
at
Sta
rt o
f Pub
lic E
nqui
ryE
nd o
f Pub
lic E
nqui
ry
Sta
rt o
f Vot
ing
End
of V
otin
g
Ado
ptio
nP
ublic
atio
n
PublicEnquiry
ETSIreview
TechnicalBody
review
ETSIprocessing
Voting
ETSIevaluation
Publication
SEM14-05
10
The One-step approval procedure - for ENs
Drafting byTechnical
Body
ETSIprocessing
1 Month 2 Weeks
4 Months 2 Weeks
Tech
nica
l Bod
y A
ppro
val
Dra
ft r
ecei
ved
by S
ecre
tari
atS
tart
of P
ublic
Enq
uiry
& V
otin
gE
nd o
f Pub
lic E
nqui
ry &
Vot
ing
Ado
ptio
n
Pub
licat
ion
ETSIevaluation
Publication
6 Months
CombinedPublic Enquiry
and Vote
SEM14-05
11
The e-Approval application - for ES, EG and EN
http://portal.etsi.org/EApproval/
SEM14-05
12
Status code
1 8 Start of work TB approval
8 8A TB approval Draft received by Secretariat
8A 9B For TAP: Draft received by Sec’t Start of PE
8A 9B For OAP: Draft received by Sec’t Start of Vote
8A 10FM For MAP: Draft received by Sec’t Start of Member Vote
8A 12 For TSs and TRs: Draft received by Sec’t Publication
9B 9C Public Enquiry (PE)
9C 9D End of PE Despatch of comments to TB
9D 9E Despatch of comments to TB End of TB review
9E 10F End of TC review Start of voting
10F 11 Vote
11 12 End of voting Publication
30 50 Withdrawal
Full list at http://portal.etsi.org/edithelp/StandardsDevelopment/home.htm?page=StatusCodes
Approval phases
SEM14-05
Approval check-list – 10 key questions
1. Is the deliverable technically stable and mature?
2. Is the title and scope of the deliverable clear?
3. Are all the appropriate test methods included (if applicable), and are requirements testable?
4. Are all normative references publicly available?
5. Are all annexes appropriately titled (informative/normative) and stable?
6. Does an approved work item exist for this deliverable?
7. Is the deliverable type the most appropriate?
8. Is the document and its associated graphics electronically available and ETSI compatible?
9. Have the ETSI Drafting Rules been adhered to and the ETSI template applied?
10. Has any sustained opposition to the approval of this draft been resolved?
13
SEM14-05
OK, but…
How do I know that there are drafts for approval?
14
SEM14-05
Technical Body approval
The draft for approval is placed in the TB’s area on the ETSI web site
Or on the Decision Support application http://webapp.etsi.org/TBdecision/Menu.asp
Members of the TB are notified by e-mail (by means of an e-mail exploder)
15
SEM14-05
Decision Support
An optional web-based tool for use by Technical Committees
16
SEM14-05
Decision Support
17
SEM14-05
Other approvals (MAP, OAP, TAP…)
Information placed on Portal home page, Publications window Nominated voting contacts (etc.) are notified by e-mail, which
contains links to: lists of the deliverables in each category a list of newly-published deliverables
The lists provide access to: the deliverables (downloadable) the relevant work programme item the Technical Body details the relevant voting application
18
SEM14-05
Portal home page notification
19
SEM14-05
Deliverables notification e-mail
20
Welcome,
From 2006-03-01 to 2006-03-07, the following activity has taken place in ETSI:
Deliverables: -----------------------------------------------------------------------------------
- 3 document(s) sent on member vote (see http://webapp.etsi.org/action/MV/MV20060505/MV20060505.htm )
- 1 document(s) sent on OAP (see http://webapp.etsi.org/action/OP/OP20060714/OP20060714.htm )
- 14 document(s) published (see http://webapp.etsi.org/action/pu/20060307/20060307.htm )
- 1 document(s) sent on Vote (see http://webapp.etsi.org/action/V/V20060512/V20060512.htm )
-----------------------------------------------------------------------------------More information can be found on http://webapp.etsi.org/deliverables/home.htmFor more information or help please send an email to: mailto:[email protected]
Best Regards,
The Editing Document Management teamETSI - Standards Production Area