SELECTION OF CONSULTANT FOR PREPARATION OF...

32
 SELECTION OF CONSULTANT FOR PREPARATION OF INTEGRATED MASTER PLAN AND DESIGNS FOR NIMZ NEAR ZAHEERABAD, SANGAREDDY, TELANGANA STATE Clarification/Response to PreBid Queries  Sl No Clause No Pg No Clause as Per RFP Query Clarification/Response 1 2.2.2 (B) 11 2.2.2 To be eligible for evaluation of its Proposal, the Applicant shall fulfil the following:  (A) Technical Capacity: The Applicant shall have, over the past 10 (Ten) years preceding the PDD, undertaken a minimum of 1 (One) Eligible Assignments as specified in Clause 2.2.2 (B). (B) Eligible Assignments: For the purposes of determining Conditions of Eligibility and for evaluating the Proposals under this RFP, the following projects shall be deemed as eligible assignments (the “Eligible Assignments”).  Experience of Detailed Master Planning and Infrastructure Planning of Greenfield Industrial Park / SEZ /Industrial Estate projects of 1500 Acres or above in a single project. We request you to kindly modify the eligible assignment to                         "Consultant should have experience of preparation of Master planning & Infrastructure Design and detail engineering for atleast 2 similar projects with project cost of Infrastructure component of INR 2500 lakhs each, within the past 10 years. And the similar project shall means Institutional / township projects with land area not less than 450 acres." RFP Clause holds good.  2 2.1.1 9 Detailed description of the objectives, scope of services, deliverables and other requirements relating to this Consultancy are specified in this RFP. In case an Applicant firm possesses the requisite experience and capabilities required for undertaking the Consultancy, it may participate in the Selection Process either individually (the “Sole Firm”) or as lead member of a consortium of firms (the “Lead Member”) in response The RFP has indicated that the lead member shall have 51% stake in the consortium. It is presumed that the stake is related to 51% share of the Total Fee. Please Clarify. Yes 

Transcript of SELECTION OF CONSULTANT FOR PREPARATION OF...

Page 1: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 SELECTION OF CONSULTANT FOR PREPARATION OF INTEGRATED MASTER PLAN AND DESIGNS FOR NIMZ NEAR ZAHEERABAD, 

SANGAREDDY, TELANGANA STATE 

Clarification/Response to Pre‐Bid Queries 

Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

1  2.2.2 (B)  11  2.2.2  To  be  eligible  for  evaluation  of  its  Proposal,  the Applicant shall fulfil the following:  (A) Technical  Capacity:  The  Applicant  shall  have,  over 

the  past  10  (Ten)  years  preceding  the  PDD, undertaken  a  minimum  of  1  (One)  Eligible Assignments as specified in Clause 2.2.2 (B). 

(B) Eligible  Assignments:  For  the  purposes  of determining  Conditions  of  Eligibility  and  for evaluating  the  Proposals  under  this  RFP,  the following  projects  shall  be  deemed  as  eligible assignments (the “Eligible Assignments”).  

Experience  of  Detailed  Master  Planning  and Infrastructure  Planning  of  Greenfield  Industrial  Park  / SEZ /Industrial Estate projects of 1500 Acres or above in a single project. 

We  request you  to kindly modify  the eligible assignment  to                                                 "Consultant should  have  experience  of  preparation  of Master planning &  Infrastructure Design  and detail  engineering  for  atleast  2  similar projects  with  project  cost  of  Infrastructure component of INR 2500 lakhs each, within the past  10  years.  And  the  similar  project  shall means  Institutional  /  township  projects with land area not less than 450 acres." 

RFP Clause holds good.  

2  2.1.1  9  Detailed description of the objectives, scope of services, deliverables  and  other  requirements  relating  to  this Consultancy  are  specified  in  this  RFP.  In  case  an Applicant  firm  possesses  the  requisite  experience  and capabilities required for undertaking the Consultancy, it may  participate  in  the  Selection  Process  either individually  (the  “Sole  Firm”)  or  as  lead member  of  a consortium of  firms  (the  “Lead Member”)  in  response 

The RFP has  indicated  that  the  lead member shall have 51%  stake  in  the  consortium.  It  is presumed  that  the  stake  is  related  to  51% share of the Total Fee. Please Clarify. 

Yes 

Page 2: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

to  this  invitation. The  term Applicant  (the “Applicant”) means the Sole Firm or Lead Member, as the case may be.   The  maximum  number  of  members  allowed  in  a consortium  is  Three  (3)  including  Lead member  (who shall have at least 51% stake in the Project), Consortium member/Associate. The manner  in which  the Proposal is required to be submitted, evaluated and accepted  is explained in this RFP. 

3  2.2.2 (B)  11  2.2.2  To  be  eligible  for  evaluation  of  its  Proposal,  the Applicant shall fulfil the following:  (C) Technical  Capacity:  The  Applicant  shall  have,  over 

the  past  10  (Ten)  years  preceding  the  PDD, undertaken  a  minimum  of  1  (One)  Eligible Assignments as specified in Clause 2.2.2 (B). 

(D) Eligible  Assignments:  For  the  purposes  of determining  Conditions  of  Eligibility  and  for evaluating  the  Proposals  under  this  RFP,  the following  projects  shall  be  deemed  as  eligible assignments (the “Eligible Assignments”).  

Experience  of  Detailed  Master  Planning  and Infrastructure  Planning  of  Greenfield  Industrial  Park  / SEZ /Industrial Estate projects of 1500 Acres or above in a single project. 

It is assumed that master plan prepared a part of  TEFS/TEFR/DPRs    shall  be  considered  for evaluation – Please Clarify 

Projects  for  which  Detailed  Master Planning and infrastructure plan shall  only  be  considered  for  evaluation. Conceptual master  Plans,  Preliminary Master  Plans  prepared  as  part  of TEFS/TEFRs/DPRs  shall  not  be considered for Evaluation.    

4  2.2.2  (C ) 

11  Financial Capacity: The Applicant shall have an average annual turnover of Rs. 25 crores during each of the last three  financial years preceding  the PDD. The  revenues 

TSIIC  is  requested  to  amend  the  clause  as given clause below.   

For minimum eligibility (Rs 25 crores), the  average  annual  turnover  of  lead member  for  the  last 3  financial  years 

Page 3: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

from  the  consulting/advisory  services  will  only  be considered  for  evaluation.  Further,  in  case  of Consortium, the Lead Member shall meet the minimum financial  capacity  as  specified  above.  Turnover  of Associates/JVs will not be considered.  

In  Case  of  a  Consortium,  the  minimum threshold capacity of Rs 25 crores shall be met by the lead member and the turnover required beyond  the  threshold  limit  for  securing  the required marks shall be jointly satisfied by the entire consortium.  

preceding  the  PDD  shall  only  be considered.  However,  as  per  clause 3.1.2  (2b),  scoring  shall  be  given considering  the  average  aggregate turnover of the entire consortium.  

5  2.2.2  (E ) 

12  Conditions of Eligibility  for Key Personnel  : Each of  the Key Personnel must  fulfil  the Conditions of Eligibility    ‐ Key Personnel  Experience   

1. Except  for  team  leader,  Urban  & Regional  Planner  ,  TSIIC  is  requested to  limit  the  length  of  professional experience for the following 

 2. TSIIC  is  requested  to  amend  the 

educational  qualifications  of  the following key personnel 

 3. TSIIC  is  also  requested  to  allow 

individual consultants to be fielded as key  personnel  for  at  least  three positions 

1. RFP clause holds good.  

2. Clause  2.2.2  (E)  –  Conditions of  Eligibility  of  Key  Personnel is amended as below.  

a. Team  Leader  :  Masters  in Engineering/Planning/Science/Architecture 

b. GIS  Expert:  Graduate engineer/Planner/Science with professional qualification of  CADD  &  GIS/Spatial Information Technology 

 3. Sub consultants are allowed to 

be  part  of  the  assignment. However, as per clause 2.14.6 of RFP, A Sub‐Consultant, shall not be a substitute for any Key Personnel. 

Page 4: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

6  3.1.2  32  The scoring criteria to be used for evaluation shall be as follows:  Sl No 

Particulars  Marks  Criteria 

2a  Master planning and Infrastructure planning for Eligible Projects 

30  3 (Three) marks for each completed Eligible Assignment, upto a maximum of Thirty (30) marks. 

 

We  request  TSIIC  to  amend  the  criteria  as requested below.  

We  suggest  TSIIC  to  consider awarding  5  marks  for  each  eligible assignment instead of 3 marks. 

We  also  request  TSIIC  to  consider eligible  projects  in  the  multiple  of threshold  limit  of  1500  acres  for assigning the marks. 

    

RFP clause holds good            

7  3.1.2 (B)  32  Sl No 

Particulars  Marks 

Criteria 

2b  Overall turnover of the firm in consultancy Business 

10  • Less Than Rs. 25 Crore = 0 (Zero) marks • Rs. 25 Crore or more, but less than 50 Crore = 2 (Two) Marks • Rs. 50 Crore or more, but less than 100 Crore = 4 (Four) Marks • Rs. 100 Crore or more, but less than 200 Crore = 6 (Six) Marks • Rs. 200 Crore or 

The marking  criteria  given  for  the  respective clause  is  very high  considering  the nature of the assignment. TSIIC is requested to limit the overall turnover to 100 crores. Further in case of  consortium  TSIIC  is  requested  to  consider the  turnover  of  all  the  consortium  partners for assigning the marks 

RFP clause holds good.   Refer to response at Sl.No 4 above.       

 

Page 5: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

more, but less than 300 Crore = 8 (Eight) Marks • More than Rs. 300 Crore = 10 (ten) Marks 

9  3.1.2 Sl no 3 

33  The CVs the staff members qualifying minimum criteria shall be evaluated as per following A: Experience of Eligible Assignments: (50% weightage) B:  Overseas/  International  experience  on  Eligible assignments (25% weightage) C:  Permanent  Association  with  the  Applicant/Firm (number of years): (25% Weightage) 

The  respective  clause  indicated  25% weightage  to  international  and  overseas experience.  Please delete  the  condition  as  it limits the competition. 

RFP clause holds good. 

10  ToR Clause 2.2.2 (d) 

55  Preparation  of  Detailed  Cost  Estimates  &  Technical Specifications for Phase 1 of NIMZ 

Detailed  technical  specifications  shall  be prepared  and  the  consultant  shall prepare  the tender Documents  for  the works  execution,  in consultation  with  Client.  The  consultant  shall coordinate  with  PMC  agency  appointed  by Client during tender evaluation (s) and selection of contractors  (s). Any modifications suggested by  Authority/PMC  shall  be  carried  out  by  the Consultant.  The  consultants  shall  attend  the pre‐bid  meeting  and  provide  necessary assistance  in  clarifying  the  queries  of  the bidders. 

As per RFP, the consultant has to support the authority during stage 3 – Construction stage and  Stage  4  –  Completion  stage  and accordingly 30% of the total consultancy fee is linked with the above stage. Whereas the first sentence  of  page  56,  indicates  that  the consultant  has  to  coordinate  with  PMC appointed by the authority. In this regard, we request TSIIC to clarify the expected role play from  the  master  plan  and  the  design consultant.  In  case  if  the  authority  requires the support of the design consultant then the payments due at stage 3 and stage 4 shall be paid on monthly basis. 

Scope of services under Stage 3 and 4 is  detailed  out  in  the RFP  ToR  clause 2.2.3 & 2.2.4. Consultant has  to carry out  all  the  services  as mentioned  in the ToR.  The payments for services under stage 3 will be made on the pro rate basis as per the actual work executed (in terms of  actual  expenditure  incurred)  with the following payment structure.  

On  award  of  contract  for implementation  of  project component – 20% 

On  completion  of  50%  of works – 30% 

Page 6: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

On closure – 50% 11  ToR 

Clause  2.4  

57  Considering the nature of the assignment and the  extent  of  the  cash  outflow  during  the stage  I  of  the  project  and  the  clarification sought on the role play of the consultant, the payment schedule has to be revised.  Secondly,  engineering  survey  and investigations are  required during  stage  I   of the  assignment,  which  will  have  substantial financial  implications on  the consultants.  It  is therefore requested to include payment stage i.e Inception report in the revised schedule.    

The revised payment schedule is as follows.  

  

12  ToR 2.2 (E ) 

48  The  consultant  shall  review  the  available  reports including  the  TEFS  report  prepared  for  the  project  at the time of Final approval from DIPP, GOI. 

It  is  understood  from  the  RFP  that  studies, including  a  techno‐economic  feasibility  study have been carried out for the proposed NIMZ We request that all such reports pertaining to past  studies  including  TEFS  report  will  be made  available  to  the  consultants.  Please clarify. 

TEFS report that was submitted to GoI at the time of final approval (2014‐15) is available with TSIIC. The same shall be  provided  to  the  selected consultant. 

13  ToR 2.4   57  Payment Schedule  Considering  the  scale of  the project and  size of deployment  required  as per  the RFP,  it  is requested  that  the  payment  schedule  be modified to include a mobilisation advance of 10% of the Total Professional Fee. 

Please refer Sl No (11). 

14  Clause 2.8 

7  Schedule of selection process ‐ Proposal Due Date (PDD) & Time 28‐02‐2017, 15.00 HRS (IST) 

In view of the documentation required for the submission  of  the  bid  and  the  technical 

The revised proposal Due Date is March 10, 2017, 1500 hrs IST 

Page 7: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

presentation,  it  is requested that  the PDD be further extended by at least two (2) weeks to enable  bidders  to  comply  with  the  full requirements as per the RFP. 

15  ‐  ‐  ‐  Could  you  please  indicate  if  there  is  any budgetary estimate available for the proposed consultancy assignment? 

The  necessary  budget  will  be  made available  for  undertaking  the consultancy assignment. 

16  ToR 2.4   57  Payment Schedule  We  request  mobilization  advance  of  10% (against Bank Guarantee) of total consultancy fee payable to the consultants. 

Please ref Sl No (11). 

17  2.28  30  Execution of agreement After acknowledgement of the LOA as aforesaid by the Selected Applicant,  it shall execute the Agreement and provide  irrevocable  Bank  Guarantee  for  Performance Security.  The  irrevocable  Bank  guarantee  for Performance Security shall be 10% (Ten Percent) of the agreed  professional  fee.  The  Bank Guarantee  shall  be from any Nationalized / Scheduled Commercial Bank  in favour  of  the  Chief  Executive  Officer,  M/s.  Medak National  Investment  &  manufacturing  Zone  Limited. The Selected Applicant shall not be entitled to seek any deviation in the Agreement. 

As  per  RFP,  the  irrevocable  Bank  guarantee for  Performance  Security  shall  be  10%  (Ten Percent) of the agreed professional fee.  Generally, Performance Security value will be 5% of the payable contact / agreement value. Therefore, we  respectfully  request  to  you  to consider  reducing  the  Performance  Security to 5% accordingly.   

RFP clause holds good  

18  2.2  12  Conditions of Eligibility for Key Personnel :  

1. Kindly  clarify,  if  Masters  in  Architecture shall also be  considered  as equivalent  to Masters  in Engineering / Planning. Please confirm. 

 2. Kindly  clarify,  if Graduate  in  science with 

professional  qualification  in  CAD  &  GIS shall also be  considered  as equivalent  to 

Please refer Sl No (5)   

Page 8: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

  Graduate  Engineer  with  professional qualification in CAD & GIS. Please confirm. 

19  Clause 2.2 (E ) 

12  Key Personnel –  1. Environment Expert 2. Water & Wastewater 3. Transportation Expert 4. Architect, Master/ Bachelor of Architecture 5. GIS Expert, 10 Years’ Experience 6. Market Study Expert, 15 years’ Experience 7. Structural Engineer, 15 years’ Experience 8. Urban  and  Regional  Planner,  15  Years’ 

Experience 

1. We  suggest  the  Environmental  expert with  qualifications  of  Master’s  in Environmental Planning. 

2. We  suggest  that  for  a  better  resource, he/she should be Master’s in Engineering/ M.  Tech  (Hydraulics  and  Water resources). 

3. We  request  that  for  the  given  project, personnel with 10 years should qualify. 

4. We  request  to  relax  the  Education qualifications  for  Architect  with  only Bachelors  in  Architecture  with  10  years’ experience. 

5. We  request  that  for  the  given  project, personnel with 5 years should qualify. 

6. We request to relax the requirement with 10  years’  experience.  MBA/PGDBA  shall be  considered  with  10  years  of experience. 

7. We request to relax the requirement with 10 years’ experience. 

8. We request to relax the requirement with 10 years’ experience. 

RFP Clause holds good 

Page 9: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

20  ToR 2.2.1.1 

46   Preparation  of  Overall  conceptual  master  Plan  – Topographic Surveys 

Kindly confirm the area and Specification. Also exclude  the  timeline  for  conducting  the topographic survey from Schedule of Services. 

The project area is about 12,635 acres. As  stated  in RFP,  the  consultant  shall undertake physical topographic survey of  the  entire  project  site  in  order  to prepare the comprehensive base map.  The  timeline  is  included  in  the schedule of services. 

21  ToR 2.2.1.1 

47  Preparation  of  Overall  conceptual  master  Plan  – Geotechnical  Investigations  ‐ The number of boreholes and trial pits shall be in accordance with the stipulations of the relevant IS (Indian Standards) codes. 

We  request  client  to  provide  estimated quantities  for  Geotechnical  investigations.  It will help the consultants to  justify the cost of Geotechnical surveys for the project area. Any extra  quantity  shall  be  payable  extra,  please clarify. Also confirm the area of Geotechnical survey.  Also  exclude  the  timeline  for conducting  the  geotechnical  survey  from Schedule of Services. 

Based  on  the  similar  projects experience  of  this  scale,  the consultant shall indentify the required number  of  bore  holes  &  trial  pits  in accordance  with  the  stipulations  of relevant IS codes.  The  timeline  is  included  in  the schedule of services. 

22  ToR 2.2.1.1 (c) 

47  Preparation  of  Comprehensive  Base Maps  for  Overall Site  (i)  Site  boundary  obtained  from  the  Topographic Survey  and  co‐related  with  the  (Digitised  Cadastral Maps). 

We  assume  that  the  client  will  provide Cadastral Map  in  digitised  (soft  copy)  form. Please confirm. 

TSIIC  shall  provide  the  available  data in the form of scanned images. It shall be the responsibility of the consultant to digitise and geo‐reference the same as  part  of  the  preparation  of comprehensive base map.  

23  Section 3.1.2,  S. No. 2b. 

32  Criteria  for Evaluation  ‐ Overall  turnover of  the  firm  in consultancy Business, 10 marks • Less Than Rs. 25 Crore = 0 (Zero) marks • Rs. 25 Crore or more, but less than 50 Crore = 2 (Two) Marks •  Rs.  50  Crore  or more,  but  less  than  100  Crore  =  4 (Four) Marks 

Kindly request the client to revise the Overall turnover scoring criteria: • Less than Rs. 25 Crores – (zero) marks •  Rs.  25  Crores  or  more,  but  less  than  30 Crore = 2 (Two) Marks •  Rs.  30  Crores  or  more,  but  less  than  35 Crores = 4 (Four) Marks 

RFP clause holds good 

Page 10: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

• Rs.  100 Crore or more, but  less  than  200 Crore  =  6 (Six) Marks • Rs.  200 Crore or more, but  less  than  300 Crore  =  8 (Eight) Marks 

•  Rs.  35  Crores  or  more,  but  less  than  40 Crores = 6 (Six) Marks •  Rs.  40  Crores  or  more,  but  less  than  45 Crores = 8 (Eight) Marks • Rs. 45 Crores or more = 10 (Ten) Marks. 

24  3.1.2 S.No 3 

32  Relevant Experience of the key personnel – The CVs the staff members qualifying minimum criteria shall be evaluated as per following A: Experience of Eligible Assignments: (50% weightage) B:  Overseas/  International  experience  on  Eligible assignments (25% weightage) C:  Permanent  Association  with  the  Applicant/Firm (number of years): (25% Weightage) Marks for the proposed Key Personnel will be assigned on relative basis across the Bidders. 

Most of the Key Personnel and Subject Expert have  in‐depth National experience and  some have worked on International assignments are associated with Voyants  since  long  time. We request you to remove the clause B and C. 

RFP clause holds good 

25  2.2.2(b)

54  Detailed  Engineering  and  Designs  for  External  Road linkages for Phase 1 of NIMZ Development. 

As per  the RFP,  the detailed Engineering and Design  is  limited  to  external  Road  and  rail linkages.  Kindly  elaborate  the  limits.  Surveys (Topographic,  Geotechnical  etc)  are  not included in consultants’ scope for the external linkages. Kindly  clarify.  These  surveys will be charged separately. 

The  revised  clause  2.2.2  (b)  is  as follows.   The  consultant  shall  identify  and 

evaluate  the  external  road (Greenfield &  upgradation) &  rail linkage  options  essential  for development of Phase‐1 of NIMZ.  

The  consultant  shall interact/consult  with  the concerned Departments/organizations including  Roads  &  Buildings, Indian  Railways  etc  while 

Page 11: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

identifying  the  feasible  external linkages for Phase‐1.  

26  2.2.2      (e ) 

56  Support  to TSIIC  to Environmental Clearances & Other Government approvals 

We understand  that  the selected consultants will be limited to support the client for getting the statutory approvals. 

Please  ref  2.2.2  (e  )  of  ToR  wherein the consultant shall support TSIIC and provide  necessary  details  in  getting the all required approvals.   

27  2.2.3  56  Stage ‐3: Construction Stage  During  the  construction  stage,  Consultants will  conduct  periodic  supervision  once  in  a month.  Anything  extra  in  a  month  will charged separately. Please confirm. 

RFP clause holds good. 

28  2.4  58  Payment Schedule  Kindly revised payment term as suggested:  Please refer Sl No (11) 

Page 12: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

29  2.2.2 (d)  55  Preparation  of  Detailed  Cost  Estimates  &  Technical Specifications for Phase 1 of NIMZ 

We  request  you  to  exclude  the  timeline required  for  tendering  process  from  the Schedule  of  services  as  it  is  dependent  on multiple stakeholders. 

RFP clause holds good.  

30  General      Kindly  confirm  whether  the  land  (project area) of 12,635 Acres  in under possession of TSIIC / Government of Telangana. 

TSIIC  is  in  possession  of  Phase  I  area currently. Balance is under acquisition 

31  2.3  57  Schedule of Services  Kindly  revise  the  Schedule  of  Services  as suggested: 

RFP clause holds good 

Page 13: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

 

32  2.8  7  Schedule  of  Selection  Process  :  Proposal  Due  Date  Because  of  the  various  requirements  asked  Please refer Sl No (14) 

Page 14: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

(PDD) & Time : 28‐02‐2017; 15.00 HRS (IST) 

for  in  the bid and  looking at  the  scale of  the project, it is requested that the PDD be kindly extended by 4 weeks. 

33  2.2.2 – Sub 

clause (b) 

11  Eligible Assignments: Experience  of  Detailed  Master  Planning  and Infrastructure  Planning  of  Greenfield  Industrial  Park  / SEZ /Industrial Estate projects of 1500 Acres or above in a  single  project. Marks  will  be  given  for  “Completed Assignments”  only  for  which  project  completion certificates  issued  by  Client  are  submitted  along with the Technical Proposal. Further,  in case of Consortium, the  Lead Member  shall meet  the minimum  technical capacity as specified above. 

Request  to  modify  definition  of  eligible assignment as follows: 

1. Experience  of  Detailed  Master Planning  and  Infrastructure  Planning of  Greenfield  Industrial  Park  /  SEZ /Industrial  Estate/  Mixed  Use Development  projects  of  1500  Acres or above in a single project. 

2. Further,  it  is  requested  that  in  case Client Certificate may not be available due to tight timeline of PDD, proof of final  invoice or payment and/or copy of relevant pages of final deliverables be allowed as proof of completion of assignment. This practice  is  accepted by several government departments. 

1. RFP clause holds good 2. In  the  absence  of  project 

completion  certificate  from client, the copy of final invoice along with receipt of payment from  client  in  books  of accounts  duly  supported  by work  Order  or  agreement (with  clear milestones) would be considered. 

34  2.2.2 – Sub 

clause (e) 

  Conditions of Eligibility for Key Personnel : c) Infrastructure planning expert d) Environment Expert e) Water and Wastewater Expert h) Architect i) Landscape Architect j) GIS Expert h) Structural Engineer 

C)Request to modify educational qualification to “Masters in Engineering” d)  Request  to  relax Minimum  Experience  on eligible assignment to “1” e) Request to modify educational qualification to “Masters in Engineering” h) As the architectural design services have to be  provided  only  for  buildings  such  as administrative  office,  it  is  requested  that requirement  of  Minimum  Experience  on eligible  assignment  be  removed  for  this 

c) Revised as Masters in Infrastructure Planning or masters in Engineering d) Environmental Expert: Should have experience  as  an  environmental expert  for  atleast  1  eligible assignment. e) RFP clause holds good. h) RFP clause holds good i  )  Landscape  Architect:  Should  have experience  as  landscape  architect  for atleast  2  projects  of  area  500  acres 

Page 15: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

position. i)  As  landscape  design  services  are  generic across  all  development  types  regardless  of land use,  it  is  requested  that  requirement of Minimum  Experience  on  eligible  assignment be  replaced  with  “Experience  as  landscape architect for minimum 2 projects of area 500 acres each” j) Request to modify educational qualification to “Graduate with professional qualification in GIS”. Request to reduce length of professional experience to 7 years. h) As the structural design services have to be provided for few buildings, it is requested that requirement  of  Minimum  Experience  on eligible  assignment  be  removed  for  this position. 

each. j) Please refer Sl No 5  h)  Structural  Engineer:  Should  have experience  as  structural  engineer  for atleast one (1)  lakh sft builtup area  in industrial estates/Industrial Parks. 

35  2.16.7  26  The rates quoted shall be firm throughout the period of performance  of  the  assignment  up  to  and  including discharge of all obligations of the Consultant under the Agreement 

We would request that this clause is removed. Based on our  industry experience, the scope, scale  and  complexity  of  such  assignments require the clients to recognize change during the duration of the assignment. Such changes that are currently unforeseen and will have an impact  requiring  design  rework will  need  to be  compensated  for  by  the  client. Adequate clauses and protection for escalations caused by  extension  of  project  duration  for  reasons beyond control of  the consultant may please be included in the contract. 

RFP  clause holds  good.   Also  refer  to clause 6.4 of draft agreement. 

36  2.25.2  29  Substitution of Key Personnel  Under  current  market  this  sometimes  Clause 2.25.2 is revised as below.  

Page 16: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

The Authority expects the Key Personnel to be available during  implementation  of  the  Agreement.  The Authority  will  not  consider  substitution  of  the  Key Personnel except for reasons of any incapacity or due to health.  Such  substitution  shall  ordinarily  be  limited  to one Key Personnel subject to equally or better qualified and  experienced  personnel  being  provided  to  the satisfaction of the Authority. 

becomes difficult to manage. It  is requested this limit be increased to 3 Key personnel. 

 The  Authority  expects  the  Key Personnel  to  be  available  during implementation  of  the  Agreement. The  Authority  will  not  consider substitution  of  the  Key  Personnel except for reasons of any incapacity or due  to health.  Such  substitution  shall ordinarily be  limited  to Three  (3) Key Personnel subject to equally or better qualified  and  experienced  personnel being  provided  to  the  satisfaction  of the Authority.  

37  2.26  30  Indemnity:  The  Consultant  shall,  subject  to  the provisions of  the Agreement,  indemnify  the Authority, for an amount not exceeding value of  the Agreement, for any direct loss or damage that is caused due to any deficiency in Services 

Request you to kindly amend as follows: Indemnity:   The Consultant shall, subject to the provisions of  the  Agreement,  indemnify  the  Authority, for  an  amount  not  exceeding  value  of  the Agreement,  for  any  direct,  indirect  or consequential  loss  or  damage  that  is  caused due to any deficiency in Services. 

Considered.  

38  2.28  30  Execution of Agreement : Last  line: “The Selected Applicant  shall not be entitled to seek any deviation in the Agreement”. 

The  last  line  in  this paragraph may please be deleted.  The  scale  scope  and  nature  of  this  project needs  to  provide  clients  and  its  consultants necessary  flexibility  to  enable  changes.  This may  be  particularly  required  owing  to  the likely  long  duration  of  this  contract.  Such 

RFP  clause  holds  good.  Also  refer  to clause 6.4 of draft agreement.  

Page 17: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

clauses  limit  the  flexibility  for both  the client and consultant. 

39  3.1.2  33  Scoring Criteria Marks will be awarded based on  the overall  capability of  the  firm,  experience  of  similar  completed assignments etc. 

It  is requested that assignments that are 80% complete  –  technical  deliverables  are submitted  but  final  sanction  by  relevant authority  is awaited, are allowed  to be given as project experience 

RFP  Clause  holds  good.  Also  refer  Sl No 33.  

40  3.1.3 Sub 

clause (B) 

33  Eligible Assignments for technical scoring: Experience  of  Detailed  Master  Planning  and Infrastructure  Planning  of  Greenfield  Industrial  Park  / SEZ /Industrial Estate projects of 1500 Acres or above in a single project. 

As the total number of projects  for scoring  is 10,  it  is  requested  that  apart  from  the  first eligible  project,  other  9  projects may  be  for any of the two scope  items – detailed master planning or infrastructure planning. 

RFP clause holds good 

41  2.2.2 Sub 

Clause (E ) 

56  Support to TSIIC in Environmental Clearances & OtherGovernment Approvals 

At  what  stage  of  the  project  is  the  client expecting  that  they would begin  the process of  obtaining  environmental  approval  for  the project? We  request  the  client  to  review  the schedule considering this aspect 

TSIIC  is  in  the  process  of  appointing consultant  for  conducting  EIA  studies and  obtaining  environmental clearances. The EIA study activities will be  taken up  in parallel  to  the master planning and infrastructure planning & designs.  

42  2.2.1.1  50  Stage I : Overall Conceptual Master Plan and PreliminaryEngineering Designs for Infrastructure 

(f)  It  is  expected  that  for  any  external connectivity  or  trunk  infrastructure requirements or  linkages  the scope  is  limited to identification of those projects. Any survey, detailed  assessment  or  engineering  design will be undertaken separately and not part of this scope. Kindly confirm. 

Please refer Sl No 25. 

43  2.2.1.1  47  c) Preparation of comprehensive base map  

We would like to know if TSIIC has acquired or intends  to  acquire  a  high  resolution  satellite imagery  for  the  site. A  latest high  resolution georeferenced  satellite  imagery  is  required 

A  latest  high  resolution  satellite imagery  shall  be  procured  by  the consultant  for  carrying  out  the landuse  analysis  and  preparation  of 

Page 18: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

for  geo‐referencing  the  cadastral  data  and updating  the existing  land use plan prepared by  the  Telangana  State  Remote  Sensing Application  Centre.  We  suggest  that  TSIIC procures high  resolution  satellite  imagery  for the preparation of the base map and updating the existing land use. In case the existing land use prepared by  the TRSAC needs  significant work, we request  that  timelines be extended to accommodate any changes. 

comprehensive base map. 

44  2.1.2.  53  Stage II: Detailed Master Plan and Detailed EngineeringDesigns for NIMZ Phase‐ I area of about 3500 acres. 

The requirement is for detailed master plan of about 3500 acres. Necessary provision  in  the contract  be  kindly  built  wherein  if  during execution  of  services,  if  such  requirement increases  by  more  than  2%,  the  client  will suitably  increase  the  fee  in  agreement  with the consultant. 

The  envisaged  area  for  Phase  I  of NIMZ  is  plus  or  minus  10%  of  3500 acres.   Also  please  refer  clause  6.4  of  draft agreement.  

45  2.1.2.  44  Stage 6 : Construction Stage Kindly  specify  clearly  the  roles  and responsibilities of the consultant in respect to TSIIC. As per RFP  it appears TSIIC will appoint PMC  to  manage  the  entire  implementation and  as  such  it  should  not  be  expected  from the  consultant  to  “ensure  that  the  project proceeds  generally  in  accordance  with  the conditions of the work contract”. If the role is limited to design support during construction, it  is  strongly  suggested  the  PMC/  contractor be  asked  to  seek  such  clarifications within  2 months of LOA.  

RFP clause holds good.             

Page 19: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

Based on the recent  industry experience with NHAI  and  DMICDC,  many  large  projects including  infrastructure  for  industrial townships are being let out on EPC basis. The client  should  consider  such model which will allow  faster  implementation  and  more certainty in costs. The client can then use the PMC  to  manage  such  contracts,  which hopefully  then  should  not  require  large construction  supervision  and  design  support teams.  The  design  requirement  in  this contract  can  then  be  limited  to  preliminary design. 

RFP Clause holds good 

46  2.2.5.2  56  Additional or revised working drawings by the contractor  can be  for  several  reasons.  It  can be due to master plan changes or any external or  construction  requirement  that  is met  on the  ground.  It  also  depends  on  the contractors  capability.  Industry  experience suggests  contractors  keep  asking  for  more and  more  design  or  drawing  details  which allows them to claim delays later. It is proposed that either the client appoints a PMC  consultant  to manage  this  on  a  day  to day  basis  or  obtain  the  service  through  the design consultant on a time charge basis. 

RFP clause holds good. 

47  2.2.4  57  Stage 7: Completion stage:On completion of the project the consultant will prepare and submit five sets of all as built drawings along with one set of reproduction prints and a soft copy of the building 

As  built  drawings  along  with  commissioning and testing etc. type of activities are typically in the scope of the contractor and as such it is suggested that this be deleted from the scope 

RFP clause holds good. 

Page 20: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

and services of each site. of the consultant. TSIIC site team will be in the best  position  to  verify  such  drawings.  We suggest the statement be modified as follows: “As  built  drawings  furnished  by  the Contractor shall be verified by the consultant and  finalise  with  the  contractor  for submission to the Authority" 

48  2.2.4  57  The Consultants should prepare and provide operation & maintenance manuals for the buildings and all services as per standard practice. 

The standard practice  is for the contractor to provide operation  and maintenance manuals based on vendor supplied items and based on operating  parameters  of  the  equipment  and commissioning procedures.  . We  suggest  the statement  be  modified  as  “Operation  and maintenance  manuals  furnished  by  the Contractor shall be verified by the consultant and  finalise  with  the  contractor  for submission to the Authority"” 

The revised clause is as follows.  Operation  and maintenance manuals furnished  by  the  Contractor  shall  be verified by  the consultant and  finalise with  the contractor  for  submission  to the Authority. 

49  2.3  57  Schedule  The  proposed  schedule  is  aggressive  and provides  very  limited  time  to  the  consultant to carry out all of  the activities mentioned  in the  scope  of  works.  For  example,  detailed topographic  survey alone  for  the  said area  is likely to take 2 to 3 months. Time for Market analysis  and  survey  will  also  need  to  be factored in.  Based  on  our  industry  experience,  to complete master plan and detailed design it will  typically  require  about  24  months  to deliver.  Request  you  to  kindly  consider  the 

RFP clause holds good.             

Page 21: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

revised  schedule  of  services  and  time duration.  We  have  also  proposed  revised stage  names  and  sequence  based  on  our industry  experience  in  delivering  Master planning and engineering projects.  Kindly  clarify  how  is  the  schedule  for  EIA (which  would  include  atleast  1  season monitoring)  factored  into  the  time  schedule from LOA to tender and construction stage.  We would  also  request  you  to  factor  in  the time  within  the  schedule  that  would  be needed  for  internal  approvals  and  approvals from  stakeholders.  Based  on  our  industry experience,  to  complete  master  plan  and detailed design  it will  typically  require  about 24 months  to  deliver.  Request  you  to  kindly consider.  

          

50  3.2.8.4  55  Payment terms: The consultant shall raise the invoices for  It  is  requested  that  payment  terms  be  RFP clause holds good.  

Page 22: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

each of the aforementioned deliverable/stage upon completion and approval by the Authority thereof. 

modified to allow consultants to raise  invoice after  submission  of  deliverables  and  atleast 60%  payment  for  that  particular  stage  on submission  of  the  deliverable  pending approval.  Since the schedule  indicates that this  is a fast track  project,  getting  necessary  approvals within a  fixed duration of 2 weeks would be critical to proceed on to subsequent stages of work. Kind request to add such time limitation to  approvals within  the  payment  terms  and schedule.  It  is  requested  to  modify  the  payment schedule  to  include  10%  payment  on submission of the inception report.  Further,  about  25%  of  the  consultant’s payment  on  the  project  is  dependent  on factors outside  the  control of  the  consultant (client’s decision to float and award tenders  –  and  contractor’s  timely performance). Therefore any payment should not be linked to Stage 4. 

      Please refer RFP clause  in page no 58 as given below.   The  consultant  shall  raise  the  invoices for  each  of  the  aforementioned deliverable/stage  upon  completion and/or approval as the case may be, by the Authority thereof.  Please refer Sl No (11) 

51  2.4  57  Payment Schedule  Request to modify as below  Refer Sl No (11). 

Page 23: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

 

 

52  2.4  57  Note: Payments for services under Stage‐3 & Stage‐4 will be made on pro‐rata basis as per the actual work executed (in terms of expenditure incurred). 

We  request  that any payments be not  linked to  Stage  4,  as  all  design  deliverables will  be completed at Stage 3. 

RFP clause holds good 

53  2.5  59  The  above  scope  of  services  are  not  exhaustive  and  the Consultant  shall  undertake  such  other  tasks  as may  be necessary to prepared the overall conceptual master plan, Detailed Master  Plan  including  the  detailed  Designs  and cost estimates for the Phase‐1 of NIMZ project. 

Request to delete this clause. We suggest the client  identifies  any  possible  significant additions  to  the scope early and  includes the same  in the amendments to the RFP.  In view of successful implementation of the project, it is extremely  important  that  the client  is  fully aware of all scope items.  In  the  event  of  new  requirements  that  have significant  impact  on  consultant’s work,  and as given in Clause 6.4 of the draft Agreement, we  suggest  that  a  Variation  Order  be 

RFP  clause  holds  good.  Please  refer clause 6.4 of draft agreement. 

Page 24: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

applicable  as  per  the  accepted  industry standard process. 

54  2.9.5  63  However not‐with‐standing anything contained above, the liability of  the Consultants  shall  extend up  to  the period for  which  the  contractor’s  (engaged  by  the  Authority) liability  for  the  works  continues,  at  the  option  of  the Authority  and  the  same  shall  be  intimated  before  the expiry of the period mentioned in this agreement. 

This  leaves  the  liability  open  ended  for  the consultant.  It  is  suggested  this  be  limited  to maximum  2  years  from  the  completion  of Stage 5. 

The revised clause is as follows.  However  not‐with‐standing  anything contained  above,  the  liability  of  the Consultants  shall  extend  up  to  the period  for  which  the  contractor’s (engaged  by  the  Authority)  liability  for the  works  continues,  at  the  option  of the Authority  subject  to a maximum of two  (2)  years  from  the  completion  of Stage 4.

55  3.4.3  82  Request to modify as below: (i) Line 1: replace “negligence” with “fraud”; (ii) Line 5 Point (i): add at the end: “including loss of profit or revenue.” 

(i) Considered. (ii) RFP clause holds good 

56  3.4.4  82  Limitation of liability  Line 2: to add as underlined: “.. caused by the negligence of the Consultant .. “ 

RFP Clause holds good 

57  3.5.1 (d)  84  Second  line:  to  replace  “beneficiary”  with “certificate holder.” 

RFP Clause holds good 

58  3.12  85  Accuracy of DocumentsThe  Consultant  shall  be  responsible  for  accuracy  of  the data  collected  by  it  directly  or  procured  from  other agencies/authorities, the designs, drawings, estimates and all other details prepared by it as part of these services. 

The consultant should not be held responsible for  the  data  provided  by  other  agencies. Kindly amend this clause. To  add  as underlined:  “Client  shall  supply  to Consultant,  in a  timely manner, all necessary and  relevant data and  information necessary for  the Consultant  to progress and  complete the  Contract.  Consultant  shall  be  entitled  to rely  on  the  accuracy  and  completeness  of 

RFP Clause holds good 

Page 25: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

such data and information.” 59  7.1.1  88  Performance Security Performance  security  of  10%  is  high.  This 

should be kindly reduced to 5%. RFP Clause holds good 

60  7.2.2  90  Liquidated Damages  The  limits  under  Liquidated  Damages  be kindly  limited  to  5%.  It  is  difficult  for consultants  to  absorb  the  risk  of consequential  damages  hence  that  be included  in  all  contract  clauses  including clause including 7.2.2. 

The  revised  clause 7.2.2    ‐  Liquidated damages for delay is as follows.  In  case  of  delay  in  completion  of Services,  liquidated  damages  not exceeding  an  amount  equal  to  0.2% (zero  point  two  per  cent)  of  the Agreement Value per day, subject    to  a   maximum   of   5%    (five   per   cent)  of    the    Agreement    Value   will    be imposed  and  shall  be  recovered  by appropriation  from  the  Performance Security  or  otherwise.  However,  in case  of  delay  due  to  reasons  beyond the control of the Consultant, suitable extension of time shall be granted 

61  3.2.2  78  Conflict of Interest  To  add  as  underlined:  “  ..shall  not  apply  for any  project  resulting  from  or  closely  related to the Services for the period for two years for any  project where  the  Consultant  have  non‐public  information  obtained  during  the execution  of  the  Services  which  gives  the Consultant  an  unfair  competitive advantage……” 

RFP Clause holds good 

62  3.2.3  78  Conflict of Interest  To add as underlined: “during the term of this Contract,  any  business  or  professional 

RFP Clause holds good 

Page 26: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

activities  which  would  conflict  with  the activities  assigned  to  them  affect  the Consultant’s  capacity  to  render  impartial, technically  sound,  objective  assistance  and advice under this Contract;” and 

63      Government approvals To  add  as  underlined:  “Client  shall,  at  its expense,  obtain  all  approvals,  authorities, licences and permits which are required from governmental, municipal or other responsible authorities for the lawful implementation and completion of the project.” 

Please refer Sl No 26.  The  client  shall  bear  the fees/payments  to  be  made  to authorities while  obtaining  necessary approvals.  

64      Payment Variations  To add underlined: “The Parties agree  that  if there is a change in the scope, timing or order the Services,  including delays of approvals by third party beyond the time allowed for in the programme,  then  to  the  extent  such  change has  not  been  caused  by  a  breach  of  this Contract  by  the  Consultant,  the  Consultant shall be entitled  to additional payment of an amount which is agreed between the parties in advance to cover losses, expenses and costs incurred  and which  is  reasonable  under  the circumstances.” 

Please  ref  clause  6.4  of  draft agreement. 

65  3.1  32  Evaluation of Technical Proposals This is a large bid combining master planning, detailed  engineering  and  construction supervision.  To  ensure  fair  and  competitive bidding we  look  forward to  the desired man‐months  for  each  key  personnel  for undertaking the assignment. 

Based  on  the  similar  projects experience, the consultant is expected to  assess  the  optimum  number  of man‐months  for  various  key  persons and  support  staff  to  execute  the assignment in a time bound manner.  

Page 27: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

66  3.1.2  32  Scoring Criteria  For  a  Technical  /Infrastructure  Consultancy Firm based  in  India  (without considering  fees received  from audit and  tax  services)  an  INR 100  Crores  firm  is  a  large  size  firm.  We request  for  earmarking maximum marks  (10 marks)  for  firms  having  turnover more  than INR  100  Crores  (average  in  last  3  financial years).  Kindly consider and confirm. 

RFP clause holds good.   As per clause 2.1.1,  page  no  (9)  of  RFP,  the applicants  are  encouraged  to  submit the  bids  in  a  consortium  as  well  to maximise the scoring of their technical proposal. 

67  2.4  58  Payment Schedule  We  suggest  the  following  payment  terms against each of the required deliverables. This would  definitely  encourage  firms  like  us  to participate in the bid.  S.No. 

Payment Milestones   Suggested Payment Terms 

1  Inception Report   10% 2  On  Submission  of 

Overall  Conceptual Master  Plan  Report (Stage‐1 services)  

10% 

Please refer Sl No (11) 

Page 28: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

3  On  approval  of Overall  Conceptual Master  Plan  Report (Stage‐1  services)  by Client  and Government  of Telangana  

05% 

4  On  Submission  of Draft  Detailed Master  Plan  Report for  Phase‐1  of NIMZ (Stage‐2 Services)  

25% 

5  On  Submission  and approval  of  Final Detailed Master Plan Report  for  Phase‐1 of  NIMZ  (Stage‐2 Services)  by  Client and  Government  of Telangana  

10% 

6  On  statutory  layout approval  by Competent Authority

05% 

Page 29: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

7  On  providing requisite  details  to ESIA  Consultant  and receipt  of Environmental Clearance  for  NIMZ Project  

05% 

8  On  submission  and approval  of  services under Stage‐3  

25% 

9  On  submission  and approval  of  services under Stage‐4  

05% 

 Kindly consider and confirm!  

68  Appendix I Form B 10,12 & 13 

123,125 & 126 

CV format  The  RFP  indicates  12  positions.  It  would  be good to have a detailed CV format which gives maximum  scope  for  detailing  in  one  single comprehensive document, especially on each project.  Please  find  in Annexure  1,  a  sample CV format for your kind consideration.   In that case separate formats of Form 8, 10 & 12 would not be required. Kindly consider and confirm 

The formats shall be submitted as per the RFP.  

69  2.2.2(B)  11  To be eligible for evaluation of its Proposal, the Applicant shall fulfil the following: 

(A) Technical Capacity: The Applicant shall have, over the  past  10  (Ten)  years  preceding  the  PDD, 

We request you to modify the clause 2.2.2(B) as  Consultant  should  possess  experience  in preparation  of  Master  planning  and 

RFP clause holds good 

Page 30: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

undertaken  a  minimum  of  1  (One)  Eligible Assignments as specified in Clause 2.2.2 (B).  

(B) Eligible  Assignments:  For  the  purposes  of determining  Conditions  of  Eligibility  and  for evaluating  the  Proposals  under  this  RFP,  the following  projects  shall  be  deemed  as  eligible assignments (the “Eligible Assignments”). 

 Experience of Detailed Master Planning and Infrastructure Planning  of  Greenfield  Industrial  Park  /  SEZ  /Industrial Estate projects of 1500 Acres or above in a single project. 

Infrastructure  design  for  at  least  2‐3  similar projects  of  minimum  400  ‐500  Acres  with project  cost  closer  to  20  ‐  30  crores with  in last ten years. 

70        Break  down  of  payment  structure  for supervision stage:‐ Ideally we would like the compensation for per package to be paid in 3 parts: 

On award of Tender 30%  On 50% completion 30%  On Closure 40% 

Please refer Sl No (10) 

71        Can  Consortium  be  formed  between  entities of  same  group  of  companies?  If  so,  can payments be made  through  the  Indian entity since currency of payment is in INR, to reduce hedging element. 

Consortium  can  be  formed  between entities  of  same  group  of  companies duly following clause 2.1.1 of the RFP.  The  lead member  of  the  consortium shall meet the minimum technical and financial  criteria  stipulated  in  clause 2.2.2 of the RFP. Further, the LoA and agreement  for  the  consultancy services would  be  executed with  the lead member  of  the  consortium  and 

Page 31: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

joint bidding agreement  submitted as per  of  the  proposal  would  be  an integral  part  of  the  agreement  to  be executed. 

72        Primary  data  collection  and  extent  of assurance of quality of existing data needs to be  provided  by  TSIIC  to  price  the  bid accurately. 

Please refer SL No (20) 

73        External  connectivity  clarity  on  list  of major infrastructure to be considered. 

Please refer Sl No (25) 

74        Since primary field survey and investigation is accounted for first two months of work, we request  that  a  5%  advance  at  submission  of inception report would be very useful. 

Please refer SL No (11) 

75  2.2.2      We request you to please accept Team leader from any member of the consortium 

RFP clause holds good 

76      General  Please extend  the  timeline  for  submission of bid due to quantum of work. 

Please refer Sl No (14) 

77  3.1.3      Do you consider  if  the  single project of 1500 acres or above in a single project is ongoing 

RFP Clause holds good 

78        Please Provide us with  large scale Plan  (Auto Cad)  of  the  entire  area  showing  physical features and levels, wind direction in morning and evening 

Consultant shall prepare the same.  

79        Is  Entire  land  12,635.14  acres  already acquired  and  is  in Possession of  TSIIC.  If not please  quantify  land  still  to  be  acquired  and Location to be marked in the Plan 

Please refer SL No (20) 

81        Is  the  land  for  the  Project  is  free  from  The  selected  consultant  shall  assess 

Page 32: SELECTION OF CONSULTANT FOR PREPARATION OF …tsiic.telangana.gov.in/wp-content/uploads/2017/02/... · 6 3.1.2 32 The scoring criteria to be used for evaluation shall be as follows:

 Sl No 

Clause No 

Pg No 

Clause as Per RFP  Query  Clarification/Response 

habitation  and  cultivation?  If  not where  you Propose  to  relocate  the  Population,  its housing,  social  and  other  Infrastructure  and Cultivation  fields.  Please  specify  location  in the plan 

the same. 

82        Please mention Location of   H.T Line & wind Power Parks if any in the vicinity 

The  selected  consultant  shall  assess the same. 

83        Mention if there is a Proposal for setting up a solar/wind Power Park  in the vicinity by TSIIC or Government  of Telangana . 

Not relevant. 

84        List  of  Cottage/Tiny  Industries  in  the  vicinity (Rural  Area‐  NYALKAL,  JHARASANGAM MANDAL) 

The  selected  consultant  shall  assess the same. 

85        Please share Market Survey  (if already Done) in  regard  to  Type  of  industries  to  come  in proposed Area. 

The  selected  consultant  shall  assess the same.