8/11/2019 SEI Student Design Competition 2014
1/66
CEE DAY PRESENTATIONGROUP: RIM3SENGINEERINGFernando Rabell
Joaquin IglesiasPatrick McAlpine
James Matzke
Sean Muirhead
-
8/11/2019 SEI Student Design Competition 2014
2/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
2
-
8/11/2019 SEI Student Design Competition 2014
3/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
3
-
8/11/2019 SEI Student Design Competition 2014
4/66
HOWITSTARTED
When?
July 2012
Who?
Engineering Service Trip, led by Mr. Jordan Ermilio, PE What we did:
This was a fact finding mission
What we learned:
They needed a Pre-School
4
-
8/11/2019 SEI Student Design Competition 2014
5/66
PROJECTDESCRIPTION
Location
Trapaing Chres, Ratanak Kiri, Cambodia
Use
Pre-School for approx. 80 students Footprint 500 m2( 5380 sq. ft)
Clients and Partners
Caramanico Foundation
Peggy Marble
Michael Oei, Architect
5
-
8/11/2019 SEI Student Design Competition 2014
6/66
-
8/11/2019 SEI Student Design Competition 2014
7/66
-
8/11/2019 SEI Student Design Competition 2014
8/66
SITEMAPKitchen
Boys & GirlsDorms
Lower-HighSchool
Elementary
Kindergarten
N
SelectedPreschoolLocation
Forested Area
Bathroom
Bathroom
8
-
8/11/2019 SEI Student Design Competition 2014
9/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
9
-
8/11/2019 SEI Student Design Competition 2014
10/66
10
DESIREDDESIGN
-
8/11/2019 SEI Student Design Competition 2014
11/66
PRE-SCHOOLRENDER
11
-
8/11/2019 SEI Student Design Competition 2014
12/66
OVERVIEW
Contents
Description of Project
Current Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
12
-
8/11/2019 SEI Student Design Competition 2014
13/66
REFERENCETEXTS
ACI 318-11
IBC 2012
ASCE 7-10
13
-
8/11/2019 SEI Student Design Competition 2014
14/66
DESIGNLOADS
Composed of:
Dead Loads:
loads that are relatively constant overtime
for example: floor tiles, carpet, walls
Live Loads:
short, temporary, or moving loads
for example: people, desks, chairs
Wind Loads Earthquake / Seismic Loads
14
-
8/11/2019 SEI Student Design Competition 2014
15/66
DEADLOADS
Roof:
Beams Self Weight*
Girders Self Weight* Roof Support System
Roof Shingles
Solar Panels
Floor
Columns
Masonry Walls
4 Concrete Decking
= 6 psf
= 25 psf
= 5 psf
= 21 psf
= 3 psf
= 10 psf
= 58 psf
= 50 psf
Section Load
*- Self-weight will be included when designing each specific member
15
-
8/11/2019 SEI Student Design Competition 2014
16/66
LIVELOADS
Roof: Roof, Maintenance
Gable Roof
Floor: Corridor
Classrooms
= 300 lbs
= 20 psf
= 100 psf
= 40 psf
Section Load
IBC Code- Table 1607
16
-
8/11/2019 SEI Student Design Competition 2014
17/66
WINDLOADS
ASCE 7 Chapter 28 , Envelope Procedure - Part1
Wind Loads Based on:Type of building/structure type
Wind Speed
Topography
Height of building
Building surface
-
8/11/2019 SEI Student Design Competition 2014
18/66
WINDLOADS
Designed as: Low-Rise Building (h
-
8/11/2019 SEI Student Design Competition 2014
19/66
BUILDINGSURFACES
12
ASCE 7-10 Figure 28.4-1
-
8/11/2019 SEI Student Design Competition 2014
20/66
BUILDINGSURFACES
13
ASCE 7-10 Figure 28.4-1
-
8/11/2019 SEI Student Design Competition 2014
21/66
DESIGNWINDPRESSURE
21
Building
SurfacePmin(psf)
Pmax
(psf)
Building
SurfacePmin
(psf)
Pmax
(psf)
1 -22.8 25.3 1E -23.5 28.3
2 -28.3 17.3 2E -37.0* 18.7
3 -22.4 4.1 3E -24.7 0.5
4 -21.0 4.1 4E -23.5 1.6
5 -3.4 21.7 5E 1.4 26.5
6 -19.2 5.9 6E 22.4 2.7
Use 37.0 psf for design
-
8/11/2019 SEI Student Design Competition 2014
22/66
SEISMICLOAD
Product of ground motion and mass of structure
Ground acceleration causes both horizontal forcesand vertical forces
Seismic design coefficients provided by USGS, andformulas given by IBC and ASCE 7 allow simplecalculations that convert ground motion into loads
Load Used
Eh
- 36 kip (horizontal)
Ev - 18 kip (vertical)
22
-
8/11/2019 SEI Student Design Competition 2014
23/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
23
-
8/11/2019 SEI Student Design Competition 2014
24/66
24
FRAMING
Structural system
Simple column-beam design with a slab floor.
Masonry Unit walls
Gable roof
Reasoning
Limited construction materials
Ascetics
Durability
-
8/11/2019 SEI Student Design Competition 2014
25/66
25
FRAMING
Building Over View
Four Class Rooms
Library
Office
Bathrooms
-
8/11/2019 SEI Student Design Competition 2014
26/66
FRAMING
Building Over View
Four Class Rooms
Library
Office
Bathrooms
26
-
8/11/2019 SEI Student Design Competition 2014
27/66
FRAMING
Building Over View
Four Class Rooms
Library
Office
Bathrooms
27
-
8/11/2019 SEI Student Design Competition 2014
28/66
-
8/11/2019 SEI Student Design Competition 2014
29/66
FRAMING
Building Over View
Four Class Rooms
Library
Office
Bathrooms
29
-
8/11/2019 SEI Student Design Competition 2014
30/66
-
8/11/2019 SEI Student Design Competition 2014
31/66
31
MEMBERDESIGN
STAAD model
Max Moment = 392 kip-in
Max Axial = 43.5 kips
-
8/11/2019 SEI Student Design Competition 2014
32/66
32
MEMBERSIZES
Column
Roof Column (40) = 16.0 kips
First Floor Column (46) = 23.7 kips
Foundation Column (46) = 43.5 kips
Design
8.5 in x 8.5 in (220 mm x 220 mm)
4 #4 bars (14mm - European Size)
8.5 in Tie Spacing (220 mm)
Capacity
Pn =127.9 kips
-
8/11/2019 SEI Student Design Competition 2014
33/66
33
MEMBERSIZES
Column Cross Section
-
8/11/2019 SEI Student Design Competition 2014
34/66
34
MEMBERSIZES
Beams (18)
Each was individually designed
Range of moments: 105 - 392 kip-in
Design
12 in x 8.5 in (300 mm x 220 mm)
16 in x 8.5 in (400 mm x 220 mm)
Number of rebar: 4 - 8
Size of rebar: #3 - #4 (8 mm - 12 mm)
-
8/11/2019 SEI Student Design Competition 2014
35/66
35
MEMBERSIZING
Example Beam Cross Section
-
8/11/2019 SEI Student Design Competition 2014
36/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
36
-
8/11/2019 SEI Student Design Competition 2014
37/66
37
ESTIMATION
Foundation
Quantity Material Price of
Material/Unit
Total
Footings 13.8 m3 Concrete $ 139.40 $ 1,930
Columns 4.46 m3 Concrete $ 139.40 $ 630
Dividers 22,620 bricks CMU $ 0.09 $ 1,930
Total $ 4,490
-
8/11/2019 SEI Student Design Competition 2014
38/66
38
Foundation
Quantity Material Price of
Material/Unit
Total
Footings 13.8 m3 Concrete $ 139.40 $ 1,930
Columns 4.46 m3 Concrete $ 139.40 $ 630
Dividers 22,620 bricks CMU $ 0.09 $ 1,930
Total $ 4,490
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
39/66
39
Foundation
Quantity Material Price of
Material/Unit
Total
Footings 13.8 m3 Concrete $ 139.40 $ 1,930
Columns 4.46 m3 Concrete $ 139.40 $ 630
Dividers 22,620 bricks CMU $ 0.09 $ 1,930
Total $ 4,490
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
40/66
40
Foundation
Quantity Material Price of
Material/Unit
Total
Footings 13.8 m3 Concrete $ 139.40 $ 1,930
Columns 4.46 m3 Concrete $ 139.40 $ 630
Dividers 22,620 bricks CMU $ 0.09 $ 1,930
Total $ 4,490
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
41/66
41
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
42/66
42
ESTIMATION
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
-
8/11/2019 SEI Student Design Competition 2014
43/66
43
ESTIMATION
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
-
8/11/2019 SEI Student Design Competition 2014
44/66
44
ESTIMATION
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
-
8/11/2019 SEI Student Design Competition 2014
45/66
45
ESTIMATION
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
-
8/11/2019 SEI Student Design Competition 2014
46/66
46
ESTIMATION
First Floor
Quantity Material Price of Material/Unit Total
Concrete Slab 52.51 m3 Concrete $ 139.40 $ 7,320
Columns 8.91 m3 Concrete $ 139.40 $ 1,250
Beams 7.77 m3 Concrete $ 139.40 $ 1,090
Girders 6.22 m3 Concrete $ 139.40 $ 870
Walls 89,550 bricks CMU $ 0.09 $ 7,620Total $ 18,150
-
8/11/2019 SEI Student Design Competition 2014
47/66
47
Roof
Quantity Material Price of Material/Unit Total
Columns 3.7 m3 Concrete $ 139.40 $ 520Beams 7.56 m3 Concrete $ 139.40 $ 1,060
Walls 18,800 bricks CMU $ 0.09 $ 1,600
C Channels 122 sections Aluminum $ 183.00 $ 22,240
L Angles 806 sections Aluminum $ 20.00 $ 16,290
Shingles 584 m2 Clay $ 13.50 $ 7.890
Total $ 49,600
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
48/66
48
ESTIMATIONRoof
Quantity Material Price of Material/Unit Total
Columns 3.7 m3 Concrete $ 139.40 $ 520Beams 7.56 m3 Concrete $ 139.40 $ 1,060
Walls 18,800 bricks CMU $ 0.09 $ 1,600
C Channels 122 sections Aluminum $ 183.00 $ 22,240
L Angles 806 sections Aluminum $ 20.00 $ 16,290
Shingles 584 m2 Clay $ 13.50 $ 7.890
Total $ 49,600
-
8/11/2019 SEI Student Design Competition 2014
49/66
49
ESTIMATIONRoof
Quantity Material Price of Material/Unit Total
Columns 3.7 m3 Concrete $ 139.40 $ 520Beams 7.56 m3 Concrete $ 139.40 $ 1,060
Walls 18,800 bricks CMU $ 0.09 $ 1,600
C Channels 122 sections Aluminum $ 183.00 $ 22,240
L Angles 806 sections Aluminum $ 20.00 $ 16,290
Shingles 584 m2 Clay $ 13.50 $ 7.890
Total $ 49,600
-
8/11/2019 SEI Student Design Competition 2014
50/66
-
8/11/2019 SEI Student Design Competition 2014
51/66
51
ESTIMATIONRoof
Quantity Material Price of Material/Unit Total
Columns 3.7 m3 Concrete $ 139.40 $ 520Beams 7.56 m3 Concrete $ 139.40 $ 1,060
Walls 18,800 bricks CMU $ 0.09 $ 1,600
C Channels 122 sections Aluminum $ 183.00 $ 22,240
L Angles 806 sections Aluminum $ 20.00 $ 16,290
Shingles 584 m2 Clay $ 13.50 $ 7.890
Total $ 49,600
-
8/11/2019 SEI Student Design Competition 2014
52/66
52
ESTIMATION
Bathrooms
Quantity Material Price of Material/Unit Total
Piping System 146 m PVC $ 7.77 $ 1,410
Water Tanks 130 bricks CMU $ 0.09 $ 20
Walls 27,104 bricks CMU $ 0.09 $ 2,310
E
-
8/11/2019 SEI Student Design Competition 2014
53/66
53
ESTIMATION
Bathrooms
Quantity Material Price of Material/Unit Total
Piping System 146 m PVC $ 7.77 $ 1,410
Water Tanks 130 bricks CMU $ 0.09 $ 20
Walls 27,104 bricks CMU $ 0.09 $ 2,310
E
-
8/11/2019 SEI Student Design Competition 2014
54/66
54
ESTIMATION
Bathrooms
Quantity Material Price of Material/Unit Total
Piping System 146 m PVC $ 7.77 $ 1,410
Water Tanks 130 bricks CMU $ 0.09 $ 20
Walls 27,104 bricks CMU $ 0.09 $ 2,310
E
-
8/11/2019 SEI Student Design Competition 2014
55/66
55
Bathrooms
Quantity Material Price of Material/Unit Total
C Channels 20 sections Aluminum $ 98.00 $ 1,950
L Angles 48 sections Aluminum $ 22.00 $ 1,040
Shingles 36 m2 Clay $ 13.50 $ 490
Wash Stations 1,112 bricks CMU $ 0.09 $ 100
Total $ 7,320
ESTIMATION
E
-
8/11/2019 SEI Student Design Competition 2014
56/66
56
Bathrooms
Quantity Material Price of Material/Unit Total
C Channels 20 sections Aluminum $ 98.00 $ 1,950
L Angles 48 sections Aluminum $ 22.00 $ 1,040
Shingles 36 m2 Clay $ 13.50 $ 490
Wash Stations 1,112 bricks CMU $ 0.09 $ 100
Total $ 7,320
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
57/66
E
-
8/11/2019 SEI Student Design Competition 2014
58/66
58
Labor Cost
Quantity Material Price of Material/Unit Total
Labor 5 workers Skilled andUnskilled
$ 8.75/day $ 4,000
ESTIMATION
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
59/66
59
Total CostsSection Total
Foundation $ 4,490
First Floor $ 18,150
Roof $ 49,600Bathrooms $ 7,320
Labor $ 4,000
Total $ 83,560
Contingency % 10
Total $ 92,000
ESTIMATION
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
60/66
60
ESTIMATION
-
8/11/2019 SEI Student Design Competition 2014
61/66
OVERVIEW
Contents
Description of Project
Desired Design
Design Loads Framing and Sizing
Cost Estimates
Concrete Testing
61
-
8/11/2019 SEI Student Design Competition 2014
62/66
CONCRETETESTING
Volcano style mixing
Gravel currently used
Sand currently used
62
-
8/11/2019 SEI Student Design Competition 2014
63/66
Pour
3 Course Aggregate
2 Fine Aggregate
1 Cement
.45 Water
7 Day Test (Two Cylinders)
4,000 psi
14 Day Test (Two Cylinders)
4,500 psi
28 Day Test (14 Cylinders)
3,000-6,000 psi (average of 5300 psi)
63
CONCRETETESTING
-
8/11/2019 SEI Student Design Competition 2014
64/66
64
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Load
(lb.
)
Position (in.)
28 Day Cylinder Tests
CONCRETETESTING
-
8/11/2019 SEI Student Design Competition 2014
65/66
RECAP
Member Sizes
Columns
220 mm x 220 mm
Beams
300 mm x 220 mm or 400 mm x 220 mm
Cost
$ 91,000
Compression Strength for Design
fc= 3,000 psi
65
-
8/11/2019 SEI Student Design Competition 2014
66/66
ACKNOWLEDGEMENTS
Caramanico Foundation Thomas & Anne Caramanico
Peggy Marble
Prof. Jordan Ermilio, PE
Monie and Natalie
In country partners
Prof. Zeyn Uzman, PE
66