Seepage Consideration - Earth Embankments and Levees

32
schnabel-eng.com Controlling Seepage Along Penetrations Through Dams and Levees Joseph S. Monroe, PE Levee and Embankment Workshop International Commission on Large Dams Seattle, Washington

description

Hydraulic dams control

Transcript of Seepage Consideration - Earth Embankments and Levees

schnabel-eng.com

Controlling Seepage Along

Penetrations Through Dams and

LeveesJoseph S. Monroe, PE

Levee and Embankment Workshop

International Commission on Large Dams

Seattle, Washington

Cause of Failure?

Background

� Types of Penetrations

� History Seepage Control Measures

� Design Considerations

� Construction Considerations

Types of Penetrations

� Conduits

� Spillways

Types of Penetrations

� Transportation Facilities

� Utilities

Historic Seepage Control Measures

� Anti-Seep Collars

Historic Seepage Control Measures

� Anti-Seep Collars

� Relatively Simple Design

� Extensive Manual Labor

� Difficult to Achieve Desired Results

Historic Seepage Control Measures

� Anti-Seep Collars

Historic Seepage Control Measures

� Use of Anti-Seep Collars Rescinded

� 1974 - USACE Technical Letter 1110-2-180

� 1974 - USACE Technical Letter 1110-2-192

� 1987 - USBR Assistant Commissioner Engineering and Research Technical Memorandum Number 9

� 2005 – Federal Emergency Management Agency Document 484

Historic Seepage Control Measures

� Rescinding Use of Anti-Seep Collars –

Alternatives to Reduce and Control

Seepage

� Filters

� “Cement Slurry in Haunch Areas of Pipe” or Concrete Cradle

Design Considerations

� Cradles for Pre-Cast Conduits

� Battered/Sloping Walls for Cast In-place

Construction

� Rigidly Behaving Structures that

Articulate with Embankment Movement

� Filters

Cradles

� “Cement Slurry in Haunch Areas of

Pipe” or Concrete Cradle

Battered Walls

Battered Cradles

Conduit and Cast-in-Place Concrete

Design Considerations

� Rigidity

� Conduits Should be Designed to Act Rigidly Under Loads Imposed – Three Edge Bearing Loads for Conduits

� Design for At-Rest Pressure to Limit Potential for Movement and Separation to Occur

� Allow for Articulation at Controlled

Locations

Conduit and Cast-in-Place Concrete

Design Considerations (continued)

� Durability

� Select Materials With Anticipated Life Spans Greater than 100-years

� Consider Bond between Selected

Materials and Soil

� Concrete versus Plastic

� Filters

� Use Accepted Criteria to Properly Design Filters to Prevent Movement of Soil Particles

Conduit and Cast-in-Place Concrete

Design Considerations (continued)

� Cradle/Battered Wall Geometry

� Facilitate Placement of Concrete

� Facilitate Placement and Compaction of Soil

� Improve Contact Between Soil and Concrete

� Articulation

Filters

Construction Considerations

� Use of Mud Slabs

� Concrete Placement

� Placement and Compaction of Soils

� Moisture Content

� Compaction Methods

� Equipment Selection

Construction Considerations

� Mud Slabs

� No Wider than Base Width of Structure

� Joints at each Construction Joint

� Rough Finish Perpendicular to Flow

Mud Slabs

Mud Slabs

Mud Slabs

Construction Considerations

� Concrete Placement

� Use Reasonable Slump Concrete

� Too Dry Prevents Adequate Movement and

Contact with Foundation and Conduits

� Too Wet Inhibits Strength and Increases

Shrinkage

� Use Vibrators to Consolidate Concrete

� Place Concrete from One Side Only To Prevent Creation of ‘Air Lock’

Concrete Placement

Construction Considerations

� Soil Placement and Compaction

� Wet of Optimum

� Control Particle Size

� Selection of Material Type

� Selection of Compaction Method

Soil Placement and Compaction

Soil Placement and Compaction

Cause of Failure???

Backfill, Design, Concrete Placement?

Concrete Placement

Thank-You