Sedco Energy: Jubilee Completions - xcd.com · Sedco Energy: Jubilee Completions LOCATION Offshore...

2
“ The efforts of the Exceed Coaches offshore was the cornerstone of the performance effort. The focus provided by the coaches to ask the right questions and not give up until tangible solutions were identified is really where we made the performance gains.” Drilling Manager Performance Management Case Study www.xcd.com Tullow Ghana were required to increase oil production to their FPSO from the Jubilee and TEN fields offshore Ghana. Exceed helped to build a project team which optimised the Sedco Energy to realise project savings of $100M and an increase in oil production of 20,000 BOPD. Sedco Energy: Jubilee Completions LOCATION Offshore Ghana DURATION 2012 - 2014 HSE 1 year LTI free COST SAVINGS $100 Million EFFICIENCY Increase in production of 20,000 BOPD ENVIRONMENT Zero spills Days Time - Planned vs Actual (Productive & Non-Productive Time) 60 40 20 0 Plan Productive Time NPT J22 Nov 2012 - Jan 2013 May 2013 - Dec 2013 J21 WI J-19 J20 J-26 GI J-18 WI Casing Leak Drawworks Brakes

Transcript of Sedco Energy: Jubilee Completions - xcd.com · Sedco Energy: Jubilee Completions LOCATION Offshore...

Page 1: Sedco Energy: Jubilee Completions - xcd.com · Sedco Energy: Jubilee Completions LOCATION Offshore Ghana DURATION 2012 - 2014 HSE 1 year LTI free COST SAVINGS $100 Million EFFICIENCY

“ The efforts of the Exceed Coaches offshore was the cornerstone of the performance effort. The focus provided by the coaches to ask the right questions and not give up until tangible solutions were identified is really where we made the performance gains.”

Drilling Manager

Performance Management Case Study

www.xcd.com

Tullow Ghana were required to increase oil production to their FPSO from the Jubilee and TEN fields offshore Ghana. Exceed helped to build a project team which optimised the Sedco Energy to realise project savings of $100M and an increase in oil production of 20,000 BOPD.

Sedco Energy: Jubilee Completions

LOCATIONOffshore Ghana

DURATION2012 - 2014

HSE1 year LTI free

COST SAVINGS$100 Million

EFFICIENCYIncrease in production

of 20,000 BOPD

ENVIRONMENTZero spills

Days

Time - Planned vs Actual (Productive & Non-Productive Time)

60

40

20

0

Plan Productive Time NPT

J22

Nov 2012 - Jan 2013 May 2013 - Dec 2013

J21 WI J-19J20 J-26 GI J-18 WI

Casing Leak

Drawworks Brakes

Page 2: Sedco Energy: Jubilee Completions - xcd.com · Sedco Energy: Jubilee Completions LOCATION Offshore Ghana DURATION 2012 - 2014 HSE 1 year LTI free COST SAVINGS $100 Million EFFICIENCY

iVISION enables smarter collaboration, managing project information efficiently and effectively from planning to execution.

• Real time learning and communication between wellsite and the engineering team

• best practice instantly shared

• accelerated learning

• enhanced safety

• immediate cost savings

At Exceed we believe that unifying everyone involved in a project and forging one common identity is vital for collaboration, cohesion and commitment.

Creating a team identity is an exceptionally important early step towards project success and that’s why at the outset of every project we ask all project team members to submit suggestions for a logo which is then featured on all project documentation.

FOR MORE INFORMATION PLEASE CONTACT:

Ian Mills | Managing Director +44 (0) 1224 577944 | [email protected]

Tim Wigham | Head of Performance Improvement +44 (0) 1224 577946 | [email protected]

www.xcd.com

Sedco Energy: Jubilee Completions

REVIEW ENGAGE

EXECUTE

SA

FETY CULTURE

SA

FETY C U LTU

RE

TRA

NSF

ORMATION LEADERSH

IP

COLLABORATION PLATFORM: iVISIO

N

Recognition & Morale

Performance

Reporting

Exe

cutio

n

Revie

w

Aft

er

Act

ion

R

evie

w

Less

ons

Close

Out

WorkSmart

Read

iness

to

Exe

cute

AWO

P

Induction

& Identity

AdvancePlanning

VideoRecord

Measu

rem

ent

Enhancing SAFETY

Preserving ENVIRONMENT

Assuring INTEGRITY

Improving EFFICIENCY

Reducing COSTS

Project Overview

Tullow Ghana contracted an express class, dynamic positioned semi-sub from

Transocean, to enable them to implement an ambitious field development

strategy offshore Ghana. Exceed was contracted to support the rig leadership

in accelerating the learning curve and establishing a high-performance

culture with a very diverse team on this challenging rig.A performance culture

assessment was conducted upfront to identify areas of concern, and to enrol

the frontline leaders in the performance improvement initiative.Thereafter,

embedded performance coaches on the rig, and focused help onshore, ensured

that a structured performance approach was followed in order to plan and

learn as effectively as possible. A valuable video-library of weekly reviews and

operational phases was also particularly useful on this campaign.

Unique 12 Step Process

KPI Actual

Induction Sessions 147

Advance planning Meetings

270

After Action Reviews 124

Lessons Learned Close Out Calls

8

Lessons Learned 715

WorkSmart 99 Winners 50% Closed

Lessons Closed 98%

Video Library (Operational Videos)

67

Video Library (Weekly Reviews)

98Complete

In Progress

Incomplete