SECTIONAL DIAGRAM

4
The spacious units are well-prepared for your capabilities to make it big. With close to 6 metres high ceiling, the units are readily designed for future expansions. SECTIONAL DIAGRAM ROOFTOP Gym, BBQ Pits & 50m Pool at the rooftop garden LEVEL 4 Offices/light industrial - 5.95m floor-to-floor height LEVEL 3 Offices/light industrial - 5.95m floor-to-floor height LEVEL 2 Offices/light industrial - 5.95m floor-to-floor height Offices/light industrial - 5.95m floor-to-floor height LEVEL 1 BASEMENT Carpark Artist’s Impression Heights are approximate and subject to change www.huttonsgroup.com

Transcript of SECTIONAL DIAGRAM

Page 1: SECTIONAL DIAGRAM

The spacious units are well-prepared for

your capabilities to make it big. With close

to 6 metres high ceiling, the units are readily

designed for future expansions.

SECTIONALDIAGRAM

ROOFTOPGym, BBQ Pits & 50m Pool at the rooftop garden

LEVEL 4Offices/light industrial - 5.95m floor-to-floor height

LEVEL 3Offices/light industrial - 5.95m floor-to-floor height

LEVEL 2Offices/light industrial - 5.95m floor-to-floor height

Offices/light industrial - 5.95m floor-to-floor height

LEVEL 1

BASEMENT Carpark

Artist’s ImpressionHeights are approximate and subject to change

www.huttonsgroup.com

Page 2: SECTIONAL DIAGRAM

BASEMENT STOREY PLAN

DIAGRAMMATIC CHART

4th Storey

#04-142F

3843sf

#04-152E

3584sf

#04-162C

2573sf

#04-172C

2573sf

#04-182D

2809sf

#04-192Ca

2573sf

#04-202C

2573sf

#04-212C

2573sf

#04-222C

2573sf

#04-232C

2573sf

#04-242B

2433sf

#04-252A

3251sf

3rd

Storey

#03-142F

3843sf

#03-152E

3584sf

#03-162C

2573sf

#03-172C

2573sf

#03-182D

2809sf

#03-192Ca

2573sf

#03-202C

2573sf

#03-212C

2573sf

#03-222C

2573sf

#03-232C

2573sf

#03-242B

2433sf

#03-252A

3251sf

2nd

Storey

#02-132F

3843sf

#02-142E

3584sf

#02-152C

2573sf

#02-162C

2573sf

#02-172D

2809sf

#02-182Ca

2573sf

#02-192C

2573sf

#02-202C

2573sf

#02-212C

2573sf

#02-222C

2573sf

#02-232B

2433sf

#02-242A

3251sf

1st

Storey

#01-111F

2691sf

#01-121D

2454sf

#01-131D

2454sf

#01-141D

2454sf

#01-151E

2314sf

#01-161Da

2454sf

#01-171D

2454sf

#01-181D

2454sf

#01-191D

2454sf

#01-201C

2336sf

#01-211B

2336sf

#01-221A

2530sf

#01-231M

2013sf

4th Storey

#04-012M

4176sf

#04-022H

2357sf

#04-032H

2357sf

#04-042H

2357sf

#04-052H

2357sf

#04-062H

2357sf

#04-072H

2357sf

#04-082H

2357sf

#04-092H

2357sf

#04-102H

2357sf

#04-112H

2357sf

#04-122H

2357sf

#04-132G

2895sf

3rd

Storey

#03-012M

4176sf

#03-022H

2357sf

#03-032H

2357sf

#03-042H

2357sf

#03-052H

2357sf

#03-062H

2357sf

#03-072H

2357sf

#03-082H

2357sf

#03-092H

2357sf

#03-102H

2357sf

#03-112H

2357sf

#03-122H

2357sf

#03-132G

2895sf

2nd

Storey

#02-012M

4176sf

#02-022L

3757sf

#02-032K

3703sf

#02-042H

2357sf

#02-052H

2357sf

#02-06 2J

2357sf

#02-072J

2357sf

#02-082H

2357sf

#02-092H

2357sf

#02-102H

2357sf

#02-112H

2357sf

#02-122G

2895sf

1st

Storey

#01-011L

3541sf

#01-021K

2476sf

#01-031K

2476sf

#01-041K

2476sf

#01-051K

2476sf

#01-061J

3057sf

#01-071H

2551sf

#01-081Ga

2131sf

#01-091G

2142sf

#01-10CANTEEN6469sf

LIFT

LO

BBY

MAI

NEN

TRAN

CE

All plans are inclusive of AC ledge, void, ancillary office and/or basement, where applicable. The plans are subject to changes as may be required or approved by relevant authorities. The cross-dotted lines are indications of the mezzanine area. The plans are not drawn to scale and are for the purpose of a visual presentation of the different layouts that are available.

0 5 10 15m

6M WIDE DRIVEWAY

LAN

DS

CA

PE

D G

AR

DE

N

(OP

EN

TO S

KY

)

6.6M W

IDE

DR

IVE

WAY

CO

MM

ON

CA

RPA

RK

LOTS

CO

MM

ON

CA

RPA

RK

LOTS

CO

MM

ON

CA

RPA

RK

LOTS

CO

MM

ON

CA

RPA

RK

LOTS

6M W

IDE

DR

IVE

WAY

4M WIDE DRIVEWAY

#01-23

#01-07

Showroom Units

Units with Basement

Standard Units with Mezzanine

Standard Units

Canteen Unit

All areas indicated are inclusive of strata void.

www.huttonsgroup.com

Page 3: SECTIONAL DIAGRAM

2ND STOREY PLAN

All plans are inclusive of AC ledge, void, ancillary office and/or basement, where applicable. The plans are subject to changes as may be required or approved by relevant authorities. The cross-dotted lines are indications of the mezzanine area. The plans are not drawn to scale and are for the purpose of a visual presentation of the different layouts that are available.

0 5 10 15m

1ST STOREY PLAN

All plans are inclusive of AC ledge, void, ancillary office and/or basement, where applicable. The plans are subject to changes as may be required or approved by relevant authorities. The cross-dotted lines are indications of the mezzanine area. The plans are not drawn to scale and are for the purpose of a visual presentation of the different layouts that are available.

0 5 10 15m

#01-09#01-08

#01-22

#01-21

#01-20#01-19

#01-18#01-17

#01-16

#01-15#01-14

#01-13#01-12

#01-11#01-10#01-07

#01-06#01-05

#01-04#01-03

#01-02#01-01

#02-13

#02-14

#02-15

#02-16

#02-17

#02-18

#02-19

#02-20

#02-21

#02-22#02-23

#02-24

#02-10#02-11

#02-12#02-09

#02-08#02-07

#02-06#02-05

#02-04

#02-03#02-02

#02-01

www.huttonsgroup.com

Page 4: SECTIONAL DIAGRAM

SPECIFICATIONS3RD & 4TH STOREY PLAN

All plans are inclusive of AC ledge, void, ancillary office and/or basement, where applicable. The plans are subject to changes as may be required or approved by relevant authorities. The cross-dotted lines are indications of the mezzanine area. The plans are not drawn to scale and are for the purpose of a visual presentation of the different layouts that are available.

0 5 10 15m

A. Structure and Architectural Specification 1. Foundation and Basement Reinforced concrete foundation system to Engineer’s requirement 2. Superstructure Reinforced concrete and/or steel structure to Engineer’s requirements 3. Roof Reinforced concrete flat roof with insulation and waterproofing system where appropriate 4. Floor Live Load Unit main level – 10.0kN/m2 Unit mezzanine – 5.0kN/m2 Unit basement – 7.5kN/m2 5. Floor to Floor Height 1st storey to 4th storey – 5.95meter (approx.) (inclusive of mezzanine level)

Basement – 3.60meter (approx.) 6. Walls External Wall RC wall / hollow block wall / clay brick wall and/or precast wall panel with skim coat and/or plaster with weather resistant emulsion paint finish, where applicable Internal Wall RC wall / hollow block wall / clay brick wall and/or precast wall panel with skim coat and/or plaster with emulsion paint finish, where applicable B. Finishes / Fittings 1. Flooring All units – Generally power float concrete floor / floor hardener Toilets – Homogeneous tile (to Architect’s selection and design) Passenger lift lobby – Stonework / homogeneous tile (to Architect’s selection and design) Internal common corridor – Concrete with hardener

Basement carpark, – Concrete with hardener driveway, ramp External driveway – Homogeneous tile / paviors / tarmac (to Architect’s selection and design)

Pool deck, BBQ area – Homogeneous tile and/or pebble wash finish

Basketball Court – Acrylic coating 2. Walls Toilet – Homogeneous tile to ceiling height (exposed area only) (to Architect’s selection and design)

Passenger lift lobby – Stonework / homogeneous tile (to Architect’s selection and design) Internal common corridor – Plaster and paint finish 3. Ceiling All units – Skim coat with emulsion paint to soffit of rc slab

Toilets – Calcium silicate board and/or gypsum plaster board and/or skim coat with emulsion paint

Lobby and internal – Calcium silicate board and/or gypsum common corridor plaster board and/or skim coat with emulsion paint 4. Windows Aluminium framed glass window system 5. Doors Unit main entrance – Glass and/or timber doors and/or fire-rated doors and/or roller-shutters as per statutory requirements, where applicable

Toilets – Timber flushed doors / PVC bi-fold doors

Common areas – Timber doors and/or fire-rated doors as per statutory requirement, where necessary 6. Sanitary Fittings Unit toilets – Generally 2 ensuite toilets with 1 wc and 1 basin. Except for unit type 1H, 1 ensuite toilet C. Electrical Specifications Unit type 1A, 1F, 1J, 1L, – 3 Phase, 100 Amp Isolator 2A, 2F, 2K, 2M

All other units – 3 Phase, 60 Amp Isolator Canteen – 3 Phase, 100 Amp Isolator D. TV / Telephone / Cable Vision Fibre Optic / Cat6 to units (without connection) E. Security CCTV to all lift lobbies and to Roof Top facilities Card access to Roof Top facilities F. Air-conditioning Applicable only to unit type 1H and 1M To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned by the Purchaser on a regular basis. This includes the cleaning of filters, clearing the condensate pipes and charging of gas G. Lifts Passenger lift – 2 nos capacity 15 pax Goods lift – 2 nos 2.5T H. Carpark Surface carpark – 25 lots Basement carpark – 135 lots Handicap carpark – 3 lots Strata carpark – 21 lots I. Loading Bays 2 nos. lorry loading bays J. Recreational Facilities Swimming Pool - 50mx8m Infinity Edge Pool Indoor Gym Basketball Half Court BBQ Pits Roof Top Pavilions Courtyard Lawn at First Storey Open Garden at Basement Level K. Lightning Protection Lightning protection is provided as per statutory requirements L. Fire Protection System Sprinkler and fire alarm system as per statutory requirements Dry riser and hose-reel system as per statutory requirement

NOTE: Warranties Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor shall assign to the Purchaser such warranties at the time when possession of the Unit is delivered to the Purchaser. Additional Notes While every reasonable care has been taken in preparation of this brochure, the Developer and its agent cannot be held responsible for any inaccuracies or omissions. All statements are believed to be correct but shall not be regarded as statements or representation of facts. All information and specifications, renderings, visual representations, and plans are current at the time of publication and are subject to change as may be required by us and/or the competent authorities. Materials, Fittings, Equipment, Finishes and Installation All information, specifications and statements herein shall not be treated to form part of any offer or contract. Floor plans are subject to amendments as may be required by the relevant authorities. Visual representations, models, showflat displays and illustrations, photographs, art renderings and other graphic representations and references, not limited to landscape and furniture, are intended to portray only artistic impressions of the development and cannot be regarded as representations of fact. Floor areas are only approximate measurements and subject to final survey.

Subject to Clause 15.3, the brand, colour and model of all materials, fittings, equipment, finishes, installations and appliances supplied shall be provided subject to Architect’s selection, market availability and the sole discretion of the Vendor. Marble, Limestone and Granite Marble, limestone and granite are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the marble, limestone or granite as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However granite, being a much harder material than marble cannot be re-polished after installation. Hence some differences may be felt at the joints. Subject to Clause 15.3, the tonality and pattern of the marble, limestone or granite selected and installed shall be subject to availability. Fan Coil Units, Electrical Points, Door Swing Positions and Plaster Ceiling Boards Layout / Location of fan coil units, electrical points, door swing positions and plaster ceiling boards are subject to Architect’s sole discretion and final design.

#03-14#04-14

#03-15#04-15

#03-16#04-16

#03-17#04-17

#03-18#04-18

#03-19#04-19

#03-20#04-20

#03-21#04-21

#03-23#04-23

#03-22#04-22

#03-25#04-25

#03-24#04-24

#03-01#04-01

#03-02#04-02

#03-03#04-03

#03-04#04-04

#03-05#04-05

#03-06#04-06

#03-07#04-07

#03-08#04-08

#03-09#04-09

#03-10#04-10

#03-11#04-11

#03-12#04-12

#03-13#04-13

www.huttonsgroup.com