Section 4.1 - West Slope Road and Bridge Projects · Hazel Valley Road at EID Canal - Bridge...

39
Index by Project Name Project Number Project Name Page # Section 4.1 - West Slope Road and Bridge Projects 78717 Airport Road - Slip Below Road 2 77123* Alder Drive at EID Canal - Bridge Replacement 4 77128* Bassi Road at Granite Creek - Bridge Replacement 6 97016 Bicycle/Pedestrian Counters - Class 1 Trails 8 77119* Blair Road at EID Canal - Bridge Replacement 10 Bridge Match Bridge Program Match 13 78716 Bucks Bar Rd - Sink Hole 14 77116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 16 78710 Cable Road - Culvert Damage 18 72143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 20 77142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 22 77139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 24 77138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 26 78701 Cosumnes Mine Rd 1 - Slip Below Road 28 78712 Cosumnes Mine Rd 2 - Slip Below Road 30 78700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 32 72377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 34 71362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 36 71361 Country Club Drive Extension - Tong Road to Bass Lake Road 38 71360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 40 72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 42 72334 Diamond Springs Parkway - Phase 1B 44 72311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 46 97012 El Dorado Trail - Los Trampas to Halcon 48 97015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 50 97014 El Dorado Trail - Missouri Flat Road to El Dorado 52 78702 Fort Jim Road - Culvert Damage 54 78707 Green Valley Rd - Slip Below Road 56 77127* Green Valley Road at Indian Creek - Bridge Replacement 58 77136* Green Valley Road at Mound Springs Creek - Bridge Replacement 60 77109* Green Valley Road at Tennessee Creek - Bridge Replacement 62 77114* Green Valley Road at Weber Creek - Bridge Replacement 64 GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 66 72376 Green Valley Road Widening from County Line to Sophia Parkway 68 77137* Greenstone Road at Slate Creek - Bridge Replacement 70 78704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 72 77135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 74 77140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 76 78724 Happy Valley Road - Slip Below Road 78 Page 1 of 39

Transcript of Section 4.1 - West Slope Road and Bridge Projects · Hazel Valley Road at EID Canal - Bridge...

Index by Project NameProject Number Project Name Page #

Section 4.1 - West Slope Road and Bridge Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 10Bridge Match Bridge Program Match 1378716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2277139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 5877136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 64GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6672376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 78

Page 1 of 39

Section 4.1 - West Slope Road and Bridge Projects, Continued77125* Hazel Valley Road at EID Canal - Bridge Replacement 8071375 Headington Road Extension - Missouri Flat Road to El Dorado Road 82

77131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9066116 Latrobe Connection 9272312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike Paths 94OP005 Metal Beam Guardrail Installation - Various Locations 9672142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 9878714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 12077117* Rubicon Trail at Ellis Creek - Bridge Replacement 12273362 Salmon Falls Road South of Glenesk Lane Realignment 12471324 Saratoga Way Extension - Phase 1 126GP147 Saratoga Way Extension - Phase 2 12878709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144

TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 14753118 Transit Service Improvements 149GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 15053126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road 15453125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 15653117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 158

Page 2 of 39

Section 4.1 - West Slope Road and Bridge Projects, ContinuedGP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 16053115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento

County Line 16253128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16453124 U.S. 50 HOV Lanes Phase 0 16671330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17072361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871376 U.S. 50/El Dorado Road Interchange Phase 2 18071359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18271346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration 18471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19471345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 5019677118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 19878711 White Meadows Rd - Slide Dumped On And Shifted Road 20072381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

County Line 202

72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interchange 204

Section 4.2 - Tahoe EIP Projects

78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495174 Chiapa Erosion Control Project 695187 Cold Creek Fisheries Enhancement Project 895191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1295197 Delaware Water Quality Project 1478725 Elks Club Drive Sinkhole 1678721 Evelyn Drive Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295180 Glenridge Erosion Control Project 2495176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 32

Page 3 of 39

Section 4.2 - Tahoe EIP Projects, Continued78722 Lakeview Drive Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 3895170 Montgomery Estates Area 2 Erosion Control Project 4095172 Montgomery Estates Area 3 Erosion Control Project 4295166 North Upper Truckee SEZ Restoration Project 4495177 Oflyng Water Quality Project 4695838 Passenger Facility 4972379 Pioneer Trail / US 50 Intersection Safety Improvement Project 50

95177 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 52

95198 San Bernardino Water Quality Project 5495192 Sawmill 2B Bike Path and Erosion Control Project 5695168 South Upper Truckee I Erosion Control Project 5895171 Tahoe Hills Erosion Control Project 60

Section 4.3A - Georgetown Airport Projects

93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;

Change Runway End ID 893503 Obstruction Survey 1093536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16

Section 4.3B - Placerville Airport Projects

93132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 20192493130 Taxiway Edge Lights 26

Section 4.4 - Transportation Facilities Improvement Projects81134 Headington Wash Rack Facility Project 2

Section 4.5 - Capital Overlay and Rehabilitation Projects72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4

Page 4 of 39

Index by Project NumberProject Number Project Name Page #

Section 4.1 - West Slope Road and Bridge Projects53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento

County Line 16253117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 15853118 Transit Service Improvements 14953124 U.S. 50 HOV Lanes Phase 0 16653125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 15653126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road 15453128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16466116 Latrobe Connection 9271319 U.S. 50/Camino Area Safety Project 17471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671324 Saratoga Way Extension - Phase 1 12671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17071333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary

Lanes on U.S. 50 19671346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian

Restoration 18471347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18271360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4071361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19471375 Headington Road Extension - Missouri Flat Road to El Dorado Road 8271376 U.S. 50/El Dorado Road Interchange Phase 2 18072142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 9872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2072187 Ice House Road Rehabilitation 8872191 Ice House Road Pavement Rehab, Ph 2. 8672308 New York Creek Trail East - Phase 2 10872310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4672312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike

Paths 94

Page 5 of 39

Section 4.1 - West Slope Road and Bridge Projects, Continued72334 Diamond Springs Parkway - Phase 1B 4472361 U.S. 50/Cameron Park Drive Interchange Improvements 17272374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley

Parkway Interchange 20472375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272376 Green Valley Road Widening from County Line to Sophia Parkway 6872377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3472378 Silva Valley Parkway/Harvard Way Intersection Improvements 13472381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

County Line 20273320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873362 Salmon Falls Road South of Glenesk Lane Realignment 12476108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13878700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3278701 Cosumnes Mine Rd 1 - Slip Below Road 2878702 Fort Jim Road - Culvert Damage 5478703 Kyburz Dr - Slide Dumped On Road 9078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7278705 String Canyon Rd - Slip Below Road 14478706 Newtown Rd - Slip Below Road 11078707 Green Valley Rd - Slip Below Road 5678708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11678709 Sciaroni Rd - Slip Below Road 13078710 Cable Road - Culvert Damage 1878711 White Meadows Rd - Slide Dumped On And Shifted Road 20078712 Cosumnes Mine Rd 2 - Slip Below Road 3078713 Mt Aukum Rd - Sink Hole 10678714 Mosquito Rd - Culvert Damage 10078715 Starkes Grade Rd - Slip Below Road 14278716 Bucks Bar Rd - Sink Hole 1478717 Airport Road - Slip Below Road 278718 Pony Express Trail Slipout 12078724 Happy Valley Road - Slip Below Road 7897012 El Dorado Trail - Los Trampas to Halcon 4897014 El Dorado Trail - Missouri Flat Road to El Dorado 5297015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097016 Bicycle/Pedestrian Counters - Class 1 Trails 877109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6477115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14077116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1677117* Rubicon Trail at Ellis Creek - Bridge Replacement 12277118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 198

Page 6 of 39

Section 4.1 - West Slope Road and Bridge Projects, Continued77119* Blair Road at EID Canal - Bridge Replacement 1077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277123* Alder Drive at EID Canal - Bridge Replacement 477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13677125* Hazel Valley Road at EID Canal - Bridge Replacement 8077126* Mosquito Road Bridge at South Fork American River 10277127* Green Valley Road at Indian Creek - Bridge Replacement 5877128* Bassi Road at Granite Creek - Bridge Replacement 677129* Mount Murphy Road at South Fork American River - Bridge Replacement 10477131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8477134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11477135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077137* Greenstone Road at Slate Creek - Bridge Replacement 7077138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2677139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7677142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 22Bridge Match Bridge Program Match 13GP147 Saratoga Way Extension - Phase 2 128GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 150GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 160GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 66OP005 Metal Beam Guardrail Installation - Various Locations 96

TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 147

Section 4.2 - Tahoe EIP Projects

72379 Pioneer Trail / US 50 Intersection Safety Improvement Project 5072380 Apache Avenue/US Highway 50 Intersection Improvement Project 473120 Meyers Corridor Operational Improvement Project 3678721 Evelyn Drive Road Failure 1878722 Lakeview Drive Road Failure 3478723 Angora Creek Road Damage 278725 Elks Club Drive Sinkhole 1678726 Fallen Leaf Road Washout 2095157 CSA #5 Erosion Control Project 1295163 Lake Tahoe Boulevard Erosion Control Project 3095166 North Upper Truckee SEZ Restoration Project 4495168 South Upper Truckee I Erosion Control Project 58

Page 7 of 39

Section 4.2 - Tahoe EIP Projects, Continued95170 Montgomery Estates Area 2 Erosion Control Project 4095171 Tahoe Hills Erosion Control Project 6095172 Montgomery Estates Area 3 Erosion Control Project 4295174 Chiapa Erosion Control Project 695175 Lake Tahoe Boulevard SEZ Project 3295176 Golden Bear Erosion Control Project 2695177 Oflyng Water Quality Project 4695177 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino

St 5295179 Meyers Stream Environment Zone/Erosion Control Project 3895180 Glenridge Erosion Control Project 2495187 Cold Creek Fisheries Enhancement Project 895191 Country Club Heights Erosion Control Project 1095192 Sawmill 2B Bike Path and Erosion Control Project 5695195 Forest View Water Quality Project 2295197 Delaware Water Quality Project 1495198 San Bernardino Water Quality Project 5495708 Highway 89 Class 1 Trail 2895838 Passenger Facility 49

Section 4.3A - Georgetown Airport Projects

93503 Obstruction Survey 1093520 Construction of AWOS 493523 Airport Layout Plan 2024 Update - Georgetown

2

93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes; Change Runway End ID 8

93535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16

Section 4.3B - Placerville Airport Projects

93130 Taxiway Edge Lights 2693132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 201924

Section 4.4 - Transportation Facilities Improvement Projects81134 Headington Wash Rack Facility Project 2

Section 4.5 - Capital Overlay and Rehabilitation Projects72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4

Page 8 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 1 Projects2017 Capital Improvement Program

CORP

72193 Overlay - El Dorado Hills Blvd. $5,397,285

West Slope

53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento County Line $5,621,404

53117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway $5,466,500

53118 Transit Service Improvements $6,985,618

53124 U.S. 50 HOV Lanes Phase 0 $17,768,551

66116 Latrobe Connection $723,300

71323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B $8,651,655

71324 Saratoga Way Extension - Phase 1 $9,326,580

71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $54,400,028

71330 U.S. 50/Bass Lake Road Interchange Improvements $5,872,156

71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $7,658,023

71360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive $7,483,000

71361 Country Club Drive Extension - Tong Road to Bass Lake Road $12,448,722

71362 Country Club Drive Extension - Silva Valley Parkway to Tong Road $8,240,000

71368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape $2,200,000

72308 New York Creek Trail East - Phase 2 $1,447,744

72310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) $1,944,101

72311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place $1,136,869

72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $5,622,588

72376 Green Valley Road Widening from County Line to Sophia Parkway $85,000

72377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway $10,751,488

72378 Silva Valley Parkway/Harvard Way Intersection Improvements $613,000

72381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line $4,428,540

76108 Silver Springs Pkwy to Bass Lake Rd (south segment) $9,456,690

Affordable 1-Affordable Housing TIM Fee Reserve $20,000,000

Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,152,126

Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $16,380,136

Bridge Match Bridge Program Match $3,687,029

GP147 Saratoga Way Extension - Phase 2 $3,310,727

GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road $8,830,500

GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway $6,029,000

OP005 Metal Beam Guardrail Installation - Various Locations $672,000

Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $8,538,272

Monday, May 22, 2017 Page 1 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 9 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 1 Projects2017 Capital Improvement Program

RDMAINT 1-Road Maintenance $7,364,955

TIM Prog TIM Fee Program Projects $14,188,952

Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000

Monday, May 22, 2017 Page 2 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 10 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 2 Projects2017 Capital Improvement Program

West Slope

53118 Transit Service Improvements $6,985,618

53125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd $6,510,500

53126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr $8,743,500

53127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road $8,381,000

53128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr $8,961,000

66116 Latrobe Connection $723,300

71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $54,400,028

71330 U.S. 50/Bass Lake Road Interchange Improvements $5,872,156

71332 U.S. 50/Cambridge Road Interchange Improvements $8,612,692

71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $22,625,416

71338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment $9,880,152

71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $7,658,023

71368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape $2,200,000

72142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 $3,920,000

72143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road $1,323,772

72312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike Paths $897,000

72361 U.S. 50/Cameron Park Drive Interchange Improvements $87,283,512

72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $5,622,588

77115 Sly Park Road at Clear Creek Crossing - Bridge Replacement $5,816,028

77116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement $8,555,734

77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $4,087,452

77138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement $4,363,075

77139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement $4,456,673

77140 Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project $368,010

78700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out $1,112,250

78701 Cosumnes Mine Rd 1 - Slip Below Road $1,796,750

78712 Cosumnes Mine Rd 2 - Slip Below Road $1,096,750

78713 Mt Aukum Rd - Sink Hole $850,000

Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,152,126

Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $16,380,136

Bridge Match Bridge Program Match $3,687,029

GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road $8,830,500

GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road $8,685,500

OP005 Metal Beam Guardrail Installation - Various Locations $672,000

Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $8,538,272

Monday, May 22, 2017 Page 3 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 11 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 2 Projects2017 Capital Improvement Program

RDMAINT 1-Road Maintenance $7,364,955

TIM Prog TIM Fee Program Projects $14,188,952

Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000

Monday, May 22, 2017 Page 4 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 12 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 3 Projects2017 Capital Improvement Program

Airports-Placerville

93130 Taxiway Edge Lights $741,034

93132 Airport Layout Plan Update and Obstruction Survey - Placerville $660,000

93133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 2019 $633,500

CORP

72190 Overlay - Patterson Drive and Missouri Flat Road $1,091,099

Facilities

81134 Headington Wash Rack Facility Project $1,491,235

West Slope

31120 MC & FP - Phase II $536,304

53118 Transit Service Improvements $6,985,618

71319 U.S. 50/Camino Area Safety Project $4,137,406

71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration $1,868,190

71347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 $5,160,916

71359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 $2,177,059

71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $6,500,147

71376 U.S. 50/El Dorado Road Interchange Phase 2 $10,475,000

72191 Ice House Road Pavement Rehab, Ph 2. $9,667,500

72334 Diamond Springs Parkway - Phase 1B $28,291,824

72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment $14,211,368

73320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization $4,808,134

77114 Green Valley Road at Weber Creek - Bridge Replacement $12,115,371

77122 Newtown Road at South Fork of Weber Creek - Bridge Replacement $5,657,900

77123 Alder Drive at EID Canal - Bridge Replacement $1,132,141

77126 Mosquito Road Bridge at South Fork American River $69,924,569

77127 Green Valley Road at Indian Creek - Bridge Replacement $5,573,479

77134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement $4,074,882

77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $4,087,452

77137 Greenstone Road at Slate Creek - Bridge Replacement $3,643,670

77142 Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation $3,247,500

78702 Fort Jim Road - Culvert Damage $1,521,356

78704 Grizzly Flat Rd - Culvert Damage + Slip Below Road $506,750

78705 String Canyon Rd - Slip Below Road $532,500

78706 Newtown Rd - Slip Below Road $2,159,375

Monday, May 22, 2017 Page 5 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 13 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 3 Projects2017 Capital Improvement Program

78707 Green Valley Rd - Slip Below Road $1,477,500

78708 Peavine Ridge Rd - Slip Below Road and Culvert Damage $555,000

78709 Sciaroni Rd - Slip Below Road $849,750

78710 Cable Road - Culvert Damage $612,280

78714 Mosquito Rd - Culvert Damage $727,851

78715 Starkes Grade Rd - Slip Below Road $1,091,000

78716 Bucks Bar Rd - Sink Hole $545,444

78717 Airport Road - Slip Below Road $596,000

97012 El Dorado Trail - Los Trampas to Halcon $1,220,404

97014 El Dorado Trail - Missouri Flat Road to El Dorado $4,205,713

97015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing $2,806,255

97016 Bicycle/Pedestrian Counters - Class 1 Trails $267,500

Appr Reimb 2-Approved Reimbursement Agreements-TIM Zones 1-7 $6,640,218

Bridge Match Bridge Program Match $3,687,029

OP005 Metal Beam Guardrail Installation - Various Locations $672,000

Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $7,483,000

RDMAINT 1-Road Maintenance $7,364,955

TIM Prog TIM Fee Program Projects $14,188,952

Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000

Monday, May 22, 2017 Page 6 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 14 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 4 Projects2017 Capital Improvement Program

Airports-Georgetown

93503 Obstruction Survey $567,696

93520 Construction of AWOS $267,500

93523 Airport Layout Plan 2024 Update - Georgetown $85,000

93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes; Change Runway En $721,356

93535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes $322,800

93536 Relocate Taxiway A Connector $583,500

93537 Runway Pavement Closure for Runway Safety Area $555,500

93538 Runway Protection Zone Land Acquisition $185,000

West Slope

53118 Transit Service Improvements $6,985,618

71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $22,625,416

71339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment $6,934,893

71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $6,500,147

71376 U.S. 50/El Dorado Road Interchange Phase 2 $10,475,000

72143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road $1,323,772

72361 U.S. 50/Cameron Park Drive Interchange Improvements $87,283,512

72376 Green Valley Road Widening from County Line to Sophia Parkway $85,000

73362 Salmon Falls Road South of Glenesk Lane Realignment $1,708,603

77109 Green Valley Road at Tennessee Creek - Bridge Replacement $6,039,993

77117 Rubicon Trail at Ellis Creek - Bridge Replacement $1,173,028

77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement $1,474,251

77126 Mosquito Road Bridge at South Fork American River $69,924,569

77127 Green Valley Road at Indian Creek - Bridge Replacement $5,573,479

77128 Bassi Road at Granite Creek - Bridge Replacement $3,868,980

77129 Mount Murphy Road at South Fork American River - Bridge Replacement $23,057,481

77131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project $1,118,478

77136 Green Valley Road at Mound Springs Creek - Bridge Replacement $5,598,110

77137 Greenstone Road at Slate Creek - Bridge Replacement $3,643,670

Appr Reimb 2-Approved Reimbursement Agreements-TIM Zones 1-7 $6,640,218

Bridge Match Bridge Program Match $3,687,029

OP005 Metal Beam Guardrail Installation - Various Locations $672,000

Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $7,483,000

RDMAINT 1-Road Maintenance $7,364,955

TIM Prog TIM Fee Program Projects $14,188,952

Monday, May 22, 2017 Page 7 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 15 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 4 Projects2017 Capital Improvement Program

Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000

Monday, May 22, 2017 Page 8 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 16 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 5 Projects2017 Capital Improvement Program

Tahoe

72379 Pioneer Trail / US 50 Intersection Safety Improvement Project $4,502,489

72380 Apache Avenue/US Highway 50 Intersection Improvement Project $510,000

73120 Meyers Corridor Operational Improvement Project $325,534

78721 Evelyn Way Road Failure $225,870

78722 Lakeview Avenue Road Failure $193,250

78723 Angora Creek Road Damage $207,625

78725 Elks Club Drive Sinkhole $462,750

78726 Fallen Leaf Road Washout $197,625

95117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St $1,610,000

95157 CSA #5 Erosion Control Project $1,541,352

95163 Lake Tahoe Boulevard Erosion Control Project $716,669

95166 North Upper Truckee SEZ Restoration Project $956,600

95168 South Upper Truckee I Erosion Control Project $596,584

95170 Montgomery Estates Area 2 Erosion Control Project $967,806

95171 Tahoe Hills Erosion Control Project $795,508

95172 Montgomery Estates Area 3 Erosion Control Project $523,886

95174 Chiapa Erosion Control Project $2,083,600

95175 Lake Tahoe Boulevard SEZ Project $289,224

95176 Golden Bear Erosion Control Project $337,682

95177 Oflyng Water Quality Project $867,500

95179 Meyers Stream Environment Zone/Erosion Control Project $2,544,337

95180 Glenridge Erosion Control Project $2,832,300

95187 Cold Creek Fisheries Enhancement Project $1,844,917

95191 Country Club Heights Erosion Control Project $1,133,605

95192 Sawmill 2B Bike Path and Erosion Control Project $2,890,120

95195 Forest View Water Quality Project $382,447

95197 Delaware Water Quality Project $750,500

95198 San Bernardino Water Quality Project $750,500

95708 Highway 89 Class 1 Trail $2,110,000

95838 Passenger Facility $140,500

West Slope

72187 Ice House Road Rehabilitation $5,719,728

77119 Blair Road at EID Canal - Bridge Replacement $1,926,090

77124 Silver Fork Road at South Fork American River - Bridge Rehabilitation $2,550,666

Monday, May 22, 2017 Page 9 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 17 of 39

Project # Description Total Cost

Community Development Agency

Supervisor District 5 Projects2017 Capital Improvement Program

77125 Hazel Valley Road at EID Canal - Bridge Replacement $3,030,013

78703 Kyburz Dr - Slide Dumped On Road $431,140

78711 White Meadows Rd - Slide Dumped On And Shifted Road $908,000

78718 Pony Express Trail Slipout $945,000

78724 Happy Valley Road - Slip Below Road $868,000

OP005 Metal Beam Guardrail Installation - Various Locations $672,000

RDMAINT 1-Road Maintenance $7,364,955

Monday, May 22, 2017 Page 10 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 18 of 39

West Slope Road and Bridge Program - Index by Project ScheduleProject Number Project Name Page #

Section 4.1 - West Slope Road and Bridge Program - Current Year Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 1078716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3271360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 5877136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6472376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 7877125* Hazel Valley Road at EID Canal - Bridge Replacement 8077131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9072312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike

Paths 9478714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 120

Page 19 of 39

Section 4.1 - West Slope Road and Bridge Program - Current Year Projects, Continued77117* Rubicon Trail at Ellis Creek - Bridge Replacement 12271324 Saratoga Way Extension - Phase 1 12678709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144

TIM Prog TIM Fee Program Projects 14653124 U.S. 50 HOV Lanes Phase 0 16672361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18471346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian

Restoration 18471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19477118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 18878711 White Meadows Rd - Slide Dumped On And Shifted Road 20072381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

County Line 202

Section 4.1 - West Slope Road and Bridge Program - 5-Year Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 1078716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2277139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 58

Page 20 of 39

Section 4.1 - West Slope Road and Bridge Program - 5-Year Projects, Continued77136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6472376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 7877125* Hazel Valley Road at EID Canal - Bridge Replacement 8077131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9066116 Latrobe Connection 9572312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike

Paths 9478714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 12077117* Rubicon Trail at Ellis Creek - Bridge Replacement 12273362 Salmon Falls Road South of Glenesk Lane Realignment 12471324 Saratoga Way Extension - Phase 1 12678709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144

TIM Prog TIM Fee Program Projects 14653124 U.S. 50 HOV Lanes Phase 0 16672361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 182

71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration 184

71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19477118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 18878711 White Meadows Rd - Slide Dumped On And Shifted Road 200

72381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line 202

Page 21 of 39

Section 4.1 - West Slope Road and Bridge Program - Ten-Year Projects77142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 38GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6666116 Latrobe Connection 95OP005 Metal Beam Guardrail Installation - Various Locations 9677126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 104

TIM Prog TIM Fee Program Projects 11053117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 15871330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17071323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 17472381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento

County Line 20272374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva

Valley Parkway Interchange 204

Section 4.1 - West Slope Road and Bridge Program - 20-Year ProjectsBridge Bridge Program Match 1372377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 34GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6671375 Headington Road Extension - Missouri Flat Road to El Dorado Road 8272142 Missouri Flat Rd Widening - China Garden to SR49 98GP147 Saratoga Way Extension - Phase 2 128TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 14753118 Transit Service Improvements 149GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 15053126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Cameron Park Drive 154

53125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 156GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 160

53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento County Line 162

53128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16471332 U.S. 50/Cambridge Road Interchange Improvements 17072361 U.S. 50/Cameron Park Drive Interchange Improvements 17271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871376 U.S. 50/El Dorado Road Interchange Phase 2 18071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary

Lanes on U.S. 50 196

72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interchange 204

Page 22 of 39

Tahoe EIP - Index by Project ScheduleProject Number Project Name Page #

Section 4.2 - Tahoe EIP Projects - Current Year Projects78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1278725 Elks Club Drive Sinkhole 1678721 Evelyn Way Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 3278722 Lakeview Avenue Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 38

95170 Montgomery Estates Area 2 Erosion Control Project40

95172 Montgomery Estates Area 3 Erosion Control Project 4295177 Oflyng Water Quality Project 4672379 Pioneer Trail / US 50 Intersection Safety Improvement Project 5095117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 5295192 Sawmill 2B Bike Path and Erosion Control Project 5695171 Tahoe Hills Erosion Control Project 60

Section 4.2 - Tahoe EIP Projects - 5- Year Projects78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1278725 Elks Club Drive Sinkhole 1678721 Evelyn Way Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 3278722 Lakeview Avenue Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 3895170 Montgomery Estates Area 2 Erosion Control Project 4095172 Montgomery Estates Area 3 Erosion Control Project 4295177 Oflyng Water Quality Project 46

72379 Pioneer Trail / US 50 Intersection Safety Improvement Project50

95117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 5295192 Sawmill 2B Bike Path and Erosion Control Project 5695171 Tahoe Hills Erosion Control Project 60

Page 23 of 39

This page intentionally left blank

Page 24 of 39

Airport Capital Improvement Program - Index by Project ScheduleProject Number Project Name Page #

Section 4.3A - Georgetown Airport - Current Year Projects93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;

Change Runway End ID 893503 Obstruction Survey 10

Section 4.3B - Placerville Airport - Current Year Projects93132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes -

2019 2493130 Taxiway Edge Lights 26

Section 4.3A - Georgetown Airport - 5-Year Projects93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;

Change Runway End ID 893503 Obstruction Survey 1093536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16

Section 4.3B - Placerville Airport - 5-Year Projects93132 Airport Layout Plan Update and Obstruction Survey - Placerville 22

93133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 20192493130 Taxiway Edge Lights 26

Section 4.3A - Georgetown Airport - 10-Year Projects93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693538 Runway Protection Zone Land Acquisition 16

Page 25 of 39

Page 26 of 39

Transportation Facilities Improvement Program - Index by Project ScheduleProject Number Project Name Page #

Section 4.4 - Transportation Facilities Improvement Current Year Projects81134 Headington Wash Rack Facility Project 2

Page 27 of 39

This page intentionally left blank

Page 28 of 39

Capital Overlay and Rehabilitation Program - Index by Project ScheduleProject Number Project Name Page #

Section 4.5 - Capital Overlay and Rehabilitation Program - Current Year Projects

72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4

Page 29 of 39

This page intentionally left blank

Page 30 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Wes

t S

lop

e

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

5312

4C

U.S

. 50

HO

V L

anes

Pha

se 0

17.7

71

7132

4P

DR

CS

arat

oga

Way

Ext

ensi

on -

Pha

se 1

C9.

332

7132

8R

CU

.S. 5

0/S

ilva

Val

ley

Par

kway

Inte

rcha

nge

- P

hase

154

.40

3

7134

6C

U.S

. 50/

Mis

sou

ri F

lat R

oad

Inte

rcha

nge

Impr

ovem

ents

- P

hase

1C

Rip

ar1.

874

EE

EE

E

7135

9C

U.S

. 50/

Mis

sou

ri F

lat R

oad

Inte

rcha

nge

- P

hase

1B

.22.

185

7136

0P

CC

oun

try

Clu

b D

rive

Rea

lignm

ent -

Bas

s La

ke R

oad

to T

ierr

a de

Dio

s D

riC

7.48

6

7136

8D

CU

.S. 5

0/S

ilva

Val

ley

Par

kway

Inte

rcha

nge

- P

hase

1 L

ands

cape

2.20

7E

EE

EE

7218

7C

Ice

Hou

se R

oad

Reh

abili

tatio

n5.

728

7230

8C

New

Yor

k C

ree

k T

rail

Eas

t - P

hase

21.

459

7231

0C

Silv

a V

alle

y P

ark

way

Cla

ss 1

and

Cla

ss 2

Bik

e L

anes

(H

arva

rd to

Gre

en1.

9410

E

7237

5P

DC

Dia

mon

d S

prin

gs P

arkw

ay -

Pha

se 1

A -

SR

-49

Rea

lignm

ent

C14

.21

11

7332

0C

Ple

asan

t Val

ley

Roa

d (S

R 4

9)/P

atte

rson

Driv

e In

ters

ectio

n S

igna

lizat

ion

4.81

12

7336

2C

Sal

mon

Fal

ls R

oad

Sou

th o

f Gle

nesk

Lan

e R

ealig

nmen

t1.

7113

7711

5*D

RC

Sly

Par

k R

oad

at C

lear

Cre

ek C

ross

ing

- B

ridge

Rep

lace

men

tC

5.82

14

7711

9*C

Bla

ir R

oad

at E

ID C

anal

- B

ridge

Rep

lace

men

t1.

9315

7712

3*C

Ald

er D

rive

at E

ID C

anal

- B

ridge

Rep

lace

men

t1.

1316

7712

4*D

RC

Silv

er F

ork

Roa

d at

Sou

th F

ork

Am

eric

an R

iver

- B

ridge

Reh

abili

tatio

nC

2.55

17

7712

5*D

CH

azel

Val

ley

Roa

d at

EID

Can

al -

Brid

ge R

epla

cem

ent

3.03

18E

7712

8*D

CB

assi

Roa

d at

Gra

nite

Cre

ek -

Brid

ge R

epla

cem

ent

C3.

8719

EE

7713

1*C

Ice

Hou

se R

oad

at J

ones

For

k S

ilver

Cre

ek -

Bri

dge

Mai

nten

ance

Pro

je1.

1220

7713

8*D

RC

Cle

ar C

reek

Roa

d at

Cle

ar C

reek

(P

M 1

.82)

- B

ridge

Rep

lace

men

tC

4.36

21E

7713

9*D

RC

Cle

ar C

reek

Roa

d at

Cle

ar C

reek

(P

M 0

.25)

- B

ridge

Rep

lace

men

tC

4.46

22E

7714

0*C

Hap

py

Val

ley

Cut

off R

oad

at C

amp

Cre

ek -

Brid

ge M

aint

enan

ce P

roje

ct0.

3723

7870

0P

DR

CC

osum

nes

Min

e R

d. B

ridge

- B

ridge

App

roac

h W

ash

Out

1.11

24

7870

1P

DR

CC

osum

nes

Min

e R

d 1

- S

lip B

elow

Roa

d1.

8025

7870

2P

DR

CF

ort J

im R

oad

- C

ulve

rt D

amag

e1.

5226

7870

3P

CK

ybur

z D

r -

Slid

e D

umpe

d O

n R

oad

0.43

27

7870

4P

DR

CG

rizzl

y F

lat R

d -

Cul

vert

Da

mag

e +

Slip

Bel

ow R

oad

0.51

28

7870

5P

DR

CS

trin

g C

anyo

n R

d -

Slip

Bel

ow R

oad

0.53

29

7870

6P

DR

CN

ewto

wn

Rd

- S

lip B

elow

Roa

d2.

1630

7870

7P

DR

CG

reen

Val

ley

Rd

- S

lip B

elow

Roa

d1.

4831

7870

8P

DR

CP

eavi

ne R

idge

Rd

- S

lip B

elow

Roa

d an

d C

ulve

rt D

amag

e0.

5632

7870

9P

DR

CS

ciar

oni R

d -

Slip

Bel

ow R

oad

0.85

33

7871

0P

DC

Cab

le R

oad

- C

ulve

rt D

amag

e0.

6134

7871

1P

DR

CW

hite

Mea

dow

s R

d -

Slid

e D

umpe

d O

n A

nd S

hifte

d R

oad

0.91

35

7871

2P

DR

CC

osum

nes

Min

e R

d 2

- S

lip B

elow

Roa

d1.

1036

7871

3C

Mt A

ukum

Rd

- S

ink

Hol

e0.

8537

7871

4P

DC

Mos

quito

Rd

- C

ulve

rt D

am

age

0.73

38

7871

5P

DR

CS

tark

es G

rade

Rd

- S

lip B

elow

Roa

d1.

0939

7871

6C

Buc

ks B

ar R

d -

Sin

k H

ole

0.55

40

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

0 P

MP

age

1 of

8

Page 31 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Wes

t S

lop

e

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

7871

7P

DR

CA

irpor

t Roa

d -

Slip

Bel

ow R

oad

0.60

41

7871

8P

DR

CP

ony

Exp

ress

Tra

il S

lipou

t0.

9542

7872

4P

DR

CH

app

y V

alle

y R

oad

- S

lip B

elow

Roa

d0.

8743

9701

2D

CE

l Dor

ado

Tra

il -

Los

Tra

mpa

s to

Hal

con

C1.

2244

9701

6P

DC

Bic

ycle

/Ped

est

rian

Cou

nter

s -

Cla

ss 1

Tra

ils0.

2745

7131

9P

DR

U.S

. 50/

Ca

min

o A

rea

Saf

ety

Pro

ject

DR

CC

C4.

1446

7214

3P

DC

amer

on P

ark

Driv

e W

iden

ing

- P

alm

er D

rive

to H

acie

nda

Roa

dD

CC

1.32

47

7231

1D

RE

l Dor

ado

Hill

s B

lvd

Cla

ss I

Bik

e P

ath:

Gov

erno

r D

rive

to B

ritta

ny P

lace

C1.

1448

7231

2P

DR

Mer

rych

ase

and

Cou

ntry

Clu

b D

rive

- S

idew

alks

and

Cla

ss II

and

Cla

ss I

C0.

9049

7237

8D

Silv

a V

alle

y P

ark

way

/Har

vard

Way

Inte

rsec

tion

Impr

ovem

ents

DC

0.61

50

7610

8P

DR

Silv

er S

prin

gs P

kwy

to B

ass

Lake

Rd

(so

uth

segm

ent)

RC

C9.

4651

E

7712

2*D

RN

ewto

wn

Roa

d at

Sou

th F

ork

of W

eber

Cre

ek -

Brid

ge R

epla

cem

ent

DC

C5.

6652

E

7713

4*D

RO

ak H

ill R

oad

at S

quaw

Hol

low

Cre

ek -

Brid

ge R

epla

cem

ent

DR

CC

4.07

53E

E

7713

5*P

DR

Han

ks E

xcha

nge

at S

quaw

Hol

low

Cre

ek -

Brid

ge R

epla

cem

ent

DR

CC

4.09

54E

E

7713

7*P

DR

Gre

enst

one

Roa

d at

Sla

te C

reek

- B

ridge

Rep

lace

men

tC

C3.

6455

EE

9701

4P

DR

El D

orad

o T

rail

- M

isso

uri F

lat R

oad

to E

l Dor

ado

DC

C4.

2156

9701

5P

DR

El D

orad

o T

rail

- M

isso

uri F

lat R

oad

Bik

e/P

edes

tra

in O

verc

ross

ing

DC

C2.

8157

7711

6*P

DR

Buc

ks B

ar R

oad

at th

e N

orth

For

k C

osum

nes

Riv

er -

Brid

ge R

epla

cem

eD

RR

CC

8.56

58E

E

7712

7*P

DR

Gre

en V

alle

y R

oad

at In

dian

Cre

ek -

Bri

dge

Rep

lace

men

tD

RC

C5.

5759

EE

7713

6*P

DR

Gre

en V

alle

y R

oad

at M

ound

Spr

ings

Cre

ek -

Brid

ge R

epla

cem

ent

DR

CC

5.60

60E

E

7219

1P

Ice

Hou

se R

oad

Pav

emen

t Reh

ab, P

h 2.

PD

RP

DR

C9.

6761

7233

4D

RD

iam

ond

Spr

ings

Par

kway

- P

hase

1B

DR

DR

DC

C28

.29

62E

E

7712

6*P

DR

Mos

quito

Roa

d B

ridge

at S

outh

For

k A

mer

ican

Riv

erD

RD

RD

CC

C69

.92

63

7712

9*P

Mou

nt M

urph

y R

oad

at S

outh

For

k A

mer

ican

Riv

er -

Brid

ge R

epla

cem

enP

DR

DR

DR

CC

23.0

664

7238

1P

DW

hite

Roc

k R

oad

Wid

enin

g (2

to 4

lane

s) -

Man

ches

ter

Driv

e to

Sac

ram

PD

PD

PD

DR

C4.

4365

7236

1P

U.S

. 50/

Ca

mer

on P

ark

Driv

e In

terc

han

ge Im

prov

emen

tsP

PD

RC

87.2

866

7237

6D

RG

reen

Val

ley

Roa

d W

iden

ing

from

Cou

nty

Line

to S

oph

ia P

ark

way

0.09

67

7710

9*G

reen

Val

ley

Roa

d at

Ten

ness

ee C

reek

- B

ridge

Rep

lace

men

t6.

0468

EE

EE

E

7711

4*G

reen

Val

ley

Roa

d at

Web

er C

reek

- B

ridge

Rep

lace

men

t12

.12

69E

EE

EE

7711

7*R

ubic

on T

rail

at E

llis

Cre

ek -

Brid

ge R

epla

cem

ent

1.17

70E

7711

8*W

entw

orth

Spr

ings

Roa

d at

Ger

le C

ree

k -

Brid

ge R

epla

cem

ent

1.47

71E

7136

1C

oun

try

Clu

b D

rive

Ext

ensi

on -

Ton

g R

oad

to B

ass

Lake

Roa

dP

PD

PD

DR

C12

.45

72

7136

2C

oun

try

Clu

b D

rive

Ext

ensi

on -

Silv

a V

alle

y P

arkw

ay to

Ton

g R

oad

PP

DP

DP

DR

C8.

2473

7714

2*C

eda

r R

avin

e R

d at

Web

er C

reek

- B

ridge

Reh

abili

tatio

nP

PD

DD

RC

3.25

74

7237

7C

ount

ry C

lub

Driv

e E

xten

sion

- E

l Dor

ado

Hill

s B

lvd

to S

ilva

Val

ley

Par

kP

PP

DD

RC

10.7

575

5311

7U

.S. 5

0 A

uxili

ary

Lane

Wes

tbou

nd -

Bas

s La

ke R

oad

to S

ilva

Va

lley

Par

PD

C5.

4776

6611

6La

tro

be C

onne

ctio

nP

DC

0.72

77

7132

3U

.S. 5

0/E

l Dor

ado

Hill

s B

oule

vard

Inte

rcha

nge

Imp

rove

men

ts -

Pha

se 2

PD

CC

8.65

78

7133

0U

.S. 5

0/B

ass

Lak

e R

oad

Inte

rcha

nge

Impr

ovem

ents

PD

CC

5.87

79

OP

005

Met

al B

eam

Gua

rdra

il In

stal

latio

n -

Var

ious

Loc

atio

nsD

C0.

6780

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

0 P

MP

age

2 of

8

Page 32 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Wes

t S

lop

e

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

7133

2U

.S. 5

0/C

am

brid

ge R

oad

Inte

rcha

nge

Impr

ovem

ents

PD

C8.

6181

7133

8U

.S. 5

0/P

onde

rosa

Rd

Inte

rcha

nge

- D

uroc

k R

d R

ealig

nmen

tD

RC

9.88

82E

7133

9U

.S. 5

0/P

onde

rosa

Rd

Inte

rcha

nge

- N

. Shi

ngle

Rd

Rea

lignm

ent

DR

C6.

9383

E

7134

7U

.S. 5

0/E

l Dor

ado

Roa

d In

terc

hang

e Im

prov

emen

ts -

Ph

1P

DR

C5.

1684

7237

4W

hite

Roc

k R

oad

Wid

enin

g (2

to 4

lane

s) -

Mon

te V

erde

Driv

e to

US

50/

PD

RC

5.62

85

GP

178

Gre

en V

alle

y R

oad

Wid

enin

g -

Fra

ncis

co to

Silv

a V

alle

y P

arkw

ayP

PD

RC

6.03

86

5311

5U

.S. 5

0 A

uxili

ary

Lane

Wes

tbou

nd -

El D

orad

o H

ills

Bou

leva

rd to

Sac

raP

DC

5.62

87

5311

8T

rans

it S

ervi

ce Im

prov

emen

tsC

6.99

88

5312

5U

.S. 5

0 A

uxili

ary

Lane

Eas

tbou

nd -

Sac

ram

ento

Cou

nty

Line

to E

l Dor

adP

DC

6.51

89

5312

6U

.S. 5

0 A

uxili

ary

Lane

Eas

tbou

nd -

Cam

brid

ge R

d to

Cam

eron

Par

k D

rP

DC

8.74

90

5312

7U

.S. 5

0 A

uxili

ary

Lane

Eas

tbou

nd -

Cam

eron

Par

k D

rive

to P

onde

rosa

RP

DC

8.38

91

5312

8U

.S. 5

0 A

uxili

ary

Lane

Wes

tbou

nd -

Pon

dero

sa R

d to

Cam

eron

Par

k D

rP

DC

8.96

92

7133

3U

.S. 5

0/P

onde

rosa

Rd/

So.

Shi

ngle

Rd

Inte

rcha

nge

Impr

ovem

ents

DR

C22

.63

93

7134

5U

.S. 5

0/S

ilva

Val

ley

Par

kway

Inte

rcha

nge

- P

hase

2 -

On

Ram

ps a

nd A

PD

C7.

6694

7137

5H

ead

ingt

on R

oad

Ext

ensi

on

- M

isso

uri F

lat R

oad

to E

l Dor

ado

Roa

dP

DC

6.50

95E

7137

6U

.S. 5

0/E

l Dor

ado

Roa

d In

terc

hang

e P

hase

2P

DR

C10

.48

96

7214

2M

isso

uri F

lat R

oad

Wid

enin

g -

Chi

na G

arde

n to

Ple

asan

t Val

ley

Roa

d/S

PD

C3.

9297

GP

147

Sar

atog

a W

ay E

xten

sion

- P

hase

2P

DR

C3.

3198

GP

148

U.S

. 50

Aux

iliar

y La

ne E

astb

ound

- B

ass

Lake

Roa

d to

Cam

brid

ge R

oad

PD

C8.

8399

GP

149

U.S

. 50

Aux

iliar

y La

ne W

estb

ound

- C

ambr

idge

Roa

d to

Bas

s La

ke R

oa

PD

C8.

6910

0

*

Not

es:

1. P

roje

ct 5

3118

- T

rans

it S

ervi

ce Im

prov

emen

ts: $

6,98

6,00

0 is

incl

ude

d in

the

20

-Yea

r pr

ogra

m fo

r bu

s fle

et e

xpan

sion

and

new

Par

k an

d R

ide

faci

litie

s.

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

0 P

MP

age

3 of

8

Page 33 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

CO

RP

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

7219

0C

Ove

rlay

- P

atte

rson

Driv

e a

nd M

isso

uri F

lat R

oad

1.09

101

7219

3P

DO

verla

y -

El D

orad

o H

ills

Blv

d.D

RC

5.40

102

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

0 P

MP

age

4 of

8

Page 34 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Air

po

rts-

Pla

cerv

ille

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

9313

0D

CT

axiw

ay E

dge

Ligh

ts0.

7410

3

9313

3P

DC

rack

Sea

l and

Rem

ark

Run

way

5-2

3, T

axiw

ays,

Apr

ons

and

T-

Han

gar

DC

C0.

6310

4

9313

2P

Airp

ort L

ayou

t Pla

n U

pdat

e an

d O

bstr

uctio

n S

urve

y -

Pla

cerv

ille

PP

PC

0.66

105

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

0 P

MP

age

5 of

8

Page 35 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Air

po

rts-

Geo

rget

ow

n 17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

9352

7D

CC

rack

Sea

l, Jo

int S

eal &

Mar

k R

unw

ay, T

axiw

ays,

Apr

ons

& T

-Han

gar

T0.

7210

6

9350

3P

Obs

truc

tion

Sur

vey

C0.

5710

7

9353

7R

unw

ay P

avem

ent C

losu

re fo

r R

unw

ay S

afet

y A

rea

PD

DC

C0.

5610

8

9353

6R

eloc

ate

Tax

iway

A C

onn

ecto

rP

DD

CC

0.58

109

9352

0C

onst

ruct

ion

of A

WO

SP

DC

0.27

110

9353

5C

rack

Sea

l and

Rem

ark

Run

way

, Tax

iwa

ys, A

pron

s an

d T

- H

ang

ar T

axil

PD

C0.

3211

1

9352

3A

irpor

t Lay

out P

lan

2024

Upd

ate

- G

eorg

etow

nP

0.09

112

9353

8R

unw

ay P

rote

ctio

n Z

one

Land

Acq

uisi

tion

PR

0.19

113

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

1 P

MP

age

6 of

8

Page 36 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Fac

iliti

es

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

8113

4H

eadi

ngto

n W

ash

Rac

k F

acili

ty P

roje

ctD

C1.

4911

4

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

1 P

MP

age

7 of

8

Page 37 of 39

Proj

ect #

Nam

eTo

tal

Cos

t($

M)

PD

= R

ight

of W

ay

RC

= P

lann

ing/

Env

ironm

enta

l =

Des

ign

= C

onst

ruct

ion

* =

Brid

ge P

roje

cts

Pro

ject

Su

mm

ary

Tab

le -

Tah

oe

17/1

818

/19

19/2

020

/21

21/2

222

/23-

26/2

727

/28-

36/3

7

E =

Env

iron

men

tal M

onito

ring

7872

1D

RC

Eve

lyn

Way

Roa

d F

ailu

re0.

2311

5

7872

2D

RC

Lake

view

Ave

nue

Roa

d F

ailu

re0.

1911

6

7872

3D

RC

Ang

ora

Cre

ek R

oad

Dam

age

0.21

117

7872

5D

RC

Elk

s C

lub

Driv

e S

inkh

ole

0.46

118

7872

6D

RC

Fal

len

Leaf

Roa

d W

asho

ut0.

2011

9

9517

7P

DC

Ofly

ng W

ater

Qua

lity

Pro

ject

CC

0.87

120

EE

EE

9517

9C

Mey

ers

Str

eam

Env

ironm

ent

Zon

e/E

rosi

on C

ontr

ol P

roje

ct2.

5412

1E

EE

9519

1D

CC

oun

try

Clu

b H

eigh

ts E

rosi

on C

ontr

ol P

roje

ct1.

1312

2E

EE

7238

0P

Apa

che

Ave

nue/

US

Hig

hway

50

Inte

rsec

tion

Impr

ovem

ent P

roje

ctD

C0.

5112

3

9511

7P

San

Ber

nard

ino

Cla

ss 1

Bik

epat

h -

Eas

t San

Ber

nard

ino

St t

o W

est S

anP

DR

CD

CC

1.61

124

EE

E

9515

7P

DC

SA

#5

Ero

sion

Con

trol

Pro

ject

DC

1.54

125

EE

7237

9P

DP

ione

er T

rail

/ US

50

Inte

rsec

tion

Saf

ety

Impr

ovem

ent P

roje

ctP

DC

C4.

5012

6E

E

9570

8P

DH

ighw

ay 8

9 C

lass

1 T

rail

PD

CC

2.11

127

EE

7312

0P

Mey

ers

Cor

ridor

Ope

ratio

nal I

mpr

ove

men

t Pro

ject

0.33

128

9516

3La

ke T

ahoe

Bou

leva

rd E

rosi

on C

ontr

ol P

roje

ct0.

7212

9E

9517

0M

ontg

omer

y E

stat

es A

rea

2 E

rosi

on C

ontr

ol P

roje

ct0.

9713

0E

9517

1T

ahoe

Hill

s E

rosi

on C

ontr

ol P

roje

ct0.

8013

1E

9517

2M

ontg

omer

y E

stat

es A

rea

3 E

rosi

on C

ontr

ol P

roje

ct0.

5213

2E

9517

5La

ke T

ahoe

Bou

leva

rd S

EZ

Pro

ject

0.29

133

E

9517

6G

olde

n B

ear

Ero

sion

Con

trol

Pro

ject

0.34

134

E

9519

2S

awm

ill 2

B B

ike

Pat

h an

d E

rosi

on C

ontr

ol P

roje

ct2.

8913

5E

9519

5F

ores

t Vie

w W

ater

Qua

lity

Pro

ject

0.38

136

E

9519

8S

an B

erna

rdin

o W

ater

Qua

lity

Pro

ject

PD

CC

C0.

7513

7E

EE

E

9519

7D

elaw

are

Wat

er

Qua

lity

Pro

ject

PD

CC

C0.

7513

8E

EE

9517

4C

hiap

a E

rosi

on C

ontr

ol P

roje

ctP

DD

RC

2.08

139

E

9518

0G

lenr

idge

Ero

sion

Con

trol

Pro

ject

PP

DD

RC

2.83

140

E

9516

8S

outh

Upp

er T

ruck

ee I

Ero

sion

Con

trol

Pro

ject

PD

RC

0.60

141

EE

9518

7C

old

Cre

ek F

ishe

ries

Enh

ance

men

t Pro

ject

PD

RC

1.82

142

E

9516

6N

orth

Upp

er T

ruck

ee S

EZ

Res

tora

tion

Pro

ject

P0.

0414

3

9583

8P

asse

nger

Fac

ility

P0.

0214

4

CIP

Pro

gram

.mdb

/Pro

ject

Sum

mar

yGrid

5/19

/201

7 3:

40:1

1 P

MP

age

8 of

8

Page 38 of 39

Figures and Tables

FIGURES Section 1 – Executive Summary:

1-1 CIP/Budget Cycle 1-2 Major Five-Year CIP/TIM Fee Update Cycle 1-3 Annual CIP Cycle 1-4 Sources of Revenue for Transportation CIP 1-5 Tahoe EIP Annual Updating Process 1-6 Airport Annual Updating Process 1-7 CORP Annual Updating Process 1-8 ACIP Annual Updating Process

TABLES Section 1 – Executive Summary:

1-1 West Slope Road/Bridge Current-Year Construction Projects 1-2 West Slope Road/Bridge Current-Year Planning, Design or Right of Way

Projects 1-3 Current Year Airport Projects 1-4 Current Year CORP Projects 1-5 CORP Infrastructure Options List

Page 39 of 39