CHAPTER 2 Section 2-01 Design and Environmental Flowcharts
1 Rev. Feb-2010
Section 2-01 Design and Environmental Flowcharts
INTRODUCTIONGeneral. The attached flowcharts outline the design and environmental processesfor major road construction projects such as reconstruction, widen & overlay, etc.They are not intended for projects such as overlay projects which do not require aninvolved interaction between design disciplines or a building block approach todesign development. A detailed discussion of the flowcharts and their relatedprocesses is provided in subsequent sections of Chapter 2.
NEPA Analysis and Documentation Flowchart: The National EnvironmentalPolicy Act (NEPA) is an established procedure to ensure all project stakeholdershave a voice in shaping projects on the national highway system and other projectsconstructed with federal funds. The NEPA Analysis and Documentation Flowchartprovides a graphical representation of the NEPA procedures to be applied.
Design Process Flowchart: Defines the design development process with nodes thatdelineate the linear progression of key plan issuances and activities. Shown aboveeach node is the data required to complete the node task, and below each node is alist of the tasks required by each program or section to continue the design process.See Section 2-02 Design Process for specific details as to how a project designrelates to the flowchart.
Environmental Process Flowchart: Overlays the NEPA process, with the majornodes of the WYDOT Design Process Flowchart to provide insight as to how thevarious processes interact with the overall project design. See Section 2-03Environmental Process for specific details of the NEPA documentation to addressthe project impact and need.
Attachments:NEPA Analysis and Documentation Flowchart - 1 Sheet (8½ x11) Design Process Flowchart - 3 Sheets (11 x 17)Environmental Process Flowchart - 3 Sheets (11 x 17)
YESNOTICEof
INTENT
PossiblePublic
Hearing
DevelopPurpose & Need
ImpactDetermination andMitigation Plans
CreateInterdisciplinary
Team(If Needed)
Alternative AnalysisFeasible Alternatives
Environmental ImpactStatement (EIS)
PossiblePublic
Meeting
PublicMeeting
OPTIONAL:CREATE
ADVISORY TEAM
CONSTRUCTIONand MONITORING
Select PreferredAlternative
FINAL EIS Public CommentRecord of Decision
(ROD)
YES
NO
ANALYSIS andDocumentation
Programmatic Clearancewith the Federal
Highway Administration (FHWA)
SCOPING(Determine Context
and Issues)OPTIONAL
NO
YES*
NEED
STIP
(Funding or Permit)FEDERAL ACTION?
*Note: Projects with SCP funding will undergo the Federal NEPA process to facilitate any possible switching to Federal funding during the course of project development.N
EA
PN
ati
on
al E
nv
iro
nm
en
tal P
olic
y A
ct
State TransportationImprovement Program (STIP)
(FONSI)
Finding of NoSignificant Impact
The number of public meetings can beexpanded or contracted depending onthe nature of the project and customerservice needs.
CEChecklist
Full blownCE
OR
NO
PossiblePublic
Meeting
CatagoricalExclusion (CE)
SignificantImpact?
OR
NO
MAYBE
Significant Impacts?
Ask Public:Is PublicMeeting
Warranted?
YES
NOTICEof
INTENT
YES
NO
EnvironmentalAssessment (EA)
ExpandedEnvironmental
Analysis
HoldPublic
Meeting
Environmental AnalysisPreferred and No-Build
Alternatives