Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 1.0 – OVERVIEW TABLE OF CONTENTS
PAGE
1.0 OVERVIEW....................................................................................................................1-1 1.1 Background ........................................................................................................1-1 1.2 Proponent...........................................................................................................1-1 1.3 Overview.............................................................................................................1-1 1.4 Public Consultation.............................................................................................1-6 1.5 Need...................................................................................................................1-9 1.6 Schedule ..........................................................................................................1-10
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
TABLE OF CONTENTS (cont) PAGE
LIST OF FIGURES
Figure 1.1-1: Project Location..................................................................................................1-2 Figure 1.1-2: KNOC Oil Sands Leases and Project Area ........................................................1-3 Figure 1.3-1: Project Area........................................................................................................1-4 Figure 1.3-2: Project Layout ....................................................................................................1-5 Figure 1.3-3: Project Footprint Photo Mosaic ..........................................................................1-7 Figure 1.3-4: Project Footprint Topography.............................................................................1-8 Figure 1.6-1: Development Schedule ....................................................................................1-11 S:\Project Ce\Ce03745\EIA\Vol 1\fnl rpt-Sec 1 overview vol 1 EIA-ce03745_100-10dec.doc
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Page 1-1
1.0 OVERVIEW
1.1 Background
The Korea National Oil Corporation (KNOC) holds 100% ownership of three oil sands leases covering 15 sections of land in Township (Twp) 76, Range (Rge) 7 West of the 4th Meridian (W4M), located approximately 10 km southeast of Conklin, Alberta (Figures 1.1-1 and 1.1-2). KNOC acquired the leases in August 2006 and immediately began an exploration program to determine the potential for commercially viable oil sands resources. Based on positive results from this exploration program, KNOC applied in March 2008 for approval to construct, operate and reclaim the BlackGold Initial Project (Initial Project). KNOC proposes to increase production through the development of the BlackGold Expansion Project (Expansion Project), which will produce an additional 3 180 m3/d (20 000 b/d) of bitumen over a period of approximately 25 years using conventional steam assisted gravity drainage (SAGD) technology. Combined, the Initial Project and the Expansion Project are referred to as “the BlackGold Project”.
1.2 Proponent
KNOC was founded by the Korean government in 1979 to explore for and develop petroleum resources. KNOC established an office in Alberta in 2006 and presently has nine employees in Alberta, all based in Calgary. The BlackGold Project represents KNOC’s first venture into Alberta’s oil sands resources. KNOC is presently involved in 46 projects in 17 countries, including the BlackGold Project in northern Alberta. Further information on KNOC’s operations can be found at KNOC’s website at http://www.knoc.co.kr/eng/index.php.
1.3 Overview
In March 2008, KNOC submitted a joint application for the Initial Project to the Alberta Energy Resources Conservation Board (ERCB) and Alberta Environment (AENV) requesting approval to produce 1 590 m3/d (10 000 b/d) of bitumen from the McMurray formation, using conventional SAGD technology. Approval of the Initial Project development is anticipated in early 2010. Assuming regulatory approval, KNOC anticipates that it will begin construction on the Initial Project in 2010 with production commencing in 2012. KNOC proposes to increase production through the development of the Expansion Project, which will produce an additional 3 180 m3/d (20 000 b/d) of bitumen over a period of approximately 25 years. Combined with production from the Initial Project, total production design capacity will be 4 770 m3/d (30 000 b/d). The Expansion Project will be integrated with the Initial Project development (Figures 1.3-1 and 1.3-2). The design of the Initial Project incorporated some pre-investment elements to accommodate potential future expansions. This pre-investment strategy enables easier integration of the Expansion Project into the Initial Project.
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\V
olum
e 0
1\F
ig0
1.0
1-0
1 P
roje
ct L
oca
tion.
mxd
Sources: © Department of Natural Resources Canada. All rightsreserved, GeoBase®, KNOC, Spatial Data Warehouse Ltd.
Project Location
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/410
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.1-1
TM
Fig01.01-01 Project Location09-12-11
DATE:
DH DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
!(
!(Chard/Janvier
Fort McMurray
Lac La Biche
Pelican Portage
PrimroseLake
Lac LaLoche
GordonLake
WinefredLake
Lac LaBiche
Ath
abas
ca
River
Saskatch
ewan
Alb
erta
Conklin
!(63
!(36
TWP 90
TWP 80
TWP 70
RGE 1 RGE 25 W4 W3
RGE 20RGE 10RGE 20
!!881
350000
350000
400000
400000
450000
450000
500000
500000
550000
550000
600000
600000
6100
000
6100
000
6150
000
6150
000
6200
000
6200
000
6250
000
6250
000
6300
000
6300
000
±20 0 20 4010
Kilometres
LegendProject Area
Open Water
Watercourse
1:1,500,000
Edmonton
Calgary
Map Extent
KNOC
Fort McMurray
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\S
ect
ion
01
- In
trod
uct
ion\
Fig
01.
01-
02 L
ease
s.m
xd
LegendLease
Project Area
Oil Sand Lease
Open Water
Watercourse
Sources: GeoBase®, KNOC, Spatial Data Warehouse Ltd.
KNOC Oil Sands Leasesand Project Area
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/100
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.1-2
KW
Fig01.01-02 Leases09-12-11
DATE:
DR DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
±1 0 1 20.5
Kilometres1:80,000
TWP 76
TWP 75
TWP 77
TWP 76
RGE 8 RGE 7 RGE 7 RGE 6 W4
ChristinaLake
Birch C
reek
Sunday Cr e
ek
Jackfish River
BP Road
!!881
Conklin
27 302628 25
17 15 1416 1813
2627 25 3025 2930 28
29
3135 36
20 22 23 1921 24
18
10 12
13
12
3534 36 31323136 33
36
25
32 343331
24
30
19
11
5 34 2 1 6
8 9 7
1 6
7
07474050705500747499030011
0747401070009
495000
495000
500000
500000
505000
505000
6155
000
6155
000
6160
000
6160
000
6165
000
6165
000
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\S
ect
ion
01
- In
trod
uct
ion\
Fig
01.
03-
01 P
roje
ct A
rea.
mxd
LegendTerrestrial Local Study Area
Project Area
Open Water
Watercourse
BlackGold Expansion Project LayoutTemporary Construction Laydown Area
Project ROW
Source Water Well
Well Pad
Baseline Disturbance
BlackGold Initial Project
Sources: GeoBase®, KNOC, Spatial Data Warehouse Ltd.
Project Area
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/100
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.3-1
KW
Fig01.03-01 Project Area09-12-15
DATE:
DR DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
±1 0 1 20.5
Kilometres1:80,000
TWP 76
TWP 75
TWP 77
TWP 76
RGE 8 RGE 7 RGE 7 RGE 6 W4
ChristinaLake
Birch C
reek
Sunday Cr e
ek
Jackfish River
BP Road
!!881
Conklin
27 302628 25
17 15 1416 1813
2627 25 3025 2930 28
29
3135 36
20 22 23 1921 24
18
10 12
13
12
3534 36 31323136 33
36
25
32 343331
24
30
19
11
5 34 2 1 6
8 9 7
1 6
7
I
106
E
J
F
D
C
G
H
B
A
104
K
105
108
117
114
111
118
112
110
116
109
113
115
107
119
495000
495000
500000
500000
505000
505000
6155
000
6155
000
6160
000
6160
000
6165
000
6165
000
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\S
ect
ion
01
- In
trod
uct
ion\
Fig
01.
03-
02 P
roje
ct L
ayou
t.mxd
RGE 7 RGE 6 W4
TWP 76
TWP 75
ChristinaLake
SundayCreek
BP Road
9
4 3 2 1
7
6
28 27 26 25
24232221
16 15 14 13
121110
36353433
30
19
18
31
I
106
E
J
F
D
C
G
H
B
A
104
K
105
108
114
111
118
112
110
116
109
113
119
117
115
107
498000
498000
500000
500000
502000
502000
504000
504000
506000
506000
6156
000
6156
000
6158
000
6158
000
6160
000
6160
000
6162
000
6162
000
LegendProject Area
Open Water
Watercourse
BlackGold Expansion Project Layout
Temporary Construction Laydown Area
Project ROW
Source Water Well
Well Pad
Baseline Disturbance
BlackGold Initial Project
±Sources: Al-Pac, GeoBase®, KNOC, Spatial Data Warehouse Ltd.
Project Layout
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/100
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.3-2
KW
Fig01.03-02 Project Layout09-12-15
DATE:
DR DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
500 0 500 1,000250
Metres1:50,000
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Page 1-6
The Expansion Project has been designed to minimize environmental disturbance. KNOC’s pre-investment strategy significantly reduces surface area requirements for the Central Processing Facilities (CPF) and reduces the environmental impact of the expanded development. The project footprint is shown on the air photo mosaic (Figure 1.3-3) and topographic map (Figure 1.3-4). Facilities will be located to avoid surface water bodies. Additional surface disturbance will be minimized through making use of as much of the existing infrastructure as possible. KNOC has maximized the use of existing roads and gathering lines corridors for gathering and distribution lines. The Expansion Project will use the export and import pipelines established for the Initial Project. Facilities required for the Expansion Project will be integrated into the Initial Project where practical. The Expansion Project will include additional facilities, such as well pads, gathering and distribution pipeline networks, steam generation, oil treatment, water treatment associated roads, and utility facilities. Initially, a total of 28 well pairs will be drilled from 3 well pads. The CPF for the Initial Project is sized to accommodate the Expansion Project. Additional production wells and well pads will be developed for the Expansion Project, as required, to maintain production throughout the project life.
1.4 Public Consultation
Prior to submitting an application for approval of the Initial Project, KNOC has undertaken an extensive consultation program with the Aboriginal communities in the area. During this process issues and concerns related to the Initial Project were raised. KNOC has continued working with the Aboriginal communities to address the identified issues and concerns. The consultation activities have been ongoing and will remain so throughout the regulatory review and approvals process for the Expansion Project. KNOC anticipates that many of the concerns raised by the Aboriginal communities during the Initial Project will also be raised about the Expansion Project. Identified concerns raised by the Aboriginal communities relate to potential effects to the biophysical environment, human environment, and traditional land use. Concern has also been expressed by Aboriginal communities about their lack of capacity to fully partake in the consultation program without support from KNOC. Furthermore, Aboriginal communities have expressed a desire to benefit from the project through economic and business opportunities. Environmental concerns that have been raised include potential impacts to air, water, fish, vegetation, and wildlife. For example, prevalent concerns have been raised about potential impacts to Christina Lake, and cumulative effects. The environmental effects assessment associated with this application discusses potential effects to the environment, and identifies the steps that KNOC will take to mitigate potentially adverse effects and enhance positive effects. KNOC will develop the project in an environmentally responsible manner.
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\S
ect
ion
01
- In
trod
uct
ion\
Fig
01.
03-
03 P
roje
ct F
acili
ties.
mxd
RGE 7 RGE 6 W4
TWP 76
TWP 75
ChristinaLake
SundayCreek
BP Road
9
4 3 2 1
7
6
28 27 26 25
24232221
16 15 14 13
121110
36353433
30
19
18
31
498000
498000
500000
500000
502000
502000
504000
504000
506000
506000
6156
000
6156
000
6158
000
6158
000
6160
000
6160
000
6162
000
6162
000
LegendProject Area
BlackGold Expansion Project
Open Water
Watercourse
Baseline Disturbance
BlackGold Initial Project
±Sources: GeoBase®, KNOC, Spatial Data Warehouse Ltd.
Project FootprintPhoto Mosaic
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/100
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.3-3
KW
Fig01.03-03 Project Facilities09-12-15
DATE:
DR DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
500 0 500 1,000250
Metres1:50,000
Note: Colour Orthophotos flown 2008 and Black and White Orthphotos flow 2005.
S:\G
is\P
roje
cts\
CE
\KN
OC
_B
lack
Go
ld\C
E03
745
_EIA
\Arc
GIS
Pro
ject
s\A
ppl
icat
ion
Re
port
Fig
ure
s\S
ect
ion
01
- In
trod
uct
ion\
Fig
01.
03-
04 T
opo
grap
hy.m
xd
RGE 7 RGE 6 W4
TWP 76
TWP 75
ChristinaLake
SundayCreek
BP Road
9
4 3 2 1
7
6
28 27 26 25
24232221
16 15 14 13
121110
36353433
30
19
18
31
1950
1925
1900
1875
1975
1850
1825
2000
2025
2050
20752100
21252150
2175
2200
1925
1975
2000
2000
2175
1875
19252125
1975
1975
1975
2025
2000
2000
1950
2200
1875
1950
1850
1850
2000
2025
2000
2200
2150
2200
2025
2175
2050
2000
2175
1975
2025
1975
2025
2025
20002175
1875
2200
2200
21752200
2000
1875
2175
1975
19752200
2000
1925
1950
2000
2175
2000
2000
2175
1975
1975
2000
2000
2175
1975
1975
1850
2125
1875
2150
498000
498000
500000
500000
502000
502000
504000
504000
506000
506000
6156
000
6156
000
6158
000
6158
000
6160
000
6160
000
6162
000
6162
000
LegendProject Area
BlackGold Expansion Project
Open Water
Watercourse
Baseline Disturbance
BlackGold Initial Project
Contour (Interval - 25 ft)
±Sources: Al-Pac, GeoBase®, KNOC, Spatial Data Warehouse Ltd.
Project FootprintTopography
BlackGold Expansion Project
QA/QC:
KW
December 2009
CE03745/100
UTM Zone 12 NAD83
PROJECT:
PROJECTION/DATUM:
ANALYST:
Figure 1.3-4
KW
Fig01.03-04 Topography09-12-15
DATE:
DR DR
KoreaNational Oil Corporation
AMECPREPARED BY:
DRAWN BY:
AMEC
500 0 500 1,000250
Metres1:50,000
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Page 1-9
Aboriginal communities have indicated that traditional land use activities occur in the vicinity of the proposed project, and that they would like to work with KNOC to minimize effects to traditional land use. KNOC has indicated their willingness to work with Aboriginal communities to complete traditional land use studies. KNOC will make best efforts to minimize effects to traditional land use. Aboriginal communities have also suggested that it is time consuming to participate in consultation processes and have requested that KNOC provide them with resources to facilitate their participation, which KNOC has done. KNOC will continue to engage and consult with Aboriginal communities, and will continue considering requests for resources that will be used by Aboriginal communities to enhance their capacity to be engaged and consulted. Interest has also been expressed with respect to monitoring programs to be established as part of the operational phase of the BlackGold Project. KNOC, together with regulatory authorities, will develop robust monitoring programs for the project. KNOC has also committed as part of its ongoing consultation, to keep stakeholders informed about its operations on an ongoing basis. Aboriginal communities have expressed an interest in business opportunities for their members. KNOC has indicated that the tendering process will consider Aboriginal content in awarding contracts for work on its site. KNOC has encouraged the Aboriginal communities to provide information about their businesses that may be able to provide products and services to KNOC during construction and operations. KNOC expects that through this exchange of information and with competitive bid processes, Aboriginal businesses will have opportunities to benefit from the project. Aboriginal communities have also raised issues with respect to cumulative effects of development within their traditional lands and the quality of direct consultation with government. Through its project design and mitigation measures described in this application, KNOC has endeavoured to minimize its environmental footprint. As a part of its consultation process, KNOC keeps regulators informed about stakeholder issues and the company’s efforts to address these issues. KNOC is also supportive of direct government consultation with Aboriginal communities.
1.5 Need
The project will assist in satisfying the growing energy needs of the marketplace. The Expansion Project will recover sufficient bitumen reserves from the McMurray and Wabiskaw Formation underlying its leases to produce approximately 3 180 m3/d (20 000 b/d) of bitumen over a period of approximately 25 years. Combined with production from the Initial Project, total production design capacity will be 4 770 m3/d (30 000 b/d).
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Page 1-10
At the same time, the project will provide direct benefits to the region, the province and Canada, as follows:
• project construction is expected to cost approximately $540 million;
• estimated total annual operations expenditures (including wages/benefits) are expected to be $112 million;
• the project will contribute taxes and royalties to municipal, provincial, and federal governments; and
• the project will employ approximately 500 people during construction and approximately 50 people on a full-time basis for operation.
1.6 Schedule
Project construction is scheduled to begin in 2013. Steaming will begin in 2015 when construction is completed. The project will continue production for approximately 25 years. Figure 1.6-1 shows a development schedule for the project.
AMECDRAWN BY:
PREPARED BY:
KNOCDRDR
Fig01.06-01 Develop Sched 09-12-11
KW
Figure1.6-1
ANALYST:
PROJECT:
CE03745/100
December 2009
KW
QA/QC:
S:\G
is\P
roje
cts
\CE
\KN
OC
_B
lackG
old
\CE
03
74
5_
EIA
\Co
relD
raw
\Se
ctio
n0
1-
Intr
od
uctio
n\F
ig0
1.0
6-0
1\F
ig0
1.0
6-0
1D
eve
lop
Sch
ed
.cd
r
DATE:
Development Schedule
KoreaNational Oil Corporation
BlackGold ProjExpansion ect
Engineering Study
Public Consultation
Prepare Regulatory Application
Regulatory Application Process
Detailed Engineering
SAGD Well Pair Drilling & Tie-In
Facility Construction
Commissioning and Start-up
Development Schedule
2009 2010 2011 2012 2013 2014 2015
Q1 Q4 Q1Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q2 Q3 Q4
BlackGold
Expansion
Project
(20,000b/d)
First Oil